Registration | About | HOME                                OATI webOASISSM Production Node                                        




Documents

  • NAESB Home Page

  • Standards of Conduct

  • Performance Metrics
    Transmission Study Metrics
    Transmission Service Request Metrics
    Business Practices, Waivers, and Exemptions
  • Business Practices

  • ATC Information
    FAC-13-2 Methodology
    Current Available Transfer Capability Implementation Document - ATCID
    Current CBM Process Document - CBMPD
    Current TRM Implementation Document - TRMID
    ATC Methodology Contact
    Current Load Forecast Descriptive Statement
    Current Postback Methodology
    Current Flowgate Methodology Grandfathered Agreements
    AFC Data Request
    AFC Data Request Requirement
    AFC Data Request Form
    AFC Mapping Data
    List of POR/PODs available on OASIS
    Sources and Sinks Mapped to AFC Zones
    OASIS Notices
  • Discretion

  • Personnel

  • Business Practice Revision Items
    BPR List
    BPR Template
    Pending BPRs
    BPR-001
    BPR-002
    BPR-005
    BPR-007
    BPR-012
    BPR-014
    BPR-015
    BPR-016
    BPR-017
    BPR-018
    BPR-019
    BPR-020
    BPR-021
    BPR-023
    BPR-024
    BPR-025
    BPR-026
    BPR-027
    BPR Approval History
    BPR001 Report
    BPR002 Report
    BPR004 Report
    BPR005 Report
    BPR006 Report
    BPR007 Report
    BPR008 Report
    BPR009 Report
    BPR010 Report
    BPR011 Report
    BPR012 Report
    BPR013 Report
    BPR014 Report
    BPR015 Report
    BPR016 Report
    BPR017 Report
    BPR018 Report
    BPR019 Report
    BPR020 Report
    BPR021 Report
    BPR022 Report
    Completed BPRs
    BPR003 (not in BPR format)
    BPR004
    BPR006
    BPR008
    BPR009
    BPR010
    BPR011
    BPR013
    BPR022
    SPP Regional Tariff
  • SPP Regional Open Access Transmission Tariff

  • SPP Criteria
    Attachment P - Timing Requirements
    Customer List
  • Customer Registration - Credit Policy - Attachment X of the SPP OATT

  • Customer Schedule 7/8 Purchases

  • Customer Tariff Purchases

  • Transmission Owner Revenue

  • Attachment S - Base Plan Upgrades
    SPP Billing Breakout Disclosure
    Business Practices
    Delayed Offering on DC Ties Posting
  • SPP OATT Business Practices

  • BPR015, 016, 017 will be effective beginning 1/19/2011
    Network Service
    Application to Undesignate Network Resource
    List of SPP NITS Customers
    New Application to Designate Network Resource
  • List of Network Resources

  • Rate Information
  • Discounts

  • Updated Discount Information
  • Price Matrix

  • Scheduling & Reactive Rates

  • Transmission
  • CBM

  • DC Ties Update

  • Flowgate Information
    Interface values
  • Outages

  • SPP Load and Reserves

  • Welsh HVDC Tie Project
  • Transmission Loading Relief

  • Curtailments

  • LLR Report

  • Flowgates
    Permanent Flowgates
    Temporary Flowgates
    General
  • SPP Corporate Website

  • Delayed Offering
    Discretion Log and Late Tag Exceptions
  • Email List Signup

  • Code of Conduct

  • Computer Ouatge Policy

  • Node Maintenance

  • Past Due List

  • Member Related Postings

  • CWG Communications Matrix
    Customer Assistance Proposal
    Overview of Customer Assistance Process
    EIS Market Information
  • SFTDA Posting

  • Supply Adequacy Calculator
  • Deployment Test Scenarios

  • EIS Market Violation Relaxation Limits (VRLs)
  • EIS Price Correction

  • Market Protocols

  • Market System Status

  • Out of Merit Energy (OOME) Directives
    FERC 890 Postings
  • FERC 890 Postings

  • Granting ATC Waiver
  • Posting Effective ATC

  • ATC Algorithm
    ATC Changes due to 10% or Greater TTC Change
    Reservation/Tagging Tools
  • Electrical Equivalence Table

  • Loss Calculator

  • Current Copy of Fax Transmission Service Request Form
    Current Copy of Fax Tag Form
  • Real Time Discounts

  • Reserving Point-to-Point Transmission Service utilizing MKEC Facilities
    General Rule for Reserving SPP Service
    Excel Version of the Loss Calculator
    Temporary Flowgates due to special operating conditions
    Time Remaining to Confirm a TSR
    Fax and Emergency Cell Numbers for Each SPP Function
    Long Term Tariff Studies
  • Posted Planning and System Impact Studies

  • Changes to Aggregate Transmission Service Study Process
    Overview of AG Study Modeling
    Large and Small Generator Interconnection Procedure Cluster Open Window
    Order 890 Effect on Pending Transmission Service Request (Revised)
    Planning
    Local Area Planning Criteria
    NNL ASTFC
  • Posted Congestion Management Process (CMP) between SPP, MISO, and PJM

  • NNL ASTFC Data Report

  • About the NNL ASTFC Data Report
    SPP Business Systems Updates - Updated 8/23/2012
    *Updated* Daily Non-firm On/Off-Peak Transmission Service
    Network Reservation Limit Validation Activation
    OATI webOASIS Private Cloud Migration
    webOASIS Upgrade to v3.5.02
    RTOSS Upgrade Planned for 11/10/2009
    SPP RTOSS/webTrans Version 4.3 Upgrade - Updated 10/8/2010
    SPP webOASIS Upgrade - Updated 11/10/2010
    OASIS Transition News
    January 2012 SPP Business Practice Update


    --Welcome to the Southwest Power Pool OASIS--


    SPP OASIS

    UPDATES
    DC Ties Update - Updated 05-24-2013 14:14 CPT
    Delayed Offering - Updated 4-17-2013 09:43 CPT
    OOME Directives - Updated 03-06-13 10:01 CPT




    WELSH HVDC Project information may be found under the Transmission Folder in the left column. Or click here for more details.


    Effective Thursday, July 12, 2012 at 1000 hours, the SPP Primary Coordination Center has relocated to 201 Worthen Drive, Little Rock, AR 72223-4936. Contact telephone numbers have NOT changed. However, the FAX numbers HAVE changed. The new FAX numbers to be used beginning on the effective date/time are as follows:

                                                 PRIMARY Coordination Center                 BACK-UP Coordination Center

    RTO Tariff Administration:                              501-482-2031                                               501-803-3756

    Interchange Authority:                                     501-482-2030                                               501-851-6580


    *In 2005 we asked all members to discontinue using the number of (501) 603-0145 to reach SPP Operations. As a courtesy, this number was left active so that when someone dialed this number it would roll over to the correct SPP Operations contact number of (501) 614-3900 until such time that all of SPPs members had changed their systems to the new number. SPP has now discontinued the old number. Please ensure that you use only (501) 614-3900 as the contact for SPP Operations. Your attention to this matter is greatly appreciated.*


    IMPORTANT UPDATE regarding the SPP Business Practices. Please see the posting labeled "January 2012 SPP Business Practice Update" in the "SPP Business Systems Updates" folder to the left Or click here for more details.


    On Monday, May 9, at 8:00am CDT, SPP will activate Daily Non-firm On-Peak and Daily Non-firm Off-Peak Transmission Services. Please see the posting titled "Daily Non-firm On/Off-Peak Transmission Service" in the SPP Business Systems Updates folder to the left or click here for more details. A "How-to" guide for requesting these services has been added to the posted document.



    Effective Monday, April 12, 2010: The Application to Undesignate a Designated Network Resource has been updated to include the undesignation of long term service on a long term basis (one year or more). Please use the new form when requesting the undesignation of a DNR.


    ATTENTION SPP Network Customers: According to currently posted SPP Business Practice 2.11, "The Request Reference Field on the [Non-firm Network] reservation should include the original network service [A.K.A. Master NITS] OASIS reference number." Please note that any request for Non-firm Network Service that does not include the Master NITS reservation number in the Request Reference field will be deemed INVALID.


    Customer information, including a working telephone and fax number, must be complete in order to submit a Transmission Service Request!!



    The previous SPP OASIS will still be available for research purposes. Only TSRs in a status of QUEUED, RECEIVED, STUDY, ACCEPTED, COUNTEROFFER, and CONFIRMED with an end date after June 24, 2009 were moved over to the webOASIS system. All other TSRs are still available for review at http://sppoasis.spp.org.

         


    ©2001-2010 OATI webOasisTM/SM - Open Access Technology International, Inc. All Rights Reserved.