Registration | About | HOME                                OATI webOASISSM Production Node                                        




Documents

  • NAESB Home Page

  • Standards of Conduct

  • Business Practices, Waivers, and Exemptions

  • OASIS Notices
  • Discretion

  • Personnel

  • FERC

  • NERC

  • SERC

  • Southeastern Regional Transmission Planning

  • 2017 PTP Rates
    GTC 2017 Point-To-Point Rates
    ATC Information
    ATC_Information
    ATCID - Effective 4/19/2014
    CBM Declaration
    TRM Values
    TRMID
    MOD Compliance Notices
    ATC Path changes
    Contact Information
    Florida Path notification
    Notices
    Business Practices
    Business Practices Version 3
    CEII
    CEII Authorization Form
    CEII Non-Disclosure Form
    CEII Procedures
    CEII Request Form
    FERC Postings
    TSR Denial of Service
    GTC Tariff
    GTC Tariff - Effective January 1 2015
    Attachments and Exhibits
    Attachment C - ATC
    Attachment D - System Impact Study Methodology
    Attachment E - Point-to-Point Customers
    Attachment F - Network Customers
    Attachment G - Real Power Factors
    Attachment K - Transmission Planning
    Attachment L - Creditworthiness Procedures
    Attachment M - OASIS
    Schedule 9 - Generation Imbalance Exhibits
    Schedule 9 - Scheduling Test Energy
    General Information
    New Customer Registration
    Point-To-Point Transmission Application
    Generation Interconnection
    Voltage Schedules in the Southern Balancing Area (SBA)
    Applications
    GI Application
    GI Application Affected System
    Data Sheets
    GI Data Sheet - Photovoltaic
    GI Data Sheet - Synchronous
    GI Data Sheet - Wind
    GI Operations
    Solar Data Sheets
    Pre Synch Operations
    Solar COD Operations
    Synchronous Data Sheet
    Synch COD Operations
    GI Requests
    List of GI Requests
    GI Requirements
    Facility Connection Requirements
    Inverter-based Information
    Modeling Data Requirements
    Power System Stabilizer Policy
    Reactive Power Requirements
    Test Energy Requirements
    Interconnection Agreement
    GI Generic IA Oct 2016
    Study Agreements
    Facilities Study Agreement
    System Impact Study Agreement
    Historical
    Attachment G - Real Power Factor Jan 2015
    Attachment G - Real Power Losses 072013
    Business Practices V0
    Central GA Transmission Study - 2009
    GTC Tariff - Effective 1997
    GTC Tariff Effective Jan 2009
    GTC-GSOC ATCID V0 - 032511
    GTC-GSOC ATCID V1 - 02172014
    Transmission Improvement Plan - Wansley
    Standards of Conduct
    SOC Booklet and Written Procedures
    Job Descriptions
    GSOC Job Descriptions
    GTC Job Descriptions
    Transmission Outages
    Outage Information
    Transmission Projects
    Project List



    Georgia Transmission Corporation

    Transmission Service

    To request Transmission Service, click on the New Customer Registration link below to register as a new customer. Download a copy of the Point-To-Point or Generation Interconnection application to begin the process. Additional information can be found under the Documents section menu at the left.

    New Customer Registration

    Point-To-Point Transmission

    Generation Interconnection

    For questions about Transmission Service or any other GTC information, please contact Troy Willis by email or call 770-270-7713.

    For questions about Generation Interconnection, please contact Troy Willis by e-mail or call 770-270-7713.

    News and Updates

    Georgia Transmission Corporation Transmission Tariff revision

         


    ©2001-2010 OATI webOasisTM/SM - Open Access Technology International, Inc. All Rights Reserved.