Registration | About | HOME                                OATI webOASISSM Production Node                                        



Documents

  • NAESB Home Page

  • Standards of Conduct

  • Business Practices, Waivers, and Exemptions

  • OASIS Notices
  • Congestion Relief Offers

  • Standards of Conduct Posting
  • Discretion

  • Personnel

  • APGI org chart 03_28_2012
    Gen and Trans outages (pdf)
    Transfer of Tapoco Transmission to Brookfield Smoky Mountain
    Transmission Reassignment Document
    HTML
    Logo
    Logo
    Transmission Rates
    APGI Tapoco Transmission Rates 2011
    APGI Info
    APGI Tapoco Available Transfer Capability Implementation Document
    APGI_Tapoco_OATT_Waiver
    Denial of Service


    Welcome To APGI - Tapoco Division (TAP)


    APGI - Tapoco Division


    Welcome to Alcoa Power Generating, Inc. - Tapoco Division. Effective July 1, 2011, Alcoa Power Generating, Inc. Tapoco Division will become a NERC registered TSP with the acronym of TAP. The TVA-Duke interface will be separated into two tie points, TVA-DUK and TVA-TAP. TAP will be a POR and POD on the TVA OASIS system and the TSP between TVA and DUK for the Santeetlah-Robbinsville tie point.
    **************************Due to the Cheoah Hydro Modernization Project a reconfiguration of the 161kv lines around Cheoah has occurred and will remain in effect until 05/01/2012.
         


    ©2001-2010 OATI webOasisTM/SM - Open Access Technology International, Inc. All Rights Reserved.