Path & Points
Last Updated July 15, 2003

SaskPower Paths and Points

Path Name

Point of Receipt

Point of Delivery

A/SPC/MH.230-SPC//

MH.230

SPC

A/SPC/SPC-MH.230//

SPC

MH.230

A/SPC/AB.SK.MC-SPC//

AB.SK.MC

SPC

A/SPC/SPC-AB.SK.MC//

SPC

AB.SK.MC

A/SPC/WAUE-SPC//

WAUE

SPC

A/SPC/SPC-WAUE//

SPC

WAUE

A/SPC/MH.230-AB.SK.MC//

MH.230

AB.SK.MC

A/SPC/MH.230-WAUE//

MH.230

WAUE

A/SPC/WAUE-MH.230//

WAUE

MH.230

A/SPC/WAUE-AB.SK.MC//

WAUE

AB.SK.MC

A/SPC/AB.SK.MC-MH.230//

AB.SK.MC

MH.230

A/SPC/AB.SK.MC-WAUE//

AB.SK.MC

WAUE

 

  1. When making a Transmission Service Request, SaskPower generating plant buses are valid Points of Receipt (PORs), rather than SPC.
  2. SPC is a valid Point of Delivery (POD) when making Transmission Service Requests.
  3. Transmission line losses are associated with the various paths and can be pre-determined by using the SaskPower Loss Calculator.
  4. IFHS and MH.115 are used only by the SaskPower Control Area for dynamic scheduling.

 

 For more information on paths contact transmission_services@saskpower.com