PPW Outages 
Nov 14, 2017 - May 17, 2018
Report created on Nov 18, 2017 at 21:00 (PPT)
Outage
Name
Outage
Id
Company Facility Flow
Gate
Segment/
JOTSFacility
Original
TTC In
Original
TTC Out
New
TTC
Start Time (PPT) Stop Time (PPT) Status Outage
Category
Outage
Type
Path
Impact
Report
TPs
Annotation Creation Time (PPT) EventId
  PPW 117095     5512     PPW     Casper-WAPA Spence 230 kV line (WAPA Spence: CB 582 & CB 586)          TOT4B-WYONORTH(PPW) 
  WAPAEAST-WAPANORTH(PPW) 
  WYOEAST-TOT4B(PPW) 
  WYOEAST-WYOCENTRAL(PPW) 

  TOT4B-WYONORTH(PPW) 
  WAPAEAST-WAPANORTH(PPW) 
  WYOEAST-TOT4B(PPW) 
  WYOEAST-WYOCENTRAL(PPW) 

  TOT4B-WYONORTH(PPW) 
  WAPAEAST-WAPANORTH(PPW) 
  WYOEAST-TOT4B(PPW) 
  WYOEAST-WYOCENTRAL(PPW)   
  638.0 
  170.0 
  638.0 
  950.0 

  638.0 
  170.0 
  638.0 
  950.0 

  638.0 
  170.0 
  638.0 
  950.0   
  638.0 
  170.0 
  638.0 
  950.0 

  638.0 
  170.0 
  638.0 
  950.0 

  638.0 
  170.0 
  638.0 
  950.0   
  638.0 
  170.0 
  638.0 
  950.0 

  629.0 
  128.0 
  629.0 
  685.0 

  629.0 
  128.0 
  629.0 
  685.0   
  2017-09-15 07:00 
  2017-09-15 07:00 
  2017-09-15 07:00 
  2017-09-15 07:00 

  2017-09-25 07:00 
  2017-09-25 07:00 
  2017-09-25 07:00 
  2017-09-25 07:00 

  2017-10-02 07:00 
  2017-10-02 07:00 
  2017-10-02 07:00 
  2017-10-02 07:00   
  2017-09-25 07:00 
  2017-09-25 07:00 
  2017-09-25 07:00 
  2017-09-25 07:00 

  2017-10-02 07:00 
  2017-10-02 07:00 
  2017-10-02 07:00 
  2017-10-02 07:00 

  2017-11-24 16:00 
  2017-11-24 16:00 
  2017-11-24 16:00 
  2017-11-24 16:00   
  Active     TRANSMISSION     PLANNED      ONPATH     PPW     Other Utility Request:Replace Foundation, Jumpers and CB's 582/586. Note:4A/4B Curve 122. WAPA E/N = 200. WYOE-WYOC (4A) = 685. WYOEAST-TOT4B & TOT4B-WYONORTH = 629. 4B Limit =829.. Path(Impact):WYOEAST-WYOCENTRAL(265)WAPAEAST-WAPANORTH (42)TOT4B-WYONORTH(9)WYOEAST-TOT4B(9). *230kV,Continuous,Include Weekends*     2017-08-03 13:24     117095  
  PPW 125236     5668     PPW     Grace: CB L107, 161/138 kV XFMR #7          GSHN-PATHC(PPW) 
  NUT-PATHC(PPW) 
  PATHC-GSHN(PPW) 

  NUT-PATHC(PPW)   
  348.0 
  1060.0 
  148.0 

  1172.0   
  348.0 
  1060.0 
  148.0 

  1172.0   
  200.0 
  747.0 
  0.0 

  859.0   
  2017-10-16 07:00 
  2017-10-16 07:00 
  2017-10-16 07:00 

  2017-11-01 00:00   
  2017-11-30 16:00 
  2017-11-01 00:00 
  2017-11-30 16:00 

  2017-11-30 16:00   
  Active     TRANSMISSION     PLANNED      ONPATH     PPW     Construction:Replace and relocate relaying and control to CBL107 and XFMR #7. Note:NUT-PATHC = 685 Summer/642 Winter. -GSHN-PATHC = 200. PATHC-GSHN = 0. Path(Impact):NUT-PATHC(313)GSHN-PATHC(148)PATHC-GSHN(148). *161kV,Continuous,Include Weekends*     2017-10-06 14:26     125236  
  PPW 122971     5716     PPW     Wallula-Walla Walla 230 kV line          WALLAWALLA-WALLULA(PPW) 
  WALLULA-WALLAWALLA(PPW)   
  402.0 
  480.0   
  402.0 
  480.0   
  0.0 
  0.0   
  2017-10-30 09:00 
  2017-10-30 09:00   
  2017-12-12 16:30 
  2017-12-12 16:30   
  Active     TRANSMISSION     PLANNED      ONPATH     PPW     Construction:Construction of new 230 kV Ring Bus at Wallula. Note:WALLAWALLA-WALLULA, WALLULA-WALLAWALLA = 0.-Cold Springs will be radial from BPA McNary. Network Load Service Arrangements may be required.-Cuts JB RTSA 400 mw Transfer to McNary to 0. Affects C&T Midpoint-Meridian Agreement. Transfers to Santiam (40 mw), Albany (84 mw) & Alvey (241 mw).. Path(Impact):WALLULA-WALLAWALLA(480)WALLAWALLA-WALLULA (402). *230kV,Continuous,Include Weekends*     2017-10-19 15:24     122971  
  PPW 125042     5648     PPW     NVE Harry Allen: Phase Shifter #2          REDB-REDBL(PPW) 
  REDBL-REDB(PPW)   
  470.0 
  470.0   
  470.0 
  470.0   
  193.0 
  293.0   
  2017-11-06 07:00 
  2017-11-06 07:00   
  2017-11-17 16:00 
  2017-11-17 16:00   
  Completed     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Replace Arrestors & Bladder. Note:REDBL-REDB (TOT 2C N>S) = 193. REDB-REDBL (TOT 2C S>N) = 293. -Net IPP Imports Impact.. Path(Impact):REDB-REDBL(277)REDBL-REDB(177). *345kV,Continuous,Include Weekends*     2017-09-25 13:10     125042  
  PPW 126090     5710     PPW     Cascade 115 kV Tie (Path 25 Schedule Limitation)          CRAG-CRAGVIEW(PPW) 
  CRAGVIEW-CRAG(PPW)   
  45.0 
  80.0   
  45.0 
  80.0   
  45.0 
  80.0   
  2017-11-12 06:00 
  2017-11-12 06:00   
  2017-11-15 05:00 
  2017-11-15 05:00   
  CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     Other Utility Request:Cascade-Benton-Deschutes 60KV Line Section (Loomis Jct-Wintu Jct) Cleared. Note:CRAG-CRAGVIEW = 0.-CRAGVIEW-CRAG = 50.. Path(Impact):CRAG-CRAGVIEW(45)CRAGVIEW-CRAG(30). *115kV,Continuous,Include Weekends*     2017-10-18 10:10     126090  
  PPW 122378     5508     PPW     Troutdale-PGE Gresham 230 kV line          GRESHAM-TROUTDALE(PPW) 
  TROUTDALE-GRESHAM(PPW)   
  659.0 
  659.0   
  659.0 
  659.0   
  659.0 
  659.0   
  2017-11-13 07:30 
  2017-11-13 07:30   
  2017-11-17 13:30 
  2017-11-17 13:30   
  Completed     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:PACW to Issue a Terminal Clearance at Troutdale For Pole Replacement. Note:GRSM-TROUT & TROUT-GRSM = 378.. Path(Impact):GRESHAM-TROUTDALE(281)TROUTDALE-GRESHAM(281). *230kV,Continuous,Include Weekends*     2017-08-03 09:37     122378  
  PPW 121217     5737     PPW     Klamath Falls-Snow Goose 230 kV line (Klamath Falls: CB 1L3)          PACW-NTLOAD(PPW) 

  PACW-NTLOAD(PPW) 

  PACW-NTLOAD(PPW)   
  9999.0 

  9999.0 

  9999.0   
  9999.0 

  9999.0 

  9999.0   
  9999.0 

  9999.0 

  9999.0   
  2017-11-13 09:00 

  2017-11-13 10:30 

  2017-11-17 13:00   
  2017-11-13 10:30 

  2017-11-17 13:00 

  2017-11-17 14:00   
  Completed     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Maintenance. Note:Southern Oregon LCC limited to 1010 mw.-Potential CRAGVIEW-CRAG restriction if Southern Oregon Load + Cascade Tie Schedule is above 1010 mw.. Path(Impact):PACW NTLOAD(9999). *230kV,Continuous,Include Weekends*     2017-11-02 12:44     121217  
  PPW 126377     5726     PPW     Burns: Series Cap Segment #1, Series Cap Segment #2 (Bypassed)          BORA-M500(PPW) 
  JBSN-JB345(PPW)   
  1090.0 
  1600.0   
  1090.0 
  1600.0   
  815.0 
  1400.0   
  2017-11-14 08:00 
  2017-11-14 08:00   
  2017-11-21 13:00 
  2017-11-21 13:00   
  Active     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Maintenance. Note:JBSN-JB345 = 2100. PacifiCorp = 1400. IPCo = 700.-BORA--M500 = 815 (IPCo determined)-. Path(Impact):JBSN-JB345(200)BORA-M500(275). *500kV,Continuous,Include Weekends*     2017-10-25 10:25     126377  
  PPW 126249     5718     PPW     PG&E Cascade-Benton-Deschutes 60 kV line (Wintu Jct-Loomis Jct Section)          CRAG-CRAGVIEW(PPW) 
  CRAGVIEW-CRAG(PPW)   
  45.0 
  80.0   
  45.0 
  80.0   
  45.0 
  80.0   
  2017-11-15 05:00 
  2017-11-15 05:00   
  2017-11-15 07:30 
  2017-11-15 07:30   
  CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     Other Utility Request:Relocate Jumpers on pole 008/170 to isolate Wintu Jct SW37. This will energize Wintu Tap from SW39. Note:CRAG-WEED restricted to "0" mw, WEED-CRAG restricted to 50 mw.. Path(Impact):CRAG-CRAGVIEW(45)CRAGVIEW-CRAG(30). *69kV,Continuous,Include Weekends*     2017-10-20 12:52     126249  
  PPW 126270     5719     PPW     Cascade 115 kV Tie (Path 25 Schedule Limitation)          CRAG-CRAGVIEW(PPW) 
  CRAGVIEW-CRAG(PPW) 

  CRAG-CRAGVIEW(PPW) 
  CRAGVIEW-CRAG(PPW)   
  45.0 
  80.0 

  45.0 
  80.0   
  45.0 
  80.0 

  45.0 
  80.0   
  45.0 
  80.0 

  45.0 
  80.0   
  2017-11-15 05:00 
  2017-11-15 05:00 

  2017-11-15 07:00 
  2017-11-15 07:00   
  2017-11-15 07:00 
  2017-11-15 07:00 

  2017-11-15 07:30 
  2017-11-15 07:30   
  CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     Other Utility Request:Relocate Jumpers on pole 008/170 to isolate Wintu Jct SW37. This will energize Wintu Tap from SW39.. Note:CRAG-CRAGVIEW = 0. -CRAGVIEW-CRAG = 50. Path(Impact):CRAG-CRAGVIEW(45)CRAGVIEW-CRAG(30). *115kV,Continuous,Include Weekends*     2017-10-20 14:45     126270  
  PPW 126320     5723     PPW     Cascade 115 kV Tie (Path 25 Schedule Limitation)          CRAG-CRAGVIEW(PPW) 
  CRAGVIEW-CRAG(PPW)   
  45.0 
  80.0   
  45.0 
  80.0   
  45.0 
  80.0   
  2017-11-15 07:00 
  2017-11-15 07:00   
  2017-11-17 16:00 
  2017-11-17 16:00   
  CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     Other Utility Request:REPLACE WINTU JCT SWITCH 37 WITH A SEECO MANUFACTURED SCADA SWITCH. Note:CRAG-CRAGVIEW = 0. -CRAGVIEW-CRAG = 50. Path(Impact):CRAG-CRAGVIEW(45)CRAGVIEW-CRAG(30). *115kV,Continuous,Include Weekends*     2017-10-23 09:53     126320  
  PPW 126130     5713     PPW     Four Corners-Pinto 345 kV line          FOURCORNE345-PINTO(PPW) 
  PACE-PINTO(PPW) 
  PINTO-FOURCORNE345(PPW) 
  REDBL-REDB(PPW) 

  FOURCORNE345-PINTO(PPW) 
  PACE-PINTO(PPW) 
  PINTO-FOURCORNE345(PPW) 
  REDBL-REDB(PPW)   
  660.0 
  740.0 
  625.0 
  470.0 

  660.0 
  740.0 
  625.0 
  470.0   
  660.0 
  740.0 
  625.0 
  470.0 

  660.0 
  740.0 
  625.0 
  470.0   
  660.0 
  740.0 
  625.0 
  470.0 

  660.0 
  740.0 
  625.0 
  470.0   
  2017-11-17 12:00 
  2017-11-17 12:00 
  2017-11-17 12:00 
  2017-11-17 12:00 

  2017-11-17 14:00 
  2017-11-17 14:00 
  2017-11-17 14:00 
  2017-11-17 14:00   
  2017-11-17 14:00 
  2017-11-17 14:00 
  2017-11-17 14:00 
  2017-11-17 14:00 

  2017-11-17 15:00 
  2017-11-17 15:00 
  2017-11-17 15:00 
  2017-11-17 15:00   
  Completed     TRANSMISSION     PLANNED      ONPATH     PPW     Other Utility Request:Switching Line to Remove Line Reactor From Service. Note:PINTO-FOURCORNE345 & FOURCORNE345-PINTO = 0. PACE-PINTO = Pinto load.-REDBL-REDB = 180-Net IPP Imports Impact.. Path(Impact):REDBL-REDB(290)PACE-PINTO(0)PINTO-FOURCORNE345(625)FOURCORNE345-PINTO(660). *345kV,Continuous,Include Weekends*     2017-10-18 14:41     126130  
  PPW 127482     5768     PPW     Threemile Knoll: Series Cap C2          JBSN-JB345(PPW) 
  NUT-PATHC(PPW) 
  PATHC-NUT(PPW)   
  1600.0 
  1172.0 
  1600.0   
  1600.0 
  1172.0 
  1600.0   
  1600.0 
  1172.0 
  1600.0   
  2017-11-18 03:30 
  2017-11-18 03:30 
  2017-11-18 03:30   
  2017-11-21 23:59 
  2017-11-21 23:59 
  2017-11-21 23:59   
  Completed     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:.. Note:JBSN-JB345 = 2125. PacifiCorp = 1417. IPCo = 708.-NUT-PATHC = 730 Summer & Winter.-PATHC-NUT = 1480 Summer/1560 Winter.. Path(Impact):PATHC-NUT(40)NUT-PATHC(442)JBSN-JB345(150). *345kV,Continuous,Include Weekends*     2017-11-18 03:26     127482  
  PATH C     5769     PPW                NUT-PATHC(PPW) 

  NUT-PATHC(PPW)   
  1172.0 

  1172.0   
  1172.0 

  1172.0   
  300.0 

  300.0   
  2017-11-18 05:00 

  2017-11-20 23:00   
  2017-11-20 23:00 

  2017-11-21 23:59   
  Cancelled     ATC SEGMENT     THERMAL      INTERNAL     PPW     Combining derates from outages 127482 and 125236     2017-11-18 04:32     PPW316  
  PPW 126096     5711     PPW     Cascade 115 kV Tie (Path 25 Schedule Limitation)          CRAG-CRAGVIEW(PPW) 
  CRAGVIEW-CRAG(PPW)   
  45.0 
  80.0   
  45.0 
  80.0   
  45.0 
  80.0   
  2017-11-18 06:00 
  2017-11-18 06:00   
  2017-11-20 17:00 
  2017-11-20 17:00   
  CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     Other Utility Request:Cascade-Benton-Deschutes 60KV Line Section (Loomis Jct-Wintu Jct) Cleared. Note:CRAG-CRAGVIEW = 0.-CRAGVIEW-CRAG = 40.. Path(Impact):CRAG-CRAGVIEW(45)CRAGVIEW-CRAG(40). *115kV,Continuous,Include Weekends*     2017-10-18 10:10     126096  
  PPW 125041     5649     PPW     NVE Harry Allen: Phase Shifter #3          REDB-REDBL(PPW) 
  REDBL-REDB(PPW)   
  470.0 
  470.0   
  470.0 
  470.0   
  193.0 
  293.0   
  2017-11-20 07:00 
  2017-11-20 07:00   
  2017-11-29 16:00 
  2017-11-29 16:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Replace Arrestors. Note:REDBL-REDB (TOT 2C N>S) = 193. REDB-REDBL (TOT 2C S>N) = 293. -Net IPP Imports Impact.. Path(Impact):REDB-REDBL(277)REDBL-REDB(177). *345kV,Continuous,Include Weekends*     2017-09-25 13:10     125041  
  PPW 125040     5650     PPW     NVE Harry Allen: 345/230 kV Bank #3          REDB-REDBL(PPW) 
  REDBL-REDB(PPW)   
  470.0 
  470.0   
  470.0 
  470.0   
  193.0 
  293.0   
  2017-11-20 07:00 
  2017-11-20 07:00   
  2017-11-22 16:00 
  2017-11-22 16:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Replace Arrestors. Note:REDBL-REDB (TOT 2C N>S) = 193. REDB-REDBL (TOT 2C S>N) = 293.. Path(Impact):REDB-REDBL(277)REDBL-REDB(177). *345kV,Continuous,Include Weekends*     2017-09-25 13:10     125040  
  PPW 121556     5480     PPW     IPCo Midpoint-Adelaide 345 kV line          BORA-M500(PPW) 
  JBSN-JB345(PPW) 

  BORA-M500(PPW) 
  JBSN-JB345(PPW)   
  1090.0 
  1600.0 

  1090.0 
  1600.0   
  1090.0 
  1600.0 

  1090.0 
  1600.0   
  810.0 
  1467.0 

  1090.0 
  1600.0   
  2017-11-20 07:00 
  2017-11-20 07:00 

  2017-11-28 14:00 
  2017-11-28 14:00   
  2017-11-28 14:00 
  2017-11-28 14:00 

  2017-11-30 16:00 
  2017-11-30 16:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Other Utility Request:Replace Structures. Note:JBSN-POP = 2200. PacifiCorp = 1467. IPCo = 733.-BORA-M500 = 810. Path(Impact):JBSN-JB345(133)BORA-M500(280). *345kV,Continuous,Include Weekends*     2017-07-18 13:56     121556  
  PPW 125644     5761     PPW     Sheridan-Yellowtail 230 kV line          TOT4B-WYONORTH(PPW) 
  WAPAEAST-WAPANORTH(PPW) 
  WYOEAST-TOT4B(PPW) 
  WYOEAST-WYOCENTRAL(PPW)   
  638.0 
  170.0 
  638.0 
  950.0   
  638.0 
  170.0 
  638.0 
  950.0   
  508.0 
  102.0 
  508.0 
  930.0   
  2017-11-27 06:00 
  2017-11-27 06:00 
  2017-11-27 06:00 
  2017-11-27 06:00   
  2017-12-18 16:00 
  2017-12-18 16:00 
  2017-12-18 16:00 
  2017-12-18 16:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Structure Replacements. Note:4A/4B Curve 109. WAPAEAST-WAPANORTH (Wheel) = 174. WYOEAST-WYOCENTRAL (4A) = 930. WYOEAST-TOT4B & TOT4B-WYONORTH = 508. 4B Limit = 682. -Yellowtail South limit to be determined by WAPA.. Path(Impact):WYOEAST-WYOCENTRAL(20)WAPAEAST-WAPANORTH (68)TOT4B-WYONORTH(130)WYOEAST-TOT4B(130). *230kV,Continuous,Include Weekends*     2017-11-15 13:57     125644  
  PPW 127401     5765     PPW     Goshen-Fish Creek Section of the Goshen-Fish Creek-Grace 161 kV line          GSHN-PATHC(PPW) 
  NUT-PATHC(PPW) 
  PATHC-GSHN(PPW)   
  348.0 
  1172.0 
  148.0   
  348.0 
  1172.0 
  148.0   
  200.0 
  859.0 
  0.0   
  2017-11-27 08:00 
  2017-11-27 08:00 
  2017-11-27 08:00   
  2017-11-30 16:00 
  2017-11-30 16:00 
  2017-11-30 16:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Relay Maintenance Including Trip Testing. Note:NUT-PATHC = 685 Summer/642 Winter. -GSHN-PATHC = 200. PATHC-GSHN = 0. Path(Impact):NUT-PATHC(313)GSHN-PATHC(148)PATHC-GSHN(148). *161kV,Continuous,Include Weekends*     2017-11-17 09:27     127401  
  PPW 116597     5477     PPW     Albina-PGE Curtis 115 kV line (Albina: CB 2P14)          PACW-PACW.PGE(PPW) 
  PACW.PGE-PACW(PPW) 

  PACW-PACW.PGE(PPW) 
  PACW.PGE-PACW(PPW)   
  415.0 
  415.0 

  415.0 
  415.0   
  415.0 
  415.0 

  415.0 
  415.0   
  299.0 
  299.0 

  415.0 
  415.0   
  2017-11-27 09:00 
  2017-11-27 09:00 

  2017-11-30 14:00 
  2017-11-30 14:00   
  2017-11-30 14:00 
  2017-11-30 14:00 

  2017-12-01 14:00 
  2017-12-01 14:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:CB Maintenance. Note:PACW-PACW.PGE & PACW.PGE-PACW = 299 Winter. Path(Impact):PACW-PACW.PGE(116)PACW.PGE-PACW(116). *115kV,Continuous,Include Weekends*     2017-07-18 12:17     116597  
  PPW 125750     5762     PPW     Glide Tap-Steamboat section of the Dixonville-Toketee Switch Station 115 kV line          HYDROGEN-PACW(PPW)      9999.0      9999.0      0.0      2017-11-28 05:00      2017-12-03 17:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Replace structure 2/33. Note:Umpqua River Hydro Project Restriction = 174 Summer/199 Winter.. Path(Impact):HYDROGEN-PACW (9999). *115kV,Continuous,Include Weekends*     2017-11-15 14:02     125750  
  PPW 127410     5767     PPW     Goodnoe Hills: 34 kV Collector #2 (4Y22)          WINDGEN-PACW(PPW)      9999.0      9999.0      0.0      2017-11-28 08:00      2017-11-28 15:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Replace Pad Mount TFMR BKR. Note:Collector #2 Generation unavailable (30 mw).. Path(Impact):WIND GEN-PACW(9999). *34.5kV,Continuous,Include Weekends*     2017-11-17 11:00     127410  
  PPW 127222     5754     PPW     IPCo Adelaide-Borah 345 kV line          BORA-M500(PPW) 
  JBSN-JB345(PPW)   
  1090.0 
  1600.0   
  1090.0 
  1600.0   
  847.0 
  1467.0   
  2017-11-29 09:00 
  2017-11-29 09:00   
  2017-11-29 13:00 
  2017-11-29 13:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Other Utility Request:Install Corona Rings on Str 392. Note:JBSN-POP = 2200. PacifiCorp = 1467. IPCo = 733.-BORA-M500 =847.. Path(Impact):JBSN-JB345(133)BORA-M500(243). *345kV,Continuous,Include Weekends*     2017-11-13 15:27     127222  
  PPW 126722     5736     PPW     Malin-PG&E Round Mtn #2 500 kV line          MALIN500-RDM500(PPW) 
  RDM500-MALIN500(PPW)   
  500.0 
  383.0   
  500.0 
  383.0   
  100.0 
  77.0   
  2017-12-03 12:00 
  2017-12-03 12:00   
  2017-12-06 17:30 
  2017-12-06 17:30   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Install Undervoltage Relay on Cap Bank #2 Controller at Round Mt Sub. Note:MALIN500-RDM500 & RDM500-MALIN500 = 0.. Path(Impact):MALIN500-RDM500(400)RDM500-MALIN500(306). *500kV,Continuous,Include Weekends*     2017-11-01 10:53     126722  
  PPW 127224     5755     PPW     NVE Harry Allen: 345/230 kV Bank #2          REDB-REDBL(PPW) 
  REDBL-REDB(PPW)   
  470.0 
  470.0   
  470.0 
  470.0   
  350.0 
  240.0   
  2017-12-04 07:00 
  2017-12-04 07:00   
  2017-12-15 15:00 
  2017-12-15 15:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:NERC Maintenance and Trench Bushing Replacement. Note:REDBL-REDB (TOT 2C N>S) = 240. REDB-REDBL (TOT 2C S>N) = 350. -Net IPP Imports Impact.. Path(Impact):REDB-REDBL(120)REDBL-REDB(230). *345kV,Continuous,Include Weekends*     2017-11-13 15:55     127224  
  PPW 117271     5251     PPW     Malin 500 kV Bay including -Captain Jack-Malin #2 500 kV line & BPA Malin-Summer Lake 500 kV line te          PACW-SMLK(PPW) 
  SMLK-PACW(PPW) 

  PACW-SMLK(PPW) 
  SMLK-PACW(PPW) 

  PACW-SMLK(PPW) 
  SMLK-PACW(PPW)   
  550.0 
  1187.0 

  550.0 
  1187.0 

  550.0 
  1187.0   
  550.0 
  1187.0 

  550.0 
  1187.0 

  550.0 
  1187.0   
  550.0 
  1187.0 

  550.0 
  1187.0 

  0.0 
  0.0   
  2017-05-01 09:00 
  2017-05-01 09:00 

  2017-09-01 09:00 
  2017-09-01 09:00 

  2017-12-04 09:00 
  2017-12-04 09:00   
  2017-05-03 15:00 
  2017-05-03 15:00 

  2017-09-10 15:00 
  2017-09-10 15:00 

  2017-12-11 15:00 
  2017-12-11 15:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:BPA DCC to issue a Clearance at Malin: 4580/4592/11L1/11L6 TERMINAL OF CAPTAIN JACK-MALIN 2 500KV LINE; BPA DCC to issue a Clearance at Malin: 4590/4592/11L3/11L7 TERMINAL OF SUMMER LAKE-MALIN NO 1 500KV LINE; South Region to issue a Clearance for Permanent Bus Work Repair at Malin. Note:PACW-SMLK & SMLK-PACW = 0.-Eliminates ESM Point to Point Service from Troutdale to Summer Lake. Eliminates Ability to Transfer Bridger Generation for Network Load Service to Southern Oregon.. Path(Impact):PACW-SMLK(550)SMLK-PACW(1187). *500kV,Continuous,Include Weekends*     2017-04-20 14:24     117271  
  PPW 126984     5750     PPW     Albina-PGE Curtis 115 kV line (Curtis-Delaware section)          PACW-PACW.PGE(PPW) 
  PACW.PGE-PACW(PPW) 

  PACW-PACW.PGE(PPW) 
  PACW.PGE-PACW(PPW) 

  PACW-PACW.PGE(PPW) 
  PACW.PGE-PACW(PPW) 

  PACW-PACW.PGE(PPW) 
  PACW.PGE-PACW(PPW) 

  PACW-PACW.PGE(PPW) 
  PACW.PGE-PACW(PPW) 

  PACW-PACW.PGE(PPW) 
  PACW.PGE-PACW(PPW) 

  PACW-PACW.PGE(PPW) 
  PACW.PGE-PACW(PPW) 

  PACW-PACW.PGE(PPW) 
  PACW.PGE-PACW(PPW) 

  PACW-PACW.PGE(PPW) 
  PACW.PGE-PACW(PPW) 

  PACW-PACW.PGE(PPW) 
  PACW.PGE-PACW(PPW) 

  PACW-PACW.PGE(PPW) 
  PACW.PGE-PACW(PPW) 

  PACW-PACW.PGE(PPW) 
  PACW.PGE-PACW(PPW)   
  415.0 
  415.0 

  415.0 
  415.0 

  415.0 
  415.0 

  415.0 
  415.0 

  415.0 
  415.0 

  415.0 
  415.0 

  415.0 
  415.0 

  415.0 
  415.0 

  415.0 
  415.0 

  415.0 
  415.0 

  415.0 
  415.0 

  415.0 
  415.0   
  415.0 
  415.0 

  415.0 
  415.0 

  415.0 
  415.0 

  415.0 
  415.0 

  415.0 
  415.0 

  415.0 
  415.0 

  415.0 
  415.0 

  415.0 
  415.0 

  415.0 
  415.0 

  415.0 
  415.0 

  415.0 
  415.0 

  415.0 
  415.0   
  415.0 
  415.0 

  299.0 
  299.0 

  415.0 
  415.0 

  415.0 
  415.0 

  415.0 
  415.0 

  415.0 
  415.0 

  415.0 
  415.0 

  415.0 
  415.0 

  415.0 
  415.0 

  415.0 
  415.0 

  415.0 
  415.0 

  415.0 
  415.0   
  2017-12-04 08:00 
  2017-12-04 08:00 

  2017-12-04 11:30 
  2017-12-04 11:30 

  2017-12-11 08:00 
  2017-12-11 08:00 

  2017-12-12 08:00 
  2017-12-12 08:00 

  2017-12-13 08:00 
  2017-12-13 08:00 

  2017-12-14 08:00 
  2017-12-14 08:00 

  2017-12-15 08:00 
  2017-12-15 08:00 

  2017-12-18 08:00 
  2017-12-18 08:00 

  2017-12-19 08:00 
  2017-12-19 08:00 

  2017-12-20 08:00 
  2017-12-20 08:00 

  2017-12-21 08:00 
  2017-12-21 08:00 

  2017-12-22 08:00 
  2017-12-22 08:00   
  2017-12-04 11:30 
  2017-12-04 11:30 

  2017-12-08 16:00 
  2017-12-08 16:00 

  2017-12-11 16:00 
  2017-12-11 16:00 

  2017-12-12 16:00 
  2017-12-12 16:00 

  2017-12-13 16:00 
  2017-12-13 16:00 

  2017-12-14 16:00 
  2017-12-14 16:00 

  2017-12-15 16:00 
  2017-12-15 16:00 

  2017-12-18 16:00 
  2017-12-18 16:00 

  2017-12-19 16:00 
  2017-12-19 16:00 

  2017-12-20 16:00 
  2017-12-20 16:00 

  2017-12-21 16:00 
  2017-12-21 16:00 

  2017-12-22 16:00 
  2017-12-22 16:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Other Utility Request:Prep Work for PGE Delaware Sub Rebuild; PACW to Stay Normal at Albina CB 2P14 for PGE Delaware Rebuild. Note:PACW-PACW.PGE & PACW.PGE-PACW = 299 Winter. Path(Impact):PACW-PACW.PGE(116)PACW.PGE-PACW(116). *115kV,Continuous,Include Weekends*     2017-11-07 15:08     126984  
  PPW 126920     5757     PPW     Ben Lomond-Terminal #1 345 kV line          NUT-PACE(PPW) 
  PACE-NUT(PPW)   
  2563.0 
  2563.0   
  2563.0 
  2563.0   
  1331.0 
  1331.0   
  2017-12-05 07:00 
  2017-12-05 07:00   
  2017-12-06 15:00 
  2017-12-06 15:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Replace B/O Insulators. Note:NUT-PACE & PACE-NUT = 1331.. Path(Impact):PACE-NUT(1232)NUT-PACE(1232). *345kV,Continuous,Include Weekends*     2017-11-14 12:37     126920  
  PPW 102186     4494     PPW     BPA Jones Canyon-BPA Santiam 230 kV line (Tumble Creek-Santiam section)          WINDGEN-PACW(PPW) 

  WINDGEN-PACW(PPW) 

  WINDGEN-PACW(PPW) 

  WINDGEN-PACW(PPW)   
  9999.0 

  9999.0 

  9999.0 

  9999.0   
  9999.0 

  9999.0 

  9999.0 

  9999.0   
  0.0 

  9999.0 

  9999.0 

  0.0   
  2016-09-14 08:00 

  2017-05-02 08:00 

  2017-10-04 08:00 

  2017-12-05 08:00   
  2016-09-14 17:00 

  2017-05-02 17:00 

  2017-10-04 17:00 

  2017-12-05 17:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Other Utility Request:Tumble Creek-Santiam Section OOS. Note:Leaning Juniper Generation must be off line before switching the Jones Canyon-Tumble Creek line out of service and again before switching it back in service.-During the line outage, Generation is restricted to 40 mw.. Path(Impact):WIND GEN-PACW(9999). *230kV,Daily,Include Weekends*     2016-05-25 12:03     102186  
  PPW 127262     5758     PPW     Populus-Terminal 345 kV line          JBSN-JB345(PPW) 
  NUT-PACE(PPW) 
  NUT-PATHC(PPW) 
  PACE-NUT(PPW)   
  1600.0 
  2563.0 
  1172.0 
  2563.0   
  1600.0 
  2563.0 
  1172.0 
  2563.0   
  1467.0 
  1398.0 
  1118.0 
  1398.0   
  2017-12-07 07:00 
  2017-12-07 07:00 
  2017-12-07 07:00 
  2017-12-07 07:00   
  2017-12-08 15:00 
  2017-12-08 15:00 
  2017-12-08 15:00 
  2017-12-08 15:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Replace B/O Insulators. Note:JBSN-JB345 = 2200. PacifiCorp = 1427. IPCo = 733.-NUT-PACE & PACE-NUT = 1398.-NUT-PATHC = 1118 Winter. Path(Impact):PACE-NUT(1165)NUT-PACE(1165)NUT-PATHC(54)JBSN-JB345(133). *345kV,Continuous,Include Weekends*     2017-11-14 12:48     127262  
  PPW 127298     5760     PPW     Albina-PGE Curtis 115 kV line (Curtis-Delaware section)          PACW-PACW.PGE(PPW) 
  PACW.PGE-PACW(PPW) 

  PACW-PACW.PGE(PPW) 
  PACW.PGE-PACW(PPW) 

  PACW-PACW.PGE(PPW) 
  PACW.PGE-PACW(PPW) 

  PACW-PACW.PGE(PPW) 
  PACW.PGE-PACW(PPW) 

  PACW-PACW.PGE(PPW) 
  PACW.PGE-PACW(PPW) 

  PACW-PACW.PGE(PPW) 
  PACW.PGE-PACW(PPW) 

  PACW-PACW.PGE(PPW) 
  PACW.PGE-PACW(PPW) 

  PACW-PACW.PGE(PPW) 
  PACW.PGE-PACW(PPW) 

  PACW-PACW.PGE(PPW) 
  PACW.PGE-PACW(PPW) 

  PACW-PACW.PGE(PPW) 
  PACW.PGE-PACW(PPW)   
  415.0 
  415.0 

  415.0 
  415.0 

  415.0 
  415.0 

  415.0 
  415.0 

  415.0 
  415.0 

  415.0 
  415.0 

  415.0 
  415.0 

  415.0 
  415.0 

  415.0 
  415.0 

  415.0 
  415.0   
  415.0 
  415.0 

  415.0 
  415.0 

  415.0 
  415.0 

  415.0 
  415.0 

  415.0 
  415.0 

  415.0 
  415.0 

  415.0 
  415.0 

  415.0 
  415.0 

  415.0 
  415.0 

  415.0 
  415.0   
  299.0 
  299.0 

  299.0 
  299.0 

  299.0 
  299.0 

  299.0 
  299.0 

  299.0 
  299.0 

  299.0 
  299.0 

  299.0 
  299.0 

  299.0 
  299.0 

  299.0 
  299.0 

  299.0 
  299.0   
  2017-12-11 07:30 
  2017-12-11 07:30 

  2017-12-12 07:30 
  2017-12-12 07:30 

  2017-12-13 07:30 
  2017-12-13 07:30 

  2017-12-14 07:30 
  2017-12-14 07:30 

  2017-12-15 07:30 
  2017-12-15 07:30 

  2017-12-18 07:30 
  2017-12-18 07:30 

  2017-12-19 07:30 
  2017-12-19 07:30 

  2017-12-20 07:30 
  2017-12-20 07:30 

  2017-12-21 07:30 
  2017-12-21 07:30 

  2017-12-22 07:30 
  2017-12-22 07:30   
  2017-12-11 16:00 
  2017-12-11 16:00 

  2017-12-12 16:00 
  2017-12-12 16:00 

  2017-12-13 16:00 
  2017-12-13 16:00 

  2017-12-14 16:00 
  2017-12-14 16:00 

  2017-12-15 16:00 
  2017-12-15 16:00 

  2017-12-18 16:00 
  2017-12-18 16:00 

  2017-12-19 16:00 
  2017-12-19 16:00 

  2017-12-20 16:00 
  2017-12-20 16:00 

  2017-12-21 16:00 
  2017-12-21 16:00 

  2017-12-22 16:00 
  2017-12-22 16:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Other Utility Request:Prep Work for PGE Delaware Sub Rebuild; PACW to Stay Normal at Albina CB 2P14 for PGE Delaware Rebuild. Note:PACW-PACW.PGE & PACW.PGE-PACW = 299 Winter. Path(Impact):PACW-PACW.PGE(116)PACW.PGE-PACW(116). *115kV,Daily,Return Weekends*     2017-11-15 09:48     127298  
  PPW 118182     5280     PPW     Cascade 115 kV Tie (Path 25 Schedule Limitation)          CRAG-CRAGVIEW(PPW) 

  CRAG-CRAGVIEW(PPW) 

  CRAG-CRAGVIEW(PPW) 

  CRAG-CRAGVIEW(PPW)   
  45.0 

  45.0 

  45.0 

  45.0   
  45.0 

  45.0 

  45.0 

  45.0   
  0.0 

  0.0 

  45.0 

  45.0   
  2017-05-31 07:00 

  2017-12-12 07:00 

  2017-12-15 07:00 

  2017-12-25 07:00   
  2017-05-31 19:00 

  2017-12-12 19:00 

  2017-12-15 19:00 

  2017-12-25 19:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Other Utility Request:Cascade-Benton-Deschutes 60kV Line Section (Wintu Jct-Benton) Cleared. Note:CRAG-CRAGVIEW = 0.. Path(Impact):CRAG-CRAGVIEW(45). *115kV,Continuous,Include Weekends*     2017-04-28 11:23     118182  
  PPW 125965     5699     PPW     Wallula-Nine Mile 230 kV line          WINDGEN-PACW(PPW) 

  WINDGEN-PACW(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  9999.0 

  0.0   
  2017-11-28 09:00 

  2017-12-12 09:00   
  2017-12-05 16:00 

  2017-12-19 16:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Construction:Moving 9 mile from old position to new position, installing fiber along 9 Mile line, installing new protection panel at the 9 Mile substation.; Nextera to Issue Terminal Clearance at Nine Mile on Sw 1W728; Nextera to Issue Terminal Clearance at Campbell on Sw 89-L1. Note:Impacts Stateline wind generation deliveries.-Nine Mile and Campbell Wind will be offline.. Path(Impact):WIND GEN-PACW(9999). *230kV,Continuous,Include Weekends*     2017-10-16 15:54     125965  
  PPW 118185     5281     PPW     Cascade 115 kV Tie (Path 25 Schedule Limitation)          CRAG-CRAGVIEW(PPW) 

  CRAG-CRAGVIEW(PPW) 

  CRAG-CRAGVIEW(PPW) 

  CRAG-CRAGVIEW(PPW)   
  45.0 

  45.0 

  45.0 

  45.0   
  45.0 

  45.0 

  45.0 

  45.0   
  0.0 

  0.0 

  0.0 

  45.0   
  2017-06-06 03:00 

  2017-06-06 06:00 

  2017-12-13 07:00 

  2017-12-25 03:00   
  2017-06-06 06:00 

  2017-06-06 13:00 

  2017-12-13 17:00 

  2017-12-25 13:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Other Utility Request:Replace Transmission Pole 7/155. Note:CRAG-CRAGVIEW = 0.. Path(Impact):CRAG-CRAGVIEW(45). *115kV,Continuous,Include Weekends*     2017-04-28 11:49     118185  
  PPW 127279     5759     PPW     Cascade 115 kV Tie (Path 25 Schedule Limitation)          CRAG-CRAGVIEW(PPW)      45.0      45.0      0.0      2017-12-14 07:00      2017-12-16 18:30      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Other Utility Request:Volta 60kV CB22 Open and Cleared. Note:CRAG-CRAGVIEW = 0.. Path(Impact):CRAG-CRAGVIEW(45). *115kV,Continuous,Include Weekends*     2017-11-14 13:55     127279  
  PPW 127250     5756     PPW     Cascade 115 kV Tie (Path 25 Schedule Limitation)          CRAG-CRAGVIEW(PPW)      45.0      45.0      0.0      2017-12-14 07:00      2017-12-14 17:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Other Utility Request:Cottonwood-Benton #2 60KV Line Cleared. Note:CRAG-CRAGVIEW = 0.. Path(Impact):CRAG-CRAGVIEW(45). *115kV,Continuous,Include Weekends*     2017-11-14 09:39     127250  
  PPW 126952     5744     PPW     Cascade 115 kV Tie (Path 25 Schedule Limitation)          CRAG-CRAGVIEW(PPW) 

  CRAG-CRAGVIEW(PPW)   
  45.0 

  45.0   
  45.0 

  45.0   
  45.0 

  0.0   
  2017-11-29 07:00 

  2017-12-15 07:00   
  2017-11-30 16:30 

  2017-12-16 16:30   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Other Utility Request:6 Year Relay Tests. Note:CRAG-CRAGVIEW = 0.. Path(Impact):CRAG-CRAGVIEW(45). *115kV,Continuous,Include Weekends*     2017-11-06 15:24     126952  
  PPW 127380     5764     PPW     Cascade 115 kV Tie (Path 25 Schedule Limitation)          CRAG-CRAGVIEW(PPW) 
  CRAGVIEW-CRAG(PPW)   
  45.0 
  80.0   
  45.0 
  80.0   
  0.0 
  80.0   
  2017-12-18 07:00 
  2017-12-18 07:00   
  2017-12-20 18:30 
  2017-12-20 18:30   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Other Utility Request:REPLACE SET A PROTECTION RELAY.. Note:CRAG-CRAGVIEW = 0. -S   2017-11-16 15:29     127380  
  PPW 127337     5763     PPW     Borah West (IPCo Path 17 Schedule Limitation)          BORA-M500(PPW)      1090.0      1090.0      1006.0      2017-12-18 09:00      2017-12-18 14:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     TTC Schedule Limit:Hunt 206A Maintenance. Note:BORA-M500 = 1006. Path(Impact):BORA-M500(84). *500kV,Continuous,Include Weekends*     2017-11-16 09:04     127337  
  PPW 127402     5766     PPW     Cascade 115 kV Tie (Path 25 Schedule Limitation)          CRAG-CRAGVIEW(PPW) 
  CRAGVIEW-CRAG(PPW)   
  45.0 
  80.0   
  45.0 
  80.0   
  0.0 
  80.0   
  2017-12-20 08:00 
  2017-12-20 08:00   
  2017-12-20 17:00 
  2017-12-20 17:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Other Utility Request:Raptor Reframing.. Note:CRAG-CRAGVIEW = 0. - -S   2017-11-17 09:55     127402  
  PPW 114612     5097     PPW     BPA Malin-Summer Lake 500 kV line          PACW-SMLK(PPW) 
  SMLK-PACW(PPW) 

  PACW-SMLK(PPW) 
  SMLK-PACW(PPW)   
  550.0 
  1187.0 

  550.0 
  1187.0   
  550.0 
  1187.0 

  550.0 
  1187.0   
  550.0 
  1187.0 

  0.0 
  0.0   
  2017-11-28 09:00 
  2017-11-28 09:00 

  2018-02-20 09:00 
  2018-02-20 09:00   
  2017-11-28 15:00 
  2017-11-28 15:00 

  2018-02-20 15:00 
  2018-02-20 15:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Energization:Sycan 3 Transfer Trip Replacement Trip Checks. Note:PACW-SMLK & SMLK-PACW = 0.-Eliminates ESM Point to Point Service from Troutdale to Summer Lake. Eliminates Ability to Transfer Bridger Generation for Network Load Service to Southern Oregon.. Path(Impact):PACW-SMLK(550)SMLK-PACW(1187). *500kV,Continuous,Include Weekends*     2017-02-07 14:49     114612  
  PPW 124942     5643     PPW     BPA Jones Canyon-BPA Santiam 230 kV line (Tumble Creek-Jones Canyon section)          WINDGEN-PACW(PPW)      9999.0      9999.0      0.0      2018-05-07 07:00      2018-05-10 15:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Other Utility Request:Replace Insulators. Note:Leaning Juniper Generation must be off line before switching the Jones Canyon-Tumble Creek line out of service and again before switching it back in service.-During the line outage, Generation is restricted to 40 mw.. Path(Impact):WIND GEN-PACW(9999). *230kV,Continuous,Include Weekends*     2017-09-21 13:02     124942  