September 20, 2008 ARC Event

Saturday September 20th 2008 19:35 EST through 20:05 EST ARC Event

Midwest ISO invoked the ARC procedure due to loss of generation for 530 MW. Up to 65 percent of the available ARC operating reserves were utilized during this period to assist in correcting the imbalance. There were no ARS events initiated during the event.