Western Area Power Administration (WAPA)
Draft
Business Practices (BPs) Common to all of WAPA's Regions
(Posted for 10 business day
comment period)
(Last
Update: 12/15/2021, Removal of Order 845 Implementation
Related BP Draft postings)
The following are the currently
proposed draft versions (posted for the 10 business day comment
period) of the Business Practices (BPs) that
are common and identical across all of WAPA's Regional
Offices, which includes (DSW, RMR, SNR, and UGP - See
Note 1 for UGP). The BPs apply to the NERC
identified TSPs: CRCM, LAPT, WALC, WAPA, WASN. Additional draft BPs specific
only to an individual Region/TSP are also posted on
that TSP's OASIS under the "Business Practices"
folder.
None..
Please
submit any comments or questions on the proposed draft BP(s) by
the due date shown above to your specific WAPA Regional Contacts:
Note 1. The UGP Region joined
the Southwest Power Pool, Inc. (SPP) as a transmission owner
and transferred functional control of all of its eligible
transmission facilities to SPP on October 1, 2015.
Transmission service and certain other services over those UGP
Regional transmission facilities are available solely under
the SPP Open Access Transmission Tariff (SPP Tariff).
Ancillary services offered by the UGP Region as a Balancing
Authority operator are also solely available under the SPP
Tariff. Therefore, certain WAPA BPs may not be currently
applicable, or have limited applicability, in the UGP Region.
Previous Draft Postings Archive (No longer
posted for comment)