
Western
Area Power Administration
Effective
Business Practices (BPs) Common to all of Western's
Regions
(Last
Update: May 8, 2013) -- Posting of Updated TSR Annulment BP
The
following are the currently effective
versions of the Business Practices (BPs) that are common and identical
across all of Western's Regional Offices, which includes (DSW, RMR,
SNR, and UGP). The BPs apply to the NERC identified TSPs: CRCM,
LAPT, WALC, WAPA, WASN. Additional BPs specific only to an
individual Region/TSP are also posted on that TSP's OASIS under the
"Business Practices" folder.
Behind
the Meter Generation Policy
Business
Practice Creation & Update Process
Conditional
Firm Transmission Service
Confidentiality
and NDA
Creditworthiness
BP & Checklist
Critical
Energy Infrastructure Information (CEII) Policy *
General
Requirements for Interconnection
LGIA
Option to Build Business Practice
Network
Integration Transmission Service (NITS) *
Network
Upgrades Policy
Planning
Redispatch Service
Resale
of Transmission Rights
Right
of First Refusal
Rollover
Rights
Simultaneous
Submission Window Processing
Transmission
Outage Crediting Policy
Transmission
Service Redirects
TSR
Annulment Business Practice (Updated, Effective
5/09/2013)
Western
OATT - Attachment K Policy Statement
* These BPs outline submissions to be sent to "Regional Contact(s) as posted on OASIS".
Those specific Western Regional contact(s) are listed below, and
transmittals should be sent to the contacts listed, as noted, for that
specific Regional office.
Any questions/submissions can be directed to your specific Western
Regional contact(s):