********************
ANNOUNCEMENT
July 14, 2008, Black Hills Corp will acquire Aquila, Inc.'s Colorado electric operations (d/b/a Aquila Networks-WPC). Prior to 2002, Aquila, Inc. was known as UtiliCorp United Inc., with utility operations in Colorado doing business as West Plains Energy.
********************
Order 890 Compliance Filing
July 10, 2008, an Order 890 Compliance filing was submitted with FERC. Links to that filing and to the revised OATT are available on the left side of this page.
********************
AQUILA/WPEL Planning Process
The OATT Attachment K has been updated to include the nine planning principles outlined in FERC Order 890.
********************
Senate Bill 100 regarding Renewable Energy
Senate Bill 100 is intended to ensure the adequacy of Colorado’s electric transmission infrastructure requiring utilities to designate energy resource zones to encourage the installation of renewables and authorizing cost recovery from electric utility customers. Aquila is seeking input from all parties interested in installing renewable generation that requires or may require transmission service in or around our service territory.