Outage Name |
Outage Id |
Company | Facility | Flow Gate |
Segment/ JOTSFacility |
Original TTC In |
Original TTC Out |
New TTC |
Start Time (PPT) | Stop Time (PPT) | Status | Outage Category |
Outage Type |
Path Impact |
Report TPs |
Annotation | Creation Time (PPT) | EventId | Last Updated (PPT) |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
PPW 171983 | 10361 | PPW | Riverton: 230 kV Cap Bank S/C 472 | 0.0 | 0.0 | 0.0 | 2021-02-18 09:03 | 2024-06-03 17:00 | ACTIVE | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Riverton: 230 kV Cap Bank S/C 472: | 2022-11-14 00:32 | 75797 | 2024-01-02 07:37 | ||
PPW 175805 | 9275 | PPW | Hemingway-Summer Lake 500 kV line (Path 75 Schedule Limitation) | H500-SMLK(PPW) H500-SMLK(PPW) H500-SMLK(PPW) |
1500.0 1500.0 1500.0 |
1500.0 1500.0 1500.0 |
1386.0 1386.0 1386.0 |
2021-06-02 12:00 2022-10-04 04:21 2023-12-01 23:59 |
2022-10-04 04:21 2023-12-01 23:59 2024-12-04 12:00 |
ACTIVE | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Hemingway-Summer Lake 500 kV line (Path 75 Schedule Limitation):Path Restriction Notes: Path 75 Westbound = 1386.: | 2021-12-21 14:06 | 80760 | 2023-11-27 09:28 | |
PPW 23-17390 | 13038 | PPW | Sigurd: 345/230 kV Bank #6 | OTHERGEN-PACE(PPW) OTHERGEN-PACE(PPW) |
9999.0 9999.0 |
9999.0 9999.0 |
9999.0 0.0 |
2023-09-21 15:33 2023-09-21 16:52 |
2023-09-21 16:52 2024-07-01 19:33 |
ACTIVE | TRANSMISSION | URGENT | ONPATH | PPW | continuous: Commissioning required transformer is being replaced Updated 11/02/2023 Take #6 XFMR out of service and replace. Based on oil sample :Possible real-time restrictions to Sigurd Solar.: | 2023-09-21 15:06 | 131763 | 2023-12-07 14:01 | |
PPW 23-19875 | 13744 | PPW | Scheduling Limitation: Path 19 (Bridger West) Scheduling Limitation | JBSN-JB345(PPW) JBSN-JB345(PPW) |
1600.0 1600.0 |
1600.0 1600.0 |
1600.0 1433.0 |
2023-10-27 05:23 2023-10-27 12:13 |
2023-10-27 12:13 2024-06-19 17:00 |
ACTIVE | TRANSMISSION | FORCED | ONPATH | PPW | continuous:Return series caps to normal.:Bridger West 2150 PAC 1433 IPCO 717: | 2023-10-27 12:22 | 134271 | 2024-02-15 19:32 | |
PPW 23-19877 | 14565 | PPW | Populus: 345 kV Series Capacitor #1 (C2) | JBSN-JB345(PPW) JBSN-JB345(PPW) JBSN-JB345(PPW) |
1600.0 1600.0 1600.0 |
1600.0 1600.0 1600.0 |
1600.0 1433.0 1433.0 |
2023-10-27 05:26 2023-10-27 05:26 2024-03-25 17:00 |
2023-10-27 05:26 2024-03-25 17:00 2024-12-31 17:00 |
ACTIVE | TRANSMISSION | FORCED | ONPATH | PPW | continuous:Segment two controller not working properly:JBSN-JB345 = 2150. PacifiCorp = 1433. IPCo = 717.: | 2023-12-04 13:10 | 134273 | 2024-03-24 16:52 | |
PPW 23-19878 | 15670 | PPW | Populus: 345 kV Series Capacitor #2 (C2) | JBSN-JB345(PPW) JBSN-JB345(PPW) JBSN-JB345(PPW) |
1600.0 1600.0 1600.0 |
1600.0 1600.0 1600.0 |
1600.0 1427.0 1427.0 |
2023-10-27 05:29 2023-10-27 05:29 2024-03-25 17:00 |
2023-10-27 05:29 2024-03-25 17:00 2024-12-31 17:00 |
ACTIVE | TRANSMISSION | FORCED | ONPATH | PPW | continuous:Segment two controller not working properly:JBSN-JB345 = 2150. PacifiCorp = 1433. IPCo = 717.: | 2024-02-12 09:57 | 134274 | 2024-03-24 16:52 | |
PPW 23-21675 | 14822 | PPW | Threemile Knoll: THREEMLE 360A 345KV CAP DIS,Threemile Knoll: Series Cap C1,Threemile Knoll: Series | JBSN-JB345(PPW) NUT-PATHC(PPW) PATHC-NUT(PPW) NUT-PATHC(PPW) |
1600.0 1172.0 1600.0 1060.0 |
1600.0 1172.0 1600.0 1060.0 |
1433.0 730.0 1480.0 618.0 |
2023-11-24 02:21 2023-11-24 02:21 2023-11-24 02:21 2024-04-01 00:00 |
2024-05-01 16:00 2024-04-01 00:00 2024-05-01 16:00 2024-05-01 16:00 |
ACTIVE | TRANSMISSION | FORCED | ONPATH | PPW | continuous:repair switch 360A:JBSN-JB345 = 2150. PacifiCorp = 1433. IPCo = 717 NUT-PATHC = 730 Summer/730 Winter. PATHC-NUT = 1480 Summer/1560 Winter.: | 2023-12-14 12:21 | 136090 | 2024-04-02 12:33 | |
PPW 23-20576 | 13993 | PPW | Dave Johnston: TIE CB 1H216,Dave Johnston: LINE CB 1H218 | WYOEAST-AEOW(PPW) | 1800.0 | 1800.0 | 1800.0 | 2023-12-13 08:35 | 2024-07-18 14:00 | ACTIVE | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Rebuild the Amasa Bay to a higher amperage:No de-rate to AW/4B with Amasa-Windstar 230 kV termporary line in service.: | 2023-11-06 14:38 | 134976 | 2024-03-13 13:09 | |
PPW 24-00097 | 14597 | PPW | Jim Bridger: 345/20 kV Unit #1 Main Bank (T3485) | JBSN-JB345(PPW) JBSN-JB345(PPW) JBSN-JB345(PPW) JBSN-JB345(PPW) |
1600.0 1600.0 1600.0 1600.0 |
1600.0 1600.0 1600.0 1600.0 |
1600.0 1600.0 1400.0 1600.0 |
2023-12-31 06:13 2023-12-31 06:45 2023-12-31 06:45 2024-04-19 19:35 |
2023-12-31 06:45 2023-12-31 06:45 2024-04-19 19:35 2024-04-30 00:00 |
COMPLETED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Natural Gas Conversion:JBSN-JB345 = 2100. PacifiCorp = 1400. IPCo = 700.: | 2023-12-06 13:32 | 136892 | 2024-04-19 19:38 | |
PPW 24-00488 | 15058 | PPW | Burns: Series Cap Segment #1 & 2 | BORA-M500(PPW) SMLK-H500(PPW) BORA-M500(PPW) SMLK-H500(PPW) BORA-M500(PPW) SMLK-H500(PPW) |
1090.0 100.0 1090.0 100.0 1090.0 100.0 |
1090.0 100.0 1090.0 100.0 1090.0 100.0 |
1090.0 100.0 959.0 96.0 959.0 96.0 |
2024-01-09 03:48 2024-01-09 03:48 2024-01-09 03:48 2024-01-09 03:48 2024-03-29 16:00 2024-03-29 16:00 |
2024-01-09 03:48 2024-01-09 03:48 2024-03-29 16:00 2024-03-29 16:00 2024-04-30 16:00 2024-04-30 16:00 |
ACTIVE | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Investigating a possible failure of relay voltage sensing component.:Path 75 limited to 507 (Midpoint Series Caps bypassed for maint). SMLK-H500 = 96; BORA-M500 = 959;: | 2024-01-03 10:34 | 138306 | 2024-03-28 10:09 | |
PPW 24-00351 | 15028 | PPW | Iron Gate: T-3135 | OTHERGEN-PACW(PPW) OTHERGEN-PACW(PPW) |
9999.0 9999.0 |
9999.0 9999.0 |
9999.0 0.0 |
2024-01-09 08:00 2024-01-09 08:54 |
2024-01-09 08:54 2024-12-31 15:30 |
ACTIVE | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Plant decommissioning: | 2023-12-29 12:31 | 138153 | 2024-01-09 08:54 | |
PPW 24-00908 | 15202 | PPW | Sigurd: 345/230 kV Bank #6 | OTHERGEN-PACE(PPW) OTHERGEN-PACE(PPW) |
9999.0 9999.0 |
9999.0 9999.0 |
9999.0 0.0 |
2024-01-09 09:15 2024-01-09 12:30 |
2024-01-09 12:30 2024-07-01 19:33 |
ACTIVE | TRANSMISSION | URGENT | ONPATH | PPW | continuous: Commissioning required transformer is being replaced Updated 11/02/2023 Take #6 XFMR out of service and replace. Based on oil sample :Possible real-time restrictions to Sigurd Solar.: | 2024-01-09 09:18 | 138727 | 2024-01-09 12:34 | |
PPW 24-00950 | 15630 | PPW | COPCO #2-Iron Gate 69 kV line | OTHERGEN-PACW(PPW) OTHERGEN-PACW(PPW) OTHERGEN-PACW(PPW) |
9999.0 9999.0 9999.0 |
9999.0 9999.0 9999.0 |
9999.0 0.0 0.0 |
2024-01-15 01:43 2024-01-15 01:43 2024-01-15 17:00 |
2024-01-15 01:43 2024-01-15 17:00 2024-12-31 17:00 |
ACTIVE | TRANSMISSION | URGENT | ONPATH | PPW | continuous:Wreck out Line-62 SCOTT WHITAKER / KEYLINE 541 430-4526 :Iron Gate Generation will not be available.: | 2024-02-09 12:14 | 138769 | 2024-02-09 12:14 | |
PPW 24-05215 | 16611 | PPW | PG&E Cascade: CB 122 | CRAG-CRAGVIEW(PPW) CRAGVIEW-CRAG(PPW) PACW-CRAGVIEW(PPW) CRAG-CRAGVIEW(PPW) CRAGVIEW-CRAG(PPW) PACW-CRAGVIEW(PPW) PACW-CRAGVIEW(PPW) |
45.0 80.0 150.0 45.0 80.0 150.0 115.0 |
45.0 80.0 150.0 45.0 80.0 150.0 115.0 |
45.0 80.0 150.0 0.0 0.0 0.0 0.0 |
2024-03-24 09:00 2024-03-24 09:00 2024-03-24 09:00 2024-03-24 09:32 2024-03-24 09:32 2024-03-24 09:32 2024-04-01 00:00 |
2024-03-24 09:32 2024-03-24 09:32 2024-03-24 09:32 2024-04-30 15:00 2024-04-30 15:00 2024-04-01 00:00 2024-04-30 15:00 |
ACTIVE | TRANSMISSION | URGENT | ONPATH | PPW | continuous:Path 25 open ended for voltage stability for a PG&E Cottonwood Bank outage. Scheduling Limitation to 0MW bi-directionally. External #24-006973.:CRAG-CRAGVIEW & CRAGVIEW-CRAG = 0.: | 2024-03-31 18:03 | 143040 | 2024-04-04 15:12 | |
PPW 24-04204 | 16150 | PPW | Castella-Nutglade Tap section of the Castella-Crag View-Mount Shasta 69 kV line | CRAGVIEW-DOGCREEK(PPW) HYDROGEN-PACW(PPW) PACW-NTLOAD(PPW) CRAGVIEW-DOGCREEK(PPW) HYDROGEN-PACW(PPW) PACW-NTLOAD(PPW) CRAGVIEW-DOGCREEK(PPW) HYDROGEN-PACW(PPW) PACW-NTLOAD(PPW) |
18.0 9999.0 9999.0 18.0 9999.0 9999.0 18.0 9999.0 9999.0 |
18.0 9999.0 9999.0 18.0 9999.0 9999.0 18.0 9999.0 9999.0 |
18.0 9999.0 9999.0 0.0 0.0 0.0 0.0 0.0 0.0 |
2024-04-01 00:09 2024-04-01 00:09 2024-04-01 00:09 2024-04-01 00:09 2024-04-01 00:09 2024-04-01 00:09 2024-04-15 18:00 2024-04-15 18:00 2024-04-15 18:00 |
2024-04-01 00:09 2024-04-01 00:09 2024-04-01 00:09 2024-04-15 18:00 2024-04-15 18:00 2024-04-15 18:00 2024-04-26 18:00 2024-04-26 18:00 2024-04-26 18:00 |
ACTIVE | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Replace Transmision under build poles for continued fire mitigation work. this will be between Nutglade sub, and castella sub.:CRAGVIEW-DOGCREEK = 0 Castella, Shotgun Creek, Slate Creek & Dog Creek will be radial from PG&E Cascade via Dog Creek (Max 3 mw). Network Load Service Arrangements may be required. Slate Creek Generation must be off line.: | 2024-03-07 08:48 | 142028 | 2024-04-02 11:27 | |
PPW 24-06062 | 16750 | PPW | Path 25 Schedule Limitation (Cascade 115 kV Tie) | CRAGVIEW-PACW(PPW) CRAGVIEW-PACW(PPW) |
108.0 108.0 |
108.0 108.0 |
108.0 0.0 |
2024-04-09 00:00 2024-04-09 02:35 |
2024-04-09 02:35 2025-04-09 00:00 |
ACTIVE | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:CRAGVIEW-PACW TTC = 0 PER PLANNING.:CRAGVIEW-PACW = 0 INDEFINITELY: | 2024-04-09 09:34 | 143888 | 2024-04-09 09:35 | |
PPW 24-02583 | 15606 | PPW | Path 25 Schedule Limitation (Cascade 115 kV Tie) | CRAG-CRAGVIEW(PPW) CRAG-CRAGVIEW(PPW) CRAGVIEW-CRAG(PPW) |
45.0 45.0 80.0 |
45.0 45.0 80.0 |
45.0 0.0 80.0 |
2024-04-11 06:00 2024-04-12 06:00 2024-04-12 06:00 |
2024-04-12 06:00 2024-05-08 18:00 2024-05-08 18:00 |
Active | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Keswick-Trinity 60kV Line (HFRA) (French Gulch-Trinity SECT) Cleared T-Line Contract to complete tag work at structures to replace poles 015/190, 015/191, 015/192, 016/214, 016/216, 017/227, 026/424, 026/436, 026/438, 027/447, 027/456, replace/repair guywire 014/174, 015/193, replace insulators 016/216, 029/494, 029/501, 029/510, replace/repair conductor 029/501, 030/520, tiewire 025/408 cotter key 029/506:CRAG-CRAGVIEW = 0; CRAGVIEW-CRAG = 80: | 2024-02-08 10:05 | 140404 | 2024-03-28 09:59 | |
PPW 24-05085 | 16428 | PPW | Path 25 Schedule Limitation (Cascade 115 kV Tie) | CRAG-CRAGVIEW(PPW) CRAGVIEW-CRAG(PPW) |
45.0 80.0 |
45.0 80.0 |
45.0 80.0 |
2024-04-15 06:00 2024-04-15 06:00 |
2024-04-19 18:00 2024-04-19 18:00 |
CANCELLED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:T-Line to replace poles 016/354, 016/355, 017/382, 018/393, 018/404, 018/409, 019/421, 019/429, 019/432, repair conductor 017/373, 017/383, 018/416, reframe poles 019/439, 019/440, replace insulators 017/376, 019/435, 019/438:CRAG-CRAGVIEW = 5; CRAGVIEW-CRAG = 80: | 2024-03-21 14:12 | 142910 | 2024-03-21 14:15 | |
PPW 24-05076 | 16455 | PPW | Clearwater 2: GSU T-3026, 7, 8 | HYDROGEN-PACW(PPW) HYDROGEN-PACW(PPW) |
9999.0 9999.0 |
9999.0 9999.0 |
9999.0 9999.0 |
2024-04-15 08:00 2024-05-07 08:00 |
2024-04-19 15:30 2024-05-10 15:30 |
CANCELLED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Clearwater 2 GSU Transformer Maintenance:Clearwater Unit 2 unavailable.: | 2024-03-22 12:38 | 142901 | 2024-04-01 11:06 | |
PPW 24-03421 | 15894 | PPW | Path 25 Schedule Limitation (Cascade 115 kV Tie) | CRAG-CRAGVIEW(PPW) CRAGVIEW-CRAG(PPW) |
45.0 80.0 |
45.0 80.0 |
5.0 80.0 |
2024-04-15 08:00 2024-04-15 08:00 |
2024-04-19 15:00 2024-04-19 15:00 |
Completed | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:T-Line to replace poles 016/354, 016/355, 017/382, 018/393, 018/404, 018/409, 019/421, 019/429, 019/432, repair conductor 017/373, 017/383, 018/416, reframe poles 019/439, 019/440, replace insulators 017/376, 019/435, 019/438:CRAG-CRAGVIEW = 5; CRAGVIEW-CRAG = 80: | 2024-02-22 13:26 | 141243 | 2024-03-21 14:17 | |
PPW 24-02119 | 15494 | PPW | BPA Jones Canyon: Cap Group 1/Section 1 | WINDGEN-PACW(PPW) WINDGEN-PACW(PPW) WINDGEN-PACW(PPW) |
9999.0 9999.0 9999.0 |
9999.0 9999.0 9999.0 |
9999.0 0.0 0.0 |
2024-04-15 07:00 2024-04-15 08:07 2024-04-18 16:00 |
2024-04-15 08:07 2024-04-18 16:00 2024-04-25 16:00 |
ACTIVE | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Maintenance:Possible restriction to Leaning Juniper Wind.: | 2024-02-01 08:23 | 139938 | 2024-04-18 10:39 | |
PPW 24-05605 | 16626 | PPW | Casper-Riverton 230 kV line | TOT4B-WYONORTH(PPW) WAPAEAST-WAPANORTH(PPW) WYOEAST-AEOW(PPW) TOT4B-WYONORTH(PPW) WAPAEAST-WAPANORTH(PPW) WYOEAST-AEOW(PPW) |
631.0 249.0 1800.0 631.0 249.0 1800.0 |
631.0 249.0 1800.0 631.0 249.0 1800.0 |
540.0 198.0 1675.0 540.0 198.0 1675.0 |
2024-04-15 08:08 2024-04-15 08:08 2024-04-15 08:08 2024-04-15 08:31 2024-04-15 08:31 2024-04-15 08:31 |
2024-04-15 08:31 2024-04-15 08:31 2024-04-15 08:31 2024-04-26 12:31 2024-04-26 12:31 2024-04-26 12:31 |
ACTIVE | TRANSMISSION | URGENT | ONPATH | PPW | continuous:Replace 4 strs and 6 arms with other "A" conditions:AW/4B Curve 118. WAPAEAST-WAPANORTH = 198. WYOEAST-AEOW (Aeolus West) = 1675. TOT4B-WYONORTH = 540. TOT 4B = 738. Potential Real Time Impact to Wyoming Generation AW/4B Curve 118. WAPAEAST-WAPANORTH = 198. WYOEAST-AEOW (Aeolus West) = 1675. TOT4B-WYONORTH = 540. TOT 4B = 738. Potential Real Time Impact to Wyoming Generation: | 2024-04-01 11:39 | 143430 | 2024-04-15 08:11 | |
PPW 24-00416 | 15050 | PPW | Huntington-Pinto 345 kV line | PACE-PINTO(PPW) PINTO-PACE(PPW) PACE-PINTO(PPW) PINTO-PACE(PPW) PACE-PINTO(PPW) PINTO-PACE(PPW) PACE-PINTO(PPW) PINTO-PACE(PPW) PACE-PINTO(PPW) PINTO-PACE(PPW) PACE-PINTO(PPW) PINTO-PACE(PPW) PACE-PINTO(PPW) PINTO-PACE(PPW) PACE-PINTO(PPW) PINTO-PACE(PPW) PACE-PINTO(PPW) PINTO-PACE(PPW) FOURCORNE345-PINTO(PPW) PACE-PINTO(PPW) PINTO-PACE(PPW) |
740.0 700.0 740.0 700.0 740.0 700.0 740.0 700.0 740.0 700.0 740.0 700.0 740.0 700.0 740.0 700.0 740.0 700.0 660.0 740.0 700.0 |
740.0 700.0 740.0 700.0 740.0 700.0 740.0 700.0 740.0 700.0 740.0 700.0 740.0 700.0 740.0 700.0 740.0 700.0 660.0 740.0 700.0 |
740.0 700.0 740.0 700.0 740.0 700.0 740.0 700.0 740.0 700.0 740.0 700.0 740.0 700.0 740.0 700.0 740.0 700.0 660.0 0.0 0.0 |
2024-01-16 08:00 2024-01-16 08:00 2024-01-17 08:00 2024-01-17 08:00 2024-02-13 08:00 2024-02-13 08:00 2024-02-19 08:00 2024-02-19 08:00 2024-03-01 08:00 2024-03-01 08:00 2024-03-13 08:00 2024-03-13 08:00 2024-04-15 08:00 2024-04-15 08:00 2024-04-15 09:00 2024-04-15 09:00 2024-04-15 09:37 2024-04-15 09:37 2024-04-15 10:00 2024-04-15 10:00 2024-04-15 10:00 |
2024-01-17 08:00 2024-01-17 08:00 2024-01-20 15:00 2024-01-20 15:00 2024-02-15 15:00 2024-02-15 15:00 2024-02-21 15:00 2024-02-21 15:00 2024-03-03 15:00 2024-03-03 15:00 2024-03-15 15:00 2024-03-15 15:00 2024-04-15 09:00 2024-04-15 09:00 2024-04-15 09:37 2024-04-15 09:37 2024-04-15 10:00 2024-04-15 10:00 2024-04-29 15:00 2024-04-29 15:00 2024-04-29 15:00 |
ACTIVE | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:PINTO - Huntington 345KV LINE REPLACE "JUMPER" INSULATORS REPLACE "JUMPER" INSULATORS :PACE-PINTO & PINTO-PACE = 0. FOURCORNE345-PINTO (TOT 2B1 S>N) = Pinto load: | 2024-01-02 12:02 | 138234 | 2024-04-17 17:37 | |
PPW 24-06565 | 16785 | PPW | Emery: 345/6.9 kV Unit 2 Xfmrs 2-1 & 2-2 | THERMALGEN-PACE(PPW) THERMALGEN-PACE(PPW) THERMALGEN-PACE(PPW) |
9999.0 9999.0 9999.0 |
9999.0 9999.0 9999.0 |
9999.0 0.0 9999.0 |
2024-04-17 09:00 2024-04-17 09:23 2024-04-19 18:50 |
2024-04-17 09:23 2024-04-19 18:50 2024-04-20 09:00 |
COMPLETED | TRANSMISSION | URGENT | ONPATH | PPW | continuous:Tube leak repairs.:Hunter (Emery) Unit #2 unavailable.: | 2024-04-16 14:24 | 144394 | 2024-04-19 18:53 | |
PPW 24-05257 | 16513 | PPW | Huntington-Pinto 345 kV line | FOURCORNE345-PINTO(PPW) PACE-PINTO(PPW) PINTO-PACE(PPW) PACE-PINTO(PPW) PINTO-PACE(PPW) |
660.0 740.0 700.0 740.0 700.0 |
660.0 740.0 700.0 740.0 700.0 |
660.0 740.0 700.0 740.0 700.0 |
2024-04-17 15:00 2024-04-17 15:00 2024-04-17 15:00 2024-04-29 15:00 2024-04-29 15:00 |
2024-04-29 15:00 2024-04-29 15:00 2024-04-29 15:00 2024-05-02 15:00 2024-05-02 15:00 |
CANCELLED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Replace structures.:PACE-PINTO & PINTO-PACE = 0. FOURCORNE345-PINTO (TOT 2B1 S>N) = Pinto load: | 2024-03-25 14:23 | 143082 | 2024-04-15 12:40 | |
PPW 24-04942 | 16575 | PPW | Hale-Spanish Fork 138kV line | THERMALGEN-PACE(PPW) THERMALGEN-PACE(PPW) |
9999.0 9999.0 |
9999.0 9999.0 |
0.0 9999.0 |
2024-04-18 06:42 2024-04-19 13:22 |
2024-04-19 13:22 2024-04-19 14:00 |
COMPLETED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:FHCA a-condition x-arm replacement str 81 :Possible real-time restriction to Lakeside 1 (Dynamo) generation.: | 2024-03-28 12:49 | 142767 | 2024-04-19 13:23 | |
PPW 24-06464 | 16782 | PPW | Path 17 Schedule Limitation (IPCo Borah West) | BORA-M500(PPW) | 1090.0 | 1090.0 | 1029.0 | 2024-04-18 08:00 | 2024-04-19 14:30 | Completed | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Six-year circuit breaker maintenance.:BORA-M500 =1029: | 2024-04-16 09:42 | 144293 | 2024-04-16 09:46 | |
PPW 24-02596 | 15620 | PPW | Copco #2 115 kV Yard-Copco #2 Plant 115 kV line | HYDROGEN-PACW(PPW) HYDROGEN-PACW(PPW) |
9999.0 9999.0 |
9999.0 9999.0 |
9999.0 0.0 |
2024-03-18 10:00 2024-04-18 10:00 |
2024-03-20 15:41 2024-04-23 15:00 |
Active | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Relay work. Each circuit breaker to be isolated prior to cycling.:GEN: Copco 2 generation must be off and remain off line for the duration of this outage.: | 2024-02-09 09:01 | 140417 | 2024-03-12 10:03 | |
PPW 24-05468 | 16719 | PPW | Swift #1: Unit #12 Main Transformer - T2100 | HYDROGEN-PACW(PPW) | 9999.0 | 9999.0 | 9999.0 | 2024-04-18 10:39 | 2024-04-22 14:39 | CANCELLED | TRANSMISSION | URGENT | ONPATH | PPW | continuous:TBD:Swift Unit #12 offline.: | 2024-04-05 15:23 | 143293 | 2024-04-15 15:10 | |
PPW 24-06729 | 16792 | PPW | Columbia (UT): CB 132 | 0.0 | 0.0 | 0.0 | 2024-04-19 06:06 | 2024-04-19 09:51 | COMPLETED | TRANSMISSION | URGENT | ONPATH | PPW | continuous:Reframe Structure #6 Columbia-Sunnyside 138kV Line:SUNNYSIDE UNAVAILABLE: | 2024-04-18 13:15 | 144559 | 2024-04-19 09:52 | ||
PPW 24-04920 | 16374 | PPW | Big Muddy-Platte Line Jct section of Dave Johnston-Platte line Jct 69kV line | 0.0 | 0.0 | 0.0 | 2024-04-19 06:30 | 2024-04-19 16:00 | CANCELLED | TRANSMISSION | PLANNED | ONPATH | PPW | 1234567 Daily:retro fitting existing poles to meet avian specifications. : | 2024-03-19 12:59 | 142745 | 2024-04-19 07:14 | ||
PPW 24-06099 | 16763 | PPW | Nutglade: CB 8G95 | 0.0 | 0.0 | 0.0 | 2024-04-19 07:24 | 2024-04-19 16:47 | COMPLETED | DISTRIBUTION | PLANNED | ONPATH | PPW | 1234567 Daily:EDGAR RICO/ WILSON 630-688-5238 Hendricks Spacer Cable installation at various locations Austin Yanke Hendricks Spacer Cable installation at various locations : | 2024-04-09 13:06 | 143925 | 2024-04-19 16:47 | ||
PPW 24-06069 | 16755 | PPW | Umatilla: RC_5W682_171403_5W658 | 0.0 | 0.0 | 0.0 | 2024-04-19 07:40 | 2024-04-19 16:04 | COMPLETED | DISTRIBUTION | URGENT | ONPATH | PPW | 1234567 Daily:WIRE PULLING JOB. UEC TO MCNARY ROCKPILE JOB.: | 2024-04-09 09:54 | 143895 | 2024-04-19 16:07 | ||
PPW 24-06763 | 16793 | PPW | Jim Bridger: 345/20 kV Unit #4 Main Bank (T3654) | JBSN-JB345(PPW) JBSN-JB345(PPW) |
1600.0 1600.0 |
1600.0 1600.0 |
1600.0 1600.0 |
2024-04-19 09:00 2024-04-19 09:15 |
2024-04-19 09:15 2024-04-21 11:27 |
COMPLETED | TRANSMISSION | FORCED | ONPATH | PPW | continuous:.:JBSN-JB345 = 2400. PacifiCorp = 1600. IPCo = 800.: | 2024-04-19 08:19 | 144593 | 2024-04-21 11:29 | |
PPW 24-05614 | 16625 | PPW | Westvaco-Blacks Fork section of the Blacks Fork-Raven 230 kV line | TRONA-WYOCENTRAL(PPW) WYOCENTRAL-TRONA(PPW) TRONA-WYOCENTRAL(PPW) WYOCENTRAL-TRONA(PPW) |
640.0 640.0 640.0 640.0 |
640.0 640.0 640.0 640.0 |
404.0 404.0 404.0 404.0 |
2024-04-19 09:30 2024-04-19 09:30 2024-04-19 09:34 2024-04-19 09:34 |
2024-04-19 09:34 2024-04-19 09:34 2024-04-26 13:34 2024-04-26 13:34 |
ACTIVE | TRANSMISSION | URGENT | ONPATH | PPW | continuous:Replace arms and complete overdue "A" conditions on the Westvaco to Blacksfork 230 section.:TRONA-WYOCENTRAL & WYOCENTRAL-TRONA = 404 Summer/560 Winter. TRONA-WYOCENTRAL & WYOCENTRAL-TRONA = 404 Summer/560 Winter.: | 2024-04-01 11:34 | 143439 | 2024-04-19 09:32 | |
PPW 24-06727 | 16790 | PPW | Dave Johnston: #4 Main Bank 357302 | 0.0 | 0.0 | 0.0 | 2024-04-19 23:58 | 2024-04-30 00:00 | ACTIVE | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Annual Maintenance Outage: | 2024-04-18 12:43 | 144557 | 2024-04-19 23:59 | ||
PPW 24-04921 | 16375 | PPW | Big Muddy-Platte Line Jct section of Dave Johnston-Platte line Jct 69kV line | 0.0 | 0.0 | 0.0 | 2024-04-20 06:30 | 2024-04-20 16:00 | CANCELLED | TRANSMISSION | PLANNED | ONPATH | PPW | 1234567 Daily:retro fitting existing poles to meet avian specifications. : | 2024-03-19 12:59 | 142746 | 2024-04-20 15:33 | ||
PPW 24-06100 | 16764 | PPW | Nutglade: CB 8G95 | 0.0 | 0.0 | 0.0 | 2024-04-20 07:32 | 2024-04-20 16:15 | COMPLETED | DISTRIBUTION | PLANNED | ONPATH | PPW | 1234567 Daily:EDGAR RICO/ WILSON 630-688-5238 Hendricks Spacer Cable installation at various locations AUSTIN YANKE Hendricks Spacer Cable installation at various locations : | 2024-04-09 13:06 | 143926 | 2024-04-20 16:18 | ||
PPW 24-06849 | 16801 | PPW | Hemingway-Summer Lake 500 kV line | H500-SMLK(PPW) PACW-NTLOAD(PPW) SMLK-H500(PPW) H500-SMLK(PPW) PACW-NTLOAD(PPW) SMLK-H500(PPW) |
1500.0 9999.0 100.0 1500.0 9999.0 100.0 |
1500.0 9999.0 100.0 1500.0 9999.0 100.0 |
0.0 0.0 0.0 1500.0 9999.0 100.0 |
2024-04-20 20:55 2024-04-20 20:55 2024-04-20 20:55 2024-04-20 22:27 2024-04-20 22:27 2024-04-20 22:27 |
2024-04-20 22:27 2024-04-20 22:27 2024-04-20 22:27 2024-04-22 17:00 2024-04-22 17:00 2024-04-22 17:00 |
COMPLETED | TRANSMISSION | FORCED | ONPATH | PPW | continuous:Investigate tripping of Hemingway-Summer Lake 500kV:H500-SMLK & SMLK-H500 = 0; BORA-M500 = 959; Network Load Service Arrangements may be required for Southern Oregon Load.: | 2024-04-20 20:55 | 144681 | 2024-04-20 22:29 | |
PPW 24-05473 | 16574 | PPW | Swift #1: Unit #13 Main Transformer - T30 | HYDROGEN-PACW(PPW) HYDROGEN-PACW(PPW) |
9999.0 9999.0 |
9999.0 9999.0 |
9999.0 0.0 |
2024-04-21 07:00 2024-04-21 07:54 |
2024-04-21 07:54 2024-04-26 16:00 |
ACTIVE | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Swift 13 annual maintenance. TIV closed and scroll case dewatered.:Swift unit #13 offline.: | 2024-03-28 12:33 | 143298 | 2024-04-21 07:54 | |
PPW 24-06858 | 16802 | PPW | Crag View-PG&E Cascade section of the PG&E Cascade-Weed Junction 115 kV line | CRAG-CRAGVIEW(PPW) CRAGVIEW-CRAG(PPW) |
45.0 80.0 |
45.0 80.0 |
0.0 0.0 |
2024-04-21 22:40 2024-04-21 22:40 |
2024-04-30 15:00 2024-04-30 15:00 |
ACTIVE | TRANSMISSION | URGENT | ONPATH | PPW | continuous:PG&E Cascade-Cragview 115kV Line section OOS for voltage control at PG&E Cascade. :CRAG-CRAGVIEW & CRAGVIEW-CRAG = 0.: | 2024-04-21 22:44 | 144690 | 2024-04-21 22:44 | |
PPW 24-04922 | 16376 | PPW | Big Muddy-Platte Line Jct section of Dave Johnston-Platte line Jct 69kV line | 0.0 | 0.0 | 0.0 | 2024-04-22 06:30 | 2024-04-22 16:00 | CANCELLED | TRANSMISSION | PLANNED | ONPATH | PPW | 1234567 Daily:retro fitting existing poles to meet avian specifications. : | 2024-03-19 12:59 | 142747 | 2024-04-22 17:29 | ||
PPW 24-04934 | 16576 | PPW | Hale-Tanner 138 kV line | THERMALGEN-PACE(PPW) THERMALGEN-PACE(PPW) |
9999.0 9999.0 |
9999.0 9999.0 |
0.0 0.0 |
2024-04-22 06:52 2024-04-22 08:00 |
2024-04-22 08:00 2024-04-24 14:00 |
ACTIVE | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:FHCA a-condition str replacement str #4:Possible real-time restriction to Lakeside 1 (Dynamo) generation.: | 2024-03-28 13:21 | 142759 | 2024-04-22 06:55 | |
PPW 24-03787 | 16003 | PPW | Path 25 Schedule Limitation (Cascade 115 kV Tie) | CRAG-CRAGVIEW(PPW) CRAGVIEW-CRAG(PPW) |
45.0 80.0 |
45.0 80.0 |
5.0 80.0 |
2024-04-22 07:00 2024-04-22 07:00 |
2024-04-26 09:00 2024-04-26 09:00 |
Active | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Remove temp poles, install new jack bus and make main bus connections.:CRAG-CRAGVIEW = 5; CRAGVIEW-CRAG = 80: | 2024-02-28 12:15 | 141611 | 2024-03-21 14:21 | |
PPW 24-06240 | 16776 | PPW | IPCo Midpoint: 500 kV Series Cap C506 | BORA-M500(PPW) BORA-M500(PPW) |
1090.0 1090.0 |
1090.0 1090.0 |
1090.0 1090.0 |
2024-04-22 06:30 2024-04-22 07:25 |
2024-04-22 07:25 2024-04-26 16:00 |
ACTIVE | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Place gravel in capacitor bank yard.:BORA-M500 = 1090;: | 2024-04-12 10:23 | 144069 | 2024-04-22 07:25 | |
PPW 24-06562 | 16786 | PPW | Parowan-Sigurd-West Cedar 230 kV line | OTHERGEN-PACE(PPW) OTHERGEN-PACE(PPW) OTHERGEN-PACE(PPW) |
9999.0 9999.0 9999.0 |
9999.0 9999.0 9999.0 |
9999.0 0.0 9999.0 |
2024-04-22 07:30 2024-04-22 07:31 2024-04-22 13:37 |
2024-04-22 07:31 2024-04-22 13:37 2024-04-22 16:00 |
COMPLETED | TRANSMISSION | URGENT | ONPATH | PPW | continuous:Remove Debris over center phase Insulators/ Parowan Valley:Granite Mountain Solar West (50MW) restricted to 0 MW.: | 2024-04-16 15:11 | 144391 | 2024-04-22 13:39 | |
PPW 24-06462 | 16803 | PPW | BPA Canby: CANBYZ CB L1662 | PACW-NTLOAD(PPW) PACW-NTLOAD(PPW) |
9999.0 9999.0 |
9999.0 9999.0 |
9999.0 0.0 |
2019-04-22 08:30 2024-04-22 08:28 |
2019-04-24 15:00 2024-04-24 15:00 |
ACTIVE | TRANSMISSION | URGENT | ONPATH | PPW | continuous:Diagnostic service.: | 2024-04-22 08:31 | 144291 | 2024-04-22 08:31 | |
PPW 24-06522 | 16783 | PPW | Naughton: Unit #1 Main Bank | THERMALGEN-PACE(PPW) THERMALGEN-PACE(PPW) |
9999.0 9999.0 |
9999.0 9999.0 |
0.0 0.0 |
2024-04-22 21:00 2024-04-23 12:00 |
2024-04-23 12:00 2024-04-27 12:00 |
Active | TRANSMISSION | URGENT | ONPATH | PPW | continuous:Circulation water line repair.:Naughton Unit #1 unavailable.: | 2024-04-16 09:54 | 144351 | 2024-04-22 21:59 | |
PPW 24-05263 | 16505 | PPW | Path 17 Schedule Limitation (IPCo Borah West) | BORA-M500(PPW) EIMPACE-EIMIPCO(PPW) BORA-M500(PPW) EIMPACE-EIMIPCO(PPW) BORA-M500(PPW) EIMPACE-EIMIPCO(PPW) |
1090.0 2350.0 1090.0 2350.0 1090.0 2350.0 |
1090.0 2350.0 1090.0 2350.0 1090.0 2350.0 |
1090.0 2350.0 797.0 2125.0 1090.0 2350.0 |
2024-04-23 06:00 2024-04-23 06:00 2024-04-23 06:08 2024-04-23 06:08 2024-05-31 16:00 2024-05-31 16:00 |
2024-04-23 06:08 2024-04-23 06:08 2024-05-31 16:00 2024-05-31 16:00 2024-07-26 16:00 2024-07-26 16:00 |
ACTIVE | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Build out 345kV bay:BORA-M500 = No Bridger West Impact. EIMPACE-EIMIPCO (ETSR Transfers) = 2125: | 2024-03-25 10:35 | 143088 | 2024-04-23 06:09 | |
PPW 24-04923 | 16377 | PPW | Big Muddy-Platte Line Jct section of Dave Johnston-Platte line Jct 69kV line | 0.0 | 0.0 | 0.0 | 2024-04-23 06:30 | 2024-04-23 16:00 | Active | TRANSMISSION | PLANNED | ONPATH | PPW | 1234567 Daily:retro fitting existing poles to meet avian specifications. : | 2024-03-19 12:59 | 142748 | 2024-03-19 12:59 | ||
PPW 24-02031 | 15479 | PPW | BPA McNary: 230 kV Main Bus Section #3,BPA McNary: 230/115 kV Bank #9 | MCNARY-WALLULA(PPW) WALLULA-MCNARY(PPW) MCNARY-WALLULA(PPW) WALLULA-MCNARY(PPW) |
480.0 480.0 480.0 480.0 |
480.0 480.0 480.0 480.0 |
480.0 480.0 402.0 402.0 |
2024-04-23 08:00 2024-04-23 08:00 2024-04-23 08:28 2024-04-23 08:28 |
2024-04-23 08:28 2024-04-23 08:28 2024-04-24 17:00 2024-04-24 17:00 |
ACTIVE | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Attach the main bus to the A-437 disconnect.: | 2024-01-31 10:56 | 139850 | 2024-04-23 08:29 | |
PPW 24-04924 | 16378 | PPW | Big Muddy-Platte Line Jct section of Dave Johnston-Platte line Jct 69kV line | 0.0 | 0.0 | 0.0 | 2024-04-24 06:30 | 2024-04-24 16:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | 1234567 Daily:retro fitting existing poles to meet avian specifications. : | 2024-03-19 12:59 | 142749 | 2024-03-19 12:59 | ||
PPW 24-05736 | 16675 | PPW | Crowfoot-Weirich section of the Fry-Weirich 115 kV line | PACW-NTLOAD(PPW) | 9999.0 | 9999.0 | 0.0 | 2024-04-24 07:00 | 2024-04-24 15:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Inter set distribution pole. 38089 Weirich Dr., Lebanon:Sweet Home & Weirich will be radial from BPA Albany. Network Load Service Arrangements may be required.: | 2024-04-04 14:23 | 143561 | 2024-04-04 14:25 | |
PPW 24-05733 | 16784 | PPW | Communications Sites: Scipio Pass (UT) Communications Site | OTHERGEN-PACE(PPW) | 9999.0 | 9999.0 | 0.0 | 2024-04-24 09:30 | 2024-04-24 16:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Replace microwave communications equipment.:BLUNDELL AND SULPURDALE GEOTHERMAL REQUIRED OFFLINE.: | 2024-04-16 13:47 | 143558 | 2024-04-16 14:02 | |
PPW 24-04925 | 16379 | PPW | Big Muddy-Platte Line Jct section of Dave Johnston-Platte line Jct 69kV line | 0.0 | 0.0 | 0.0 | 2024-04-25 06:30 | 2024-04-25 16:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | 1234567 Daily:retro fitting existing poles to meet avian specifications. : | 2024-03-19 12:59 | 142750 | 2024-03-19 12:59 | ||
PPW 24-06318 | 16775 | PPW | Mile Hi: CB 5L104,Mile Hi: CB 5L105 | OTHERGEN-PACW(PPW) | 9999.0 | 9999.0 | 0.0 | 2024-04-25 10:00 | 2024-04-25 17:30 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | 1234567 Daily:Feeder Tie with 5L104 and 5L105 to energize new 1000mcm copper Get-A-Way on 5L104. move load from 5L104 to 5L105 . :Metzker (Lakeview) Solar unavailable.: | 2024-04-12 09:16 | 144147 | 2024-04-15 10:46 | |
PPW 24-04926 | 16380 | PPW | Big Muddy-Platte Line Jct section of Dave Johnston-Platte line Jct 69kV line | 0.0 | 0.0 | 0.0 | 2024-04-26 06:30 | 2024-04-26 16:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | 1234567 Daily:retro fitting existing poles to meet avian specifications. : | 2024-03-19 12:59 | 142751 | 2024-03-19 12:59 | ||
PPW 24-06776 | 16796 | PPW | Jim Bridger: 345/20 kV Unit #1 Main Bank (T3485) | JBSN-JB345(PPW) | 1600.0 | 1600.0 | 1600.0 | 2024-04-27 00:00 | 2024-04-28 00:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:feed pump leak repair:JBSN-JB345 = 2400. PacifiCorp = 1600. IPCo = 800.: | 2024-04-19 10:36 | 144606 | 2024-04-20 10:28 | |
PPW 24-06834 | 16800 | PPW | Swift #2: Unit #21 Main Transformer - T2102 | 0.0 | 0.0 | 0.0 | 2024-04-28 07:00 | 2024-05-10 16:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:EXCITER CHANGE OUT: | 2024-04-19 15:29 | 144666 | 2024-04-22 10:11 | ||
PPW 24-04565 | 16281 | PPW | Populus-Terminal 345 kV line | NUT-PACE(PPW) NUT-PATHC(PPW) PACE-NUT(PPW) PATHC-NUT(PPW) |
2563.0 1060.0 2563.0 1600.0 |
2563.0 1060.0 2563.0 1600.0 |
1398.0 788.0 1398.0 1600.0 |
2024-04-29 07:00 2024-04-29 07:00 2024-04-29 07:00 2024-04-29 07:00 |
2024-05-09 14:00 2024-05-09 14:00 2024-05-09 14:00 2024-05-09 14:00 |
SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Bridgerland: Commission CBs 10C4, 10C7, 10D20, SWs 10C1, 10C2(GRD), 10C3, 10C5, 10C6, 10C11, 10D18, 10D19, 10D21, 10D22, 10C23 (GRD), 10F25, PTs 6, 7,8. Leave SW 10F25 open and tagged.:NUT-PACE & PACE-NUT = 1398. NUT-PATHC = 800 Summer/900 Winter. PATHC-NUT = 1410 Summer/No restriction Winter: | 2024-03-13 15:08 | 142390 | 2024-03-15 10:22 | |
PPW 24-05414 | 16798 | PPW | Railroad: 230/138 kV Bank #1 | WINDGEN-PACE(PPW) | 9999.0 | 9999.0 | 0.0 | 2024-04-29 07:30 | 2024-05-01 15:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:We are going to be performing relay maint on XFMR#1. We need to be able to test all the associated equipment for the XFMR:Real-time wind restrictions at Hinshaw/Longhollow and Mountain Wind may be required. (May impact PACE-UINTA).: | 2024-04-19 13:08 | 143239 | 2024-04-19 13:08 | |
PPW 24-05093 | 16794 | PPW | NWE Peterson: CB 230-133 | ANTE-MLCK(PPW) MLCK-ANTE(PPW) |
66.0 90.0 |
66.0 90.0 |
57.0 82.0 |
2024-04-29 08:00 2024-04-29 08:00 |
2024-04-30 14:30 2024-04-30 14:30 |
SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Breaker Maintenance: | 2024-04-19 10:27 | 142918 | 2024-04-19 10:27 | |
PPW 24-05026 | 16427 | PPW | Dixonville: 115 kV Main Bus,Dixonville-Glide Tap section of the Dixonville-Toketee Switch Station 11 | HYDROGEN-PACW(PPW) HYDROGEN-PACW(PPW) |
9999.0 9999.0 |
9999.0 9999.0 |
9999.0 0.0 |
2024-04-15 08:00 2024-04-29 08:00 |
2024-04-29 08:00 2024-05-16 17:00 |
SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:This work will replace SW 2U2A, SW 2U23 and 2U21. Reconductor from SW 2U2A to SW 2U23 and 2U22 to SW 2U21.:Umpqua River Hydro Project Restriction = 174 Summer/199 Winter.: | 2024-03-21 10:37 | 142851 | 2024-04-09 08:22 | |
PPW 24-04119 | 16149 | PPW | Diamond Hill-EWEB McKenzie section of the BPA Alvey-Diamond Hill 230 kV line | PACW-NTLOAD(PPW) PACW-NTLOAD(PPW) PACW-NTLOAD(PPW) |
9999.0 9999.0 9999.0 |
9999.0 9999.0 9999.0 |
9999.0 9999.0 0.0 |
2024-03-26 08:00 2024-04-03 08:00 2024-04-29 08:00 |
2024-04-03 08:00 2024-04-10 13:00 2024-05-08 13:00 |
SCHEDULED | TRANSMISSION | URGENT | ONPATH | PPW | continuous:Install Coyote Splice Box on pole 5/35 pulling fiber to 2/36.:Network Load Service must be arranged for EWEB McKenzie. Eliminates ability to move Network Load Service from Alvey to Gresham. Eliminates C&T Point to Point Service from Troutdale to Summer Lake.: | 2024-03-07 08:40 | 141943 | 2024-03-13 14:31 | |
PPW 24-02594 | 15629 | PPW | BPA Malin-Summer Lake 500 kV line | PACW-SMLK(PPW) SMLK-PACW(PPW) |
550.0 1187.0 |
550.0 1187.0 |
0.0 0.0 |
2024-04-29 08:00 2024-04-29 08:00 |
2024-05-24 15:00 2024-05-24 15:00 |
SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Major/Control Relay Maintenance on the BPA Summer Lake - Malin Line Relays at BPA Summer Lake. Line can remain in-service. Relays will be removed one-at-a-time with redundant relaying.:PACW-SMLK & SMLK-PACW = 0. Eliminates ESM Point to Point Service from Troutdale to Summer Lake. Eliminates Ability to Transfer Bridger Generation for Network Load Service to Southern Oregon.: | 2024-02-09 11:53 | 140415 | 2024-02-09 11:53 | |
PPW 24-06736 | 16804 | PPW | Dalton: CB 55 | 0.0 | 0.0 | 0.0 | 2024-04-29 08:30 | 2024-04-29 16:00 | SCHEDULED | DISTRIBUTION | URGENT | ONPATH | PPW | continuous:Open CB 55 and transformer side disconnect to CB 55 lock and tag the switch for customer maintenance. : | 2024-04-22 10:41 | 144566 | 2024-04-22 10:41 | ||
PPW 24-02145 | 15520 | PPW | Clearwater Switching Station: CB 2U155 | HYDROGEN-PACW(PPW) | 9999.0 | 9999.0 | 0.0 | 2024-04-29 10:00 | 2024-05-03 16:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Breaker minor maint.:Lemolo 2 and Clearwater 2 Hydro unavailable.: | 2024-02-02 13:00 | 139964 | 2024-02-02 13:00 | |
PPW 24-01180 | 15261 | PPW | COPCO No. 2-Ager section of COPCO No. 2-Yreka 115 kV line | CRAGVIEW-CRAG(PPW) CRAGVIEW-CRAG(PPW) CRAGVIEW-CRAG(PPW) CRAGVIEW-CRAG(PPW) |
80.0 80.0 80.0 80.0 |
80.0 80.0 80.0 80.0 |
80.0 80.0 80.0 60.0 |
2024-01-31 15:00 2024-03-20 15:00 2024-04-08 15:00 2024-04-29 15:00 |
2024-01-31 18:00 2024-03-20 18:00 2024-04-08 18:00 2024-04-29 18:00 |
SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | 1234567 Daily:REPLACE JUMPER CONNECTOR ON SWITCH 2G75:CRAGVIEW-CRAG = 60 summer/ 80 winter.: | 2024-01-16 09:49 | 138999 | 2024-04-05 11:00 | |
PPW 24-06189 | 16770 | PPW | Sigurd-Sigurd Solar 230 kV,Sigurd Solar: SW 89-H | OTHERGEN-PACE(PPW) | 9999.0 | 9999.0 | 0.0 | 2024-04-29 19:00 | 2024-04-30 04:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Annual maintenance on Sigurd Solar switch 89-H1.:Sigurd Solar generation unavailable.: | 2024-04-10 15:05 | 144018 | 2024-04-10 15:13 | |
PPW 24-06728 | 16791 | PPW | Yellowtail-NWE Rimrock 161 kV line | 0.0 | 0.0 | 0.0 | 2024-04-30 07:30 | 2024-04-30 15:30 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:HOLD YELLOWTAIL - RIMROCK OPEN FOR NWE WORK. NO CLEARANCE.:No Impact to WYON-YTP or YTP-WYON. The Yellowtail-Rimrock 161 kV line is not a component of the Yellowtail-South Path.: | 2024-04-18 12:54 | 144558 | 2024-04-18 12:54 | ||
PPW 24-04376 | 16194 | PPW | Red Butte-Harry Allen 345 kV line | REDB-REDBL(PPW) REDBL-REDB(PPW) REDB-REDBL(PPW) REDBL-REDB(PPW) |
515.0 515.0 515.0 515.0 |
515.0 515.0 515.0 515.0 |
515.0 515.0 0.0 0.0 |
2024-04-16 08:00 2024-04-16 08:00 2024-04-30 08:00 2024-04-30 08:00 |
2024-04-16 13:00 2024-04-16 13:00 2024-04-30 13:00 2024-04-30 13:00 |
SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Clear Bird nest at STR 1:REDBL-REDB & REDB-REDBL (TOT 2C) = 0.: | 2024-03-08 12:33 | 142200 | 2024-04-16 14:47 | |
PPW 24-06131 | 16766 | PPW | Blacks Fork-Monument 230 kV line | TRONA-WYOCENTRAL(PPW) WYOCENTRAL-TRONA(PPW) |
640.0 640.0 |
640.0 640.0 |
404.0 404.0 |
2024-04-30 08:18 2024-04-30 08:18 |
2024-05-04 12:18 2024-05-04 12:18 |
SCHEDULED | TRANSMISSION | URGENT | ONPATH | PPW | continuous:Change out rotten arms on Blacks fork to Monument 230 line.:TRONA-WYOCENTRAL & WYOCENTRAL-TRONA = 404 Summer/560 Winter.: | 2024-04-10 10:06 | 143957 | 2024-04-11 10:11 | |
PPW 24-01895 | 15984 | PPW | Roberts Creek: CB 3U66 | THERMALGEN-PACW(PPW) THERMALGEN-PACW(PPW) |
9999.0 9999.0 |
9999.0 9999.0 |
9999.0 0.0 |
2024-04-10 10:00 2024-04-30 10:00 |
2024-04-12 16:30 2024-05-03 16:30 |
SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:BMMO, Breaker minor maint.:Roseburg Forest Products Plant Net generation or load curtailed to 20 MW or less: | 2024-02-26 13:44 | 139714 | 2024-03-22 12:15 | |
PPW 24-02363 | 15563 | PPW | Path 25 Schedule Limitation (Cascade 115 kV Tie) | CRAG-CRAGVIEW(PPW) CRAG-CRAGVIEW(PPW) CRAGVIEW-CRAG(PPW) |
45.0 45.0 80.0 |
45.0 45.0 80.0 |
45.0 0.0 80.0 |
2024-04-01 05:00 2024-05-01 05:00 2024-05-01 05:00 |
2024-04-01 05:05 2024-05-01 05:05 2024-05-01 05:05 |
SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Benton 60kV CB 42 Breaker Maintenance:CRAG-CRAGVIEW = 0; CRAGVIEW-CRAG = 80: | 2024-02-05 10:46 | 140182 | 2024-03-28 13:05 | |
PPW 24-04647 | 16282 | PPW | Path 25 Schedule Limitation (Cascade 115 kV Tie) | CRAG-CRAGVIEW(PPW) CRAGVIEW-CRAG(PPW) |
45.0 80.0 |
45.0 80.0 |
5.0 80.0 |
2024-05-01 06:00 2024-05-01 06:00 |
2024-05-01 18:00 2024-05-01 18:00 |
SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:PAINT STRUCTURE 016/353 DESCHUTES SW 59 (HWY 44).:CRAG-CRAGVIEW = 5; CRAGVIEW-CRAG = 80: | 2024-03-14 09:28 | 142472 | 2024-03-21 14:29 | |
PPW 24-06695 | 16797 | PPW | Thermopolis-Grass Creek section of the Thermopolis-Oregon Basin 230 kV Line | TOT4B-WYONORTH(PPW) WAPAEAST-WAPANORTH(PPW) WYOEAST-AEOW(PPW) WYONORTH-YTP(PPW) YTP-WYONORTH(PPW) |
631.0 249.0 1800.0 400.0 400.0 |
631.0 249.0 1800.0 400.0 400.0 |
565.0 228.0 1746.0 337.0 337.0 |
2024-05-01 06:30 2024-05-01 06:30 2024-05-01 06:30 2024-05-01 06:30 2024-05-01 06:30 |
2024-05-02 18:00 2024-05-02 18:00 2024-05-02 18:00 2024-05-02 18:00 2024-05-02 18:00 |
SCHEDULED | TRANSMISSION | URGENT | ONPATH | PPW | continuous:Arm change outs on multiple strs on Overdue "A" conditions:AW/4B Curve 112. WAPAEAST-WAPANORTH = 228. WYOEAST-AEOW (Aeolus West) = 1746. TOT4B-WYONORTH = 565. TOT 4B = 793. Potential Wyoming generation restriction. YTP-WYONORTH & WYONORTH-YTP = 337. Yellowtail South = 526 total (Series 6).: | 2024-04-19 10:52 | 144525 | 2024-04-19 10:56 | |
PPW 24-02138 | 15495 | PPW | BPA McNary: CB B997 | WINDGEN-PACW(PPW) | 9999.0 | 9999.0 | 9999.0 | 2024-02-05 07:00 | 2024-02-06 16:00 | CANCELLED | TRANSMISSION | URGENT | ONPATH | PPW | continuous:Diagnostic Service.: | 2024-02-01 10:13 | 139957 | 2024-02-02 10:47 | |
PPW 24-02188 | 15519 | PPW | Upalco-Emma Park 138 kV line | PACE-NTLOAD(PPW) PACE-VNL(PPW) VNL-PACE(PPW) PACE-NTLOAD(PPW) PACE-VNL(PPW) VNL-PACE(PPW) |
9999.0 140.0 138.0 9999.0 140.0 138.0 |
9999.0 140.0 138.0 9999.0 140.0 138.0 |
9999.0 140.0 138.0 0.0 0.0 0.0 |
2024-02-26 08:00 2024-02-26 08:00 2024-02-26 08:00 2024-05-01 08:00 2024-05-01 08:00 2024-05-01 08:00 |
2024-02-28 17:00 2024-02-28 17:00 2024-02-28 17:00 2024-05-03 17:00 2024-05-03 17:00 2024-05-03 17:00 |
SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Replace structures 349, 375:PACE-VNL = 0. VNL-PACE = Ashley load. Network Load Service Arrangements may be required for Ashley. Impact to TOT-1A & CRSP Schedules. Bonanza West (Path 33) = 645.: | 2024-02-02 12:40 | 140007 | 2024-02-21 09:28 | |
PPW 24-03806 | 16012 | PPW | BPA McNary: CB A400 | WINDGEN-PACW(PPW) | 9999.0 | 9999.0 | 0.0 | 2024-05-02 06:30 | 2024-05-02 11:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:BPA CB maintenance. CB bypassed.:Orchard Wind Farm restricted to 0 MW. Limit Orchard Wind Farm to 0 MW.: | 2024-02-28 14:49 | 141630 | 2024-02-28 14:49 | |
PPW 24-06018 | 16769 | PPW | BPA Salem-Dallas section of the BPA Salem-Monpac 115 kV line | PACW-NTLOAD(PPW) | 9999.0 | 9999.0 | 0.0 | 2024-05-02 10:10 | 2024-07-03 14:10 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Road widening for round about Hwy 99 and Clow Corner. :Network Load Service may need to arranged for Dallas & Independence via Monpac. (Monpac Sw 2M88 will be closed & Dallas Sw 2M150 will be open) BPA to Stay Normal at Salem on CB B52 & Albany CB B518.: | 2024-04-10 14:40 | 143844 | 2024-04-10 14:48 | |
PPW 24-05086 | 16429 | PPW | Path 25 Schedule Limitation (Cascade 115 kV Tie) | CRAG-CRAGVIEW(PPW) CRAGVIEW-CRAG(PPW) |
45.0 80.0 |
45.0 80.0 |
5.0 80.0 |
2024-05-03 06:00 2024-05-03 06:00 |
2024-05-03 18:00 2024-05-03 18:00 |
SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:T-Line to replace poles 000/004, 006/129 & replace/repair hardware 005/104:CRAG-CRAGVIEW = 5; CRAGVIEW-CRAG = 80: | 2024-03-21 14:47 | 142911 | 2024-03-21 14:47 | |
PPW 24-06132 | 16767 | PPW | Firehole-Little Mtn section of the Firehole-WAPA Flaming Gorge 230 kV line | FGE-WYOCENTRAL(PPW) PACW-NTLOAD(PPW) WYOCENTRAL-FGE(PPW) FGE-WYOCENTRAL(PPW) PACW-NTLOAD(PPW) WYOCENTRAL-FGE(PPW) |
200.0 9999.0 200.0 200.0 9999.0 200.0 |
200.0 9999.0 200.0 200.0 9999.0 200.0 |
20.0 0.0 0.0 200.0 9999.0 200.0 |
2024-05-03 08:40 2024-05-03 08:40 2024-05-03 08:40 2024-05-07 12:40 2024-05-07 12:40 2024-05-07 12:40 |
2024-05-07 12:40 2024-05-07 12:40 2024-05-07 12:40 2024-06-07 12:40 2024-06-07 12:40 2024-06-07 12:40 |
SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Change out rotten arms on multiple strs on the Firehole to Little mtn section 230kv line.:WYOCENTRAL-FGE = 0. FGE-WYOCENTRAL = Little Mtn Load. Network Load Service Arrangements may be required. WYOCENTRAL-FGE = 0. FGE-WYOCENTRAL = Little Mtn Load. Network Load Service Arrangements may be required.: | 2024-04-10 10:27 | 143958 | 2024-04-17 10:24 | |
PPW 24-03530 | 15944 | PPW | Klamath Co-Gen: GSU 301 | THERMALGEN-PACW(PPW) | 9999.0 | 9999.0 | 0.0 | 2024-05-03 10:00 | 2024-05-24 14:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:High Side grounding on GSU 301:Klamath Co-Gen GSU301 unavailable.: | 2024-02-23 16:17 | 141352 | 2024-02-23 16:17 | |
PPW 24-03528 | 15942 | PPW | Klamath Co-Gen: GSU 101 | THERMALGEN-PACW(PPW) | 9999.0 | 9999.0 | 0.0 | 2024-05-03 15:56 | 2024-05-10 19:56 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:GSU101 Testing:Klamath Co-Gen GSU101 unavailable.: | 2024-02-23 15:59 | 141350 | 2024-02-23 15:59 | |
PPW 24-06706 | 16799 | PPW | Oregon Basin-Garland section of the Bowler-Oregon Basin 230 kV line | TOT4B-WYONORTH(PPW) WAPAEAST-WAPANORTH(PPW) WYOEAST-AEOW(PPW) WYONORTH-YTP(PPW) YTP-WYONORTH(PPW) |
631.0 249.0 1800.0 400.0 400.0 |
631.0 249.0 1800.0 400.0 400.0 |
574.0 227.0 1800.0 400.0 400.0 |
2024-05-04 06:30 2024-05-04 06:30 2024-05-04 06:30 2024-05-04 06:30 2024-05-04 06:30 |
2024-05-07 18:00 2024-05-07 18:00 2024-05-07 18:00 2024-05-07 18:00 2024-05-07 18:00 |
SCHEDULED | TRANSMISSION | URGENT | ONPATH | PPW | continuous:Change out strs on 1/87 and 3/88. Overdue "A" conditions on Oregon Basin to Garland 230kv line:AW/4B Curve 108. WAPAEAST-WAPANORTH = 227. WYOEAST-AEOW (Aeolus West) = 1800. TOT4B-WYONORTH = 574. TOT 4B = 801 Potential Real Time Impact to Wyoming Generation. Yellowtail South limit to be determined by WAPA. YTP-WYONORTH & WYONORTH-YTP = 242. Yellowtail South = 378 total (Series 5). Limit Pryor Mountain Wind to 40 MW during switching. AW/4B Curve 108. WAPAEAST-WAPANORTH = 227. WYOEAST-AEOW (Aeolus West) = 1800. TOT4B-WYONORTH = 574. TOT 4B = 801. Possible real time restriction to Wyoming Generation. Yellowtail South limit to be determined by WAPA. YTP-WYONORTH & WYONORTH-YTP = 242. Yellowtail South = 378 total (Series 5).: | 2024-04-19 13:21 | 144536 | 2024-04-19 13:23 | |
PPW 24-06324 | 16779 | PPW | Emery-Spanish Fork 345 kV line | THERMALGEN-PACE(PPW) | 9999.0 | 9999.0 | 9999.0 | 2024-05-06 07:00 | 2024-05-12 14:00 | CANCELLED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Gateway South OL360A, 360b line crossing -Emery - Spanish Fork and Huntington to Spanish Fork 345kV: | 2024-04-15 10:06 | 144153 | 2024-04-19 09:47 | |
PPW 24-01664 | 15352 | PPW | Captain Jack-Olinda 500 kV line | MALIN500-RDM500(PPW) RDM500-MALIN500(PPW) |
800.0 612.0 |
800.0 612.0 |
475.0 416.0 |
2024-05-06 08:00 2024-05-06 08:00 |
2024-05-10 15:00 2024-05-10 15:00 |
SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:WAPA to replace river crossing spacers:MALIN500-RDM500 = 475. RDM500-MALIN500 = 416.: | 2024-01-24 09:56 | 139483 | 2024-01-24 09:56 | |
PPW 24-00664 | 15092 | PPW | Fry: 230/115 kV Bank #1 T2254 | PACW-NTLOAD(PPW) | 9999.0 | 9999.0 | 0.0 | 2024-05-06 08:01 | 2024-05-17 14:01 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:LTC Maint.:Murder Creek and Oremet substations fed from BPA Albany-BPA Salem 115 kV line. Network load service may be needed.: | 2024-01-05 12:52 | 138482 | 2024-01-05 12:52 | |
PPW 24-05827 | 16671 | PPW | IPCO Borah: C341 Series Cap (Populus #1) | JBSN-JB345(PPW) NUT-PATHC(PPW) |
1600.0 1060.0 |
1600.0 1060.0 |
1600.0 800.0 |
2024-05-06 09:00 2024-05-06 09:00 |
2024-05-10 15:00 2024-05-10 15:00 |
SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Yearly inspection:NUT-PATHC = 800 Summer/900 Winter.: | 2024-04-04 12:05 | 143653 | 2024-04-04 12:05 | |
PPW 24-06198 | 16773 | PPW | Hale-Midway 138 kV line | DEER_CREEK-PACE(PPW) HYDROGEN-PACE(PPW) |
5.0 9999.0 |
5.0 9999.0 |
0.0 0.0 |
2024-05-07 07:00 2024-05-07 07:00 |
2024-05-16 16:00 2024-05-16 16:00 |
SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Install new relaying :DRCRK-PACE = 0. Deer Creek Hydro unavailable.: | 2024-04-11 10:32 | 144027 | 2024-04-11 10:32 | |
PPW 24-06070 | 16756 | PPW | BPA Foster Tap-BPA Lebanon Section of the Foster-BPA Lebanon 115 kV Line | HYDROGEN-PACW(PPW) | 9999.0 | 9999.0 | 0.0 | 2024-05-08 08:00 | 2024-05-08 15:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Trip checks to Foster CB 2M38 and USACOE CBs XP1, XP2, and XP02.:Foster Hydro USCE Unit #1 and #2 unavailable.: | 2024-04-09 10:02 | 143896 | 2024-04-09 10:02 | |
PPW 24-02531 | 15595 | PPW | BPA McNary: 115/69 kV Bank #10 | WINDGEN-PACW(PPW) | 9999.0 | 9999.0 | 0.0 | 2024-05-09 07:00 | 2024-05-09 16:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Differential relay test trip checks.:Orchard Wind required offline.: | 2024-02-07 14:32 | 140352 | 2024-02-07 14:32 | |
PPW 24-05527 | 16631 | PPW | Bridgerland: 345/138 kV XFMR | NUT-PACE(PPW) NUT-PATHC(PPW) PACE-NUT(PPW) PATHC-NUT(PPW) |
2563.0 1060.0 2563.0 1600.0 |
2563.0 1060.0 2563.0 1600.0 |
1398.0 688.0 1398.0 1410.0 |
2024-05-10 07:00 2024-05-10 07:00 2024-05-10 07:00 2024-05-10 07:00 |
2024-05-10 14:00 2024-05-10 14:00 2024-05-10 14:00 2024-05-10 14:00 |
SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:**Commissioning REQ** Bridgerland Commission CBs 7H43, 7H46 SWs 7H44, 7H45, 7F26, 3P27 Station Service PTs 9, 10 XFMR 1:NUT-PACE & PACE-NUT = 1398. NUT-PATHC = 800 Summer/900 Winter. PATHC-NUT = 1410 Summer/No restriction Winter: | 2024-04-02 14:54 | 143352 | 2024-04-02 14:54 | |
PPW 24-03529 | 15943 | PPW | Klamath Co-Gen: GSU 201 | THERMALGEN-PACW(PPW) | 9999.0 | 9999.0 | 0.0 | 2024-05-10 14:00 | 2024-05-24 14:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:GSU 201 Testing:Klamath Co-Gen GSU201 unavailable.: | 2024-02-23 16:11 | 141351 | 2024-02-23 16:11 | |
PPW 24-03753 | 16001 | PPW | Klamath Co-Gen: 11L20 ABC SW | THERMALGEN-PACW(PPW) THERMALGEN-PACW(PPW) THERMALGEN-PACW(PPW) |
9999.0 9999.0 9999.0 |
9999.0 9999.0 9999.0 |
9999.0 0.0 9999.0 |
2024-05-10 14:00 2024-05-10 14:30 2024-05-24 13:30 |
2024-05-10 14:30 2024-05-24 13:30 2024-05-24 14:00 |
SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Replace SW blades and operators on 11L20:Klamath Co-Generation #201 unavailable.: | 2024-02-28 10:10 | 141577 | 2024-02-29 13:40 | |
PPW 24-03435 | 15930 | PPW | BPA Summer Lake: CB 4957,BPA Summer Lake: CB 4958,Hemingway-Summer Lake 500 kV line | BORA-M500(PPW) H500-SMLK(PPW) PACW-NTLOAD(PPW) SMLK-H500(PPW) |
1090.0 1500.0 9999.0 100.0 |
1090.0 1500.0 9999.0 100.0 |
1090.0 1500.0 9999.0 100.0 |
2024-05-11 08:00 2024-05-11 08:00 2024-05-11 08:00 2024-05-11 08:00 |
2024-05-24 17:00 2024-05-24 17:00 2024-05-24 17:00 2024-05-24 17:00 |
CANCELLED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:BPA Summer Lake CB 4957 Maintenance, CB 4958 Repairs:H500-SMLK & SMLK-H500 = 0; BORA-M500 = 959; Network Load Service Arrangements may be required for Southern Oregon Load.: | 2024-02-23 14:40 | 141257 | 2024-04-08 10:38 | |
PPW 24-00011 | 10513 | PPW | Hemingway-Summer Lake 500 kV line | H500-SMLK(PPW) JBSN-JB345(PPW) PACW-NTLOAD(PPW) SMLK-H500(PPW) |
1500.0 1600.0 9999.0 100.0 |
1500.0 1600.0 9999.0 100.0 |
0.0 1600.0 0.0 0.0 |
2024-05-11 08:00 2024-05-11 08:00 2024-05-11 08:00 2024-05-11 08:00 |
2024-05-24 17:00 2024-05-24 17:00 2024-05-24 17:00 2024-05-24 17:00 |
SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Spacer replacement :H500-SMLK & SMLK-H500 = 0; Network Load Service Arrangements may be required for Southern Oregon Load.: | 2023-02-10 12:28 | 114287 | 2023-02-14 13:50 | |
PPW 24-02591 | 15631 | PPW | BPA Summer Lake: CB 4957,BPA Summer Lake: CB 4958,Hemingway-Summer Lake 500 kV line | H500-SMLK(PPW) PACW-NTLOAD(PPW) SMLK-H500(PPW) |
1500.0 9999.0 100.0 |
1500.0 9999.0 100.0 |
0.0 0.0 0.0 |
2024-05-11 08:00 2024-05-11 08:00 2024-05-11 08:00 |
2024-05-24 17:00 2024-05-24 17:00 2024-05-24 17:00 |
SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Major/Control Relay Maintenance:H500-SMLK & SMLK-H500 = 0; BORA-M500 = 959; Network Load Service Arrangements may be required for Southern Oregon Load.: | 2024-02-09 12:21 | 140412 | 2024-02-09 12:21 | |
PPW 24-04733 | 16312 | PPW | Latigo-Three Buttes 230 kV line | WINDGEN-PACE(PPW) | 9999.0 | 9999.0 | 0.0 | 2024-05-13 06:00 | 2024-05-16 18:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Annual outage.:Three Buttes Wind unavailable.: | 2024-03-15 10:03 | 142558 | 2024-03-15 10:03 | |
PPW 24-06016 | 16788 | PPW | Emery: GEN CB 302 | 0.0 | 0.0 | 0.0 | 2024-05-13 06:30 | 2024-08-12 15:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Replace CB302 at Emery: | 2024-04-18 10:29 | 143842 | 2024-04-19 09:40 | ||
PPW 24-06268 | 16781 | PPW | CCPD River Road Plant: PCB 1 | THERMALGEN-PACW(PPW) | 9999.0 | 9999.0 | 0.0 | 2024-05-13 07:30 | 2024-05-31 16:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Overhaul River Road PCB-1 and Install new disconnects.:CCPD River Road unavailable.: | 2024-04-16 08:56 | 144097 | 2024-04-16 08:56 | |
PPW 24-06077 | 16757 | PPW | Moonshine: 230/34.5 kV Bank T-1 | WINDGEN-PACE(PPW) | 9999.0 | 9999.0 | 0.0 | 2024-05-14 06:00 | 2024-05-14 18:00 | SCHEDULED | TRANSMISSION | URGENT | ONPATH | PPW | continuous:1-Year substation offline maintenance.:Power County Wind Units #1 and #2 unavailable.: | 2024-04-09 10:44 | 143903 | 2024-04-09 10:44 | |
PPW 24-04626 | 16346 | PPW | Carbon-Spanish Fork #1 138 kV line,Carbon-Spanish Fork #2 138 kV line | OTHERGEN-PACE(PPW) PACE-VNL(PPW) VNL-PACE(PPW) |
9999.0 140.0 138.0 |
9999.0 140.0 138.0 |
0.0 75.0 75.0 |
2024-05-15 07:00 2024-05-15 07:00 2024-05-15 07:00 |
2024-05-23 14:00 2024-05-23 14:00 2024-05-23 14:00 |
SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:GWS Line Crossing:No de-rate. Use normal scheduling limits: PACE-VNL = 140 & VNL-PACE = 138 PACE-VNL & VNL-PACE = 75 Summer, 112 Winter. Graphite Solar limited to 10 MW.: | 2024-03-18 10:16 | 142451 | 2024-03-18 10:16 | |
PPW 24-04827 | 16345 | PPW | Top of the World (Duke Energy): 230/34 kV T1,Top of the World (Duke Energy): 230/34 kV T2 | WINDGEN-PACW(PPW) | 9999.0 | 9999.0 | 0.0 | 2024-05-20 06:00 | 2024-05-23 18:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Annual outage maintenance.:Top of the world wind farm unavailable.: | 2024-03-18 09:10 | 142652 | 2024-03-18 09:10 | |
PPW 24-06426 | 16787 | PPW | BPA McNary-Cold Springs section of the BPA McNary-Wallula 230 kV line | 0.0 | 0.0 | 0.0 | 2024-05-20 08:00 | 2024-05-20 17:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Replacing wood cross arm with steel truss: | 2024-04-17 09:58 | 144255 | 2024-04-17 09:58 | ||
PPW 24-05657 | 16632 | PPW | Sunbeam-Treasureton 230 kV line | NUT-PATHC(PPW) NUT-SUNBEAM(PPW) SUNBEAM-NUT(PPW) |
1060.0 1.0 45.0 |
1060.0 1.0 45.0 |
500.0 0.0 0.0 |
2024-05-20 09:00 2024-05-20 09:00 2024-05-20 09:00 |
2024-05-31 16:00 2024-05-31 16:00 2024-05-31 16:00 |
SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Replace 2 A-Condition structures:NUT-PATHC = 500 Summer/900 Winter. NUT-SUNBEAM & SUNBEAM-NUT = 0. Network Resource Transmission Service arrangements must be made for Moonbeam generation (Power County Wind at Sunbeam) through Idaho Power.: | 2024-04-02 15:12 | 143482 | 2024-04-02 15:12 | |
PPW 24-05857 | 16768 | PPW | Merwin: CB 2P50,Merwin: CB 2P51 | 0.0 | 0.0 | 0.0 | 2024-05-21 08:00 | 2024-05-22 16:30 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | 1234567 Daily:Relay maintenance. I will be disabling the trip from the breaker failure relay. Relay maintenance requires that we roll the breaker failure lockout. I would like to take one breaker at a time out of service to preform testing. : | 2024-04-10 14:38 | 143683 | 2024-04-10 14:38 | ||
PPW 24-02769 | 15981 | PPW | Antelope: CB 167 | ANTE-GSHN(PPW) GSHN-ANTE(PPW) |
170.0 90.0 |
170.0 90.0 |
10.0 0.0 |
2024-05-27 10:00 2024-05-27 10:00 |
2024-05-31 14:00 2024-05-31 14:00 |
SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:BMMO on CB167:ANTE-GSHN & GSHN-ANTE = 0.: | 2024-02-26 12:35 | 140590 | 2024-02-26 12:35 | |
PPW 24-03295 | 15846 | PPW | Swift #2-Woodland Tap 230 kV line,BPA Ross-BPA Woodland Tap-BPA Lexington 230kV Line | HYDROGEN-PACW(PPW) PACW-WOODLANDTAP(PPW) WOODLANDTAP-PACW(PPW) |
9999.0 370.0 370.0 |
9999.0 370.0 370.0 |
0.0 0.0 0.0 |
2024-05-28 08:00 2024-05-28 08:00 2024-05-28 08:00 |
2024-05-31 16:00 2024-05-31 16:00 2024-05-31 16:00 |
SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Replace line drops at Woodland Tap.:Swift #1 & #2 Generation unavailable (333 mw). PACW-WOODLANDTAP & WOODLANDTAP-PACW = 0.: | 2024-02-21 09:55 | 141117 | 2024-02-21 09:55 | |
PPW 24-00186 | 14928 | PPW | Malin: 500 kV CAP Group #1,Malin-PG&E Round Mountain #1 500 kV line | MALIN500-RDM500(PPW) RDM500-MALIN500(PPW) |
800.0 612.0 |
800.0 612.0 |
625.0 416.0 |
2024-05-28 08:00 2024-05-28 08:00 |
2024-05-30 15:00 2024-05-30 15:00 |
SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous: PCB Routine Services on 4188 and 4189:MALIN500-RDM500 = 625. RDM500-MALIN500 = 416.: | 2023-12-20 11:26 | 137782 | 2023-12-20 11:26 | |
PPW 24-06081 | 16758 | PPW | BPA Ponderosa: 230 kV Non-GIS Interconnect Bus | PONDEROSA115-PONDEROSAPAC(PPW) | 182.0 | 182.0 | 182.0 | 2024-06-03 08:00 | 2024-06-06 15:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Relay maintenance. Non-redundant PJC differential relay.:PONDEROSA115-PONDEROSAPAC =182 Summer/270 Winter.: | 2024-04-09 11:07 | 143907 | 2024-04-09 11:07 | |
PPW 24-02144 | 15521 | PPW | Clearwater Switching Station: CB 2U157 | HYDROGEN-PACW(PPW) HYDROGEN-PACW(PPW) |
9999.0 9999.0 |
9999.0 9999.0 |
9999.0 0.0 |
2024-04-22 10:00 2024-06-03 10:00 |
2024-04-26 16:00 2024-06-07 16:00 |
SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Breaker minor maint.:Clearwater 1 Hydro unavailable.: | 2024-02-02 13:07 | 139963 | 2024-04-22 08:15 | |
PPW 24-05350 | 16573 | PPW | Leaning Juniper Wind: 230/34 kV Bank #1,Leaning Juniper Wind: 34.5 kV Main Bus | WINDGEN-PACW(PPW) | 9999.0 | 9999.0 | 0.0 | 2024-06-12 10:00 | 2024-06-13 14:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Perform control circuitry checks and protective device testing:Leaning Juniper Wind restricted to 0 MW.: | 2024-03-28 12:18 | 143175 | 2024-03-28 12:18 | |
PPW 24-04189 | 16311 | PPW | Cove (OR): 230/69 kV Bank #2 (T3398) | COVEPACW-ROUNDBUTTE(PPW) ROUNDBUTTE-COVEPACW(PPW) |
123.0 123.0 |
123.0 123.0 |
60.0 60.0 |
2024-07-01 12:00 2024-07-01 12:00 |
2024-07-21 12:00 2024-07-21 12:00 |
SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:T-3398 LTC Maintenance and Bushing Replacement:COVEPACW-ROUNDBUTTE & ROUNDBUTTE-COVEPACW = 60.: | 2024-03-15 09:39 | 142013 | 2024-03-15 09:39 | |
PPW 24-04663 | 16295 | PPW | Bonanza-Mona 345 kV line | 0.0 | 0.0 | 0.0 | 2024-07-09 06:00 | 2024-07-09 16:30 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | 1234567 Daily:Replacing dead end insulators.: | 2024-03-14 09:58 | 142488 | 2024-03-14 09:58 | ||
PPW 24-03078 | 16263 | PPW | Newell-Tulelake Tap section of Hornet-Newell 69 kV line 5 | PACW-NTLOAD(PPW) | 9999.0 | 9999.0 | 0.0 | 2024-07-09 06:30 | 2024-07-10 18:30 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Replace 2 Poles. 4/33 and 14/33. Hwy 139:BPA Canby to provide Network Service for Perez, Clear Lake, and SVEC Austin load Approx 5 Me. Network load service agreements may be needed.: | 2024-03-12 13:33 | 140900 | 2024-03-12 13:33 | |
PPW 24-04665 | 16296 | PPW | Bonanza-Mona 345 kV line | 0.0 | 0.0 | 0.0 | 2024-07-10 06:00 | 2024-07-10 16:30 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | 1234567 Daily:Replacing dead end insulators.: | 2024-03-14 09:58 | 142490 | 2024-03-14 09:58 | ||
PPW 24-04666 | 16297 | PPW | Bonanza-Mona 345 kV line | 0.0 | 0.0 | 0.0 | 2024-07-11 06:00 | 2024-07-11 16:30 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | 1234567 Daily:Replacing dead end insulators.: | 2024-03-14 09:58 | 142491 | 2024-03-14 09:58 | ||
PPW 24-02598 | 15607 | PPW | Dog Creek-PG&E Cascade 60 kV line | CRAG-DOGCREEK(PPW) | 10.0 | 10.0 | 0.0 | 2024-07-15 07:00 | 2024-07-16 18:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Delta-Mountain Gate JCT 60kV Line (PACW) (HFRA) (Delta-Antler SECT) Cleared : T-Line to complete enhanced inspection tags to replace structures at 00/19, 01/27, 02/67, 03/70, Repair guy wire at 03/74A, 03/74B, 03/74C, Replace insulators at 02/66, Repair structures at 00/01, 00/03, 00/11, 01/23, 01/42:CRAG-DOGCREEK = 0;: | 2024-02-08 12:33 | 140419 | 2024-02-08 12:46 | |
PPW 24-02600 | 15608 | PPW | Dog Creek-PG&E Cascade 60 kV line | CRAG-DOGCREEK(PPW) | 10.0 | 10.0 | 0.0 | 2024-07-17 07:00 | 2024-07-19 18:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Delta-Mountain Gate JCT 60kV Line (EPSS) (HFRA) (Antler-Mountain Gate SECT) Cleared T-Line to complete enhanced inspection tags to repair guy wire at 08/124, 09/134, 14/179B, Replace structures at 10/142, 10/145, 12/163, 14/177, Repair structures at 08/121, 08/125, 08/126, 09/128, 09/131, 14/179, 14/183, Replace splices at 11/99, Repair splices at 11/149A:CRAG-DOGCREEK = 0;: | 2024-02-08 12:44 | 140421 | 2024-02-08 12:46 | |
PPW 24-02950 | 15722 | PPW | Path 25 Schedule Limitation (Cascade 115 kV Tie) | CRAG-CRAGVIEW(PPW) CRAG-CRAGVIEW(PPW) CRAGVIEW-CRAG(PPW) |
45.0 45.0 80.0 |
45.0 45.0 80.0 |
45.0 0.0 80.0 |
2024-04-11 05:15 2024-07-21 05:15 2024-07-21 05:15 |
2024-04-11 05:20 2024-07-21 05:20 2024-07-21 05:20 |
SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Cascade 60kV CB 72 Breaker Exercise Exercise CB 72 for annual maintenance. (BFD 6/24/2024):CRAG-CRAGVIEW = 0; CRAGVIEW-CRAG = 80: | 2024-02-14 12:54 | 140771 | 2024-04-02 08:32 | |
PPW 24-03478 | 15929 | PPW | Cove (OR): 230/69 kV Bank #1 (T3886) | COVEPACW-ROUNDBUTTE(PPW) ROUNDBUTTE-COVEPACW(PPW) |
123.0 123.0 |
123.0 123.0 |
60.0 60.0 |
2024-07-22 10:00 2024-07-22 10:00 |
2024-07-26 15:00 2024-07-26 15:00 |
SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Transformer Relay Maintenance and Trip Checking:COVEPACW-ROUNDBUTTE & ROUNDBUTTE-COVEPACW = 60.: | 2024-02-23 14:27 | 141300 | 2024-02-23 14:27 | |
PPW 24-01403 | 15269 | PPW | Dave Johnston-TSGT Laramie River Station 230 kV line | DJ-WYOEAST(PPW) WYOEAST-DJ(PPW) |
790.0 790.0 |
790.0 790.0 |
478.0 478.0 |
2024-09-03 08:00 2024-09-03 08:00 |
2024-09-13 16:00 2024-09-13 16:00 |
SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:TSGT 2024 structure replacements.:DJ-WYOEAST & WYOEAST-DJ = 442 (Dave Johnston-WAPA Stegall 230 kV line rating): | 2024-01-18 10:59 | 139222 | 2024-01-18 11:14 | |
PPW 24-03091 | 16240 | PPW | Bullard-Davis Creek section of the Alturas-Bullard 115 kV line | OTHERGEN-PACW(PPW) | 9999.0 | 9999.0 | 0.0 | 2024-09-10 07:00 | 2024-09-10 18:30 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | 1234567 Daily:LINE WORK:Airport Solar and Garrett Solar restricted to 0 MW during switching.: | 2024-03-11 09:47 | 140913 | 2024-03-11 09:47 | |
PPW 24-03094 | 16789 | PPW | Cedarville Tap-Davis Creek Tap section of the Alturas-Bullard 115 kV line | OTHERGEN-PACW(PPW) | 9999.0 | 9999.0 | 0.0 | 2024-09-11 07:00 | 2024-09-11 18:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | 1234567 Daily:LINE WORK:Airport Solar and Garrett Solar restricted to 0 MW during switching.: | 2024-04-18 10:52 | 140916 | 2024-04-18 10:52 | |
PPW 24-03095 | 16795 | PPW | Alturas-Cedarville Tap section of the Alturas-Bullard 115 kV line | OTHERGEN-PACW(PPW) | 9999.0 | 9999.0 | 0.0 | 2024-09-12 07:00 | 2024-09-12 18:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | 1234567 Daily:Replace pole 10/55, Hwy 299. :Airport Solar and Garrett Solar restricted to 0 MW during switching.: | 2024-04-19 10:29 | 140917 | 2024-04-19 10:29 | |
PPW 24-00012 | 10515 | PPW | Hemingway-Summer Lake 500 kV line | H500-SMLK(PPW) JBSN-JB345(PPW) PACW-NTLOAD(PPW) SMLK-H500(PPW) |
1500.0 1600.0 9999.0 100.0 |
1500.0 1600.0 9999.0 100.0 |
0.0 1467.0 0.0 0.0 |
2024-09-14 08:00 2024-09-14 08:00 2024-09-14 08:00 2024-09-14 08:00 |
2024-09-27 17:00 2024-09-27 17:00 2024-09-27 17:00 2024-09-27 17:00 |
SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Spacer replacement :H500-SMLK & SMLK-H500 = 0; Network Load Service Arrangements may be required for Southern Oregon Load.: | 2023-02-10 12:39 | 114288 | 2023-02-10 12:39 | |
PPW 24-00086 | 15593 | PPW | Populus: 345 kV Series Capacitor #2 (C2),Populus: 345 kV Series Capacitor #2 (C1) | JBSN-JB345(PPW) | 1600.0 | 1600.0 | 1433.0 | 2024-09-16 07:30 | 2024-09-20 16:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:CT Work and Trigger Circuit. Maintenance:JBSN-JB345 = 2150. PacifiCorp = 1433. IPCo = 717.: | 2024-02-06 14:24 | 136707 | 2024-02-06 14:24 | |
PPW 24-00085 | 15594 | PPW | Populus: 345 kV Series Capacitor #1 (C2),Populus: 345 kV Series Capacitor #1 (C1) | JBSN-JB345(PPW) | 1600.0 | 1600.0 | 1433.0 | 2024-09-23 07:30 | 2024-09-27 16:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:CT work and Control circuits. Cap Bank Maintenance and addition of new relays. :JBSN-JB345 = 2150. PacifiCorp = 1433. IPCo = 717.: | 2024-02-06 14:26 | 136706 | 2024-02-06 14:26 | |
PPW 24-02033 | 15467 | PPW | BPA Ponderosa: 500/230 kV Bank #1,BPA Ponderosa: CB 4618 | BPAT.PACW-PONDEROSA230(PPW) | 267.0 | 267.0 | 267.0 | 2024-09-23 08:00 | 2024-10-03 15:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Transformer diagnostic service.:BPAT.PACW-PONDEROSA230 = 617 Summer/ 700 Winter: | 2024-01-30 15:53 | 139852 | 2024-01-30 15:53 | |
PPW 24-00049 | 13659 | PPW | Echo-Hinkle 69kV line | WINDGEN-PACW(PPW) | 9999.0 | 9999.0 | 0.0 | 2024-10-07 08:00 | 2024-10-10 16:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Annual substation maintenance (oil sampling), Echo Hinkle 69kV Transmission Line maintenance:Echo and blacksmith generation limited to 0 MW. Both sites disconnected from the transmission system.: | 2023-10-19 14:21 | 133780 | 2023-10-19 14:21 | |
PPW 24-05727 | 16656 | PPW | Hermiston-Umatilla section of the Hermiston-BPA McNary 69 kV line | WINDGEN-PACW(PPW) WINDGEN-PACW(PPW) |
9999.0 9999.0 |
9999.0 9999.0 |
9999.0 0.0 |
2024-05-28 10:00 2024-11-18 10:00 |
2024-05-31 15:00 2024-11-22 15:00 |
SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Hermiston CB 3W90 BMMO & Line Side Disc Repairs:Orchard Wind required offline. Orchard Wind required offline.: | 2024-04-03 14:13 | 143552 | 2024-04-22 10:26 | |
PPW 25-00004 | 16651 | PPW | BPA Jones Canyon-BPA Santiam 230 kV line | WINDGEN-PACW(PPW) | 9999.0 | 9999.0 | 0.0 | 2025-01-09 08:00 | 2025-01-09 16:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Line maintenance:COI and PDCI restrictions to be determined by BPA. Leaning Juniper restricted to 0 MW during switching, and 40 MW for duration of outage.: | 2024-04-03 11:19 | 143568 | 2024-04-03 11:19 |