PPW Outages 
Jul 16, 2018 - Jan 16, 2019
Report created on Jul 20, 2018 at 02:00 (PPT)
Outage
Name
Outage
Id
Company Facility Flow
Gate
Segment/
JOTSFacility
Original
TTC In
Original
TTC Out
New
TTC
Start Time (PPT) Stop Time (PPT) Status Outage
Category
Outage
Type
Path
Impact
Report
TPs
Annotation Creation Time (PPT) EventId Last Updated (PPT)
  PPW 134513     6123     PPW     Prospect Central: 69 kV Bus 1, T-3069,70,71 then 69 kV Bus 2          HYDROGEN-PACW(PPW)      9999.0      9999.0      9999.0      2018-05-23 08:00      2018-07-20 15:30      Active     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Repair Sw. 3R106; Repair Sw. 3R137; Repair Sw. 3R187. Note:Prospect 1,3 & 4 will be offline.-For duration of work on Sw 3R106 total generation at Prospect limited to 20 MW (scheduled from 0800-1200)-No additional restrictions from 1230-1600.. Path(Impact):HYDROGEN-PACW (9999). *115kV,Continuous,Include Weekends*     2018-05-21 09:04     134513     2018-06-04 19:47  
  PPW 135664     6165     PPW     Lemolo 2: 115/12 kV Xfmr T3029,30,31          HYDROGEN-PACW(PPW)      9999.0      9999.0      0.0      2018-07-11 08:00      2018-07-27 15:30      Active     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:GSU Maintenance. Note:Lemolo 2 unit generation unavailable. Path(Impact):HYDROGEN-PACW (9999). *Continuous,Include Weekends*     2018-06-18 15:49     135664     2018-07-11 08:21  
  PPW 132109     6087     PPW     Jim Bridger-Mustang 230 kV line          JBSN-WYOCENTRAL(PPW) 
  WAPAEAST-WAPANORTH(PPW) 
  WYOCENTRAL-JBSN(PPW) 
  WYOEAST-WYOCENTRAL(PPW)   
  600.0 
  170.0 
  600.0 
  950.0   
  600.0 
  170.0 
  600.0 
  950.0   
  400.0 
  147.0 
  400.0 
  755.0   
  2018-07-16 06:00 
  2018-07-16 06:00 
  2018-07-16 06:00 
  2018-07-16 06:00   
  2018-07-27 16:00 
  2018-07-27 16:00 
  2018-07-27 16:00 
  2018-07-27 16:00   
  Active     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:A-Condition Insulator Replacement. Note:4A/4B Curve 121. WAPAEAST-WAPANORTH = 219. WYOEAST-WYOCENTRAL (4A) = 755. 4B Limit = 857.-JBSN-WYOC & WYOC-JBSN = 400. Potential Real Time Impact to Jim Bridger Generation.-Great Divide will be radial from WAPA Spence via Mustang. Network Load Service Arrangements may be required.. Path(Impact):WYOEAST-WYOCENTRAL(195)WYOCENTRAL-JBSN(200)JBSN-WYOCENTRAL(200)WAPAEAST-WAPANORTH (23). *230kV,Continuous,Include Weekends*     2018-05-07 09:47     132109     2018-07-11 19:52  
  PPW 131467     5923     PPW     Rolling Hills Wind Collector: 34 kV Circuit #6          WINDGEN-PACE(PPW)      9999.0      9999.0      9999.0      2018-07-16 06:00      2018-07-16 13:00      TERMINATED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Wind Turbine DTA Maintenance. Note:Rolling Hills circuit #6 wind generation will be unavailable (25.5 MW). Path(Impact):WIND GEN-PACE(9999). *34.5kV,Continuous,Include Weekends*     2018-02-23 12:48     131467     2018-07-16 14:32  
  PPW 136588     6192     PPW     Latigo-Three Buttes 230 kV line & Three Buttes (Duke Energy): Entire Farm          WINDGEN-PACE(PPW)      9999.0      9999.0      9999.0      2018-07-16 07:00      2018-07-19 16:00      TERMINATED     TRANSMISSION     PLANNED      ONPATH     PPW     Customer Request:Issue a Terminal Clearance at Latigo for Full Three Buttes (Campbell Hill) Site Outage. Note:Three Buttes Generation unavailable (99 mw).. Path(Impact):WIND GEN-PACE(9999). *230kV,Continuous,Include Weekends*     2018-07-13 11:35     136588     2018-07-19 11:19  
  PPW 136447     6190     PPW     WAPA Yellowtail-WAPA Lovell #1 115 kV line          YTP-WYONORTH(PPW)      400.0      400.0      272.0      2018-07-16 08:00      2018-07-20 15:00      Active     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Replace Cross Arms. Note:YTS to Series #1, 425 MW's. LAPT = 153 MW's, PACE = 272 MW's. Path(Impact):YTP-WYONORTH(128). *115kV,Continuous,Include Weekends*     2018-07-10 08:52     136447     2018-07-10 10:26  
  PPW 131466     5922     PPW     Rolling Hills Wind Collector: 34 kV Circuit #1          WINDGEN-PACE(PPW)      9999.0      9999.0      0.0      2018-07-17 06:00      2018-07-17 13:00      Completed     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Wind Turbine DTA Maintenance. Note:Rolling Hills circuit #1 wind generation will be unavailable (22 MW). Path(Impact):WIND GEN-PACE(9999). *34.5kV,Continuous,Include Weekends*     2018-02-23 12:39     131466     2018-06-10 19:32  
  PPW 136477     6193     PPW     Hemingway-Summer Lake 500 kV line (Summer Lake Sw 4952)          H500-SMLK(PPW) 
  JBSN-JB345(PPW) 
  PACW-NTLOAD(PPW) 
  SMLK-H500(PPW)   
  1500.0 
  1600.0 
  9999.0 
  100.0   
  1500.0 
  1600.0 
  9999.0 
  100.0   
  1500.0 
  1600.0 
  9999.0 
  100.0   
  2018-07-17 21:00 
  2018-07-17 21:00 
  2018-07-17 21:00 
  2018-07-17 21:00   
  2018-07-18 09:00 
  2018-07-18 09:00 
  2018-07-18 09:00 
  2018-07-18 09:00   
  TERMINATED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:BPA DCC to issue a Terminal Clearance at Summer Lake; IPCo to issue a Terminal Clearance at Hemingway; Sw 4952 Repair. Note:H500-SMLK & SMLK-H500 = 0.-JBSN-JB345 = 2200. PacifiCorp = 1467. IPCo = 733.-Network Load Service Arrangements may be required for Southern Oregon Load.. Path(Impact):JBSN-JB345(133)PACW NTLOAD(9999)SMLK-H500(100)H500-SMLK(1500). *500kV,Continuous,Include Weekends*     2018-07-16 09:21     136477     2018-07-18 04:41  
  PPW 131455     5916     PPW     Glenrock Wind Collector: 34 kV Circuit #1          WINDGEN-PACE(PPW)      9999.0      9999.0      0.0      2018-07-18 06:00      2018-07-18 13:00      Completed     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Wind Turbine DTA Maintenance. Note:Circuit #1 Generation unavailable (23 MW).. Path(Impact):WIND GEN-PACE(9999). *34.5kV,Daily,Include Weekends*     2018-02-23 11:48     131455     2018-06-10 23:19  
  PPW 132582     5986     PPW     BPA Jones Canyon: Cap Group 1/Section 2          WINDGEN-PACW(PPW) 

  WINDGEN-PACW(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  2018-07-18 08:00 

  2018-07-19 15:00   
  2018-07-19 15:00 

  2018-07-20 15:00   
  TERMINATED     TRANSMISSION     PLANNED      ONPATH     PPW     Other Utility Request:Diagnostic Service; Leaning Juniper Restricted. Note:Leaning Juniper restricted to 83 MW. Path(Impact):WIND GEN-PACW(9999). *230kV,Continuous,Include Weekends*     2018-03-22 12:58     132582     2018-07-19 15:28  
  PPW 136643     6197     PPW     Gadsby: CB 31 (Unit #1), Gadsby-Jordan 46kV line including Gadsby: CB 52 and 46kV North Bus          THERMALGEN-PACE(PPW)      9999.0      9999.0      9999.0      2018-07-18 21:00      2018-07-19 07:30      TERMINATED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Switch 23A failed. This is to reinstall North to East bus jumper, make 23A repairs, and to replace bad insulators. The work will restore the 46kv bus to normal.. Path(Impact):THERMAL GEN-PACE(9999). *46kV,Continuous,Include Weekends*     2018-07-18 20:55     136643     2018-07-19 11:13  
  PPW 131471     5925     PPW     Rolling Hills Wind Collector: 34 kV Circuit #2, 34 kV Circuit #3          WINDGEN-PACE(PPW)      9999.0      9999.0      9999.0      2018-07-19 06:00      2018-07-19 13:00      TERMINATED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Wind Turbine DTA Maintenance. Note:Rolling Hills circuit #2 (17 MW) and circuit #3 (12 MW) wind generation will be unavailable.. Path(Impact):WIND GEN-PACE(9999). *34.5kV,Continuous,Include Weekends*     2018-02-23 12:59     131471     2018-07-19 12:08  
  PPW 131454     5915     PPW     Glenrock Wind Collector: 34 kV Circuit #5          WINDGEN-PACE(PPW)      9999.0      9999.0      0.0      2018-07-20 06:00      2018-07-20 13:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Wind Turbine DTA Maintenance. Note:Circuit #5 Generation unavailable (12 MW).. Path(Impact):WIND GEN-PACE(9999). *34.5kV,Daily,Include Weekends*     2018-02-23 11:45     131454     2018-06-13 05:57  
  PPW 131464     5921     PPW     Rolling Hills Wind Collector: 34 kV Circuit #5          WINDGEN-PACE(PPW)      9999.0      9999.0      0.0      2018-07-20 06:00      2018-07-20 13:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Wind Turbine DTA Maintenance. Note:Rolling Hills circuit #5 wind generation will be unavailable (18 MW). Path(Impact):WIND GEN-PACE(9999). *34.5kV,Continuous,Include Weekends*     2018-02-23 12:31     131464     2018-06-10 19:41  
  PPW 136242     6184     PPW     Leaning Juniper: CB 1K11, (Entire Farm Outage)          WINDGEN-PACW(PPW)      9999.0      9999.0      9999.0      2018-07-20 08:00      2018-07-24 14:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Maintenance on Breaker 1K11.. Note:Leaning Juniper Generation will not be available.. Path(Impact):WIND GEN-PACW(0). *230kV,Continuous,Include Weekends*     2018-07-05 09:47     136242     2018-07-08 04:10  
  PPW 132818     6054     PPW     Merwin-BPA Cardwell 115 kV line          HYDROGEN-PACW(PPW)      9999.0      9999.0      9999.0      2018-07-23 06:00      2018-07-27 18:00      CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:To Relocate Line Into Ariel; BPA to Issue Terminal Clearance at BPA Cardwell; Cowlitz to Issue Terminal Clearance at Ariel. Note:Maximum Generating capability at Merwin/Yale is 162 mw (Summer) and 210 mw (Winter). *PCC-706. Path(Impact):HYDROGEN-PACW (9999). *115kV,Continuous,Include Weekends*     2018-04-18 14:09     132818     2018-07-13 19:24  
  PPW 133502     6056     PPW     Merwin: 115 kV Bus 'C', Merwin-BPA Cardwell 115 kV line          HYDROGEN-PACW(PPW)      9999.0      9999.0      0.0      2018-07-23 06:00      2018-08-01 18:30      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:To pull in conductors over bus to 1/1 on Kalama line and 2/1 on Lewis River line. Cutover New Line Section from Ariel to Merwin.; BPA to Issue Terminal Clearance at BPA Cardwell; Cowlitz to Issue Terminal Clearance at Ariel. Note:Maximum Generating capability at Merwin/Yale is 162 mw (Summer) and 210 mw (Winter). *PCC-706. Path(Impact):HYDROGEN-PACW (19998). *115kV,Continuous,Include Weekends*     2018-04-18 14:30     133502     2018-07-13 19:21  
  PPW 135196     6152     PPW     BPA Fairview-Isthmus 230 kV line          PACW-NTLOAD(PPW)      9999.0      9999.0      0.0      2018-07-23 08:30      2018-07-26 16:30      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:BPA MCC to issue a Terminal Clearance at Fairview; Pole Change Out 4/009L. Note:Load normally fed from Isthmus source will now be fed from BPA Fairview 115 kV (approx. 35 additional MW). Network load service may be required.. Path(Impact):PACW NTLOAD(9999). *230kV,Continuous,Include Weekends*     2018-06-07 15:05     135196     2018-06-07 16:00  
  PPW 136718     6194     PPW     Goodnoe Hills: 34 kV Collector #1 (4Y21)          WINDGEN-PACW(PPW)      9999.0      9999.0      0.0      2018-07-26 08:00      2018-07-26 17:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Replace failed padmount transformer.. Note:Collector #1 Generation unavailable (26 MW).. Path(Impact):WIND GEN-PACW(9999). *34.5kV,Continuous,Include Weekends*     2018-07-17 14:37     136718     2018-07-20 00:16  
  PPW 136719     6195     PPW     Goodnoe Hills: 34 kV Collector #4 (4Y24)          WINDGEN-PACW(PPW)      9999.0      9999.0      0.0      2018-07-26 08:00      2018-07-26 17:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Replace failed padmount transformer at G-71.. Note:Collector #1 Generation unavailable (26 MW).-Collector #4 Generation unavailable (18 mw).. Path(Impact):WIND GEN-PACW(9999). *34.5kV,Continuous,Include Weekends*     2018-07-17 14:42     136719     2018-07-20 00:18  
  PPW 132640     5988     PPW     Atlantic City-Rock Springs 230 kV line          TOT4B-WYONORTH(PPW) 
  WAPAEAST-WAPANORTH(PPW) 
  WYOEAST-TOT4B(PPW) 
  WYOEAST-WYOCENTRAL(PPW)   
  638.0 
  170.0 
  638.0 
  950.0   
  638.0 
  170.0 
  638.0 
  950.0   
  573.0 
  155.0 
  573.0 
  735.0   
  2018-07-30 06:00 
  2018-07-30 06:00 
  2018-07-30 06:00 
  2018-07-30 06:00   
  2018-08-07 16:00 
  2018-08-07 16:00 
  2018-08-07 16:00 
  2018-08-07 16:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:A condition maintenance. Note:4A/4B Curve 117. WAPA E/N = 227. WYOE-WYOC (4A) = 735. WYOEAST-TOT4B & TOT4B-WYONORTH = 573. 4B Limit = 800.. Path(Impact):WYOEAST-WYOCENTRAL(215)WAPAEAST-WAPANORTH (15)TOT4B-WYONORTH(65)WYOEAST-TOT4B(65). *230kV,Continuous,Include Weekends*     2018-03-23 14:19     132640     2018-07-02 17:05  
  PPW 133285     6025     PPW     BPA Troutdale: 230 kV Main Bus - East Section including CB A126 & A128 and -Troutdale-BPA Troutdale          GRESHAM-TROUTDALE(PPW) 
  TROUTDALE-GRESHAM(PPW)   
  548.0 
  548.0   
  548.0 
  548.0   
  402.0 
  402.0   
  2018-07-30 07:00 
  2018-07-30 07:00   
  2018-07-30 14:30 
  2018-07-30 14:30   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Separate CB A126 & A128 From Main Bus. Note:GRSM-TROUT & TROUT-GRSM = 402.. Path(Impact):GRESHAM-TROUTDALE(146)TROUTDALE-GRESHAM(146). *230kV,Continuous,Include Weekends*     2018-04-10 10:02     133285     2018-04-10 10:02  
  PPW 135475     6177     PPW     Blue Rim-South Trona section of the Firehole Monument 230 kV line          TRONA-NUT(PPW) 
  TRONA-WYOCENTRAL(PPW) 
  WYOCENTRAL-TRONA(PPW)   
  475.0 
  640.0 
  640.0   
  475.0 
  640.0 
  640.0   
  213.0 
  424.0 
  424.0   
  2018-07-30 07:00 
  2018-07-30 07:00 
  2018-07-30 07:00   
  2018-07-31 15:00 
  2018-07-31 15:00 
  2018-07-31 15:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Replace Idler Arms/Insulators. Note:TRONA-NUT = 213.-TRONA-WYOCENTRAL & WYOCENTRAL-TRONA = 424 Summer/560 Winter.. Path(Impact):TRONA-WYOCENTRAL(216)WYOCENTRAL-TRONA(216)TRONA-NUT(262). *230kV,Continuous,Include Weekends*     2018-07-02 15:08     135475     2018-07-02 15:31  
  PPW 135534     6178     PPW     Mansface-Blue Rim section of the Firehole-Monument 230 kV line          TRONA-NUT(PPW) 
  TRONA-WYOCENTRAL(PPW) 
  WYOCENTRAL-TRONA(PPW)   
  475.0 
  640.0 
  640.0   
  475.0 
  640.0 
  640.0   
  213.0 
  424.0 
  424.0   
  2018-08-01 07:00 
  2018-08-01 07:00 
  2018-08-01 07:00   
  2018-08-02 15:00 
  2018-08-02 15:00 
  2018-08-02 15:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Re-insulate Structure. Note:TRONA-NUT = 213.-TRONA-WYOCENTRAL & WYOCENTRAL-TRONA = 424 Summer/560 Winter.. Path(Impact):TRONA-WYOCENTRAL(216)WYOCENTRAL-TRONA(216)TRONA-NUT(262). *230kV,Continuous,Include Weekends*     2018-07-02 15:11     135534     2018-07-02 15:11  
  PPW 136720     6196     PPW     Knott-PGE Tabor section of the Columbia-PGE Tabor-Knott 57 kV line          PACW-NTLOAD(PPW) 

  PACW-NTLOAD(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  0.0 

  0.0   
  2018-08-01 20:00 

  2018-08-02 20:00   
  2018-08-02 06:00 

  2018-08-03 06:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Install New Pole. Note:Owens Illinois will be served radially from PGE Tabor (~6 MW). Network load arrangements may be required.. Path(Impact):PACW NTLOAD(9999). *57kV,Daily,Include Weekends*     2018-07-17 15:32     136720     2018-07-19 09:33  
  PPW 136153     6179     PPW     South Trona-Monument section of the Firehole-Monument 230 kV line          TRONA-NUT(PPW) 
  TRONA-WYOCENTRAL(PPW) 
  WYOCENTRAL-TRONA(PPW)   
  475.0 
  640.0 
  640.0   
  475.0 
  640.0 
  640.0   
  278.0 
  424.0 
  424.0   
  2018-08-03 06:00 
  2018-08-03 06:00 
  2018-08-03 06:00   
  2018-08-03 15:00 
  2018-08-03 15:00 
  2018-08-03 15:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Replace DE Assemblies. Note:TRONA-NUT = 278.-TRONA-WYOCENTRAL & WYOCENTRAL-TRONA = 424 Summer/560 Winter.. Path(Impact):TRONA-WYOCENTRAL(216)WYOCENTRAL-TRONA(216)TRONA-NUT(197). *230kV,Continuous,Include Weekends*     2018-07-02 15:16     136153     2018-07-02 15:16  
  PPW 132820     6051     PPW     Merwin-Ariel section of the Merwin-BPA Cardwell 115 kV line          HYDROGEN-PACW(PPW) 

  HYDROGEN-PACW(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  2018-08-06 06:00 

  2018-08-08 18:00   
  2018-08-08 18:00 

  2018-08-10 18:00   
  CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Cutover New Line Section from Ariel to Hwy 503. Note:Maximum Generating capability at Merwin/Yale is 162 MW (Summer) and 210 MW (Winter).. Path(Impact):HYDROGEN-PACW (9999). *115kV,Continuous,Include Weekends*     2018-04-18 13:54     132820     2018-07-13 19:26  
  PPW 135227     6139     PPW     Ariel-BPA Cardwell section of the Merwin-BPA Cardwell 115 kV line          HYDROGEN-PACW(PPW)      9999.0      9999.0      9999.0      2018-08-06 06:30      2018-08-08 18:00      CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     Construction:To cutover new Ariel-Hwy 503 line section. Note:Maximum Generating capability at Merwin/Yale is 162 mw (Summer) and 210 mw (Winter). *PCC-706. Path(Impact):HYDROGEN-PACW (9999). *115kV,Continuous,Include Weekends*     2018-06-06 09:30     135227     2018-07-13 19:28  
  PPW 127441     6039     PPW     BPA Ross-Woodland Tap section of the BPA Ross-Woodland Tap-BPA Lexington 230 kV line          HYDROGEN-PACW(PPW) 

  HYDROGEN-PACW(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  0.0 

  9999.0   
  2018-08-06 08:00 

  2018-08-13 08:00   
  2018-08-10 16:00 

  2018-08-17 16:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Other Utility Request:Re-Sag Between 19/2 and 20/3 for Impairment at 19/4. Note:Swift generation will be restricted to 0, while switching at the beginning and end of the outage, line SW's at tap are deadline switching only.. Path(Impact):HYDROGEN-PACW (9999). *230kV,Continuous,Include Weekends*     2018-04-13 15:24     127441     2018-04-23 15:41  
  PPW 136417     6189     PPW     Toketee Plant: 115/7.2 kV T2989,90,91          HYDROGEN-PACW(PPW)      9999.0      9999.0      0.0      2018-08-07 08:00      2018-08-09 15:30      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Repair Nitrogen leak on GSU. Note:Toketee Unit 1 generation unavailable. Path(Impact):HYDROGEN-PACW (9999). *115kV,Continuous,Include Weekends*     2018-07-10 07:59     136417     2018-07-10 07:59  
  PPW 132646     6088     PPW     Wyopo-Atlantic City section of the Riverton-Atlantic City 230 kV line          TOT4B-WYONORTH(PPW) 
  WAPAEAST-WAPANORTH(PPW) 
  WYOEAST-TOT4B(PPW) 
  WYOEAST-WYOCENTRAL(PPW)   
  638.0 
  170.0 
  638.0 
  950.0   
  638.0 
  170.0 
  638.0 
  950.0   
  573.0 
  155.0 
  573.0 
  735.0   
  2018-08-08 06:00 
  2018-08-08 06:00 
  2018-08-08 06:00 
  2018-08-08 06:00   
  2018-08-11 16:00 
  2018-08-11 16:00 
  2018-08-11 16:00 
  2018-08-11 16:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:A condition maintenance. Note:4A/4B Curve 117. WAPAEAST-WAPANORTH (Wheel) = 227. WYOEAST-WYOCENTRAL (4A) = 735. WYOEAST-TOT4B & TOT4B-WYONORTH = 573. 4B Limit = 800.. Path(Impact):WYOEAST-WYOCENTRAL(215)WAPAEAST-WAPANORTH (15)TOT4B-WYONORTH(65)WYOEAST-TOT4B(65). *230kV,Continuous,Include Weekends*     2018-05-07 10:00     132646     2018-07-18 14:58  
  PPW 132894     6089     PPW     Mustang-WAPA Spence 230 kV line          JBSN-WYOCENTRAL(PPW) 
  WAPAEAST-WAPANORTH(PPW) 
  WYOCENTRAL-JBSN(PPW) 
  WYOEAST-WYOCENTRAL(PPW)   
  600.0 
  170.0 
  600.0 
  950.0   
  600.0 
  170.0 
  600.0 
  950.0   
  400.0 
  147.0 
  400.0 
  755.0   
  2018-08-13 06:00 
  2018-08-13 06:00 
  2018-08-13 06:00 
  2018-08-13 06:00   
  2018-08-14 16:00 
  2018-08-14 16:00 
  2018-08-14 16:00 
  2018-08-14 16:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:A condition maintenance. Note:4A/4B Curve 121. WAPAEAST-WAPANORTH = 219. WYOEAST-WYOCENTRAL (4A) = 755. 4B Limit = 857.-JBSN-WYOC & WYOC-JBSN = 400. Potential Real Time Impact to Jim Bridger Generation.-Great Divide will be radial from WAPA Spence via Mustang. Network Load Service Arrangements may be required.. Path(Impact):WYOEAST-WYOCENTRAL(195)WYOCENTRAL-JBSN(200)JBSN-WYOCENTRAL(200)WAPAEAST-WAPANORTH (23). *230kV,Continuous,Include Weekends*     2018-05-07 11:17     132894     2018-05-22 13:23  
  PPW 131571     5949     PPW     Diamond Hill-EWEB McKenzie section of the BPA Alvey-Diamond Hill 230 kV line          PACW-NTLOAD(PPW) 

  PACW-NTLOAD(PPW) 

  PACW-NTLOAD(PPW) 

  PACW-NTLOAD(PPW)   
  9999.0 

  9999.0 

  9999.0 

  9999.0   
  9999.0 

  9999.0 

  9999.0 

  9999.0   
  0.0 

  0.0 

  0.0 

  0.0   
  2018-08-13 06:00 

  2018-08-14 06:00 

  2018-08-15 06:00 

  2018-08-16 06:00   
  2018-08-13 18:30 

  2018-08-14 18:30 

  2018-08-15 18:30 

  2018-08-16 18:30   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Structure replacements; EWEB to issue a Terminal Clearance at McKenzie. Note:Network Load Service must be arranged for EWEB McKenzie.-Eliminates ability to move Network Load Service from Alvey to Gresham. Eliminates C&T Point to Point Service from Troutdale to Summer Lake.-Murder creek load will be served from BPA Albany-Salem source. Path(Impact):PACW NTLOAD(9999). *230kV,Daily,Include Weekends*     2018-03-01 12:41     131571     2018-03-01 12:41  
  PPW 132904     6090     PPW     Latham-Platte 230 kV line          WAPAEAST-WAPANORTH(PPW) 
  WYOEAST-WYOCENTRAL(PPW)   
  170.0 
  950.0   
  170.0 
  950.0   
  142.0 
  692.0   
  2018-08-15 06:00 
  2018-08-15 06:00   
  2018-08-16 16:00 
  2018-08-16 16:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:A Condition Maintenance. Note:4A/4B Curve 107. WAPAEAST-WAPANORTH (Wheel) = 214. WYOEAST-WYOCENTRAL (4A) = 692. 4B Limit = 875.-Pioneer, Foote Creek, High Plains/McFadden Ridge, Seven Mile Hill & Dunlap Wind restricted to a combined total of 375 mw.-Potential Additional Real Time Miners Area Wind Generation restriction.. Path(Impact):WYOEAST-WYOCENTRAL(258)WAPAEAST-WAPANORTH (28). *230kV,Continuous,Include Weekends*     2018-05-07 13:23     132904     2018-05-07 13:23  
  PPW 132905     6091     PPW     Platte-Miners-Standpipe 230 kV line          WAPAEAST-WAPANORTH(PPW) 
  WYOEAST-WYOCENTRAL(PPW)   
  170.0 
  950.0   
  170.0 
  950.0   
  121.0 
  574.0   
  2018-08-17 06:00 
  2018-08-17 06:00   
  2018-08-18 16:00 
  2018-08-18 16:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:A Condition Repairs. Note:4A/4B Curve 106. WAPAEAST-WAPANORTH (Wheel) = 193. WYOEAST-WYOCENTRAL (4A) = 574. 4B Limit = 865.-Pioneer, Foote Creek, High Plains/McFadden Ridge, Seven Mile Hill & Dunlap Wind restricted to a combined total of 375 mw.-Potential Additional Real Time Miners Area Wind Generation restriction.. Path(Impact):WYOEAST-WYOCENTRAL(376)WAPAEAST-WAPANORTH (49). *230kV,Continuous,Include Weekends*     2018-05-07 13:53     132905     2018-05-07 13:53  
  PPW 131572     5948     PPW     BPA Alvey-EWEB McKenzie section of the BPA Alvey-Diamond Hill 230 kV line          PACW-NTLOAD(PPW)      9999.0      9999.0      0.0      2018-08-17 06:00      2018-08-17 18:30      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Arm Replacements; BPA to Issue Terminal Clearance at Alvey. Note:Eliminates ability to move Network Load Service from Alvey to Gresham. Eliminates C&T Point to Point Service from Troutdale to Summer Lake.-Murder creek load will be served from BPA Albany-Salem source. Path(Impact):PACW NTLOAD(9999). *230kV,Daily,Include Weekends*     2018-03-01 12:37     131572     2018-03-01 12:37  
  PPW 133287     6026     PPW     BPA Troutdale: 230 kV Main Bus - East Section including CB A126 & A128 and -Troutdale-BPA Troutdale          GRESHAM-TROUTDALE(PPW) 
  TROUTDALE-GRESHAM(PPW)   
  548.0 
  548.0   
  548.0 
  548.0   
  402.0 
  402.0   
  2018-08-17 09:30 
  2018-08-17 09:30   
  2018-08-17 16:30 
  2018-08-17 16:30   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Reconnect CB A126 & A128 To Main Bus. Note:GRSM-TROUT & TROUT-GRSM = 402.. Path(Impact):GRESHAM-TROUTDALE(146)TROUTDALE-GRESHAM(146). *230kV,Continuous,Include Weekends*     2018-04-10 10:03     133287     2018-04-10 10:03  
  PPW 131573     5947     PPW     Fry-Calapooya section of the Diamond Hill-Fry 230 kV line          PACW-NTLOAD(PPW) 

  PACW-NTLOAD(PPW) 

  PACW-NTLOAD(PPW) 

  PACW-NTLOAD(PPW)   
  9999.0 

  9999.0 

  9999.0 

  9999.0   
  9999.0 

  9999.0 

  9999.0 

  9999.0   
  0.0 

  0.0 

  0.0 

  0.0   
  2018-08-20 06:00 

  2018-08-21 06:00 

  2018-08-22 06:00 

  2018-08-23 06:00   
  2018-08-20 18:30 

  2018-08-21 18:30 

  2018-08-22 18:30 

  2018-08-23 18:30   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Structure and Arm Replacements. Note:Network Load Service must be arranged for Calapooya, Diamond Hill & EWEB McKenzie.-Eliminates ability to move Network Load Service from Alvey to Gresham. Eliminates C&T Point to Point Service from Troutdale to Summer Lake.-Murder creek load will be served from BPA Albany-Salem source. Path(Impact):PACW NTLOAD(9999). *230kV,Daily,Include Weekends*     2018-03-01 12:32     131573     2018-03-01 12:32  
  PPW 132906     6093     PPW     Amasa-Difficulty 230 kV line          WAPAEAST-WAPANORTH(PPW) 
  WYOEAST-WYOCENTRAL(PPW)   
  170.0 
  950.0   
  170.0 
  950.0   
  161.0 
  920.0   
  2018-08-20 06:00 
  2018-08-20 06:00   
  2018-08-26 16:00 
  2018-08-26 16:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:A condition Maintenance. Note:4A/4B Curve 103. WAPAEAST-WAPANORTH (Wheel) = 233. WYOEAST-WYOCENTRAL (4A) = 920.-Foote Creek, High Plains/McFadden Ridge, Seven Mile Hill & Dunlap Wind restricted to a combined total of 375 mw.-Potential Additional Real Time Miners Area Wind Generation restriction.. Path(Impact):WYOEAST-WYOCENTRAL(30)WAPAEAST-WAPANORTH (9). *230kV,Continuous,Include Weekends*     2018-05-07 15:55     132906     2018-05-09 10:45  
  PPW 131574     5946     PPW     Calapooya-Diamond Hill section of the Diamond Hill-Fry 230 kV line          PACW-NTLOAD(PPW) 

  PACW-NTLOAD(PPW) 

  PACW-NTLOAD(PPW) 

  PACW-NTLOAD(PPW) 

  PACW-NTLOAD(PPW)   
  9999.0 

  9999.0 

  9999.0 

  9999.0 

  9999.0   
  9999.0 

  9999.0 

  9999.0 

  9999.0 

  9999.0   
  0.0 

  0.0 

  0.0 

  0.0 

  0.0   
  2018-08-24 06:00 

  2018-08-25 06:00 

  2018-08-26 06:00 

  2018-08-27 06:00 

  2018-08-28 06:00   
  2018-08-24 18:30 

  2018-08-25 18:30 

  2018-08-26 18:30 

  2018-08-27 18:30 

  2018-08-28 18:30   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Structure and Arm Replacements. Note:Network Load Service must be arranged for Diamond Hill & EWEB McKenzie. Eliminates ability to move Network Load Service from Alvey to Gresham. Eliminates ESM Point to Point Service from Troutdale to Summer Lake.-Murder creek load will be served from BPA Albany-Salem source. Path(Impact):PACW NTLOAD(9999). *230kV,Daily,Include Weekends*     2018-03-01 12:30     131574     2018-03-01 12:30  
  PPW 133504     6055     PPW     Merwin-BPA Cardwell 115 kV line          HYDROGEN-PACW(PPW)      9999.0      9999.0      0.0      2018-08-27 06:00      2018-08-29 18:30      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Construction:Relocate Line Position; BPA to Issue Terminal Clearance at BPA Cardwell; Cowlitz to Issue Terminal Clearance at Ariel. Note:Maximum Generating capability at Merwin/Yale is 162 mw (Summer) and 210 mw (Winter). *PCC-706. Path(Impact):HYDROGEN-PACW (9999). *115kV,Continuous,Include Weekends*     2018-04-18 14:11     133504     2018-04-18 15:08  
  PPW 132910     6095     PPW     Difficulty-Shirley Basin 230 kV line          WAPAEAST-WAPANORTH(PPW) 
  WYOEAST-WYOCENTRAL(PPW)   
  170.0 
  950.0   
  170.0 
  950.0   
  161.0 
  920.0   
  2018-08-27 06:00 
  2018-08-27 06:00   
  2018-08-27 16:00 
  2018-08-27 16:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:A Condition Repair. Note:4A/4B Curve 103. WAPAEAST-WAPANORTH (Wheel) = 233. WYOEAST-WYOCENTRAL (4A) = 920.-Foote Creek, High Plains/McFadden Ridge, Seven Mile Hill & Dunlap Wind restricted to a combined total of 375 mw.-Potential Additional Real Time Miners Area Wind Generation restriction.. Path(Impact):WYOEAST-WYOCENTRAL(30)WAPAEAST-WAPANORTH (9). *230kV,Continuous,Include Weekends*     2018-05-08 08:47     132910     2018-05-17 16:33  
  PPW 128221     5806     PPW     BPA McNary-Roundup #1 230 kV line          PACW-NTLOAD(PPW)      9999.0      9999.0      0.0      2018-08-27 08:00      2018-08-30 16:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Pole Replacement. Note:Pendleton Area 69 kV load will be served from IPCo La Grande source. Network Load Service Arrangements may be required.. Path(Impact):PACW NTLOAD(9999). *230kV,Continuous,Include Weekends*     2017-12-08 09:31     128221      2017-12-08 09:31  
  PPW 129444     6000     PPW     Muddy Creek-Mountain Wind 138 kV line          WINDGEN-PACE(PPW)      9999.0      9999.0      0.0      2018-08-27 08:30      2018-08-30 14:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:WECC Maintenance, Test Relays. Note:Mountain Wind will be offline (60 MW). Path(Impact):WIND GEN-PACE(9999). *138kV,Continuous,Include Weekends*     2018-03-29 07:57     129444     2018-03-29 07:57  
  PPW 129742     5872     PPW     Burns: Series Cap Segment #1, Series Cap Segment #2          JBSN-JB345(PPW)      1600.0      1600.0      1600.0      2018-08-27 11:00      2018-08-31 14:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Cap Inspection and Testing. Note:JBSN-JB345 = 2100. PacifiCorp = 1400. IPCo = 700. -. Path(Impact):JBSN-JB345(200). *500kV,Continuous,Include Weekends*     2018-01-24 15:03     129742     2018-05-04 07:03  
  PPW 132911     6096     PPW     Freezeout-Standpipe 230 kV line          WAPAEAST-WAPANORTH(PPW) 
  WYOEAST-WYOCENTRAL(PPW)   
  170.0 
  950.0   
  170.0 
  950.0   
  132.0 
  813.0   
  2018-08-28 06:00 
  2018-08-28 06:00   
  2018-08-28 16:00 
  2018-08-28 16:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:A Condition Repair. Note:4A/4B 105. WAPAEAST-WAPANORTH (Wheel) = 204. WYOEAST-WYOCENTRAL (4A) = 813. 4B Limit = 864.-Potential Additional Real Time Miners Area Wind Generation restriction.-WAPA INFO 18-1569.. Path(Impact):WYOEAST-WYOCENTRAL(137)WAPAEAST-WAPANORTH (38). *230kV,Continuous,Include Weekends*     2018-05-08 09:06     132911     2018-05-17 16:31  
  PPW 134615     6120     PPW     Leaning Juniper: Total Plant Restriction          WINDGEN-PACW(PPW)      9999.0      9999.0      0.0      2018-08-28 08:00      2018-08-28 16:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Other Utility Request:Jones Canyon Sw Repair. Note:Leaning Juniper Wind Restricted to 66 MW Max.. Path(Impact):WIND GEN-PACW(9999). *Continuous,Include Weekends*     2018-05-17 16:28     134615     2018-05-17 16:28  
  PPW 132915     6097     PPW     Jim Bridger-Rock Springs 230 kV line          JBSN-WYOCENTRAL(PPW) 
  THERMALGEN-PACE(PPW) 
  WYOCENTRAL-JBSN(PPW)   
  600.0 
  9999.0 
  600.0   
  600.0 
  9999.0 
  600.0   
  400.0 
  0.0 
  400.0   
  2018-08-29 06:00 
  2018-08-29 06:00 
  2018-08-29 06:00   
  2018-09-02 16:00 
  2018-09-02 16:00 
  2018-09-02 16:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:A condition Maintenance. Note:No Impact to 4A/4B or WAPA E/N with one of two parallel lines out of service between Jim Bridger & Rock Springs. -JBSN-WYOC & WYOC-JBSN = 400. Potential Real Time Impact to Jim Bridger Generation.. Path(Impact):WYOCENTRAL-JBSN(200)JBSN-WYOCENTRAL(200)THERMAL GEN-PACE(9999). *230kV,Continuous,Include Weekends*     2018-05-08 09:27     132915     2018-05-08 09:27  
  PPW 136234     6183     PPW     Thermopolis: 230/115 kV Bank #2 (T3735)          TOT4B-WYONORTH(PPW) 
  WAPAEAST-WAPANORTH(PPW) 
  WYOEAST-TOT4B(PPW) 
  WYOEAST-WYOCENTRAL(PPW)   
  638.0 
  170.0 
  638.0 
  950.0   
  638.0 
  170.0 
  638.0 
  950.0   
  543.0 
  145.0 
  543.0 
  945.0   
  2018-08-29 07:00 
  2018-08-29 07:00 
  2018-08-29 07:00 
  2018-08-29 07:00   
  2018-08-31 12:00 
  2018-08-31 12:00 
  2018-08-31 12:00 
  2018-08-31 12:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:PACW to Issue a Clearance for Arrestor Replacement. Note:4A/4B Curve 114. WAPA E/N = 217. WYOE-WYOC (4A) = 945. WYOEAST-TOT4B & TOT4B-WYONORTH = 543. 4B Limit = 760.-Yellowtail South to be determined by WAPA.. Path(Impact):WYOEAST-WYOCENTRAL(5)WAPAEAST-WAPANORTH (25)TOT4B-WYONORTH(95)WYOEAST-TOT4B(95). *230kV,Continuous,Include Weekends*     2018-07-05 08:26     136234     2018-07-05 08:26  
  PPW 133500     6072     PPW     Merwin-Chelatchie Tap section of the Merwin-Yale 115 kV line          HYDROGEN-PACW(PPW) 

  HYDROGEN-PACW(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  9999.0 

  0.0   
  2018-05-21 06:30 

  2018-09-04 06:30   
  2018-05-25 18:30 

  2018-09-07 18:30   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Construction:Substation Improvements. Note:Yale Generation unavailable (170 mw).. Path(Impact):HYDROGEN-PACW (9999). *115kV,Continuous,Return Weekends*     2018-04-25 07:30     133500     2018-05-03 10:10  
  PPW 133288     6027     PPW     BPA Troutdale: 230 kV Main Bus - East Section including CB A118 & A122 and -Troutdale-BPA Troutdale          GRESHAM-TROUTDALE(PPW) 
  TROUTDALE-GRESHAM(PPW)   
  548.0 
  548.0   
  548.0 
  548.0   
  402.0 
  402.0   
  2018-09-04 07:00 
  2018-09-04 07:00   
  2018-09-04 14:00 
  2018-09-04 14:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Separate CB A118 & A122 From Main Bus. Note:GRSM-TROUT & TROUT-GRSM = 402.. Path(Impact):GRESHAM-TROUTDALE(146)TROUTDALE-GRESHAM(146). *230kV,Continuous,Include Weekends*     2018-04-10 10:05     133288     2018-04-10 10:05  
  PPW 132956     6099     PPW     Echo Springs-Latham section of the Point of Rocks-Latham 230 kV line          WAPAEAST-WAPANORTH(PPW) 
  WYOEAST-WYOCENTRAL(PPW)   
  170.0 
  950.0   
  170.0 
  950.0   
  142.0 
  692.0   
  2018-09-06 06:00 
  2018-09-06 06:00   
  2018-09-06 15:00 
  2018-09-06 15:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:A Condition Repair. Note:4A/4B Curve 107. WAPAEAST-WAPANORTH (Wheel) = 214. WYOEAST-WYOCENTRAL (4A) = 692. 4B Limit = 875.-Pioneer, Foote Creek, High Plains/McFadden Ridge, Seven Mile Hill & Dunlap Wind restricted to a combined total of 375 mw..-Potential Additional Real Time Miners Area Wind Generation restriction.. Path(Impact):WYOEAST-WYOCENTRAL(258)WAPAEAST-WAPANORTH (28). *230kV,Continuous,Include Weekends*     2018-05-08 13:28     132956     2018-06-04 09:06  
  PPW 132959     6101     PPW     Casper-Riverton 230 kV line          TOT4B-WYONORTH(PPW) 
  WAPAEAST-WAPANORTH(PPW) 
  WYOEAST-TOT4B(PPW) 
  WYOEAST-WYOCENTRAL(PPW)   
  638.0 
  170.0 
  638.0 
  950.0   
  638.0 
  170.0 
  638.0 
  950.0   
  591.0 
  137.0 
  591.0 
  717.0   
  2018-09-10 06:00 
  2018-09-10 06:00 
  2018-09-10 06:00 
  2018-09-10 06:00   
  2018-09-12 16:00 
  2018-09-12 16:00 
  2018-09-12 16:00 
  2018-09-12 16:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:A condition arm replacement. Note:4A/4B Curve 118. WAPAEAST-WAPANORTH (Wheel) = 209. WYOEAST-WYOCENTRAL (4A) = 717. WYOEAST-TOT4B & TOT4B-WYONORTH = 591. 4B Limit = 800.. Path(Impact):WYOEAST-WYOCENTRAL(233)WAPAEAST-WAPANORTH (33)TOT4B-WYONORTH(47)WYOEAST-TOT4B(47). *230kV,Continuous,Include Weekends*     2018-05-08 13:40     132959     2018-05-09 10:25  
  PPW 131651     5941     PPW     BPA Salem-Dallas section of the BPA Salem-Monpac 115 kV line          PACW-NTLOAD(PPW)      9999.0      9999.0      0.0      2018-09-10 07:00      2018-09-15 17:30      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Structure and Insulator Replacements. Note:Network Load Service may need to arranged for Dallas & Independence via Monpac. (Monpac Sw 2M88 will be closed & Dallas Sw 2M150 will be open)-. Path(Impact):PACW NTLOAD(9999). *115kV,Continuous,Include Weekends*     2018-03-01 08:47     131651     2018-03-01 14:18  
  PPW 132960     6103     PPW     Riverton-Thermopolis 230 kV line          TOT4B-WYONORTH(PPW) 
  WAPAEAST-WAPANORTH(PPW) 
  WYOEAST-TOT4B(PPW) 
  WYOEAST-WYOCENTRAL(PPW)   
  638.0 
  170.0 
  638.0 
  950.0   
  638.0 
  170.0 
  638.0 
  950.0   
  589.0 
  148.0 
  589.0 
  888.0   
  2018-09-13 06:00 
  2018-09-13 06:00 
  2018-09-13 06:00 
  2018-09-13 06:00   
  2018-09-13 16:00 
  2018-09-13 16:00 
  2018-09-13 16:00 
  2018-09-13 16:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:A Condition Arm Replacement; PACE to Issue a Clearance to WAPA for Installing Aerial Marker Balls. Note:4A/4B Curve 116. WAPAEAST-WAPANORTH (Wheel) = 220. WYOEAST-WYOCENTRAL (4A) = 888. WYOEAST-TOT4B & TOT4B-WYONORTH = 589. 4B Limit = 809.. Path(Impact):WYOEAST-WYOCENTRAL(62)WAPAEAST-WAPANORTH (22)TOT4B-WYONORTH(49)WYOEAST-TOT4B(49). *230kV,Continuous,Include Weekends*     2018-05-08 13:53     132960     2018-07-17 15:38  
  PPW 132963     6104     PPW     Buffalo-MDU Sheridan 230 kV line          PACE-NTLOAD(PPW)      9999.0      9999.0      0.0      2018-09-17 06:00      2018-09-21 16:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:A condition Arm Replacement. Note:Alternate Transmission Arrangements may required for WyoDak Area Generation or to serve PacifiCorp Load.-No 4A/4B or WAPA Wheel impact as long as Sheridan is tied through to WyoDak via Tongue River.. Path(Impact):PACE NTLOAD(9999). *230kV,Continuous,Include Weekends*     2018-05-08 15:28     132963     2018-05-09 10:26  
  PPW 131653     5942     PPW     Dallas-Monpac section of the BPA Salem-Monpac 115 kV line          PACW-NTLOAD(PPW)      9999.0      9999.0      0.0      2018-09-17 07:00      2018-09-19 17:30      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Insulator Replacements. Note:Network Load Service may need to arranged for Independence via Monpac. (Monpac Sw 2M88 will be closed & Monpac Sw 2M139 and Dallas Sw 2M149 will be open). Path(Impact):PACW NTLOAD(9999). *115kV,Continuous,Include Weekends*     2018-03-01 08:50     131653     2018-03-01 14:17  
  PPW 130214     5874     PPW     PGE Bethel-Parrish Gap 230 kV line          BETHEL-PACW(PPW) 
  PACW-PACW.PGE(PPW) 
  PACW.PGE-PACW(PPW) 

  BETHEL-PACW(PPW) 
  PACW-PACW.PGE(PPW) 
  PACW.PGE-PACW(PPW) 

  BETHEL-PACW(PPW) 
  PACW-PACW.PGE(PPW) 
  PACW.PGE-PACW(PPW) 

  BETHEL-PACW(PPW) 
  PACW-PACW.PGE(PPW) 
  PACW.PGE-PACW(PPW)   
  0.0 
  320.0 
  320.0 

  0.0 
  320.0 
  320.0 

  0.0 
  320.0 
  320.0 

  0.0 
  320.0 
  320.0   
  0.0 
  320.0 
  320.0 

  0.0 
  320.0 
  320.0 

  0.0 
  320.0 
  320.0 

  0.0 
  320.0 
  320.0   
  0.0 
  320.0 
  320.0 

  0.0 
  320.0 
  320.0 

  0.0 
  320.0 
  320.0 

  0.0 
  159.0 
  159.0   
  2018-04-02 08:00 
  2018-04-02 08:00 
  2018-04-02 08:00 

  2018-05-14 08:00 
  2018-05-14 08:00 
  2018-05-14 08:00 

  2018-05-23 08:00 
  2018-05-23 08:00 
  2018-05-23 08:00 

  2018-09-17 08:00 
  2018-09-17 08:00 
  2018-09-17 08:00   
  2018-04-20 16:00 
  2018-04-20 16:00 
  2018-04-20 16:00 

  2018-05-23 08:00 
  2018-05-23 08:00 
  2018-05-23 08:00 

  2018-06-01 16:00 
  2018-06-01 16:00 
  2018-06-01 16:00 

  2018-10-05 16:00 
  2018-10-05 16:00 
  2018-10-05 16:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:PAC to Issue Terminal Clearance at Parrish for PGE Installation of CT for New EIM Metering; PGE to Issue Terminal Clearance at Bethel; Repair Broken Cross-Arm. Note:BETHEL-PACW = 0. PACW-BETHEL = Parrish Gap Load.-PACW-PGE.PACW & PACW.PGE-PACW = 159 Summer/149 Winter-Eliminates Network Load Service from Troutdale to Fry. Elminates C&T Point to Point Service from Troutdale to Summer Lake.. Path(Impact):BETHEL-PACW(402)PACW-PACW.PGE(161)PACW.PGE-PACW(161). *230kV,Continuous,Include Weekends*     2018-01-24 15:20     130214     2018-04-12 09:35  
  PPW 136804     6198     PPW     Big Grassy-Jefferson 161 kV line (Jefferson - Idaho: CB 163)          PACE-NTLOAD(PPW)      9999.0      9999.0      0.0      2018-09-17 08:00      2018-10-12 15:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Change Out Line and Bus Switches and Bypass Switch to CB 163 at Jefferson. Note:Big Grassy 69 kV Load will be served by NWE from Millcreek via Dillon/Dell. Network Load Service Arrangements may be required.-Any path restrictions are to be determined by NWE.. Path(Impact):PACE NTLOAD(9999). *161kV,Continuous,Include Weekends*     2018-07-19 14:23     136804     2018-07-19 14:24  
  PPW 131654     5940     PPW     Goshen-EPUD Creswell section of the BPA Alvey-Martin Creek 115 kV line          PACW-NTLOAD(PPW)      9999.0      9999.0      0.0      2018-09-20 07:00      2018-09-20 17:30      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Reframes. Note:Village Green load will be served from BPA Martin Creek substation. Network load service may be required.. Path(Impact):PACW NTLOAD(9999). *115kV,Continuous,Include Weekends*     2018-03-01 08:37     131654     2018-03-01 08:57  
  PPW 133289     6028     PPW     BPA Troutdale: 230 kV Main Bus - East Section including CB A118 & A122 and -Troutdale-BPA Troutdale          GRESHAM-TROUTDALE(PPW) 
  TROUTDALE-GRESHAM(PPW)   
  548.0 
  548.0   
  548.0 
  548.0   
  402.0 
  402.0   
  2018-09-21 10:00 
  2018-09-21 10:00   
  2018-09-21 16:30 
  2018-09-21 16:30   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Reconnect CB A118 & A122 To Main Bus. Note:GRSM-TROUT & TROUT-GRSM = 402.. Path(Impact):GRESHAM-TROUTDALE(146)TROUTDALE-GRESHAM(146). *230kV,Continuous,Include Weekends*     2018-04-10 10:06     133289     2018-04-10 10:06  
  PPW 132965     6105     PPW     Kaycee-Midwest section of the Buffalo-Claim Jumper 230 kV line          TOT4B-WYONORTH(PPW) 
  WAPAEAST-WAPANORTH(PPW) 
  WYOEAST-TOT4B(PPW) 
  WYOEAST-WYOCENTRAL(PPW)   
  638.0 
  170.0 
  638.0 
  950.0   
  638.0 
  170.0 
  638.0 
  950.0   
  600.0 
  145.0 
  600.0 
  945.0   
  2018-09-24 06:00 
  2018-09-24 06:00 
  2018-09-24 06:00 
  2018-09-24 06:00   
  2018-09-25 16:00 
  2018-09-25 16:00 
  2018-09-25 16:00 
  2018-09-25 16:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:A Condition Maintenance. Note:4A/4B Curve 119. WAPAEAST-WAPANORTH (Wheel) = 217. WYOEAST-WYOCENTRAL (4A) = 945. WYOEAST-TOT4B & TOT4B-WYONORTH = 600. 4B Limit = 817.. Path(Impact):WYOEAST-WYOCENTRAL(5)WAPAEAST-WAPANORTH (25)TOT4B-WYONORTH(38)WYOEAST-TOT4B(38). *230kV,Continuous,Include Weekends*     2018-05-09 08:22     132965     2018-05-17 16:32  
  PPW 131655     5939     PPW     EPUD Creswell-Village Green section of the BPA Alvey-BPA Martin Creek 115 kV line          PACW-NTLOAD(PPW)      9999.0      9999.0      0.0      2018-09-24 07:00      2018-09-26 17:30      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Reframes. Note:Village Green load will be served from BPA Martine Creek. Network load service may be required.. Path(Impact):PACW NTLOAD(9999). *115kV,Continuous,Include Weekends*     2018-03-01 08:24     131655     2018-03-01 08:52  
  PPW 131718     5967     PPW     Union Gap-BPA Midway 230 kV line mitigated with -Hopland-Union Gap section of the BPA Moxee-Union Ga          MIDWAY230-PACW(PPW) 
  PACW-MIDWAY230(PPW) 
  PACW-NTLOAD(PPW) 

  MIDWAY230-PACW(PPW) 
  PACW-MIDWAY230(PPW) 
  PACW-NTLOAD(PPW) 

  MIDWAY230-PACW(PPW) 
  PACW-MIDWAY230(PPW) 
  PACW-NTLOAD(PPW) 

  MIDWAY230-PACW(PPW) 
  PACW-MIDWAY230(PPW) 
  PACW-NTLOAD(PPW) 

  MIDWAY230-PACW(PPW) 
  PACW-MIDWAY230(PPW) 
  PACW-NTLOAD(PPW) 

  MIDWAY230-PACW(PPW) 
  PACW-MIDWAY230(PPW) 
  PACW-NTLOAD(PPW) 

  MIDWAY230-PACW(PPW) 
  PACW-MIDWAY230(PPW) 
  PACW-NTLOAD(PPW) 

  MIDWAY230-PACW(PPW) 
  PACW-MIDWAY230(PPW) 
  PACW-NTLOAD(PPW) 

  MIDWAY230-PACW(PPW) 
  PACW-MIDWAY230(PPW) 
  PACW-NTLOAD(PPW) 

  MIDWAY230-PACW(PPW) 
  PACW-MIDWAY230(PPW) 
  PACW-NTLOAD(PPW)   
  150.0 
  150.0 
  9999.0 

  150.0 
  150.0 
  9999.0 

  150.0 
  150.0 
  9999.0 

  150.0 
  150.0 
  9999.0 

  150.0 
  150.0 
  9999.0 

  150.0 
  150.0 
  9999.0 

  150.0 
  150.0 
  9999.0 

  150.0 
  150.0 
  9999.0 

  150.0 
  150.0 
  9999.0 

  150.0 
  150.0 
  9999.0   
  150.0 
  150.0 
  9999.0 

  150.0 
  150.0 
  9999.0 

  150.0 
  150.0 
  9999.0 

  150.0 
  150.0 
  9999.0 

  150.0 
  150.0 
  9999.0 

  150.0 
  150.0 
  9999.0 

  150.0 
  150.0 
  9999.0 

  150.0 
  150.0 
  9999.0 

  150.0 
  150.0 
  9999.0 

  150.0 
  150.0 
  9999.0   
  150.0 
  150.0 
  9999.0 

  150.0 
  150.0 
  9999.0 

  150.0 
  150.0 
  9999.0 

  150.0 
  150.0 
  9999.0 

  150.0 
  150.0 
  9999.0 

  0.0 
  0.0 
  0.0 

  0.0 
  0.0 
  0.0 

  0.0 
  0.0 
  0.0 

  0.0 
  0.0 
  0.0 

  0.0 
  0.0 
  0.0   
  2018-05-14 08:00 
  2018-05-14 08:00 
  2018-05-14 08:00 

  2018-05-15 08:00 
  2018-05-15 08:00 
  2018-05-15 08:00 

  2018-05-16 08:00 
  2018-05-16 08:00 
  2018-05-16 08:00 

  2018-05-17 08:00 
  2018-05-17 08:00 
  2018-05-17 08:00 

  2018-05-18 08:00 
  2018-05-18 08:00 
  2018-05-18 08:00 

  2018-09-24 08:00 
  2018-09-24 08:00 
  2018-09-24 08:00 

  2018-09-25 08:00 
  2018-09-25 08:00 
  2018-09-25 08:00 

  2018-09-26 08:00 
  2018-09-26 08:00 
  2018-09-26 08:00 

  2018-09-27 08:00 
  2018-09-27 08:00 
  2018-09-27 08:00 

  2018-09-28 08:00 
  2018-09-28 08:00 
  2018-09-28 08:00   
  2018-05-14 17:00 
  2018-05-14 17:00 
  2018-05-14 17:00 

  2018-05-15 17:00 
  2018-05-15 17:00 
  2018-05-15 17:00 

  2018-05-16 17:00 
  2018-05-16 17:00 
  2018-05-16 17:00 

  2018-05-17 17:00 
  2018-05-17 17:00 
  2018-05-17 17:00 

  2018-05-18 17:00 
  2018-05-18 17:00 
  2018-05-18 17:00 

  2018-09-24 17:00 
  2018-09-24 17:00 
  2018-09-24 17:00 

  2018-09-25 17:00 
  2018-09-25 17:00 
  2018-09-25 17:00 

  2018-09-26 17:00 
  2018-09-26 17:00 
  2018-09-26 17:00 

  2018-09-27 17:00 
  2018-09-27 17:00 
  2018-09-27 17:00 

  2018-09-28 17:00 
  2018-09-28 17:00 
  2018-09-28 17:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:BPA to issue a Terminal Clearance at Midway A998 Terminal; Transferring and Replacing 3 Pole Structure 3/17; Transfer Hopland to BPA Moxee source. Note:MIDW2-PACW & PACW-MIDW2 = 0.-Hopland will be fed radially from BPA Moxee source, network load service may be required.-Reduces Yakima Area Load Service Capability. Path(Impact):MIDWAY230-PACW(150)PACW-MIDWAY230(150)PACW NTLOAD(9999). *230kV,Daily,Include Weekends*     2018-03-09 11:29     131718     2018-05-02 15:27  
  PPW 135197     6137     PPW     BPA Ross-Woodland Tap-BPA Lexington 230 kV line including-Swift #2-Woodland Tap 230 kV line          HYDROGEN-PACW(PPW) 
  PACW-WOODLANDTAP(PPW) 
  WOODLANDTAP-PACW(PPW)   
  9999.0 
  370.0 
  370.0   
  9999.0 
  370.0 
  370.0   
  0.0 
  0.0 
  0.0   
  2018-09-24 08:00 
  2018-09-24 08:00 
  2018-09-24 08:00   
  2018-09-30 16:30 
  2018-09-30 16:30 
  2018-09-30 16:30   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Other Utility Request:Replace Disconnects A1010, A1008, & A1009. Note:Swift #1 & #2 Generation unavailable (333 mw).-PACW-WOODLANDTAP & WOODLANDTAP-PACW = 0.. Path(Impact):HYDROGEN-PACW (9999)PACW-WOODLANDTAP(370)WOODLANDTAP-PACW(370). *230kV,Continuous,Include Weekends*     2018-06-05 13:57     135197     2018-06-15 15:38  
  PPW 131007     5905     PPW     Sheridan-Yellowtail 230 kV line          TOT4B-WYONORTH(PPW) 
  WAPAEAST-WAPANORTH(PPW) 
  WYOEAST-TOT4B(PPW) 
  WYOEAST-WYOCENTRAL(PPW) 

  TOT4B-WYONORTH(PPW) 
  WAPAEAST-WAPANORTH(PPW) 
  WYOEAST-TOT4B(PPW) 
  WYOEAST-WYOCENTRAL(PPW)   
  638.0 
  170.0 
  638.0 
  950.0 

  638.0 
  170.0 
  638.0 
  950.0   
  638.0 
  170.0 
  638.0 
  950.0 

  638.0 
  170.0 
  638.0 
  950.0   
  638.0 
  170.0 
  638.0 
  950.0 

  508.0 
  102.0 
  508.0 
  930.0   
  2018-05-01 06:00 
  2018-05-01 06:00 
  2018-05-01 06:00 
  2018-05-01 06:00 

  2018-10-01 06:00 
  2018-10-01 06:00 
  2018-10-01 06:00 
  2018-10-01 06:00   
  2018-05-29 16:30 
  2018-05-29 16:30 
  2018-05-29 16:30 
  2018-05-29 16:30 

  2018-10-29 16:30 
  2018-10-29 16:30 
  2018-10-29 16:30 
  2018-10-29 16:30   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:24 A Condition Structure Replacements. Note:4A/4B Curve 109. WAPAEAST-WAPANORTH (Wheel) = 174. WYOEAST-WYOCENTRAL (4A) = 930. WYOEAST-TOT4B & TOT4B-WYONORTH = 508. 4B Limit = 682. -Yellowtail South limit to be determined by WAPA.. Path(Impact):WYOEAST-WYOCENTRAL(20)WAPAEAST-WAPANORTH (68)TOT4B-WYONORTH(130)WYOEAST-TOT4B(130). *230kV,Continuous,Include Weekends*     2018-02-14 15:31     131007     2018-03-23 08:57  
  PPW 120995     5459     PPW     BPA McNary-Roundup #1 230 kV line          PACW-NTLOAD(PPW)      9999.0      9999.0      0.0      2018-10-04 07:30      2018-10-05 16:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Fiber Replacement. Note:Pendleton Area 69 kV load will be served from IPCo La Grande source. Network Load Service Arrangements may be required.. Path(Impact):PACW NTLOAD(9999). *230kV,Continuous,Include Weekends*     2017-07-06 13:37     120995      2017-07-06 13:37  
  PPW 122729     5541     PPW     BPA McNary-Dalreed section of the BPA McNary-Jones Canyon 230 kV line (Morrow Flat-Dalreed section)          PACW-NTLOAD(PPW) 
  WINDGEN-PACW(PPW)   
  9999.0 
  9999.0   
  9999.0 
  9999.0   
  0.0 
  0.0   
  2018-10-08 06:30 
  2018-10-08 06:30   
  2018-10-08 17:00 
  2018-10-08 17:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Other Utility Request:Fiber Replacement Within Boardman Substation Bay 4 Tower 1/1.. Note:Dalreed will be radial from BPA Jones Canyon. Network Load Service Arrangements may be required. Leaning Juniper Generation must be off line before switching the BPA Jones Canyon-Dalreed line section out of service and again before switching it back in service. During the line outage, Leaning Juniper Generation is restricted to 40 mw.. Path(Impact):WIND GEN-PACW(9999)PACW NTLOAD(9999). *230kV,Continuous,Include Weekends*     2017-08-10 09:37     122729      2017-08-10 09:43  
  PPW 134311     6151     PPW     Hemingway-Summer Lake 500 kV line          H500-SMLK(PPW) 
  JBSN-JB345(PPW) 
  PACW-NTLOAD(PPW) 
  SMLK-H500(PPW) 

  H500-SMLK(PPW) 
  JBSN-JB345(PPW) 
  PACW-NTLOAD(PPW) 
  SMLK-H500(PPW)   
  1500.0 
  1600.0 
  9999.0 
  100.0 

  1500.0 
  1600.0 
  9999.0 
  100.0   
  1500.0 
  1600.0 
  9999.0 
  100.0 

  1500.0 
  1600.0 
  9999.0 
  100.0   
  1500.0 
  1600.0 
  9999.0 
  100.0 

  0.0 
  1467.0 
  0.0 
  0.0   
  2018-10-01 08:00 
  2018-10-01 08:00 
  2018-10-01 08:00 
  2018-10-01 08:00 

  2018-10-08 08:00 
  2018-10-08 08:00 
  2018-10-08 08:00 
  2018-10-08 08:00   
  2018-10-05 16:30 
  2018-10-05 16:30 
  2018-10-05 16:30 
  2018-10-05 16:30 

  2018-10-12 16:30 
  2018-10-12 16:30 
  2018-10-12 16:30 
  2018-10-12 16:30   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:BPA DCC to issue a Terminal Clearance at Summer Lake; IPCo to issue a Terminal Clearance at Hemingway; Insulator Washing and Bird Deflector Installation. Note:H500-SMLK & SMLK-H500 = 0.-JBSN-JB345 = 2200. PacifiCorp = 1467. IPCo = 733.-Network Load Service Arrangements may be required for Southern Oregon Load.. Path(Impact):JBSN-JB345(133)PACW NTLOAD(9999)SMLK-H500(100)H500-SMLK(1500). *500kV,Continuous,Include Weekends*     2018-06-07 15:01     134311     2018-06-29 10:36  
  PPW 129257     5842     PPW     Three Mile Canyon: CB 4K2          WINDGEN-PACW(PPW)      9999.0      9999.0      0.0      2018-10-19 08:00      2018-10-19 16:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Customer Request:Grid Operator to Issue a Terminal Clearance for Three Mile Canyon Wind Farm Transformer Maintenance. Note:Three Mile Canyon Wind Generation will not be available.. Path(Impact):WIND GEN-PACW(9999). *34.5kV,Continuous,Include Weekends*     2018-01-04 14:11     129257      2018-01-04 14:12  