Xcel Energy Postings Archive

2003 Biennial Report
The 2003 Minnesota Biennial Transmission Project Report has been posted on the MinnElecTrans web site (www.minnelectrans.com). The entire report has been posted which includes the appendices. The larger appendices (VII, VIII, and IX) that include the maps are shown separately.

G-405
On August 19th 2004, personnel from Xcel Energy' s transmission function met with personnel from Xcel Energy's merchant function and discussed generator interconnection #G-405. Transmission personnel relayed to Markets that the MISO-hosted scoping meeting for the interconnection had occurred earlier in the day, and that it was uncertain whether the interconnection would occur at 115-kV (the Northern States Power system) or 161-kV (Great River Energy's system). Transmission personnel also relayed that it appeared that the generator had not requested the accelerated process under the MISO tariff.