Registration | About | HOME                                OATI webOASISSM Production Node                                        



Documents

  • NAESB Home Page

  • Standards of Conduct
  • Emergency Circumstances Deviations

  • Marketing and Energy Affiliate List

  • Shared Facilities

  • TFE Job Descriptions

  • Potential Merger Partners

  • Information Disclosure

  • Voluntary Consent to Share Non-Affiliated Customer Information

  • Discretionary Actions under Tariff

  • Chief Compliance Officer

  • Written Procedures for Implementation

  • Performance Metrics
  • Specific Network Impact Studies

  • Transmission Service Request Studies

  • Transmission Study Metrics

  • Redispatch Costs Report

  • Business Practices, Waivers, and Exemptions
  • Business Practices

  • Waivers and Exemptions

  • ATC Information
  • ATC Implementation Document

  • Equivalent ATC/TTC Postings

  • Data Request Form (MOD-001-1 R9)

  • TTC Study Report Request Form (MOD-029-1 R4)

  • Flowgate Analysis Request Form (MOD-030 R2.1.4)

  • Rating Change Notification (MOD- 030-2 R2.5.1)

  • TRM Implementation Document

  • ATC Methodology Contact

  • Tariff
  • Open Access Transmission Tariff

  • Attachment E: PTP Customer List

  • Attachment I: NT Customer List

  • Long-Term NT Resource Designations

  • Short-Term NT Resource Designations

  • NT Resource Undesignations

  • OATT Web Page

  • OASIS Notices
  • Discretion

  • Personnel

  • Doing Business
  • Becoming a Customer

  • Contact Information

  • Business Practices System

  • ATC Methodology

  • Procedures

  • Tariff

  • Basic Credit Standards

  • Rates

  • Generation & Energy Imbalance Reports

  • Hot Springs Capacity Management Agreement
  • Capacity Management and Tagging Provisions for Transactions through Hot Springs

  • Attachment 1: Hot Springs FAQ

  • Attachment 2: Capacity Management Procedures Agreement

  • Transmission Availability
  • Balancing Reserves

  • Implementation of LTF ATC Methodology Decision

  • Contract & Scheduling Points List

  • Long-Term ATC, AFC and Conditional Firm Inventory

  • Long-Term Firm (LTF) PTDF Calculator

  • Long-Term Pending Queue

  • Reservation to e-Tag Point Relationships

  • Short Term Firm (STF) PTDF Calculator

  • North of Echo Lake and South of Custer Nomograms

  • Outages
    BPAT Outages
  • Hourly TTC Path Limits

  • Outage Summary

  • Proposed 45 Day Outages

  • Generation Interconnection
  • Interconnection Information

  • Generation Interconnection Request Queue

  • Technical Requirements for Interconnection

  • Operations Information
  • Operations (OPI) Website

  • Area Control Error (ACE) Annual Reports

  • System Planning
  • Attachment K Planning Process



  • Click here to select your certificate and login


    Welcome to BPA Transmission Services

    Posted 5/26/2016:   Memorial Day Holiday Hours
    On Friday, May 27, 2016, the Transmission Services Reservation Desk will be open until 12:00pm PPT, Capacity Desk will be open until 1:30pm PPT, and the Preschedule Desk will be open normal hours.

    The Transmission Services Reservation, Capacity, and Preschedule Desks will be closed on Monday, May 30, 2016 for the Memorial Day holiday.                    

    Posted 5/25/2016:   Update: Preschedule Hourly Market Processing Issues
    BPA Transmission Services asks customers to resubmit their hourly firm requests for today’s preschedule. Thank you.                                       

    Posted 5/25/2016:   Preschedule Hourly Market Processing Issues
    BPA Transmission Services is experiencing difficulties with the hourly market for the May 25, 2016, preschedule. We are working with our vendor to resolve the issue as soon as possible. Thank you for your patience.

    Posted 5/24/2016:   Completion of BPAT Systems Update
    BPAT has completed the update of its Available Flowgate Capabilities. Thank you for your patience during this process.

    Originally Posted 5/24/2016:   Reminder of BPAT Systems Update
    On Tuesday, 05/24/2016, from approximately 15:00 PPT to 18:00 PPT, BPA Transmission Services will be preparing for the release of the June 2016 Base Case. All changes will be effective June 1, 2016 at 14:00 PPT. Thank you for your patience during this process.

    Originally Posted 5/20/2016:   BPAT Systems Update
    On Tuesday, 05/24/2016, from approximately 15:00 PPT to 18:00 PPT, BPA Transmission Services will be preparing for the release of the June 2016 Base Case. All changes will be effective June 1, 2016 at 14:00 PPT. Follow-up messages will be sent before and after. Thank you for your patience during this process.

    Posted 5/23/2016:   webTrans Upgrade
    OATI will be deploying a change to BPAT Production webTrans starting at noon tomorrow (Tuesday, May 24). There may be a short delay of up to 15 minutes in tag and TSR processing between 12:00 pm PPT and 12:30 pm PPT as certain programs are restarted. The deployment of the change should be transparent to CDE users.

    Posted 5/17/2016:   Advance Notice of 2016 Cluster Study
    Bonneville Power Administration Transmission Services (BPAT) is providing advance noticeof its intent to perform a Cluster Study of certain transmission service requests (TSRs) over the Network portion of the Federal Columbia River Transmission System.

    Updated 5/17/2016:   Upcoming BPAT Systems Maintenance Events
    BPAT's e-Tag and OASIS software vendor will be performing network maintenance during the following days/times. There may be short periods of network disruptions during these maintenance events. We apologize for any inconvenience this may cause:

    Day Time
    June 1, 2016 6:00 - 7:00 PPT
    May 17, 2016 17:00 - 18:00 PPT
    April 19, 2016 17:00 - 18:00 PPT
    March 15, 2016 17:00 - 18:00 PPT

    Posted 4/21/2016:   Sys Data Posting Issue Resolved
    We have resolved our sys data posting issue and sys data functionality is now working correctly. Thank you for your patience.

    Originally Posted 4/20/2016:   Sys Data Posting Issue
    We are currently experiencing a posting issue with sys data in our Production OASIS environment. Customers can still access our sys data via init reports. However, we have entered a critical ticket with our vendor and they are aggressively working to fix this issue. We apologize for any inconvenience.

    Posted 4/11/2016:   webTrans Upgrade
    OATI will be deploying a change to BPAT Production webTrans starting at noon today (Monday, April 11). There may be a short delay of up to 10 minutes in tag and TSR processing between 12:00 pm PPT and 12:30 pm PPT as certain programs are restarted. The deployment of the change should be transparent to CDE users.

    Posted 3/23/2016:   Completion of BPAT Systems Update
    BPAT has completed the update of its Available Flowgate Capabilities. Thank you for your patience during this process.

    Originally Posted 3/23/2016:   Reminder of BPAT Systems Update
    On Wednesday, 03/23/2016, from approximately 15:00 PPT to 18:00 PPT, BPA Transmission Services will be preparing for the release of the May 2016 Base Case. All changes will be effective April 1, 2016 at 14:00 PPT. Thank you for your patience during this process.

    Originally Posted 3/18/2016:   BPAT Systems Update
    On Wednesday, 03/23/2016, from approximately 15:00 PPT to 18:00 PPT, BPA Transmission Services will be preparing for the release of the May 2016 Base. All changes will be effective April 1, 2016 at 14:00 PPT. Follow-up messages will be sent before and after. Thank you for your patience during this process.

    Posted 3/9/2016:   Reminder - Reserving & Scheduling Transmission over the Time Change
    Effective March 13, 2016 at 0200 Pacific Prevailing Time, BPA Transmission Services will set all clocks to Pacific Daylight Saving Time (Advanced Standard Time). For more information concerning how to submit transmission requests and e-Tags that span the time change, see the Return to Daylight Saving Time bulletinposted on the Transmission Services external website page.

    Originally Posted 2/22/2016:   Reserving & Scheduling Transmission over the Time Change
    Effective March 13, 2016 at 0200 Pacific Prevailing Time, BPA Transmission Services will set all clocks to Pacific Daylight Saving Time (Advanced Standard Time). For more information concerning how to submit transmission requests and e-Tags that span the time change, see the Return to Daylight Saving Time bulletinposted on the Transmission Services external website page.

    Posted 3/7/2016:   webTrans Upgrade
    OATI will be deploying a change to BPAT Production webTrans starting at noon Tuesday, March 8. A delay of up to 15 minutes in tag and TSR processing is expected between 12:00 pm PPT and 12:30 pm PPT as certain programs are restarted. The deployment of the change should be transparent to CDE users.

    Posted 3/3/2016:   Regional Flow Forecast Tool
    As a result of the Northwest Power Pool Market Assessment and Coordination Initiative efforts and supporting company funding, a tool has been developed that provides a forecast of expected near-term flows on a set of WECC flowgates. The forecasts are computed projections of flows based upon current actual flows, generation forecasts, load forecasts and impedance base flow calculations using the system network model.

    Beginning on March 31, 2015, access to production forecasts were available for regional TSP & BA entities.

    Beginning on April 14, 2016, access to production forecasts will be available for all OATT customers of the supporting TSPs to paths included in the displays operated by the respective TSPs. This includes access for market function employees.

    Procedures for requesting access can be obtained from Peak Reliability.

    Reposted 1/25/2016 (Originally posted 06/17/10-10/3/2014):   Transmission Service Requests Redirect Issues
    Multiple redirect Transmission Service Requests (TSRs) submitted with the same related ref # (parent) and at approximately the same queue time may result in one of two situations that can be problematic. More Information

    Posted 10/1/2015:   Operational Controls for Balancing Reserves
    As of October 1, 2015, the curtailment e-Tag Reason/Comment (for balancing reserve curtailments) will be: OCBR - Exceeding Reserve Threshold (Level X) [curtailment id].

    Posted 9/25/2015:   Point-to-Point Short Distance Discount (SDD) Correction
    BPA provided PTP SDD discounts in error and will be seeking to recover the amounts of unwarranted discounts from affected customers. Click here for more information.

    Posted 7/24/2015:   NITS Version 2.0 (WEQ 002-5.10.3)
    The new NITS Version 2.0 WEQ Standard will be fully implemented on the BPAT OASIS no later than April 24, 2016. In order to meet this implementation deadline, BPAT will be taking the following steps to fully implement the new standards:

    1. By October 24, 2015, BPAT will provide each existing NT customer specific information that BPAT intends to post on OASIS in the Version 2.0 NITS templates.
    2. BPAT NT customers will have 3 months to review the data and coordinate with BPAT to resolve any issues. Customer review and issue resolution must be completed by January 24, 2016.
    3. All NITS data will be posted to the Version 2.0 NITS templates by March 24, 2016.
    4. BPAT will enable all Version 2.0 NITS templates and functionality by April 24, 2016.
    5. Training will be provided in the spring of 2016. BPAT will provide instructions and/or procedures for navigating NITS 2.0 on OASIS at the time of training.

    If you have questions, please e-mail nits@bpa.gov.

    Posted 6/10/2015:   SE Idaho Load Update
    BPA has an update on the option that was identified as its top priority for service to customer loads in Southeast Idaho. Please see the updatefor additional information.

    Posted 04/06/2015:   Suspension of Partial Offers of Less Than 12 Months to Long-Term Service Requests
    Effective immediately, BPAT is suspending making partial service offers of less than 12 months in duration to long-term firm requests as set forth in its current Partial Long-Term Firm Service Business Practice. BPAT is taking this action to reconsider its policy regarding these offers. BPAT expects the suspension to last approximately two months.

    BPAT is rescinding current offers of partial service less than 1 year in duration unless customer(s) who received those offers want to accept them and take the service. Offers that have already been confirmed by the customer on BPA's OASIS will not be rescinded.

    The suspension does NOT apply to partial offers that are 1 year or longer in duration. Customers receiving these offers must confirm the counteroffer on OASIS or BPAT will remove them from the queue.

    In the coming weeks, BPAT will solicit customer comment on its policy regarding partial offers that are less than 12 months in duration. Questions should be directed to the appropriate Transmission Account Executive or the BPAT Reservation Desk.

    Posted 5/2/14:   Effective Immediately - OASIS Reservation Points Suspended
    Until further notice, BPA Transmission Services (BPAT) is suspending use of the following OASIS reservation points in the long-term market as a "source" for new long-term original transmission service requests on BPA's system:

    • RKYRCH230
    • RKYRCH230MIDCR
    • VALHALA115
    • VALHALA115DOPD
    • VALHALA115MIDC

    During this time, BPAT will invalidate original long-term requests submitted using these points as a source. BPAT will continue processing redirect, reassignment and rollover requests identifying one of these points as a source when the parent reservation uses the point as a source.

    BPA does not currently have the ability to provide additional long-term service from these points and needs to further consider the policies and agreements regarding service at these points before it can accept additional original long-term requests. BPAT is evaluating potential solutions. Once BPAT implements a solution, it will issue another notice that customers can again submit long-term requests using these points as a source.

    Other Mid-Columbia area points, including the points associated with the Columbia, Sickler, Vantage, and Midway substations, remain available for use as a source. If you have any questions, please contact the Reservation Desk at (360) 418-8499.

    Posted 4/2/14:   Transmission Reassignment Reporting Requirement
    This notice serves as a reminder to transmission customers of the obligation to accurately report information associated with transmission capacity reassignments, including but not limited to pricing information, on BPA's Open Access Same-Time Information System (OASIS). Customers reassigning transmission scheduling rights (Resellers) are required to report all reassignments on BPA's OASIS as per section 23.3 of BPA's tariff and section A.2 of BPA's Resale of Transmission Service Business Practice, v.10. Failure to report this information accurately can potentially lead to criminal sanctions under 18 U.S.C. § 1001, which makes it a crime for any person knowingly and willingly to make to any Agency or Department of the United States any false, fictitious or fraudulent statements.

    Pursuant to section 220 of the Federal Power Act, 16 U.S.C. § 824t, and Federal Energy Regulatory Commission (Commission) Order No. 768, BPA will begin filing capacity reassignment information in Electric Quarterly Reports (EQR) with the Commission in April of 2014. BPA will not be responsible for the accuracy of the information. If the Commission has questions regarding the accuracy of the information reported by the Reseller on BPA's OASIS, BPA will refer the Commission to the Reseller.

    Posted 2/13/14:   Update: Invalid Reservation Points for Transmission Service Requests on BPA Network
    BPAT deactivated the USCNDNBDRE230, NELWAY230, and WANETA230 points in OASIS on 02/12/2014. BPAT may reactivate these points, as needed, to modify how it models and reserves capacity for the Canadian Entitlement Return obligation required under the Columbia River Treaty. Customers may continue to use USCNDNBDRW500 and USCNDNBDRCNTGS for requesting transmission service on the west side of the Northern Intertie. If you have any questions, please contact the Reservation Desk at (360) 418-8499.

    Originally Posted 5/16/13:  Reminder: Invalid Reservation Points for Transmission Service Requests on BPA Network
    BPA Transmission Services (BPAT) would like to remind its customers that on August 10, 2010, BPAT posted a notice on its OASIS that the following points are not valid reservation points for transmission service on its OASIS:

    • USCNDNBDRE230
    • NELWAY230
    • WANETA230

    BPAT reminds customers that any new requests for service using these points will be deemed INVALID by BPAT. Customers may continue to use USCNDNBDRW500 and USCNDNBDRCNTGS for requesting transmission service on the west side of the Northern Intertie. If you have any questions, please contact the Reservation Desk at (360) 418-8499.

    Posted 11/14/12:  SE Idaho Load Service Update
    BPA has an update on the option that was identified as its top priority for service to customer loads in Southeast Idaho. Please see the updatefor additional information.

         