Registration | About | HOME                                OATI webOASISSM Production Node                                        



Documents

  • NAESB Home Page

  • Standards of Conduct

  • Business Practices, Waivers, and Exemptions

  • FERC

  • ATC Information
    ATC Methodology
    ATC, TTC, CBM, TRM Posted Data (Query Instructions)
    CBM Methodology
    DNR Information
    EKPC Designated Network Resources
    LGE-KU Designated Network Resources
    Generation Interconnection Information
    EKPC Generation Interconnection Queue
    Load Information
    Actual Peak Load (Query Instructions)
    Forecasted Peak Load (Query Instructions)
    Short Term Load Forecast Methodology
    Redispatch Costs
    3rd Party Offers for Congestion
    Monthly Cost of Redispatch
    Transmission Service Information
    Service Request Metrics (Query Instructions)
    Studies
    SIS 76371132 (Horse Cave)
    Transmission Tariff
    EKPC OATT
    OASIS Notices
  • Congestion Relief Offers

  • Discretion

  • Personnel

  • Files
    Excutive Staff Job Description
    Transmission Planning
    CPPP 11-14-07 Stakeholders Meeting Details
    Central Public Power Partnership Stakeholder Meeting - Nov. 14
    Connection Requirements
    Notice of Interregional Stakeholder Meeting - Nov. 1
    Order 890 Attachment K (Draft)
    Order 890 Planning Principles Strawman Proposal
    Org Chart
    SOL Methodology for the Planning Horizon
    Standards of Conduct
    TEE CRSG Certification of Deliverability
    Transmission Planning Transfer Capability Methodology


    ***** NOTICE *****
    Effective June 1, 2013, East Kentucky Power Cooperative will no longer be registered as a Transmission Service Provider. All existing Firm transmission service reservations will be converted to PJM reservations. Any new transmission service reservations must be requested through the PJM OASIS.      


    ©2001-2010 OATI webOasisTM/SM - Open Access Technology International, Inc. All Rights Reserved.