| Registration | About | HOME | OATI webOASISSM Production Node |
|
STANDARDS OF CONDUCT
DEVIATIONS
Employee Transfer
OASIS Notices
BUSINESS PRACTICES
BP Development
Tagging Practices
NETWORK FORMS AND BUSINESS PRACTICES
ATC
ATC Naratives
TARIFF
205 Filings - Revision to 890 OATT
206 Filings - 890 Compliance OATT
676 Compliance Filings
ORDER 890
Attachment K Related
PSE Plans
CEII
LOAD DATA
Peak Load Data 2007
Peak Load Data 2008
FORECAST LOAD DATA
Forecast Load 2008
OUTAGES
CONSENT LETTERS
GENERATION INTERCONNECTION
Generator Testing
Large Generation Documents
Small Generation Documents
PSE TECH SPECS FOR INTERCONNECTION
STUDIES
GENERAL INFORMATION
May 2008 NOC and Attach K Mtg
MISC
ColumbiaGrid Related
NEWS
Old News
|
Posted revised Large Generation Queue in Generation Interconnection folder on June 26 2009 Posted revised List of Available Studies in Studies folder on June 26 2009 Posted revised Technical Requirements and Operating Procedures documents for Large Generators, Small Generators, non-jurisdictional generators, and Transmission Systems and Loads in Large Generation Interconnection subfolder, Small Generation Documents subfolder, Generation Interconnection folder, and General Information folder, respectively, on June 11 2009 Posted a Disclosure Posting in Deviations subfolder in Standards of Conduct folder on June 11 2009 Posted revised Large Generation Queue in Generation Interconnection folder on June 10 2009 Posted revised List of Available Studies in Studies folder on June 10 2009 Posted Within-Hour Scheduling BP in Business Practices folder on May 27 2009 Posted Within-Hour TSR Submittal BP in Business Practices folder on May 27 2009 Posted revised Large Generation Queue in Generation Interconnection folder on May 13 2009 Posted revised List of Available Studies document in Studies folder on May 13 2009 Posted a Disclosure Posting in Deviations subfolder in Standards of Conduct folder on May 06 2009 PSEI has reviewed submitted comments to its Within-Hour Scheduling Business Practices and will delay full implementation until June 1, 2009. This will allow for additional training and business practice refinement. Please monitor this site for updates. Posted April 30 2009 Posted revised PSE Job Descriptions documents in Standards of Conduct folder on April 29 2009 Posted PSEI's 1Q 2009 Study Metrics in Studies folder on April 16 2009 Posted a Disclosure Posting in Deviations subfolder in Standards of Conduct folder on April 14 2009 Posted for comment - Draft for Comment Within-Hour Scheduling Business Practice. Send comments to transmaster@pse.com before close of business April 24 2009. Proposed effective date is May 1 2009. See postings in BP Development subfolder in Business Practices folder on March 27 2009 Starting April 1 2009 PSEI will no longer discount Point-to-Point Transmission Services on Washington facilities Posted revised Large Generation Queue in Generation Interconnection folder on March 6 2009 Posted revised List of Available Studies document in Studies folder on March 6 2009 Posted new ATC for PSEI-ORCAS document in the ATC Narratives subfolder in the ATC folder on March 5 2009 PSE WECC Annual Reports (2005-2009) moved from General Information folder to the new PSE Plans subfolder in Order 890 folder on Febraury 26 2009 Posted revised Standards of Conduct Procedures in Standards of Conduct folder on February 19 2009 Posted revised Network Service Business Practices in Network Forms and Business Practices folder on February 17 2009 Posted revised PSE Affiliates document in Standards of Conduct folder on February 13 2009 Posted revised List of Available Studies document in Studies folder on February 9 2009 Posted revised Standards of Conduct Procedures document in Standards of Conduct folder on January 30 2009 Posted revised PSE Job Descriptions document in Standards of Conduct folder on January 30 2009 Posted revised Shared Facilities document in Standards of Conduct folder on January 30 2009 Posted revised PSE Affiliates document in Standards of Conduct folder on January 30 2009 Posted latest Open Access Transmission Tariff (2008-10-15) in Tariff folder on January 29 2009 Posted for comment - Draft for Comment DNR BPs 20090128. Send comments to transmaster@pse.com before close of business February 11 2009. Proposed effective date is February 12 2009. See postings in BP Development subfolder in Business Practices folder on January 28 2009 Posted new TTC Change for WINDRIDGE-PSEI in ATC Naratives subfolder in ATC folder on January 26 2009 Posted new ATC for PSEI-ORCAS document in the ATC Narratives subfolder in the ATC folder on January 22 2009 Posted new Single DNR Un-Designation form in Network Forms and Business Practices folder on January 22 2009 Posted revised ATC for MIDC-PSEI in ATC Naratives subfolder in ATC folder on January 22 2009 Posted PSEIs 4Q 2008 Study Metrics in Studies folder on January 9 2009 Posted revised Technical Requirements and Operating Procedures documents for Large Generators, Small Generators, non-jursidictional generators, and Transmission Systems and Loads in PSE Tech Specs for Interconnection folder on January 2 2009 Any trouble with posted documents please call 425-462-3400 normal business hours PPT. | ||||||||||||||||