Registration | About | HOME                                OATI webOASISSM Production Node                                        



Documents

  • NAESB Home Page

  • Performance Metrics
    1 - Transmission Study Metrics (37.6(h))
    2 - Transmission Service Request Metrics (37.6(i))
    3 - Redispatch Cost 37.6(j)(2)
    Business Practices, Waivers, and Exemptions
    1 -Transmission Service Requests
    2 - Curtailments and Interruptions
    3 - Schedules
    4 - Losses
    5 -Rates
    6 - TSR Annulment
    Draft Business Practices for Comment
    TSR Annulment
    ATC Information
    1 ATC Implementation Document - ATCID (MOD-001-1)
    2 CBM Implementation Document - CBMID (MOD-004-1)
    3 TRM Implementation Document - TRMID (MOD-008-1)
    4 ATC Methodology Contact (WEQ-001-16)
    5 Load Forecast Descriptive Statement (WEQ-001-17.6.5)
    6 Postback Methodology
    7 MOD-029 Report BHCT
    Standards of Conduct
    1 Emergency Circumstances Deviations
    2 Information Disclosure (358.5(b)(3))
  • Information Disclosure

  • 3 Voluntary Consent to Share Non-Affiliated Customer Information (358.5(b)(4))
    4 Black Hills Standards of Conduct Compliance Procedures (358.7(d))
    5 Marketing and Energy Affiliate List (358.7(e)(1)
    6 Shared Facilites (358.7(e)(2)
    7 Potential Merger Partners (358.7(e)(3))
    8 Organizational Chart & Job Description (358.7(f)(1)
    9 Transfers (358.7(f)(2))
    10 Chief Compliance Officer (358.8(c)(2))
    11 Common Employees (358.4(b)(iii))
    12 Discretionary Actions under Tariff (358.5(c)(4))
    13 Discounts (358.5(d))
    2/3/2017 Redacted File
    BHCT OATT
  • BHCT OATT

  • 2 BHCT ATTACHMENT K 6/15/2009
    3 BHCT APPENDIX 1 TO LGIP - INTERCONNECTION REQUEST
    4 BHCE WestConnect Participation Filing
    5 Regional Transmission Service Customer Application
    6 Update Transmission Rates Effective 8-16-2011
    7 Updated Transmission Rates Effective 8-1-2016
    NITS on OASIS
    BHCT NITS on OASIS Intro
    NITS Letter
    NITS on OASIS Workbook
    Customer Presentations
    BHCOE May 2011 Customer Presentations
    FERC Order 890
    place holder
    General Information
    1-BHCT OASIS MAP
    2- Transmission Services Application
    3-DESIGNATED NETWORK RESOURCE ATTESTATION
    4-Designated Network Load and Resources
    5-REQUEST FOR MODIFICATION OF TRANSMISSION SERVICE
    6-TRANSMISSION PROVIDER BROKERING POWER FOR AFFILIATES
    7-How to Contact Us
    8-BHCT WestConnect Participation Application
    Interconnection Requests
    1-BHC Facility Interconnection Requirements
    2-Generator Interconnection Queue
    3 - LGIA Interconnection Request Form
    4 - LGIA Request How -To
    WPC-2005-01
    WPC-2005-01 Feasibility Study Report
    BHCT-G3
    BHCT-G3 Feasibility Study Report
    BHCT-G3 System Impact Study Report
    BHCT-G3 Facilities Study Report
    BHCT-G4
    BHCT-G4 Feasibility Study Report
    BHCT-G4 System Impact Study Report
    BHCT-G4 Facilities Study Report
    BHCT-G5
    BHCT-G5 Feasibility Study Report
    BHCT-G5 System Impact Study Report
    BHCT-G5 Facilites Study Report
    BHCT-G6
    BHCT-G6 SYSTEM IMPACT STUDY REPORT
    BHCT-G8
    BHCT-G8 SYSTEM IMPACT STUDY REPORT
    BHCT-G8 FACILITIES STUDY REPORT FINAL
    BHCT-G10
    BHCT-G10 Facilities Study Report Final
    BHCT-G10 SYSTEM IMPACT STUDY REPORT
    BHCT-G11
    BHCT G-11 Facilities Study
    Final BHCT-G11 System Impact Study
    BHCT - G13
    Final Facilities Study
    Final System Impact Study
    BHCT - G18
    Final BHCT-G18 System Impact Study
    Final BHCT-G18 Facilities Study
    BHCT - G19
    Feasibility Study
    Final System Impact Study
    BHCT - G20
    System Impact Study
    Joint Dispatch Initiative
    Joint Dispatch Customer Authorization Data Release Form
    Joint Dispatch Path NF ATC Calc
    Load Forecast
  • Load Forecast

  • Network Customer DNR Temporary Terminations
    BHCE 1-2017
    BHCE 2-2017
    BHCE 3-2017
    BHCE 4-2017
    2016
    BHCE 1-2016
    BHCE 2-2016
    BHCE 3-2016
    BHCE 4-2016
    BHCE 5-2016
    BHCE 6-2016
    BHCE 7-2016
    BHCE 8-2016
    BHCE 9-2016
    BHCE 10-2016
    BHCE 11-2016
    BHCE 12-2016
    2015
    BHCE 01-2015
    BHCE 02-2015
    BHCE 03-2015
    BHCE 04-2015
    BHCE 05-2015
    BHCE 06-2015
    BHCE 07-2015
    BHCE 08-2015
    BHCE 09-2015
    BHCE 10-2015
    BHCE 11-2015
    BHCE 12-2015
    2014
    BHCE 01-2014
    BHCE 02-2014
    BHCE 03-2014
    BHCE 04-2014
    BHCE 05-2014
    BHCE 06-2014
    BHCE 07-2014
    BHCE 08-2014
    BHCE 09-2014
    BHCE 10-2014
    BHCE 11-2014
    BHCE 12-2014
    OASIS Notices
  • Congestion Relief Offers

  • Discretion

  • Personnel

  • Joint Energy Dispatch Initiative
    JEDI Meeting Notes 021913
    JEDI Presentation 021913
    Outages
  • BHCT Outages

  • wesTTrans Outages

  • System Information
  • ACE Data 10min 2013

  • ACE Data 1 Min 01-2013

  • ACE Data 1 Min 02-2013

  • ACE Data 1 Min 03-2013

  • ACE Data 1 Min 04-2013

  • ACE Data 1 Min 05-2013

  • ACE Data 1 Min 06-2013

  • ACE Data 1 Min 07-2013

  • ACE Data 1 Min 08-2013

  • ACE Data 1 Min 09-2013

  • ACE Data 1 Min 10-2013

  • ACE Data 1 Min 11-2013

  • ACE Data 1 Min 12-2013

  • 2014 ACE Data
  • ACE Data 10 min

  • Ace Data 1 min

  • ACE_Data_1_Min_02-2015

  • 2015 ACE Data
  • ACE_Data_10_Min

  • ACE_Data_1_Min_01-2015

  • ACE_Data_1_Min_02-2015

  • ACE_Data_1_Min_03-2015

  • ACE_Data_1_Min_04-2015

  • ACE_Data_1_Min_05-2015

  • ACE_Data_1_Min_06-2015

  • ACE_Data_1_Min_07-2015

  • ACE_Data_1_Min_08-2015

  • ACE_Data_1_Min_09-2015

  • ACE_Data_1_Min_10-2015

  • ACE_Data_1_Min_11-2015

  • ACE_Data_1_Min_12-2015

  • 2016 ACE Data
  • ACE_Data_10_Min_2016

  • ACE_Data_1_Min_09-2016

  • ACE_Data_1_Min_01-2016

  • ACE_Data_1_Min_02-2016

  • ACE_Data_1_Min_03-2016

  • ACE_Data_1_Min_04-2016

  • ACE_Data_1_Min_05-2016

  • ACE_Data_1_Min_06-2016

  • ACE_Data_1_Min_07-2016

  • ACE_Data_1_Min_08-2016

  • ACE_Data_1_Min_10-2016

  • ACE_Data_1_Min_11-2016

  • ACE_Data_1_Min_12-2016

  • System Maps
    BHCE Maps
    Transmission Planning
    BHCE 2014-2025 Load Forecast
    How to Contact Us
    TCPC Registration Form
    TCPC Registration Letter
    BHCT Attachment K Hyperlink List
    BHCT Attachment K Business Practices
    BHCT Attachment K Economic Study Request Form
    BHCT Attachment K Methdology Criteria Business Practice
    BHCT FACILITIES RATING
    BHCT FACILITIES RATING METHODOLOGY
    CEII
    CEII Procedures
    Posted BHCT CEII Information
    Economic Studies
    BHCT Economic Study Request History
    Economic Study Request Form
    TCPC - 2010
    2009 Q4 Meeting Notice (08Dec2009)
    2009 Q4 Meeting Agenda (08Dec2009)
    2009 Q4 Meeting Presentation (08Dec2009)
    2009 Q4 Meeting Notes (08Dec2009)
    Data Request Worksheet
    2010 BHCE LTP Study Scope
    2010 Q1 Meeting Notice (25Mar2010)
    2010 Q1 Meeting Presentation (25Mar2010)
    2010 Q1 Meeting Notes (25Mar2010)
    2010 Q2 Meeting Notice (30Jun2010)
    2010 Q2 Meeting Presentation (30Jun2010)
    2010 Q2 Meeting Notes (30Jun2010)
    DRAFT 2010 BHCT LTP Report
    2010 Q3 Meeting Notice (18Oct2010)
    2010 Q3 Meeting Presentation (18Oct2010)
    2010 Q3 Meeting Notes (18Oct2010)
    FINAL 2010 BHCT LTP Report (02Nov2010)
    TCPC - 2011
    2010-2011 BHCT LTP Study Scope
    Data Request Worksheet
    2010 Q4 Meeting Notice (13Dec2010)
    2010 Q4 Meeting Presentation (13Dec2010)
    2010 Q4 Meeting Notes (13Dec2010)
    2011 Q1 Meeting Notice (16Mar2011)
    2011 Q1 Meeting Presentation (16Mar2011)
    2011 Q1 Meeting Notes (16Mar2011)
    2011 Q2/Q3 Meeting Notice (04Oct2011)
    2011 Q2/Q3 Meeting Presentation (04Oct2011)
    2011 Q2/Q3 Meeting Notes (04Oct2011)
    2011 Q4 Meeting Notice (20Dec2011)
    DRAFT 2011 BHCT LTP Report (17Dec2011)
    2011 Q4 Meeting Presentation (20Dec2011)
    2011 Q4 Meeting Notes (20Dec2011)
    FINAL 2011 BHCT LTP Report (13Jan2012)
    TCPC - 2012
    2012 BHCT LTP Study Scope
    2012 BHCT TCPC Q2 Meeting Notes
    2012 BHCT TCPC Q2 Meeting Presentation
    2012 BHCT TCPC Q3 Meeting Notice (27Sept2012)
    2012 Data Request Worksheet
    2012 Q2 Meeting Notice (21Jun2012)
    2012 BHCT TCPC Q3 Meeting Notes (September 27, 2012)
    2012 BHCT TCPC Q3 Meeting Presentation (27Sept2012)REVISED
    2012 BHCT TCPC Q4 Meeting #1 Notice (28Nov2012)
    2012 BHCT TCPC Q4 Meeting Presentation (28Nov2012)
    2012 BHCT TCPC Q4 Meeting #2 Notice (18Dec2012)
    2012 BHCT TCPC Q4 Meeting Notes (28Nov2012)
    2012 BHCT TCPC Q4-2 Meeting Presentation (18Dec2012)
    2012 BHCT TCPC Q4 Meeting Notes (18Dec2012)
    Final 2012 BHCT LTP Report
    TCPC - 2013
    2013 BHCT TCPC Q1 Meeting Notice (07Feb2013)
    2013 BHCT LTP Study Scope (04Feb2013)
    2013 BHCT TCPC Q1 Meeting Presentation (07Feb2013)
    2013 BHCT TCPC Q2 Meeting
    2013 BHCT TCPC Q2 Meeting Notice (26Mar2013)
    2013 BHCT TCPC Q2 Meeting Presentation 11Apr2013
    2013 BHCT TCPC Q3 Meeting Presentation 27Sept2013-Final
    2013 BHCT TCPC Q3 Meeting Notes (27Sept2013)
    2013 BHCT TCPC Q4 Meeting Notice (18Dec2013)
    2013 BHCT TCPC Q4 Meeting Notes (18Dec2013)
    2013 BHCT TCPC Q4 Meeting Presentation 18Dec2013
    2013 Final BHCT LTP Report
    TCPC - 2014
    2014 BHCT TCPC Q1 Meeting Notes
    2014 BHCT TCPC Q1 Meeting Notice
    2014 BHCT TCPC Q1 Meeting Presentation
    2014 BHCT TCPC Q2 Meeting Notes (June 19 2014)
    2014 BHCT TCPC Q2 Meeting Notice (29May2014)
    2014 BHCT TCPC Q2 Meeting Presentation (19Jun2014)
    2014 BHCT TCPC Q3 Meeting Notes (Sept 24 2014)
    2014 BHCT TCPC Q3 Meeting Notice (24Sept2014)
    2014 BHCT TCPC Q3 Meeting Presentation (24Sep2014)
    2014 BHCT TCPC Q4 Meeting Notes (Dec 18 2014)
    2014 BHCT TCPC Q4 Meeting Notice (18Dec2014)
    2014 BHCT TCPC Q4 Meeting Presentation (18Dec2014)
    2014 BHCT LTP Study Scope
    2014 BHCT LTP Report Final
    TCPC - 2015
    2015 BHCT LTP Report
    2015 BHCT LTP Study Scope
    2015 BHCT TCPC Q1 Meeting Notes (March 20 2015)
    2015 BHCT TCPC Q1 Meeting Notice
    2015 BHCT TCPC Q1 Presentation
    2015 BHCT TCPC Q2 Meeting Notes (June 17 2015)
    2015 BHCT TCPC Q2 Meeting Notice
    2015 BHCT TCPC Q2 Meeting Presentation
    2015 BHCT TCPC Q3 Meeting Notes (Oct 8, 2015)
    2015 BHCT TCPC Q3 Meeting Presentation (8Oct2015)
    2015 BHCT TCPC Q4 Meeting Notes (Dec 16, 2015)
    2015 BHCT TCPC Q4 Meeting Notice
    2015 BHCT TCPC Q4 Meeting Presentation (16Dec2015)
    2015 BHCT TCPC Q4 Meeting Presentation (16Dec2015) Rev
    2015 TCPC Data Request Worksheet
    2015 BHCT LTP TCPC Q3 Meeting Notice
    TCPC - 2016
    2016 BHCT TCPC Q1 Meeting Notes (18Apr2016)
    2016 BHCT TCPC Q1 Meeting Notice
    2016 BHCT TCPC Q1 Meeting Presentation (15April2016)
    2016 BHCT TCPC Q3 Meeting Notes (29Sep2016)
    2016 BHCT TCPC Q3 Meeting Notice
    2016 BHCT TCPC Q3 Meeting Presentation (27Sept2016)
    2016 BHCT TCPC Q4 Meeting Notes (01Dec2016)
    2016 BHCT TCPC Q4 Meeting Notice
    2016 BHCT TCPC Q4 Meeting Presentation (06Dec2016)
    FINAL 2016 BHCT LTP Report (01-03-17)
    FINAL 2016 BHCT LTP Study Scope
    TCPC - 2017
    FINAL 2017 BHCT LTP Study Scope
    2017 BHCT TCPC Q1 Meeting Presentation (30Mar2017)
    2017 BHCT TCPC Q1 Meeting Notes (30Mar2017)
    2017 BHCT TCPC Q2 Meeting Presentation (22June2017)
    2017 BHCT TCPC Q2 Meeting Notes (27June2017)
    2017 BHCT TCPC Q3 Meeting Notes (19Oct2017)
    2017 BHCT TCPC Q3 Meeting Presentation (26Oct2017)
    Other Study Reports
    NERC CATEGORY C STUDY_WPC
    FINAL La Junta Tie Study_041609
    CO Rule 3627 - 2012
    Rule 3627 Joint 10-Year Report_FINAL
    Appendix A to 3627 Report
    CO Rule 3627 - 2014
    Final 10-Year Report
    Final 20-Year Report
    SB-100
  • SB-100 Website



  • Black Hills/Colorado Electric Utilities


    09/12/17: On Thursday September 7, 2017 Non Public Transmission Customer information in the form of generator outage information was temporarily visible to BHP marketing function employees though an outage management software system. The information was not utilized by marketing function employees, and upon noticing the issue the marketing function employees reported the issue to the Transmission Services Group who immediately remedied the access issue and disallowed any further access.

    08/01/17: Two real time generation operators will be at the system control emergency dispatch center for testing of emergency functions in compliance with EOP-008-1 from 08:00 AM to 10:00 AM on August 1, 2017.

     

    05/04/17: One real time generation operator will be at the system control emergency dispatch center for testing of emergency functions in compliance with EOP-008-1 from 11:00AM to 1:00 PM May 5, 2017.

     

    05/02/17: Two real time generation operators will be at the system control emergency dispatch center for testing of emergency functions in compliance with EOP-008-1 from 08:30 AM to 10:30 AM May 2, 2017.

     

    02/07/17: Two real time generation operators will be at the system control emergency dispatch center for testing of emergency functions in compliance with EOP-008-1 from 08:30 AM to 10:30 AM February 7, 2017.

     

    02/3/2017: On February 3, 2017, Black Hills Transmission became aware of a Standards of Conduct incident that occurred on January 27, 2017. The Black Hills Transmission and Marketing Functions were performing testing of the new transmission/generation outage software and during this testing a single marketing function employee saw a screen with test and real transmission and generation outages. The information shown did not identify outages on a scheduling path and the employee did not use any of the information for a marketing advantage. An example of the information in the test environment can be found in the Standard of Conduct folder. Generator outage information has been redacted in the document as this market sensitive and not transmission function information.

     

    12/05/16: Two real time generation operators will be at the system control emergency dispatch center for testing of emergency functions in compliance with EOP-008-1 from 08:30 AM to 10:30 AM December 5, 2016.

     

    11/14/16: The 2016 Q4 Stakeholder Meeting will be held November 30, 2016 at 2 pm MPT. For full details see the notice in the Transmission Planning folder under TCPC 2016.

     

    09/26/16: The 2016 Q3 Stakeholder Meeting will be held September 29, 2016 at 11 am MPT. For full details see the notice in the Transmission Planning folder under TCPC 2016.

     

    09/13/16: A system impact study results meeting for BHCT-G20 is scheduled for 8:30 A.M. MST Tuesday September 13, 2016. For interconnection details please see the interconnection queue. For meeting information please contact the FERC Tariff and Compliance Manager at 605 721-2220.

     

    08/2/16: Two real time generation operators will be at the system control emergency dispatch center for testing of emergency functions in compliance with EOP-008-1 from 08:30 AM to 10:30 AM August 2, 2016.

     

    07/29/16:   Discounted Hourly Transmission Rates

    The hourly non-firm transmission rate will change from $2.50/MWh to the discounted rate of $1.50/MWh effective August 1, 2016.

     

    07/15/16: Effective July 18, 2016, Matthew Jester, Rotational Engineer for Transmission Services (transmission function employee) is transferring to Generation Dispatch and Power Marketing as a Rotational Engineer (marketing function employee).

     

    06/20/16: The Joint Dispatch Customer Authorization Data Release Form §358.7 has been posted under the Joint Dispatch Initiative folder. Posted 6/20/2016.

     

    05/02/16: Two real time generation operators will be at the system control emergency dispatch center for testing of emergency functions in compliance with EOP-008-1 from 08:30 AM to 10:30 AM May 3, 2016.

     

    04/06/16: Results Meeting with Affiliate

    A facilities study results meeting for BHCT-G11 is scheduled for 12:30 P.M. MST Wednesday April 6, 2016. For interconnection details please see the interconnection queue. For meeting information please contact the FERC Tariff and Compliance Manager at 605 721-2220.

     

    02/02/16: Two real time generation operators will be at the system control emergency dispatch center for testing of emergency functions in compliance with EOP-008-1 from 08:30 AM to 10:30 AM today.

     

    10/22/15: The business practice for Annulments has been updated and is effective immediately. The file can be found in the Business Practice, Waivers, and Exemptions folder.

     

    09/23/15: Four real time generation operators will be at the system control emergency dispatch center for testing of emergency functions in compliance with EOP-008-1 from 08:30 AM to 10:30 AM today.

     

    07/27/15: In accordance with NAESB Version 003 standards, and FERC Order 676-H, Black Hills Colorado Electric posted on July 23, 2015 a Plan and Procedures on OASIS for transitioning existing customers NITS service arrangements to Version 002 NITS OASIS Templates. This document can be found under the NITS on OASIS folder to the left.

     

    05/22/15: The FERC Order 676-H Service across Multiple Transmission Systems (SAMTS) coordinated group functionality was activated on May 15, 2015.

     

    05/11/15: Scoping Meeting with Affiliate

    A system impact study results meeting for BHCT-G11 is rescheduled for 1:00 P.M. MST Tuesday May 12th, 2015. For interconnection details please see the interconnection queue. For meeting information please contact the FERC Tariff and Compliance Manager at 605 721-2220.

     

    05/01/15: Scoping Meeting with Affiliate

    A system impact study results meeting for BHCT-G11 is scheduled for 3:00 P.M. MST Monday May 4th, 2015. For interconnection details please see the interconnection queue. For meeting information please contact the FERC Tariff and Compliance Manager at 605 721-2220.

     

    04/21/15: The e-Tag 1.8.2 cutover was completed on March 30, 2015. All new tags created after the cutover date are on the new e-Tag 1.8.2. Tags created in version 1.8.1 for dates occurring after the cutover will be supported until April 30, 2015 HE 00 CST.

     

    01/14/15: Effective January 15, 2015, Eric Egge, Director of Electric Transmission Services (transmission function employee) is transferring to be the Director of Generation Dispatch and Power Marketing (marketing function employee).

     

    10/29/14: Four real time generation operators will be at the system control emergency dispatch center for testing of emergency functions in compliance with EOP-008-1 from 08:30 AM to 11:30 AM today.

     

    09/23/14: Public Service Company of Colorado, Black Hills Colorado Electric and Platte River Power Authority are jointly hosting a customer meeting on September 29 at 9:30 AM at the Xcel Energy Offices, 1800 Larimer, Denver CO to discuss a filing the three tentatively plan on making at the Federal Energy Regulatory Commission in early November. For more information, please contact Kenna Hagan at 605-716-3961.

     

    09/11/14: It was discovered on 09/10/14 that generation dispatch and energy marketing employees had access to SCADA reports beyond the normal restricted permissions of AGC and generation SCADA information. The permissions were inadvertently changed during the most recent SCADA software system upgrade that occurred in mid-August. The SCADA report permissions were corrected and tested within a few hours of discovery. The generation dispatch employees were not aware of the change and did not query the information or use it for business, marketing or other purposes.

     

    09/10/14: Black Hills will be experiencing a planned extended outage at the Boone substation as posted on OASIS. Black Hills transmission group will coordinate with Network customers related to scheduling impacts during the outage. If there are any immediate questions please call the FERC Tariff and Administration Department at (605) 721-2220 .

     

    08/20/14: On August 20, 2014, Black Hills will be meeting with its merchant function, PRPA and PSCO via telephone to discuss the development of a joint dispatch agreement.

     

    08/12/14: On August 12, 2014, Black Hills will be meeting with PRPA and PSCO at the PRPA Headquarters to discuss the possibilities of developing a joint dispatch agreement.

     

    08/05/14: On August 5, 2014 Black Hills will be meeting with its merchant function at Black Hill's offices to discuss the possibilities of developing a joint dispatch agreement.

     

    08/04/14: On August 4, 2014 Black Hills will be meeting with its merchant function at Black Hill's offices to discuss the possibilities of developing a joint dispatch agreement.

     

    07/22/14: On July 22, 2014 Black Hills will be meeting with PRPA and PSCO at the PRPA Headquarters to discuss the possibilities of developing a joint dispatch agreement.

     

    06/20/14:   Discounted Hourly Transmission Rates

    The hourly non-firm transmission rate will change from the discounted rate of $1.00/MWh to the discounted rate of $2.50/MWh effective July 1, 2014.

     

    05/15/14: In the course of gathering information for business purposes, an accountant inadvertently disclosed to a marketing function manager that Black Hills Colorado Electric was considering changing the discount for non-firm hourly service from $1.00 to $2.50. No change to the rate has been made at this time.

     

    01/15/14: Four real time generation operators will be at the system control emergency dispatch center for testing of emergency functions in compliance with EOP-008-1 from 10:00 AM to 1:00 PM today. (Andy Currie, Cady Paris, Chad Thies, Chase Whittaker.

     

    12/30/13: As of January 2nd BHBE & BHCT systems will have updated TTC values for numerous paths.

     

    08/20/13: Notice: Jim Haefs, held a Real Time Marketer position (marketing function employee) and has transferred to a System Operator position (transmission function employee) effective August 19, 2013.

     

    08/06/13: An accidental disclosure was made to Black Hills Colorado Electric's Generation Dispatch and Power Marketing personnel that gave them advance notice of a change in TTC for the CCW—BHCE path. The public change in TTC was made on OASIS within one hour of disclosure.

     

    06/26/13: A real time generation dispatcher will be at the system control emergency dispatch center for testing of emergency functions in compliance with EOP-008-1.

     

    02/28/13: Notice of Meeting

    The Joint Energy Dispatch Initiative meeting was held Tuesday February 19, 2013 at Western’s Loveland office. The meeting notes have been posted under OASIS Notices.

     

    12/14/12: Contact Information-

    For request for service or inquiries about the tariff please contact Kenna Hagan, Manager of FERC Tariff Administration and Policy, at 605-716-3961 or by email at Kenna.Hagan@blackhillscorp.com.

     

    ********************

     

    Outage on Boone-DOT Tap

    There is a possibility for an outage on the Boone-DOT Tap in 2013. If this outage were to occur it would limit BHCT’s ability to serve network load from its system for an extended period of time. BHCT will be holding a meeting with the affected customers to discuss the impacts to them.

     

    ********************

     

    Contact Information For request for service or inquiries about the tariff please contact Eric Egge, Director of Transmission Services, at 605-721-2646 or by email at eric.egge@blackhillscorp.com.

     

    ********************

     

    Scoping Meeting with Affiliate

    An interconnection request scoping meeting for BHCT-G11 is scheduled for 10:00 A.M. MPT Monday July 23, 2012. For interconnection details please see the interconnection queue. For meeting information please contact the FERC Tariff and Compliance Manager at 605 721-2285.

     

    ********************

     

    Discounted Hourly Transmission Rates

    The hourly non-firm transmission rate has been discounted to $1.00 for all periods effective 9-10-11.

     

    ********************

     

    New Transmission Rates

    Posted "Updated Transmission Rates effective 8-16-11" under "BHCT JOATT".

     

    ********************

     

    Regional Transmission Service BHCT became a WestConnect Regional Transmission Service participant effective July 1, 2011. The FERC Tariff filing and customer application are located in the BHCT OATT folder.

     

    ********************

    BHCE Planning Process BHCE has updated its OATT Attachment K to include the nine planning principles outlined in FERC Order 890.

     

    ********************

     

    Senate Bill 100 regarding Renewable Energy

     

    Senate Bill 100 is intended to ensure the adequacy of Colorado’s electric transmission infrastructure requiring utilities to designate energy resource zones to encourage the installation of renewables and authorizing cost recovery from electric utility customers. BHCE is seeking input from all parties interested in installing renewable generation that requires or may require transmission service in or around our service territory.

     

    ********************

     

    SB-100 Stakeholder Meeting

     

    Black Hills Colorado Electric will be holding a public stakeholder meeting on April 22, 2009.  A meeting announcement, agenda and registration form can be found in the "SB-100" folder to the left.

     

         


    ©2001-2010 OATI webOasisTM/SM - Open Access Technology International, Inc. All Rights Reserved.