Combined wesTTrans Transmission Outages
Jul 20, 2018 
Outage
Name
Outage
Id
Company Facility Flow
Gate
Segment Original
TTC In
Original
TTC Out
New
TTC
Start Time (PS) Stop Time (PS) Status Outage
Category
Outage
Type
Path
Impact
Report
TPs
Comments Creation Time (PS) Event ID Last Updated (PS)
AVAT Outages:
AZPS Outages:
  LIBERTY PHASE SHIFTER     222162     AZPS               MOENKOPI500-WILLOWBEACH(AZPS) 
  WILLOWBEACH-MOENKOPI500(AZPS) 

  MOENKOPI500-WILLOWBEACH(AZPS) 
  WILLOWBEACH-MOENKOPI500(AZPS) 

  MOENKOPI500-WILLOWBEACH(AZPS) 
  WILLOWBEACH-MOENKOPI500(AZPS)   
  1555.0 
  1555.0 

  1555.0 
  1555.0 

  1555.0 
  1555.0   
  1555.0 
  1555.0 

  1555.0 
  1555.0 

  1555.0 
  1555.0   
  1366.0 
  1366.0 

  1366.0 
  1366.0 

  1366.0 
  1366.0   
  2017-02-04 10:00 
  2017-02-04 10:00 

  2017-03-31 18:00 
  2017-03-31 18:00 

  2017-12-31 13:00 
  2017-12-31 13:00   
  2017-03-31 18:00 
  2017-03-31 18:00 

  2017-12-31 13:00 
  2017-12-31 13:00 

  2019-01-01 00:00 
  2019-01-01 00:00   
  Active     TRANSMISSION     FORCED      ONPATH     AZPS     Liberty Phase Shifter at Liberty relayed.     2017-02-04 09:09     AZPS88002      2017-12-15 09:18  
BEPW Outages:
  Summer 2018 Limit     33886     WACM     TOT-3 (BEPW)     TOT-3 BASIN (BEPW)     AU>LRS(BEPW) 
  LRS>AU(BEPW) 
  LRS>STY(BEPW) 
  STY>LRS(BEPW)   
  722.0     722.0     421.5 
  421.5 
  247.5 
  247.5   
  2018-06-01 00:00 
  2018-06-01 00:00 
  2018-06-01 00:00 
  2018-06-01 00:00   
  2018-11-01 00:00 
  2018-11-01 00:00 
  2018-11-01 00:00 
  2018-11-01 00:00   
  Active     Transmission     Planned      OnPath     BEPW,WACM     TOT-3 Summer 2018 Ratings of 1680 MW for system intact (Cell A1). Using Cell A2 with zero DC tie schedule the Limit will be 1557 MW and BEPWs share of transfer is 669 MW. RRV     2018-04-26 08:59     WACM11189      2018-06-27 08:10  
  System Conditions     34339     WACM     YTS     YT-SOUTH     YTW>DJ(LAPT)      225.0     225.0     212.0      2018-06-04 09:00      2018-07-11 09:20      Completed     Transmission     Planned      OnPath     BEPW,CRCM,LAPT,WACM     Outage Request C-18-1087. YTS=Series #11.     2018-05-18 07:18     WACM11278      2018-07-11 09:20  
  AU-LRS 345     34676     BEPW     TOT-3 (BASIN), LRS>AU 345 kV          AU>LRS(BEPW) 
  LRS>AU(BEPW)   
  508.0 
  423.0   
  508.0 
  423.0   
  0.0 
  0.0   
  2018-07-09 09:00 
  2018-07-09 09:00   
  2018-07-09 13:40 
  2018-07-09 13:40   
  Completed     TRANSMISSION     FORCED      ONPATH     BEPW     Outage Request C-18-1840.     2018-06-20 11:18     BEPW11348      2018-07-09 13:40  
  SCS-Spring Canyon 230 kV     34772     WACM     TOT-3 - Basin     TOT-3 BASIN (BEPW)     AU>LRS(BEPW) 
  LRS>AU(BEPW) 
  LRS>STY(BEPW) 
  STY>LRS(BEPW)   
  722.0     722.0     381.8 
  381.8 
  224.2 
  224.2   
  2018-07-23 08:00 
  2018-07-23 08:00 
  2018-07-23 08:00 
  2018-07-23 08:00   
  2018-07-26 14:00 
  2018-07-26 14:00 
  2018-07-26 14:00 
  2018-07-26 14:00   
  Scheduled     Transmission     Planned      OffPath     BEPW,WACM     Outage Request C-18-1943. TOT3/Path 36=Series #13.     2018-07-09 08:32     WACM11377      2018-07-09 10:45  
  System Conditions     34730     WACM     TOT-1A     TOT-1A     BOZ>CRG(CRCM) 
  CRG>BOZ(CRCM) 
  CRG>SWR(CRCM) 
  SWR>CRG(CRCM) 
  SWR>VNL(CRCM) 
  VNL>FGE(CRCM) 
  VNL>SWR(CRCM)   
  395.0     395.0     194.3 
  194.3 
  104.7 
  104.7 
  104.7 
  179.4 
  104.7   
  2018-07-31 04:00 
  2018-07-31 04:00 
  2018-07-31 04:00 
  2018-07-31 04:00 
  2018-07-31 04:00 
  2018-07-31 04:00 
  2018-07-31 04:00   
  2018-07-31 10:00 
  2018-07-31 10:00 
  2018-07-31 10:00 
  2018-07-31 10:00 
  2018-07-31 10:00 
  2018-07-31 10:00 
  2018-07-31 10:00   
  Scheduled     Transmission     Planned      OnPath     BEPW,CRCM,LAPT,WACM     Outage Request: INFO-18-1992. TOT1/Path 30=Series #4.     2018-07-03 10:32     WACM11361      2018-07-03 10:32  
  AU-KU1B 345/230/13/8xfmr     34943     WACM     TOT-3 basin     TOT-3 BASIN (BEPW)     AU>LRS(BEPW) 
  LRS>AU(BEPW) 
  LRS>STY(BEPW) 
  STY>LRS(BEPW)   
  722.0     722.0     330.8 
  330.8 
  194.3 
  194.3   
  2018-09-17 12:00 
  2018-09-17 12:00 
  2018-09-17 12:00 
  2018-09-17 12:00   
  2018-11-16 16:00 
  2018-11-16 16:00 
  2018-11-16 16:00 
  2018-11-16 16:00   
  Scheduled     Transmission     Planned      OnPath     BEPW,WACM     Outage Request: C-18=2200. TOT3/Path 36=Series #28.     2018-07-16 10:32     WACM11462      2018-07-16 10:32  
BHBE Outages:
  BHBE 1159     61456     BHBE     WESTHILL-SOUTH RAPID 230 KV LINE - Line rebuild project               0.0      0.0      0.0      2018-03-05 08:00      2018-07-25 10:00      ACTIVE     TRANSMISSION     PLANNED      ONPATH     BHBE     Construction:Initial CL - Line rebuild project; Reduced CL; Expanded CL; Alpha-CL for Besler to install new sub arrestors at Westhill. See request #18-1524. Path(Impact):RC-SGW(40)SGW-RC(0). *230kV,Continuous,Include Weekends*     2018-01-24 08:33     1159     2018-07-19 06:38  
  BHBE 5968     61462     BHBE     RC-RCWest: RC to RCWest = 0mw, RCWest to RC = 0mw               0.0      0.0      0.0      2018-03-05 08:00      2018-07-25 10:00      ACTIVE     TRANSMISSION     PLANNED      ONPATH     BHBE     System Conditions:Due to SRC-Westhill 230kv line outage. Note:RAS Runback due to system Conditions. Path(Impact):RC-RCWEST(400)RCWEST-RC(200). *230kV,Continuous,Include Weekends*     2018-01-26 07:45     5968     2018-07-17 10:24  
  BHBE 3490     59251     BHBE     WESTHILL-STEGALL 230 KV LINE - Phase #1 outage               0.0      0.0      0.0      2018-08-13 08:00      2018-11-30 16:00      CANCELLED     TRANSMISSION     PLANNED      ONPATH     BHBE     Construction:Initial CL - Line rebuild project; Reduced CL; Expanded CL; WAPA's ICS-CL #. Path(Impact):RC-SGW(273)SGW-RC(318). *230kV,Continuous,Include Weekends*     2017-08-07 11:33     3490      2017-08-07 11:33  
  BHBE 3491     64552     BHBE     STEGALL, STEGALL BKR 1282 and WESTHILL-STEGALL 230 KV LINE - Phase #1 outage for line rebuild proje               0.0      0.0      0.0      2018-08-13 08:00      2018-11-30 16:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     BHBE     Construction:Initial CL - Line rebuild project; Reduced CL; Expanded CL; WAPA's ICC to Black Hills on switch switches at Stegall; Besler's Alpha Clearance for Arrester work in October 2018. (See request #18-1732). Path(Impact):RC-SGW(273)SGW-RC(318). *230kV,Continuous,Include Weekends*     2018-07-18 09:09     3491     2018-07-18 09:09  
  BHBE 6183     61572     BHBE     RC-RCWest: RC to RCWest = 150mw TESTING to resolve interface issue               0.0      0.0      0.0      2018-12-30 08:00      2018-12-30 08:10      CANCELLED     TRANSMISSION     PLANNED      ONPATH     BHBE     Maintenance:TEST OUTAGE to resolve posting interface issue. Note:RAS Runback due to system Conditions. Path(Impact):RC-RCWEST(10). *230kV,Continuous,Include Weekends*     2018-02-09 13:31     6183     2018-02-09 16:21  
  BHBE 6186     61573     BHBE     RC-RCWest: RC to RCWest = 150mw TESTING to resolve interface issue               0.0      0.0      0.0      2018-12-30 09:00      2018-12-30 09:10      CANCELLED     TRANSMISSION     PLANNED      ONPATH     BHBE     Maintenance:TEST OUTAGE to resolve posting interface issue. Note:RAS Runback due to system Conditions. Path(Impact):RC-RCWEST(10). *230kV,Continuous,Include Weekends*     2018-02-09 14:53     6186     2018-02-09 16:26  
  BHBE 6188     61574     BHBE     RC-RCWest: RC to RCWest = 150mw TESTING to resolve interface issue               0.0      0.0      0.0      2018-12-30 10:00      2018-12-30 10:10      CANCELLED     TRANSMISSION     PLANNED      ONPATH     BHBE     Maintenance:TEST OUTAGE to resolve posting interface issue. Note:RAS Runback due to system Conditions. Path(Impact):RC-RCWEST(10). *230kV,Continuous,Include Weekends*     2018-02-09 15:10     6188     2018-02-09 16:09  
  BHBE 6191     61575     BHBE     RC-RCWest: RC to RCWest = 150mw TESTING to resolve interface issue               0.0      0.0      0.0      2018-12-30 11:00      2018-12-30 11:10      CANCELLED     TRANSMISSION     PLANNED      ONPATH     BHBE     Maintenance:TEST OUTAGE to resolve posting interface issue. Note:RAS Runback due to system Conditions. Path(Impact):RC-RCWEST(10). *230kV,Continuous,Include Weekends*     2018-02-09 17:09     6191     2018-02-09 17:25  
  BHBE 6192     61576     BHBE     RC-RCWest: RC to RCWest = 150mw TESTING to resolve interface issue               0.0      0.0      0.0      2018-12-30 12:00      2018-12-30 12:10      CANCELLED     TRANSMISSION     PLANNED      ONPATH     BHBE     Maintenance:TEST OUTAGE to resolve posting interface issue. Note:RAS Runback due to system Conditions. Path(Impact):RC-RCWEST(10). *230kV,Continuous,Include Weekends*     2018-02-09 17:10     6192     2018-02-09 17:26  
  BHBE 6201     61598     BHBE     RC-RCWest: RC to RCWest = 150mw TESTING to resolve interface issue               0.0      0.0      0.0      2018-12-30 13:00      2018-12-30 13:10      CANCELLED     TRANSMISSION     PLANNED      ONPATH     BHBE     Maintenance:TEST OUTAGE to resolve posting interface issue. Note:RAS Runback due to system Conditions. Path(Impact):RC-RCWEST(10). *230kV,Continuous,Include Weekends*     2018-02-12 08:44     6201     2018-02-12 09:57  
  BHBE 6202     61617     BHBE     RC-RCWest: RC to RCWest = 150mw TESTING to resolve interface issue               0.0      0.0      0.0      2018-12-30 14:00      2018-12-30 14:10      CANCELLED     TRANSMISSION     PLANNED      ONPATH     BHBE     Maintenance:TEST OUTAGE to resolve posting interface issue. Note:RAS Runback due to system Conditions. Path(Impact):RC-RCWEST(10). *230kV,Continuous,Include Weekends*     2018-02-14 17:08     6202     2018-02-14 17:08  
  BHBE 1153     59250     BHBE     WESTHILL-STEGALL 230 KV LINE - Phase #1 outage               0.0      0.0      0.0      2019-03-11 08:00      2019-11-15 16:00      CANCELLED     TRANSMISSION     PLANNED      ONPATH     BHBE     Construction:Initial CL - Line rebuild project; Reduced CL; Expanded CL; WAPA's ICS-CL #. Path(Impact):RC-SGW(273)SGW-RC(318). *230kV,Continuous,Include Weekends*     2017-08-07 11:29     1153      2017-08-07 11:29  
BHCT Outages:
  BHCT 762     57581     BHCT     PUEBLO RESERVOIR-WEST STATION 115 KV LINE               0.0      0.0      0.0      2019-07-08 07:00      2019-07-12 14:00      CANCELLED     TRANSMISSION     PLANNED      ONPATH     BHCT     Testing:TESTING COMPASS INTERFACE. Note:(Path Restriction Notes) Testing COMPASS interface - Not a real outage. Path(Impact):READER-BHCE(102). *115kV,Daily,Include Weekends*     2017-03-16 15:46     762      2017-08-03 11:27  
BPAT Outages:
  COI     2483     BPAT     COI Path Rating          AC_N>S(BPAT) 
  AC_S>N(BPAT) 

  AC_N>S(BPAT) 
  AC_S>N(BPAT) 

  AC_N>S(BPAT) 
  AC_S>N(BPAT) 

  AC_N>S(BPAT) 
  AC_S>N(BPAT) 

  AC_N>S(BPAT) 
  AC_S>N(BPAT) 

  AC_N>S(BPAT) 
  AC_S>N(BPAT) 

  AC_N>S(BPAT) 
  AC_S>N(BPAT)   
  4800.0 
  3675.0 

  4800.0 
  3675.0 

  4800.0 
  3675.0 

  4800.0 
  3675.0 

  4800.0 
  3675.0 

  4800.0 
  3675.0 

  4800.0 
  3675.0   
  2007-11-23 12:00 
  2007-11-23 12:00 

  2010-01-01 00:00 
  2010-01-01 00:00 

  2010-11-17 00:00 
  2010-11-17 00:00 

  2012-03-01 00:00 
  2012-03-01 00:00 

  2023-01-01 00:00 
  2023-01-01 00:00 

  2025-01-01 00:00 
  2025-01-01 00:00 

  2026-01-01 00:00 
  2026-01-01 00:00   
  2010-01-01 00:00 
  2010-01-01 00:00 

  2010-11-17 00:00 
  2010-11-17 00:00 

  2012-03-01 00:00 
  2012-03-01 00:00 

  2023-01-01 00:00 
  2023-01-01 00:00 

  2025-01-01 00:00 
  2025-01-01 00:00 

  2026-01-01 00:00 
  2026-01-01 00:00 

  2028-01-01 00:00 
  2028-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     Path Rating     2007-11-23 12:40     BPAT2116      2017-12-11 11:16  
  PDCI     2477     BPAT     PDCI_Path_Rating          DC_N>S(BPAT) 
  DC_S>N(BPAT) 

  DC_N>S(BPAT) 
  DC_S>N(BPAT) 

  DC_N>S(BPAT) 
  DC_S>N(BPAT) 

  DC_N>S(BPAT) 
  DC_S>N(BPAT) 

  DC_N>S(BPAT) 
  DC_S>N(BPAT)   
  2990.0 
  2084.0 

  2990.0 
  2084.0 

  2990.0 
  2084.0 

  3100.0 
  1904.0 

  3100.0 
  1904.0   
  2007-11-23 13:00 
  2007-11-23 13:00 

  2010-01-01 00:00 
  2010-01-01 00:00 

  2012-03-01 00:00 
  2012-03-01 00:00 

  2017-12-12 00:00 
  2017-12-12 00:00 

  2026-01-01 00:00 
  2026-01-01 00:00   
  2010-01-01 00:00 
  2010-01-01 00:00 

  2012-03-01 00:00 
  2012-03-01 00:00 

  2017-12-12 00:00 
  2017-12-12 00:00 

  2026-01-01 00:00 
  2026-01-01 00:00 

  2028-01-01 00:00 
  2028-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     Path Rating     2007-11-23 12:16     BPAT2114      2017-12-11 11:21  
  LAGR     2642     BPAT     LAGR_Path_Rating          LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT)   
  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0   
  2007-11-23 17:00 
  2007-11-23 17:00 

  2010-01-01 00:00 
  2010-01-01 00:00 

  2012-03-01 00:00 
  2012-03-01 00:00 

  2023-01-01 00:00 
  2023-01-01 00:00 

  2024-01-01 00:00 
  2024-01-01 00:00 

  2025-01-01 00:00 
  2025-01-01 00:00 

  2026-01-01 00:00 
  2026-01-01 00:00   
  2010-01-01 00:00 
  2010-01-01 00:00 

  2012-03-01 00:00 
  2012-03-01 00:00 

  2023-01-01 00:00 
  2023-01-01 00:00 

  2024-01-01 00:00 
  2024-01-01 00:00 

  2025-01-01 00:00 
  2025-01-01 00:00 

  2026-01-01 00:00 
  2026-01-01 00:00 

  2028-01-01 00:00 
  2028-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     Path Rating     2007-11-23 15:34     BPAT2145      2017-12-11 11:23  
  WOG     2798     BPAT     WOG_Path_Rating          WOGARR_E>W(BPAT) 

  WOGARR_E>W(BPAT) 

  WOGARR_E>W(BPAT) 

  WOGARR_E>W(BPAT) 

  WOGARR_E>W(BPAT)   
  2000.0 

  2000.0 

  2000.0 

  2000.0 

  2000.0   
  2007-11-23 19:00 

  2010-01-01 00:00 

  2012-03-01 00:00 

  2023-01-01 00:00 

  2026-01-01 00:00   
  2010-01-01 00:00 

  2012-03-01 00:00 

  2023-01-01 00:00 

  2026-01-01 00:00 

  2028-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     Path Rating     2007-11-23 18:09     BPAT2182      2017-12-11 11:32  
  WOG     2810     BPAT     WOG_Path_Rating_W-E          WOGARR_W>E(BPAT) 

  WOGARR_W>E(BPAT) 

  WOGARR_W>E(BPAT) 

  WOGARR_W>E(BPAT) 

  WOGARR_W>E(BPAT) 

  WOGARR_W>E(BPAT)   
  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0   
  2007-11-23 19:00 

  2009-08-21 08:00 

  2010-01-01 00:00 

  2012-03-01 00:00 

  2023-01-01 00:00 

  2026-01-01 00:00   
  2009-08-21 08:00 

  2010-01-01 00:00 

  2012-03-01 00:00 

  2023-01-01 00:00 

  2026-01-01 00:00 

  2028-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     Path Rating     2007-11-23 18:53     BPAT2186      2017-12-11 11:37  
  RATS     2847     BPAT     RATS_Path_Rating          RATS_N>S(BPAT) 
  RATS_S>N(BPAT) 

  RATS_N>S(BPAT) 
  RATS_S>N(BPAT) 

  RATS_N>S(BPAT) 
  RATS_S>N(BPAT) 

  RATS_N>S(BPAT) 
  RATS_S>N(BPAT) 

  RATS_N>S(BPAT) 
  RATS_S>N(BPAT)   
  300.0 
  300.0 

  300.0 
  300.0 

  300.0 
  300.0 

  300.0 
  300.0 

  300.0 
  300.0   
  2007-11-28 00:00 
  2007-11-28 00:00 

  2010-01-01 00:00 
  2010-01-01 00:00 

  2012-03-01 00:00 
  2012-03-01 00:00 

  2023-01-01 00:00 
  2023-01-01 00:00 

  2026-01-01 00:00 
  2026-01-01 00:00   
  2010-01-01 00:00 
  2010-01-01 00:00 

  2012-03-01 00:00 
  2012-03-01 00:00 

  2023-01-01 00:00 
  2023-01-01 00:00 

  2026-01-01 00:00 
  2026-01-01 00:00 

  2028-01-01 00:00 
  2028-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     Path Rating     2007-11-26 09:09     BPAT2191      2017-12-11 11:28  
  NI     11545     BPAT     NI_E_Path_Limit          NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT)   
  400.0 
  400.0 

  400.0 
  400.0 

  400.0 
  400.0 

  400.0 
  400.0 

  400.0 
  400.0 

  400.0 
  400.0 

  400.0 
  400.0 

  400.0 
  400.0   
  2008-02-01 00:00 
  2008-02-01 00:00 

  2009-08-25 00:00 
  2009-08-25 00:00 

  2010-01-01 00:00 
  2010-01-01 00:00 

  2012-03-01 00:00 
  2012-03-01 00:00 

  2023-01-01 00:00 
  2023-01-01 00:00 

  2024-01-01 00:00 
  2024-01-01 00:00 

  2025-01-01 00:00 
  2025-01-01 00:00 

  2026-01-01 00:00 
  2026-01-01 00:00   
  2009-08-25 00:00 
  2009-08-25 00:00 

  2010-01-01 00:00 
  2010-01-01 00:00 

  2012-03-01 00:00 
  2012-03-01 00:00 

  2023-01-01 00:00 
  2023-01-01 00:00 

  2024-01-01 00:00 
  2024-01-01 00:00 

  2025-01-01 00:00 
  2025-01-01 00:00 

  2026-01-01 00:00 
  2026-01-01 00:00 

  2028-01-01 00:00 
  2028-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     Path Rating     2008-01-30 13:04     BPAT3025      2017-12-11 11:24  
  WOH     48745     BPAT     WOH_Path Rating          WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT)   
  4250.0 

  4250.0 

  4250.0 

  4250.0 

  4250.0 

  4250.0 

  4250.0   
  2008-11-01 00:00 

  2010-01-01 00:00 

  2012-03-01 00:00 

  2023-01-01 00:00 

  2024-01-01 00:00 

  2025-01-01 00:00 

  2026-01-01 00:00   
  2010-01-01 00:00 

  2012-03-01 00:00 

  2023-01-01 00:00 

  2024-01-01 00:00 

  2025-01-01 00:00 

  2026-01-01 00:00 

  2028-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     West of Hatwai Path Rating     2008-10-08 15:30     BPAT7061      2017-12-11 11:37  
  IDNW     88205     BPAT     IDNW_Path_Rating          ID-NW_E>W(BPAT) 
  ID-NW_W>E(BPAT) 

  ID-NW_E>W(BPAT) 
  ID-NW_W>E(BPAT) 

  ID-NW_E>W(BPAT) 
  ID-NW_W>E(BPAT)   
  2400.0 
  1200.0 

  2400.0 
  1200.0 

  2400.0 
  1200.0   
  2009-08-21 08:00 
  2009-08-21 08:00 

  2010-01-01 00:00 
  2010-01-01 00:00 

  2012-03-01 00:00 
  2012-03-01 00:00   
  2010-01-01 00:00 
  2010-01-01 00:00 

  2012-03-01 00:00 
  2012-03-01 00:00 

  2013-09-11 00:00 
  2013-09-11 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     IDNW Path Rating     2009-08-21 07:26     BPAT11246      2013-09-10 07:40  
  JDW     152758     BPAT     JDW_Path_Limit          JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT)   
  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0   
  2011-03-15 09:00 

  2012-03-01 00:00 

  2023-01-01 00:00 

  2024-01-01 00:00 

  2025-01-01 00:00 

  2026-01-01 00:00   
  2012-03-01 00:00 

  2023-01-01 00:00 

  2024-01-01 00:00 

  2025-01-01 00:00 

  2026-01-01 00:00 

  2028-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     Long term limit     2011-03-15 08:44     BPAT22259      2017-12-11 11:22  
  RCW     152760     BPAT     RCW_Path_Limit          ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT)   
  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0   
  2011-03-15 09:00 

  2012-03-01 00:00 

  2023-01-01 00:00 

  2024-01-01 00:00 

  2025-01-01 00:00 

  2026-01-01 00:00   
  2012-03-01 00:00 

  2023-01-01 00:00 

  2024-01-01 00:00 

  2025-01-01 00:00 

  2026-01-01 00:00 

  2028-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     Long term limit     2011-03-15 08:46     BPAT22260      2017-12-11 11:29  
  NI     154275     BPAT     NI_Path_Rating          NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT)   
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  3150.0 
  2000.0 
  2850.0 
  2000.0 

  3150.0 
  2000.0 
  2850.0 
  2000.0 

  3150.0 
  2000.0 
  2850.0 
  2000.0 

  3150.0 
  2000.0 
  2850.0 
  2000.0 

  3150.0 
  2000.0 
  2850.0 
  2000.0   
  2011-04-01 00:00 
  2011-04-01 00:00 
  2011-04-01 00:00 
  2011-04-01 00:00 

  2012-03-01 00:00 
  2012-03-01 00:00 
  2012-03-01 00:00 
  2012-03-01 00:00 

  2023-01-01 00:00 
  2023-01-01 00:00 
  2023-01-01 00:00 
  2023-01-01 00:00 

  2024-01-01 00:00 
  2024-01-01 00:00 
  2024-01-01 00:00 
  2024-01-01 00:00 

  2025-01-01 00:00 
  2025-01-01 00:00 
  2025-01-01 00:00 
  2025-01-01 00:00 

  2026-01-01 00:00 
  2026-01-01 00:00 
  2026-01-01 00:00 
  2026-01-01 00:00   
  2012-03-01 00:00 
  2012-03-01 00:00 
  2012-03-01 00:00 
  2012-03-01 00:00 

  2023-01-01 00:00 
  2023-01-01 00:00 
  2023-01-01 00:00 
  2023-01-01 00:00 

  2024-01-01 00:00 
  2024-01-01 00:00 
  2024-01-01 00:00 
  2024-01-01 00:00 

  2025-01-01 00:00 
  2025-01-01 00:00 
  2025-01-01 00:00 
  2025-01-01 00:00 

  2026-01-01 00:00 
  2026-01-01 00:00 
  2026-01-01 00:00 
  2026-01-01 00:00 

  2028-01-01 00:00 
  2028-01-01 00:00 
  2028-01-01 00:00 
  2028-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     Path Rating     2011-03-30 16:12     BPAT22537      2017-12-11 11:25  
  MI     167689     BPAT     MI_Path_TTC          MI_E>W(BPAT) 

  MI_E>W(BPAT) 

  MI_E>W(BPAT) 

  MI_E>W(BPAT)   
  1930.0 

  1930.0 

  1930.0 

  1930.0   
  2011-10-01 00:00 

  2012-03-01 00:00 

  2023-01-01 00:00 

  2026-01-01 00:00   
  2012-03-01 00:00 

  2023-01-01 00:00 

  2026-01-01 00:00 

  2028-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     Townsend-Garrison (NWE path operator)     2011-08-30 13:34     BPAT24565      2017-12-11 11:23  
  14_Month     173144     BPAT     LAG_All_Lines_in_Service          LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT) 

  LAGR_E>W(BPAT) 
  LAGR_W>E(BPAT)   
  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0 

  413.0 
  350.0   
  2011-11-01 00:00 
  2011-11-01 00:00 

  2012-05-01 00:00 
  2012-05-01 00:00 

  2012-06-01 00:00 
  2012-06-01 00:00 

  2012-11-01 00:00 
  2012-11-01 00:00 

  2014-02-01 00:00 
  2014-02-01 00:00 

  2014-03-01 00:00 
  2014-03-01 00:00 

  2014-04-01 00:00 
  2014-04-01 00:00 

  2014-05-01 00:00 
  2014-05-01 00:00 

  2014-06-01 00:00 
  2014-06-01 00:00 

  2014-07-01 00:00 
  2014-07-01 00:00 

  2014-08-01 00:00 
  2014-08-01 00:00 

  2015-10-01 00:00 
  2015-10-01 00:00 

  2015-11-01 00:00 
  2015-11-01 00:00 

  2015-12-01 00:00 
  2015-12-01 00:00 

  2015-12-01 12:00 
  2015-12-01 12:00 

  2017-02-01 00:00 
  2017-02-01 00:00 

  2017-03-01 00:00 
  2017-03-01 00:00 

  2017-04-01 00:00 
  2017-04-01 00:00 

  2017-05-01 00:00 
  2017-05-01 00:00 

  2017-06-01 00:00 
  2017-06-01 00:00 

  2017-07-01 00:00 
  2017-07-01 00:00 

  2017-08-01 00:00 
  2017-08-01 00:00 

  2017-09-01 00:00 
  2017-09-01 00:00 

  2017-10-01 00:00 
  2017-10-01 00:00 

  2017-11-01 00:00 
  2017-11-01 00:00 

  2017-11-30 23:00 
  2017-11-30 23:00 

  2018-01-01 00:00 
  2018-01-01 00:00 

  2018-02-01 00:00 
  2018-02-01 00:00 

  2018-03-01 00:00 
  2018-03-01 00:00 

  2018-04-01 00:00 
  2018-04-01 00:00 

  2018-05-01 00:00 
  2018-05-01 00:00 

  2018-06-01 00:00 
  2018-06-01 00:00 

  2018-07-01 00:00 
  2018-07-01 00:00 

  2018-08-01 00:00 
  2018-08-01 00:00 

  2018-09-01 00:00 
  2018-09-01 00:00 

  2018-10-01 00:00 
  2018-10-01 00:00 

  2018-11-01 00:00 
  2018-11-01 00:00 

  2018-12-01 00:00 
  2018-12-01 00:00 

  2019-01-01 00:00 
  2019-01-01 00:00 

  2019-02-01 00:00 
  2019-02-01 00:00 

  2019-03-01 00:00 
  2019-03-01 00:00 

  2019-04-01 00:00 
  2019-04-01 00:00 

  2019-05-01 00:00 
  2019-05-01 00:00 

  2019-06-01 00:00 
  2019-06-01 00:00 

  2019-07-01 00:00 
  2019-07-01 00:00 

  2019-08-01 00:00 
  2019-08-01 00:00 

  2019-09-01 00:00 
  2019-09-01 00:00   
  2012-05-01 00:00 
  2012-05-01 00:00 

  2012-06-01 00:00 
  2012-06-01 00:00 

  2012-11-01 00:00 
  2012-11-01 00:00 

  2014-02-01 00:00 
  2014-02-01 00:00 

  2014-03-01 00:00 
  2014-03-01 00:00 

  2014-04-01 00:00 
  2014-04-01 00:00 

  2014-05-01 00:00 
  2014-05-01 00:00 

  2014-06-01 00:00 
  2014-06-01 00:00 

  2014-07-01 00:00 
  2014-07-01 00:00 

  2014-08-01 00:00 
  2014-08-01 00:00 

  2015-10-01 00:00 
  2015-10-01 00:00 

  2015-11-01 00:00 
  2015-11-01 00:00 

  2015-12-01 00:00 
  2015-12-01 00:00 

  2015-12-01 12:00 
  2015-12-01 12:00 

  2017-02-01 00:00 
  2017-02-01 00:00 

  2017-03-01 00:00 
  2017-03-01 00:00 

  2017-04-01 00:00 
  2017-04-01 00:00 

  2017-05-01 00:00 
  2017-05-01 00:00 

  2017-06-01 00:00 
  2017-06-01 00:00 

  2017-07-01 00:00 
  2017-07-01 00:00 

  2017-08-01 00:00 
  2017-08-01 00:00 

  2017-09-01 00:00 
  2017-09-01 00:00 

  2017-10-01 00:00 
  2017-10-01 00:00 

  2017-11-01 00:00 
  2017-11-01 00:00 

  2017-11-30 23:00 
  2017-11-30 23:00 

  2018-01-01 00:00 
  2018-01-01 00:00 

  2018-02-01 00:00 
  2018-02-01 00:00 

  2018-03-01 00:00 
  2018-03-01 00:00 

  2018-04-01 00:00 
  2018-04-01 00:00 

  2018-05-01 00:00 
  2018-05-01 00:00 

  2018-06-01 00:00 
  2018-06-01 00:00 

  2018-07-01 00:00 
  2018-07-01 00:00 

  2018-08-01 00:00 
  2018-08-01 00:00 

  2018-09-01 00:00 
  2018-09-01 00:00 

  2018-10-01 00:00 
  2018-10-01 00:00 

  2018-11-01 00:00 
  2018-11-01 00:00 

  2018-12-01 00:00 
  2018-12-01 00:00 

  2019-01-01 00:00 
  2019-01-01 00:00 

  2019-02-01 00:00 
  2019-02-01 00:00 

  2019-03-01 00:00 
  2019-03-01 00:00 

  2019-04-01 00:00 
  2019-04-01 00:00 

  2019-05-01 00:00 
  2019-05-01 00:00 

  2019-06-01 00:00 
  2019-06-01 00:00 

  2019-07-01 00:00 
  2019-07-01 00:00 

  2019-08-01 00:00 
  2019-08-01 00:00 

  2019-09-01 00:00 
  2019-09-01 00:00 

  2019-10-01 00:00 
  2019-10-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     LaGrande -All Lines in Service (Year Round)     2011-10-21 14:38     BPAT25449      2018-06-20 12:04  
  14_Month     173147     BPAT     RCW_All_Lines_in_Service          ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT) 

  ROCKCK_GEN(BPAT)   
  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0   
  2011-11-01 00:00 

  2012-05-01 00:00 

  2012-11-01 00:00 

  2014-02-01 00:00 

  2014-03-01 00:00 

  2014-04-01 00:00 

  2014-05-01 00:00 

  2014-06-01 00:00 

  2014-07-01 00:00 

  2014-08-01 00:00 

  2015-10-01 00:00 

  2015-11-01 00:00 

  2015-12-01 00:00 

  2015-12-01 12:00 

  2017-02-01 00:00 

  2017-03-01 00:00 

  2017-04-01 00:00 

  2017-05-01 00:00 

  2017-06-01 00:00 

  2017-07-01 00:00 

  2017-08-01 00:00 

  2017-09-01 00:00 

  2017-10-01 00:00 

  2017-11-01 00:00 

  2017-11-30 23:00 

  2017-12-30 00:00 

  2018-01-01 00:00 

  2018-02-01 00:00 

  2018-03-01 00:00 

  2018-04-01 00:00 

  2018-05-01 00:00 

  2018-06-01 00:00 

  2018-07-01 00:00 

  2018-08-01 00:00 

  2018-10-01 00:00 

  2018-11-01 00:00 

  2018-12-01 00:00 

  2019-01-01 00:00 

  2019-02-01 00:00 

  2019-03-01 00:00 

  2019-04-01 00:00 

  2019-05-01 00:00 

  2019-06-01 00:00 

  2019-07-01 00:00 

  2019-08-01 00:00 

  2019-09-01 00:00   
  2012-05-01 00:00 

  2012-11-01 00:00 

  2014-02-01 00:00 

  2014-03-01 00:00 

  2014-04-01 00:00 

  2014-05-01 00:00 

  2014-06-01 00:00 

  2014-07-01 00:00 

  2014-08-01 00:00 

  2015-10-01 00:00 

  2015-11-01 00:00 

  2015-12-01 00:00 

  2015-12-01 12:00 

  2017-02-01 00:00 

  2017-03-01 00:00 

  2017-04-01 00:00 

  2017-05-01 00:00 

  2017-06-01 00:00 

  2017-07-01 00:00 

  2017-08-01 00:00 

  2017-09-01 00:00 

  2017-10-01 00:00 

  2017-11-01 00:00 

  2017-11-30 23:00 

  2017-12-30 00:00 

  2018-01-01 00:00 

  2018-02-01 00:00 

  2018-03-01 00:00 

  2018-04-01 00:00 

  2018-05-01 00:00 

  2018-06-01 00:00 

  2018-07-01 00:00 

  2018-08-01 00:00 

  2018-10-01 00:00 

  2018-11-01 00:00 

  2018-12-01 00:00 

  2019-01-01 00:00 

  2019-02-01 00:00 

  2019-03-01 00:00 

  2019-04-01 00:00 

  2019-05-01 00:00 

  2019-06-01 00:00 

  2019-07-01 00:00 

  2019-08-01 00:00 

  2019-09-01 00:00 

  2019-10-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     Rock Creek - All Lines in Service (Year Round)     2011-10-21 14:39     BPAT25450      2018-06-20 12:03  
  14_Month     173150     BPAT     JDW_All_Lines_in_Service          JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT) 

  JDWIND_GEN(BPAT)   
  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0 

  1200.0   
  2011-11-01 00:00 

  2012-05-01 00:00 

  2012-11-01 00:00 

  2014-02-01 00:00 

  2014-03-01 00:00 

  2014-04-01 00:00 

  2014-05-01 00:00 

  2014-06-01 00:00 

  2014-07-01 00:00 

  2014-08-01 00:00 

  2015-10-01 00:00 

  2015-11-01 00:00 

  2015-12-01 00:00 

  2015-12-01 12:00 

  2017-02-01 00:00 

  2017-03-01 00:00 

  2017-04-01 00:00 

  2017-05-01 00:00 

  2017-06-01 00:00 

  2017-07-01 00:00 

  2017-08-01 00:00 

  2017-09-01 00:00 

  2017-10-01 00:00 

  2017-11-01 00:00 

  2017-11-30 23:00 

  2018-01-01 00:00 

  2018-02-01 00:00 

  2018-03-01 00:00 

  2018-04-01 00:00 

  2018-05-01 00:00 

  2018-06-01 00:00 

  2018-07-01 00:00 

  2018-08-01 00:00 

  2018-10-01 00:00 

  2018-11-01 00:00 

  2018-12-01 00:00 

  2019-01-01 00:00 

  2019-02-01 00:00 

  2019-03-01 00:00 

  2019-04-01 00:00 

  2019-05-01 00:00 

  2019-06-01 00:00 

  2019-07-01 00:00 

  2019-08-01 00:00 

  2019-09-01 00:00   
  2012-05-01 00:00 

  2012-11-01 00:00 

  2014-02-01 00:00 

  2014-03-01 00:00 

  2014-04-01 00:00 

  2014-05-01 00:00 

  2014-06-01 00:00 

  2014-07-01 00:00 

  2014-08-01 00:00 

  2015-10-01 00:00 

  2015-11-01 00:00 

  2015-12-01 00:00 

  2015-12-01 12:00 

  2017-02-01 00:00 

  2017-03-01 00:00 

  2017-04-01 00:00 

  2017-05-01 00:00 

  2017-06-01 00:00 

  2017-07-01 00:00 

  2017-08-01 00:00 

  2017-09-01 00:00 

  2017-10-01 00:00 

  2017-11-01 00:00 

  2017-11-30 23:00 

  2018-01-01 00:00 

  2018-02-01 00:00 

  2018-03-01 00:00 

  2018-04-01 00:00 

  2018-05-01 00:00 

  2018-06-01 00:00 

  2018-07-01 00:00 

  2018-08-01 00:00 

  2018-10-01 00:00 

  2018-11-01 00:00 

  2018-12-01 00:00 

  2019-01-01 00:00 

  2019-02-01 00:00 

  2019-03-01 00:00 

  2019-04-01 00:00 

  2019-05-01 00:00 

  2019-06-01 00:00 

  2019-07-01 00:00 

  2019-08-01 00:00 

  2019-09-01 00:00 

  2019-10-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     John Day Wind - All Lines in Service (Year Round)     2011-10-21 14:41     BPAT25451      2018-06-20 12:03  
  WOCN     181812     BPAT     WOCN_LT          C-CASC_N(BPAT)      10000.0      2012-03-01 09:00      2032-01-01 00:00      Cancelled     TRANSMISSION     PLANNED      ONPATH     BPAT     WOCN long-term limit     2012-02-29 14:15     BPAT26934      2012-02-29 14:15  
  14_Month     185758     BPAT     WOM_All_Lines_in_Service          WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT) 

  WOMCNY(BPAT)   
  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0 

  4500.0   
  2012-04-01 00:00 

  2012-05-01 00:00 

  2012-06-01 00:00 

  2012-11-01 00:00 

  2013-03-01 00:00 

  2014-06-01 00:00 

  2014-07-01 00:00 

  2014-08-01 00:00 

  2015-10-01 00:00 

  2015-11-01 00:00 

  2015-12-01 00:00 

  2015-12-01 12:00 

  2017-02-01 00:00 

  2017-03-01 00:00 

  2017-04-01 00:00 

  2017-05-01 00:00 

  2017-06-01 00:00 

  2017-07-01 00:00 

  2017-08-01 00:00 

  2017-09-01 00:00 

  2017-10-01 00:00 

  2017-11-01 00:00 

  2017-11-30 23:00 

  2018-01-01 00:00 

  2018-02-01 00:00 

  2018-03-01 00:00 

  2018-04-01 00:00 

  2018-05-01 00:00 

  2018-06-01 00:00 

  2018-07-01 00:00 

  2018-08-01 00:00 

  2018-10-01 00:00 

  2018-11-01 00:00 

  2018-12-01 00:00 

  2019-01-01 00:00 

  2019-02-01 00:00 

  2019-03-01 00:00 

  2019-04-01 00:00 

  2019-05-01 00:00 

  2019-06-01 00:00 

  2019-07-01 00:00 

  2019-08-01 00:00 

  2019-09-01 00:00   
  2012-05-01 00:00 

  2012-06-01 00:00 

  2012-11-01 00:00 

  2013-03-01 00:00 

  2014-06-01 00:00 

  2014-07-01 00:00 

  2014-08-01 00:00 

  2015-10-01 00:00 

  2015-11-01 00:00 

  2015-12-01 00:00 

  2015-12-01 12:00 

  2017-02-01 00:00 

  2017-03-01 00:00 

  2017-04-01 00:00 

  2017-05-01 00:00 

  2017-06-01 00:00 

  2017-07-01 00:00 

  2017-08-01 00:00 

  2017-09-01 00:00 

  2017-10-01 00:00 

  2017-11-01 00:00 

  2017-11-30 23:00 

  2018-01-01 00:00 

  2018-02-01 00:00 

  2018-03-01 00:00 

  2018-04-01 00:00 

  2018-05-01 00:00 

  2018-06-01 00:00 

  2018-07-01 00:00 

  2018-08-01 00:00 

  2018-10-01 00:00 

  2018-11-01 00:00 

  2018-12-01 00:00 

  2019-01-01 00:00 

  2019-02-01 00:00 

  2019-03-01 00:00 

  2019-04-01 00:00 

  2019-05-01 00:00 

  2019-06-01 00:00 

  2019-07-01 00:00 

  2019-08-01 00:00 

  2019-09-01 00:00 

  2019-10-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     West of McNary - All Lines in Service (Year Round)     2012-03-29 12:34     BPAT27351      2018-06-20 12:04  
  14_Month     191688     BPAT     WOH_All_lines_in_service          WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT) 

  WOH_E>W(BPAT)   
  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0 

  4275.0   
  2012-06-01 08:00 

  2012-11-01 00:00 

  2014-02-01 00:00 

  2014-03-01 00:00 

  2014-04-01 00:00 

  2014-05-01 00:00 

  2014-06-01 00:00 

  2014-07-01 00:00 

  2014-08-01 00:00 

  2015-10-01 00:00 

  2015-11-01 00:00 

  2015-12-01 00:00 

  2015-12-01 12:00 

  2017-02-01 00:00 

  2017-03-01 00:00 

  2017-04-01 00:00 

  2017-05-01 00:00 

  2017-06-01 00:00 

  2017-07-01 00:00 

  2017-08-01 00:00 

  2017-09-01 00:00 

  2017-10-01 00:00 

  2017-11-01 00:00 

  2017-11-30 23:00 

  2018-01-01 00:00 

  2018-02-01 00:00 

  2018-03-01 00:00 

  2018-04-01 00:00 

  2018-05-01 00:00 

  2018-06-01 00:00 

  2018-07-01 00:00 

  2018-08-01 00:00 

  2018-10-01 00:00 

  2018-11-01 00:00 

  2018-12-01 00:00 

  2019-01-01 00:00 

  2019-02-01 00:00 

  2019-03-01 00:00 

  2019-04-01 00:00 

  2019-05-01 00:00 

  2019-06-01 00:00 

  2019-07-01 00:00 

  2019-08-01 00:00 

  2019-09-01 00:00   
  2012-11-01 00:00 

  2014-02-01 00:00 

  2014-03-01 00:00 

  2014-04-01 00:00 

  2014-05-01 00:00 

  2014-06-01 00:00 

  2014-07-01 00:00 

  2014-08-01 00:00 

  2015-10-01 00:00 

  2015-11-01 00:00 

  2015-12-01 00:00 

  2015-12-01 12:00 

  2017-02-01 00:00 

  2017-03-01 00:00 

  2017-04-01 00:00 

  2017-05-01 00:00 

  2017-06-01 00:00 

  2017-07-01 00:00 

  2017-08-01 00:00 

  2017-09-01 00:00 

  2017-10-01 00:00 

  2017-11-01 00:00 

  2017-11-30 23:00 

  2018-01-01 00:00 

  2018-02-01 00:00 

  2018-03-01 00:00 

  2018-04-01 00:00 

  2018-05-01 00:00 

  2018-06-01 00:00 

  2018-07-01 00:00 

  2018-08-01 00:00 

  2018-10-01 00:00 

  2018-11-01 00:00 

  2018-12-01 00:00 

  2019-01-01 00:00 

  2019-02-01 00:00 

  2019-03-01 00:00 

  2019-04-01 00:00 

  2019-05-01 00:00 

  2019-06-01 00:00 

  2019-07-01 00:00 

  2019-08-01 00:00 

  2019-09-01 00:00 

  2019-10-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     West of Hatwai - All Lines in Service (Year Round)     2012-05-30 07:33     BPAT28676      2018-06-20 12:02  
  14_Month     203317     BPAT     SOB_All_Lines_in_Service          SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT) 

  SBNDRY_N>S(BPAT)   
  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0 

  1350.0   
  2012-11-01 09:00 

  2014-02-01 00:00 

  2014-03-01 00:00 

  2014-04-01 00:00 

  2014-05-01 00:00 

  2014-06-01 00:00 

  2014-07-01 00:00 

  2014-08-01 00:00 

  2014-09-01 00:00 

  2014-10-01 00:00 

  2014-11-01 00:00 

  2014-12-01 00:00 

  2015-01-01 00:00 

  2015-02-01 00:00 

  2015-03-01 00:00 

  2015-04-01 00:00 

  2015-05-01 00:00 

  2015-06-01 00:00 

  2015-07-01 00:00 

  2015-08-01 00:00 

  2015-09-01 00:00 

  2015-11-01 00:00 

  2015-12-01 00:00 

  2015-12-01 12:00 

  2017-02-01 00:00 

  2017-03-01 00:00 

  2017-04-01 00:00 

  2017-05-01 00:00 

  2017-06-01 00:00 

  2017-07-01 00:00 

  2017-08-01 00:00 

  2017-09-01 00:00 

  2017-10-01 00:00 

  2017-11-01 00:00 

  2017-11-30 23:00 

  2018-01-01 00:00 

  2018-02-01 00:00 

  2018-03-01 00:00 

  2018-04-01 00:00 

  2018-05-01 00:00 

  2018-06-01 00:00 

  2018-07-01 00:00 

  2018-08-01 00:00 

  2018-10-01 00:00 

  2018-11-01 00:00 

  2018-12-01 00:00 

  2019-01-01 00:00 

  2019-02-01 00:00 

  2019-03-01 00:00 

  2019-04-01 00:00 

  2019-05-01 00:00 

  2019-06-01 00:00 

  2019-07-01 00:00 

  2019-08-01 00:00 

  2019-09-01 00:00   
  2014-02-01 00:00 

  2014-03-01 00:00 

  2014-04-01 00:00 

  2014-05-01 00:00 

  2014-06-01 00:00 

  2014-07-01 00:00 

  2014-08-01 00:00 

  2014-09-01 00:00 

  2014-10-01 00:00 

  2014-11-01 00:00 

  2014-12-01 00:00 

  2015-01-01 00:00 

  2015-02-01 00:00 

  2015-03-01 00:00 

  2015-04-01 00:00 

  2015-05-01 00:00 

  2015-06-01 00:00 

  2015-07-01 00:00 

  2015-08-01 00:00 

  2015-09-01 00:00 

  2015-11-01 00:00 

  2015-12-01 00:00 

  2015-12-01 12:00 

  2017-02-01 00:00 

  2017-03-01 00:00 

  2017-04-01 00:00 

  2017-05-01 00:00 

  2017-06-01 00:00 

  2017-07-01 00:00 

  2017-08-01 00:00 

  2017-09-01 00:00 

  2017-10-01 00:00 

  2017-11-01 00:00 

  2017-11-30 23:00 

  2018-01-01 00:00 

  2018-02-01 00:00 

  2018-03-01 00:00 

  2018-04-01 00:00 

  2018-05-01 00:00 

  2018-06-01 00:00 

  2018-07-01 00:00 

  2018-08-01 00:00 

  2018-10-01 00:00 

  2018-11-01 00:00 

  2018-12-01 00:00 

  2019-01-01 00:00 

  2019-02-01 00:00 

  2019-03-01 00:00 

  2019-04-01 00:00 

  2019-05-01 00:00 

  2019-06-01 00:00 

  2019-07-01 00:00 

  2019-08-01 00:00 

  2019-09-01 00:00 

  2019-10-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     South of Boundary - All Lines in Service (Year Round)     2012-10-25 14:00     BPAT31256      2018-06-20 12:05  
  14_Month     210658     BPAT     WOJD_All_Lines_in_Service          WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT)   
  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0 

  3750.0   
  2013-02-21 00:00 

  2013-03-01 00:00 

  2014-06-01 00:00 

  2014-07-01 00:00 

  2014-08-01 00:00 

  2015-08-27 09:00 

  2016-12-01 00:00 

  2017-01-01 00:00 

  2017-02-01 00:00 

  2017-03-01 00:00 

  2017-04-01 00:00 

  2017-05-01 00:00 

  2017-06-01 00:00 

  2017-07-01 00:00 

  2017-08-01 00:00 

  2017-09-01 00:00 

  2017-10-01 00:00 

  2017-11-01 00:00 

  2017-11-30 23:00 

  2018-01-01 00:00 

  2018-02-01 00:00 

  2018-03-01 00:00 

  2018-04-01 00:00 

  2018-05-01 00:00 

  2018-06-01 00:00 

  2018-07-01 00:00 

  2018-08-01 00:00 

  2018-10-01 00:00 

  2018-11-01 00:00 

  2018-12-01 00:00 

  2019-01-01 00:00 

  2019-02-01 00:00 

  2019-03-01 00:00 

  2019-04-01 00:00 

  2019-05-01 00:00 

  2019-06-01 00:00 

  2019-07-01 00:00 

  2019-08-01 00:00 

  2019-09-01 00:00   
  2013-03-01 00:00 

  2014-06-01 00:00 

  2014-07-01 00:00 

  2014-08-01 00:00 

  2015-08-27 09:00 

  2016-12-01 00:00 

  2017-01-01 00:00 

  2017-02-01 00:00 

  2017-03-01 00:00 

  2017-04-01 00:00 

  2017-05-01 00:00 

  2017-06-01 00:00 

  2017-07-01 00:00 

  2017-08-01 00:00 

  2017-09-01 00:00 

  2017-10-01 00:00 

  2017-11-01 00:00 

  2017-11-30 23:00 

  2018-01-01 00:00 

  2018-02-01 00:00 

  2018-03-01 00:00 

  2018-04-01 00:00 

  2018-05-01 00:00 

  2018-06-01 00:00 

  2018-07-01 00:00 

  2018-08-01 00:00 

  2018-10-01 00:00 

  2018-11-01 00:00 

  2018-12-01 00:00 

  2019-01-01 00:00 

  2019-02-01 00:00 

  2019-03-01 00:00 

  2019-04-01 00:00 

  2019-05-01 00:00 

  2019-06-01 00:00 

  2019-07-01 00:00 

  2019-08-01 00:00 

  2019-09-01 00:00 

  2019-10-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     West of John Day - All Lines in Service (Year Round)     2013-02-19 10:46     BPAT33076      2018-06-20 12:05  
  14_Month     215522     BPAT     WNAPM_All_lines_in_service          WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT) 

  WANAPM_N>S(BPAT)   
  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0 

  750.0   
  2013-06-04 00:00 

  2014-08-01 00:00 

  2015-08-27 14:00 

  2015-11-23 11:00 

  2016-03-24 11:00 

  2016-05-26 10:00 

  2016-06-24 15:00 

  2016-08-04 08:00 

  2016-08-26 13:00 

  2016-10-05 15:00 

  2016-11-07 14:00 

  2017-01-03 14:00 

  2017-03-03 14:00 

  2017-05-02 15:00 

  2017-06-28 14:00 

  2017-07-26 14:00 

  2017-08-28 14:00 

  2017-09-28 15:00 

  2019-01-01 00:00 

  2019-02-01 00:00 

  2019-03-01 00:00 

  2019-04-01 00:00 

  2019-05-01 00:00 

  2019-06-01 00:00 

  2019-07-01 00:00 

  2019-08-01 00:00 

  2019-09-01 00:00   
  2014-08-01 00:00 

  2015-08-27 14:00 

  2015-11-23 11:00 

  2016-03-24 11:00 

  2016-05-26 10:00 

  2016-06-24 15:00 

  2016-08-04 08:00 

  2016-08-26 13:00 

  2016-10-05 15:00 

  2016-11-07 14:00 

  2017-01-03 14:00 

  2017-03-03 14:00 

  2017-05-02 15:00 

  2017-06-28 14:00 

  2017-07-26 14:00 

  2017-08-28 14:00 

  2017-09-28 15:00 

  2019-01-01 00:00 

  2019-02-01 00:00 

  2019-03-01 00:00 

  2019-04-01 00:00 

  2019-05-01 00:00 

  2019-06-01 00:00 

  2019-07-01 00:00 

  2019-08-01 00:00 

  2019-09-01 00:00 

  2019-10-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     Wanapum Injection - All Lines in Service (Year Round)     2013-05-31 09:59     BPAT34494      2018-06-20 12:06  
  RATS     242385     BPAT     RATS 03/03/15 - 06/01/16          RATS_S>N(BPAT) 

  RATS_S>N(BPAT) 

  RATS_S>N(BPAT) 

  RATS_S>N(BPAT) 

  RATS_S>N(BPAT) 

  RATS_S>N(BPAT) 

  RATS_S>N(BPAT) 

  RATS_S>N(BPAT) 

  RATS_S>N(BPAT) 

  RATS_S>N(BPAT) 

  RATS_S>N(BPAT) 

  RATS_S>N(BPAT) 

  RATS_S>N(BPAT) 

  RATS_S>N(BPAT) 

  RATS_S>N(BPAT) 

  RATS_S>N(BPAT) 

  RATS_S>N(BPAT) 

  RATS_S>N(BPAT) 

  RATS_S>N(BPAT) 

  RATS_S>N(BPAT) 

  RATS_S>N(BPAT) 

  RATS_S>N(BPAT) 

  RATS_S>N(BPAT) 

  RATS_S>N(BPAT) 

  RATS_S>N(BPAT) 

  RATS_S>N(BPAT)   
  220.0 

  220.0 

  220.0 

  220.0 

  220.0 

  220.0 

  220.0 

  220.0 

  220.0 

  220.0 

  220.0 

  220.0 

  220.0 

  220.0 

  220.0 

  220.0 

  220.0 

  220.0 

  220.0 

  220.0 

  220.0 

  220.0 

  220.0 

  220.0 

  220.0 

  220.0   
  2015-03-03 00:00 

  2016-06-01 00:00 

  2016-07-01 00:00 

  2016-08-01 00:00 

  2016-09-01 00:00 

  2016-10-01 00:00 

  2016-11-01 00:00 

  2016-12-01 00:00 

  2017-01-01 00:00 

  2017-02-01 00:00 

  2017-03-01 00:00 

  2017-04-01 00:00 

  2017-05-01 00:00 

  2017-06-01 00:00 

  2017-07-01 00:00 

  2017-08-01 00:00 

  2017-09-01 00:00 

  2017-10-01 00:00 

  2017-11-01 00:00 

  2018-01-01 00:00 

  2018-02-01 00:00 

  2018-03-01 00:00 

  2018-04-01 00:00 

  2018-05-01 00:00 

  2018-06-01 00:00 

  2019-09-01 00:00   
  2016-06-01 00:00 

  2016-07-01 00:00 

  2016-08-01 00:00 

  2016-09-01 00:00 

  2016-10-01 00:00 

  2016-11-01 00:00 

  2016-12-01 00:00 

  2017-01-01 00:00 

  2017-02-01 00:00 

  2017-03-01 00:00 

  2017-04-01 00:00 

  2017-05-01 00:00 

  2017-06-01 00:00 

  2017-07-01 00:00 

  2017-08-01 00:00 

  2017-09-01 00:00 

  2017-10-01 00:00 

  2017-11-01 00:00 

  2018-01-01 00:00 

  2018-02-01 00:00 

  2018-03-01 00:00 

  2018-04-01 00:00 

  2018-05-01 00:00 

  2018-06-01 00:00 

  2019-09-01 00:00 

  2019-10-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     NVE - Network condition Until Further Notice     2015-02-27 12:37     BPAT44918      2018-06-20 12:15  
  SCSTER NOEL     241257     BPAT     SOC NOEL Long Term          N_ECOL_S>N(BPAT) 
  SCSTER_N>S(BPAT) 

  N_ECOL_S>N(BPAT) 
  SCSTER_N>S(BPAT) 

  N_ECOL_S>N(BPAT) 
  SCSTER_N>S(BPAT)   
  2800.0 
  1850.0 

  2800.0 
  1850.0 

  2800.0 
  1850.0   
  2015-11-01 00:00 
  2015-11-01 00:00 

  2025-01-01 00:00 
  2025-01-01 00:00 

  2026-01-01 00:00 
  2026-01-01 00:00   
  2025-01-01 00:00 
  2025-01-01 00:00 

  2026-01-01 00:00 
  2026-01-01 00:00 

  2028-01-01 00:00 
  2028-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     SCSTER & N_ECOL Long-term limit     2015-01-30 10:54     BPAT44295      2017-12-11 11:27  
  NOHANF     241268     BPAT     North of Hanford          NOHANF(BPAT) 

  NOHANF(BPAT) 

  NOHANF(BPAT)   
  4450.0 

  4450.0 

  4450.0   
  2015-11-01 00:00 

  2025-01-01 13:00 

  2026-01-01 00:00   
  2025-01-01 13:00 

  2026-01-01 00:00 

  2028-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     NOHAN Long-term limit     2015-01-30 11:06     BPAT44298      2017-12-11 11:25  
  WOMCNY     255118     BPAT     West of McNary LT Rating          WOMCNY(BPAT) 

  WOMCNY(BPAT)   
  4500.0 

  4500.0   
  2015-11-02 00:00 

  2026-01-01 00:00   
  2026-01-01 00:00 

  2028-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     West of McNary Long-Term Limit.     2015-10-27 10:32     BPAT51473      2017-12-11 11:38  
  WOJD     255121     BPAT     West of John Day Long-Term Limit          WOJD_E>W(BPAT) 

  WOJD_E>W(BPAT)   
  4300.0 

  4300.0   
  2015-11-02 00:00 

  2026-01-01 00:00   
  2026-01-01 00:00 

  2028-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     West of John Day Long Term Limit.     2015-10-27 10:35     BPAT51474      2017-12-11 11:38  
  WOSLATT     255124     BPAT     West of Slatt Path Rating          WOSLATT(BPAT) 

  WOSLATT(BPAT)   
  4200.0 

  4200.0   
  2015-11-02 00:00 

  2026-01-01 00:00   
  2026-01-01 00:00 

  2028-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     West of Slatt Long-term Limit.     2015-10-27 10:37     BPAT51475      2017-12-11 11:39  
  RAVR_PAUL     255209     BPAT     Raver -Paul LT Rating          RAVR_PAUL(BPAT) 

  RAVR_PAUL(BPAT)   
  1450.0 

  1450.0   
  2015-11-02 00:00 

  2026-01-01 00:00   
  2026-01-01 00:00 

  2028-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     Raver-Paul Long-term Limit.     2015-10-27 14:00     BPAT51479      2017-12-11 11:28  
  PAUL_ALSN     255212     BPAT     Paul Allston Path Rating          PAUL_ALSN(BPAT) 

  PAUL_ALSN(BPAT) 

  PAUL_ALSN(BPAT)   
  2409.0 

  2250.0 

  2250.0   
  2015-11-02 00:00 

  2016-10-12 00:00 

  2026-01-01 00:00   
  2016-10-12 00:00 

  2026-01-01 00:00 

  2028-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     Paul Allston Long-term Limit.     2015-10-27 14:03     BPAT51480      2017-12-11 11:27  
  SOALSN     255215     BPAT     South of Allston Path Rating          SOALSN(BPAT) 

  SOALSN(BPAT)   
  2950.0 

  2950.0   
  2015-11-02 00:00 

  2026-01-01 00:00   
  2026-01-01 00:00 

  2028-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     South of Allston Long-term Limit.     2015-10-27 14:05     BPAT51481      2017-12-11 11:30  
  W_LOMO     255224     BPAT     West of LOMO Path Rating          W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT)   
  4200.0 

  4200.0   
  2015-11-02 00:00 

  2026-01-01 00:00   
  2026-01-01 00:00 

  2028-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     West of Lower Monumental Long-term Limit.     2015-10-27 14:15     BPAT51482      2017-12-11 11:39  
  WOCS     255230     BPAT     West of Cascades South Path Rating          C-CASC_S(BPAT) 

  C-CASC_S(BPAT)   
  7500.0 

  7500.0   
  2015-11-02 00:00 

  2026-01-01 00:00   
  2026-01-01 00:00 

  2028-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     West of Cascades South Long-term Limit.     2015-10-27 14:21     BPAT51484      2017-12-11 11:18  
  14 MONTH     255188     BPAT     Northern Intertie ALIS          NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT) 

  NI_EAST_N>S(BPAT) 
  NI_EAST_S>N(BPAT) 
  NI_TOTL_N>S(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_N>S(BPAT) 
  NI_WEST_S>N(BPAT)   
  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0 

  400.0 
  400.0 
  3150.0 
  2000.0 
  2850.0 
  2000.0   
  2015-11-04 00:00 
  2015-11-04 00:00 
  2015-11-04 00:00 
  2015-11-04 00:00 
  2015-11-04 00:00 
  2015-11-04 00:00 

  2017-02-01 00:00 
  2017-02-01 00:00 
  2017-02-01 00:00 
  2017-02-01 00:00 
  2017-02-01 00:00 
  2017-02-01 00:00 

  2017-03-01 00:00 
  2017-03-01 00:00 
  2017-03-01 00:00 
  2017-03-01 00:00 
  2017-03-01 00:00 
  2017-03-01 00:00 

  2017-04-01 00:00 
  2017-04-01 00:00 
  2017-04-01 00:00 
  2017-04-01 00:00 
  2017-04-01 00:00 
  2017-04-01 00:00 

  2017-05-01 00:00 
  2017-05-01 00:00 
  2017-05-01 00:00 
  2017-05-01 00:00 
  2017-05-01 00:00 
  2017-05-01 00:00 

  2017-06-01 00:00 
  2017-06-01 00:00 
  2017-06-01 00:00 
  2017-06-01 00:00 
  2017-06-01 00:00 
  2017-06-01 00:00 

  2017-07-01 00:00 
  2017-07-01 00:00 
  2017-07-01 00:00 
  2017-07-01 00:00 
  2017-07-01 00:00 
  2017-07-01 00:00 

  2017-08-01 00:00 
  2017-08-01 00:00 
  2017-08-01 00:00 
  2017-08-01 00:00 
  2017-08-01 00:00 
  2017-08-01 00:00 

  2017-09-01 00:00 
  2017-09-01 00:00 
  2017-09-01 00:00 
  2017-09-01 00:00 
  2017-09-01 00:00 
  2017-09-01 00:00 

  2017-10-01 00:00 
  2017-10-01 00:00 
  2017-10-01 00:00 
  2017-10-01 00:00 
  2017-10-01 00:00 
  2017-10-01 00:00 

  2017-11-01 00:00 
  2017-11-01 00:00 
  2017-11-01 00:00 
  2017-11-01 00:00 
  2017-11-01 00:00 
  2017-11-01 00:00 

  2017-11-30 23:00 
  2017-11-30 23:00 
  2017-11-30 23:00 
  2017-11-30 23:00 
  2017-11-30 23:00 
  2017-11-30 23:00 

  2017-12-31 23:00 
  2017-12-31 23:00 
  2017-12-31 23:00 
  2017-12-31 23:00 
  2017-12-31 23:00 
  2017-12-31 23:00 

  2018-01-01 00:00 
  2018-01-01 00:00 
  2018-01-01 00:00 
  2018-01-01 00:00 
  2018-01-01 00:00 
  2018-01-01 00:00 

  2018-02-01 00:00 
  2018-02-01 00:00 
  2018-02-01 00:00 
  2018-02-01 00:00 
  2018-02-01 00:00 
  2018-02-01 00:00 

  2018-03-01 00:00 
  2018-03-01 00:00 
  2018-03-01 00:00 
  2018-03-01 00:00 
  2018-03-01 00:00 
  2018-03-01 00:00 

  2018-04-01 00:00 
  2018-04-01 00:00 
  2018-04-01 00:00 
  2018-04-01 00:00 
  2018-04-01 00:00 
  2018-04-01 00:00 

  2018-05-01 00:00 
  2018-05-01 00:00 
  2018-05-01 00:00 
  2018-05-01 00:00 
  2018-05-01 00:00 
  2018-05-01 00:00 

  2018-06-01 00:00 
  2018-06-01 00:00 
  2018-06-01 00:00 
  2018-06-01 00:00 
  2018-06-01 00:00 
  2018-06-01 00:00 

  2018-07-01 00:00 
  2018-07-01 00:00 
  2018-07-01 00:00 
  2018-07-01 00:00 
  2018-07-01 00:00 
  2018-07-01 00:00 

  2018-08-01 00:00 
  2018-08-01 00:00 
  2018-08-01 00:00 
  2018-08-01 00:00 
  2018-08-01 00:00 
  2018-08-01 00:00 

  2018-10-01 00:00 
  2018-10-01 00:00 
  2018-10-01 00:00 
  2018-10-01 00:00 
  2018-10-01 00:00 
  2018-10-01 00:00 

  2018-11-01 00:00 
  2018-11-01 00:00 
  2018-11-01 00:00 
  2018-11-01 00:00 
  2018-11-01 00:00 
  2018-11-01 00:00 

  2018-12-01 00:00 
  2018-12-01 00:00 
  2018-12-01 00:00 
  2018-12-01 00:00 
  2018-12-01 00:00 
  2018-12-01 00:00 

  2019-01-01 00:00 
  2019-01-01 00:00 
  2019-01-01 00:00 
  2019-01-01 00:00 
  2019-01-01 00:00 
  2019-01-01 00:00 

  2019-02-01 00:00 
  2019-02-01 00:00 
  2019-02-01 00:00 
  2019-02-01 00:00 
  2019-02-01 00:00 
  2019-02-01 00:00 

  2019-03-01 00:00 
  2019-03-01 00:00 
  2019-03-01 00:00 
  2019-03-01 00:00 
  2019-03-01 00:00 
  2019-03-01 00:00 

  2019-04-01 00:00 
  2019-04-01 00:00 
  2019-04-01 00:00 
  2019-04-01 00:00 
  2019-04-01 00:00 
  2019-04-01 00:00 

  2019-05-01 00:00 
  2019-05-01 00:00 
  2019-05-01 00:00 
  2019-05-01 00:00 
  2019-05-01 00:00 
  2019-05-01 00:00 

  2019-06-01 00:00 
  2019-06-01 00:00 
  2019-06-01 00:00 
  2019-06-01 00:00 
  2019-06-01 00:00 
  2019-06-01 00:00 

  2019-07-01 00:00 
  2019-07-01 00:00 
  2019-07-01 00:00 
  2019-07-01 00:00 
  2019-07-01 00:00 
  2019-07-01 00:00 

  2019-08-01 00:00 
  2019-08-01 00:00 
  2019-08-01 00:00 
  2019-08-01 00:00 
  2019-08-01 00:00 
  2019-08-01 00:00 

  2019-09-01 00:00 
  2019-09-01 00:00 
  2019-09-01 00:00 
  2019-09-01 00:00 
  2019-09-01 00:00 
  2019-09-01 00:00   
  2017-02-01 00:00 
  2017-02-01 00:00 
  2017-02-01 00:00 
  2017-02-01 00:00 
  2017-02-01 00:00 
  2017-02-01 00:00 

  2017-03-01 00:00 
  2017-03-01 00:00 
  2017-03-01 00:00 
  2017-03-01 00:00 
  2017-03-01 00:00 
  2017-03-01 00:00 

  2017-04-01 00:00 
  2017-04-01 00:00 
  2017-04-01 00:00 
  2017-04-01 00:00 
  2017-04-01 00:00 
  2017-04-01 00:00 

  2017-05-01 00:00 
  2017-05-01 00:00 
  2017-05-01 00:00 
  2017-05-01 00:00 
  2017-05-01 00:00 
  2017-05-01 00:00 

  2017-06-01 00:00 
  2017-06-01 00:00 
  2017-06-01 00:00 
  2017-06-01 00:00 
  2017-06-01 00:00 
  2017-06-01 00:00 

  2017-07-01 00:00 
  2017-07-01 00:00 
  2017-07-01 00:00 
  2017-07-01 00:00 
  2017-07-01 00:00 
  2017-07-01 00:00 

  2017-08-01 00:00 
  2017-08-01 00:00 
  2017-08-01 00:00 
  2017-08-01 00:00 
  2017-08-01 00:00 
  2017-08-01 00:00 

  2017-09-01 00:00 
  2017-09-01 00:00 
  2017-09-01 00:00 
  2017-09-01 00:00 
  2017-09-01 00:00 
  2017-09-01 00:00 

  2017-10-01 00:00 
  2017-10-01 00:00 
  2017-10-01 00:00 
  2017-10-01 00:00 
  2017-10-01 00:00 
  2017-10-01 00:00 

  2017-11-01 00:00 
  2017-11-01 00:00 
  2017-11-01 00:00 
  2017-11-01 00:00 
  2017-11-01 00:00 
  2017-11-01 00:00 

  2017-11-30 23:00 
  2017-11-30 23:00 
  2017-11-30 23:00 
  2017-11-30 23:00 
  2017-11-30 23:00 
  2017-11-30 23:00 

  2017-12-31 23:00 
  2017-12-31 23:00 
  2017-12-31 23:00 
  2017-12-31 23:00 
  2017-12-31 23:00 
  2017-12-31 23:00 

  2018-01-01 00:00 
  2018-01-01 00:00 
  2018-01-01 00:00 
  2018-01-01 00:00 
  2018-01-01 00:00 
  2018-01-01 00:00 

  2018-02-01 00:00 
  2018-02-01 00:00 
  2018-02-01 00:00 
  2018-02-01 00:00 
  2018-02-01 00:00 
  2018-02-01 00:00 

  2018-03-01 00:00 
  2018-03-01 00:00 
  2018-03-01 00:00 
  2018-03-01 00:00 
  2018-03-01 00:00 
  2018-03-01 00:00 

  2018-04-01 00:00 
  2018-04-01 00:00 
  2018-04-01 00:00 
  2018-04-01 00:00 
  2018-04-01 00:00 
  2018-04-01 00:00 

  2018-05-01 00:00 
  2018-05-01 00:00 
  2018-05-01 00:00 
  2018-05-01 00:00 
  2018-05-01 00:00 
  2018-05-01 00:00 

  2018-06-01 00:00 
  2018-06-01 00:00 
  2018-06-01 00:00 
  2018-06-01 00:00 
  2018-06-01 00:00 
  2018-06-01 00:00 

  2018-07-01 00:00 
  2018-07-01 00:00 
  2018-07-01 00:00 
  2018-07-01 00:00 
  2018-07-01 00:00 
  2018-07-01 00:00 

  2018-08-01 00:00 
  2018-08-01 00:00 
  2018-08-01 00:00 
  2018-08-01 00:00 
  2018-08-01 00:00 
  2018-08-01 00:00 

  2018-10-01 00:00 
  2018-10-01 00:00 
  2018-10-01 00:00 
  2018-10-01 00:00 
  2018-10-01 00:00 
  2018-10-01 00:00 

  2018-11-01 00:00 
  2018-11-01 00:00 
  2018-11-01 00:00 
  2018-11-01 00:00 
  2018-11-01 00:00 
  2018-11-01 00:00 

  2018-12-01 00:00 
  2018-12-01 00:00 
  2018-12-01 00:00 
  2018-12-01 00:00 
  2018-12-01 00:00 
  2018-12-01 00:00 

  2019-01-01 00:00 
  2019-01-01 00:00 
  2019-01-01 00:00 
  2019-01-01 00:00 
  2019-01-01 00:00 
  2019-01-01 00:00 

  2019-02-01 00:00 
  2019-02-01 00:00 
  2019-02-01 00:00 
  2019-02-01 00:00 
  2019-02-01 00:00 
  2019-02-01 00:00 

  2019-03-01 00:00 
  2019-03-01 00:00 
  2019-03-01 00:00 
  2019-03-01 00:00 
  2019-03-01 00:00 
  2019-03-01 00:00 

  2019-04-01 00:00 
  2019-04-01 00:00 
  2019-04-01 00:00 
  2019-04-01 00:00 
  2019-04-01 00:00 
  2019-04-01 00:00 

  2019-05-01 00:00 
  2019-05-01 00:00 
  2019-05-01 00:00 
  2019-05-01 00:00 
  2019-05-01 00:00 
  2019-05-01 00:00 

  2019-06-01 00:00 
  2019-06-01 00:00 
  2019-06-01 00:00 
  2019-06-01 00:00 
  2019-06-01 00:00 
  2019-06-01 00:00 

  2019-07-01 00:00 
  2019-07-01 00:00 
  2019-07-01 00:00 
  2019-07-01 00:00 
  2019-07-01 00:00 
  2019-07-01 00:00 

  2019-08-01 00:00 
  2019-08-01 00:00 
  2019-08-01 00:00 
  2019-08-01 00:00 
  2019-08-01 00:00 
  2019-08-01 00:00 

  2019-09-01 00:00 
  2019-09-01 00:00 
  2019-09-01 00:00 
  2019-09-01 00:00 
  2019-09-01 00:00 
  2019-09-01 00:00 

  2019-10-01 00:00 
  2019-10-01 00:00 
  2019-10-01 00:00 
  2019-10-01 00:00 
  2019-10-01 00:00 
  2019-10-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     Northern Intertie -All Lines in Service (Year Round)     2015-10-27 11:37     BPAT51477      2018-06-20 12:01  
  WOCN     255892     BPAT     West of Cascades North Path Rating          C-CASC_N(BPAT) 

  C-CASC_N(BPAT)   
  10700.0 

  10700.0   
  2015-11-10 00:00 

  2026-01-01 00:00   
  2026-01-01 00:00 

  2028-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     West of Cascades North Long-term Limit.     2015-11-09 10:26     BPAT51802      2017-12-11 11:17  
  14 MONTH     260712     BPAT     West of LOMO E>W All Lines in Service          W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT) 

  W_LOMO_E>W(BPAT)   
  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0   
  2016-03-17 00:00 

  2017-06-01 00:00 

  2017-07-01 00:00 

  2017-08-01 00:00 

  2017-09-01 00:00 

  2017-10-01 00:00 

  2017-11-01 00:00 

  2017-11-30 23:00 

  2018-01-01 00:00 

  2018-02-01 00:00 

  2018-03-01 00:00 

  2018-04-01 00:00 

  2018-05-01 00:00 

  2018-06-01 00:00 

  2018-07-01 00:00 

  2018-08-01 00:00 

  2018-10-01 00:00 

  2018-11-01 00:00 

  2018-12-01 00:00 

  2019-01-01 00:00 

  2019-02-01 00:00 

  2019-03-01 00:00 

  2019-04-01 00:00 

  2019-05-01 00:00 

  2019-06-01 00:00 

  2019-07-01 00:00 

  2019-08-01 00:00 

  2019-09-01 00:00   
  2017-06-01 00:00 

  2017-07-01 00:00 

  2017-08-01 00:00 

  2017-09-01 00:00 

  2017-10-01 00:00 

  2017-11-01 00:00 

  2017-11-30 23:00 

  2018-01-01 00:00 

  2018-02-01 00:00 

  2018-03-01 00:00 

  2018-04-01 00:00 

  2018-05-01 00:00 

  2018-06-01 00:00 

  2018-07-01 00:00 

  2018-08-01 00:00 

  2018-10-01 00:00 

  2018-11-01 00:00 

  2018-12-01 00:00 

  2019-01-01 00:00 

  2019-02-01 00:00 

  2019-03-01 00:00 

  2019-04-01 00:00 

  2019-05-01 00:00 

  2019-06-01 00:00 

  2019-07-01 00:00 

  2019-08-01 00:00 

  2019-09-01 00:00 

  2019-10-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     West of LOMO - All Lines in Service (Year Round)     2016-03-16 13:36     BPAT53767      2018-06-20 12:07  
  14 MONTH     261306     BPAT     Columbia Injection ALIS          CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT) 

  CLMBIA_N>S(BPAT)   
  1100.0 

  1100.0 

  1100.0 

  1100.0 

  1100.0 

  1100.0 

  1100.0 

  1100.0 

  1100.0 

  1100.0 

  1100.0 

  1300.0 

  1300.0   
  2016-04-02 00:00 

  2016-05-26 10:00 

  2017-05-02 15:00 

  2017-06-05 10:00 

  2017-11-28 14:00 

  2017-12-20 12:00 

  2017-12-20 13:00 

  2018-02-28 17:00 

  2018-04-19 15:00 

  2018-05-14 11:00 

  2018-05-14 13:00 

  2018-06-01 00:00 

  2019-09-01 00:00   
  2016-05-26 10:00 

  2017-05-02 15:00 

  2017-06-05 10:00 

  2017-11-28 14:00 

  2017-12-20 12:00 

  2017-12-20 13:00 

  2018-02-28 17:00 

  2018-04-19 15:00 

  2018-05-14 11:00 

  2018-05-14 13:00 

  2018-06-01 00:00 

  2019-09-01 00:00 

  2019-10-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     Columbia Injection All Lines in Service. (Year Round)     2016-04-01 14:58     BPAT53960      2018-06-20 11:57  
  14 MONTH     262981     BPAT     West of Slatt ALIS          WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT) 

  WOSLATT(BPAT)   
  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0 

  4200.0   
  2016-05-12 00:00 

  2017-08-01 00:00 

  2017-09-01 00:00 

  2017-10-01 00:00 

  2017-11-01 00:00 

  2017-11-30 23:00 

  2018-01-01 00:00 

  2018-02-01 00:00 

  2018-03-01 00:00 

  2018-04-01 00:00 

  2018-05-01 00:00 

  2018-06-01 00:00 

  2018-07-01 00:00 

  2018-08-01 00:00 

  2018-10-01 00:00 

  2018-11-01 00:00 

  2018-12-01 00:00 

  2019-01-01 00:00 

  2019-02-01 00:00 

  2019-03-01 00:00 

  2019-04-01 00:00 

  2019-05-01 00:00 

  2019-06-01 00:00 

  2019-07-01 00:00 

  2019-08-01 00:00 

  2019-09-01 00:00   
  2017-08-01 00:00 

  2017-09-01 00:00 

  2017-10-01 00:00 

  2017-11-01 00:00 

  2017-11-30 23:00 

  2018-01-01 00:00 

  2018-02-01 00:00 

  2018-03-01 00:00 

  2018-04-01 00:00 

  2018-05-01 00:00 

  2018-06-01 00:00 

  2018-07-01 00:00 

  2018-08-01 00:00 

  2018-10-01 00:00 

  2018-11-01 00:00 

  2018-12-01 00:00 

  2019-01-01 00:00 

  2019-02-01 00:00 

  2019-03-01 00:00 

  2019-04-01 00:00 

  2019-05-01 00:00 

  2019-06-01 00:00 

  2019-07-01 00:00 

  2019-08-01 00:00 

  2019-09-01 00:00 

  2019-10-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     West of Slatt - All Lines in Service (Year Round).     2016-05-11 12:16     BPAT54573      2018-06-20 12:07  
  14 month     231091     BPAT     PA All lines in service          PAUL_ALSN(BPAT) 

  PAUL_ALSN(BPAT) 

  PAUL_ALSN(BPAT) 

  PAUL_ALSN(BPAT) 

  PAUL_ALSN(BPAT) 

  PAUL_ALSN(BPAT) 

  PAUL_ALSN(BPAT) 

  PAUL_ALSN(BPAT) 

  PAUL_ALSN(BPAT) 

  PAUL_ALSN(BPAT) 

  PAUL_ALSN(BPAT) 

  PAUL_ALSN(BPAT) 

  PAUL_ALSN(BPAT) 

  PAUL_ALSN(BPAT)   
  2260.0 

  2260.0 

  2260.0 

  2260.0 

  2260.0 

  2200.0 

  2200.0 

  2200.0 

  2200.0 

  2200.0 

  2200.0 

  2200.0 

  2200.0 

  2200.0   
  2016-06-01 00:00 

  2016-11-01 00:00 

  2017-09-01 00:00 

  2017-10-01 00:00 

  2017-11-01 00:00 

  2017-11-04 00:00 

  2019-02-01 00:00 

  2019-03-01 00:00 

  2019-04-01 00:00 

  2019-05-01 00:00 

  2019-06-01 00:00 

  2019-07-01 00:00 

  2019-08-01 00:00 

  2019-09-01 00:00   
  2016-11-01 00:00 

  2017-09-01 00:00 

  2017-10-01 00:00 

  2017-11-01 00:00 

  2017-11-04 00:00 

  2019-02-01 00:00 

  2019-03-01 00:00 

  2019-04-01 00:00 

  2019-05-01 00:00 

  2019-06-01 00:00 

  2019-07-01 00:00 

  2019-08-01 00:00 

  2019-09-01 00:00 

  2019-10-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     PA All lines in service.      2014-07-01 14:02     BPAT39523      2018-06-20 12:08  
  NOJDAY     271567     BPAT     NJD_Path_Rating          NOJDAY(BPAT) 

  NOJDAY(BPAT)   
  8400.0 

  8400.0   
  2016-11-01 00:00 

  2026-01-01 00:00   
  2026-01-01 00:00 

  2028-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     NOJDAY Path Rating     2016-10-27 13:55     BPAT58592      2017-12-11 11:26  
  14 MONTH     279732     BPAT     SOA          SOALSN(BPAT) 
  SOALSN_S>N(BPAT) 

  SOALSN(BPAT) 
  SOALSN_S>N(BPAT) 

  SOALSN(BPAT) 
  SOALSN_S>N(BPAT) 

  SOALSN(BPAT) 
  SOALSN_S>N(BPAT) 

  SOALSN(BPAT) 
  SOALSN_S>N(BPAT) 

  SOALSN(BPAT) 

  SOALSN(BPAT) 

  SOALSN(BPAT) 
  SOALSN_S>N(BPAT)   
  2725.0 
  1170.0 

  3130.0 
  1380.0 

  2880.0 
  1380.0 

  2880.0 
  1280.0 

  3110.0 
  1320.0 

  3070.0 

  3100.0 

  3100.0 
  1320.0   
  2017-04-01 00:00 
  2017-04-01 00:00 

  2017-06-06 00:00 
  2017-06-06 00:00 

  2017-11-02 14:00 
  2017-11-02 14:00 

  2017-11-04 00:00 
  2017-11-04 00:00 

  2018-05-23 00:00 
  2018-05-23 00:00 

  2018-05-24 00:00 

  2018-06-08 00:00 

  2019-09-01 00:00 
  2019-09-01 00:00   
  2017-06-06 00:00 
  2017-06-06 00:00 

  2017-11-02 14:00 
  2017-11-02 14:00 

  2017-11-04 00:00 
  2017-11-04 00:00 

  2018-05-23 00:00 
  2018-05-23 00:00 

  2018-05-24 00:00 
  2019-09-01 00:00 

  2018-06-08 00:00 

  2019-09-01 00:00 

  2019-10-01 00:00 
  2019-10-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     SOA - All lines in service MW limit reflects forecasted NW generation updates     2017-03-31 09:25     BPAT62911      2018-06-20 11:55  
  14 MONTH     279736     BPAT     RAVR PAUL          RAVR_PAUL(BPAT) 

  RAVR_PAUL(BPAT) 

  RAVR_PAUL(BPAT) 

  RAVR_PAUL(BPAT) 

  RAVR_PAUL(BPAT)   
  1625.0 

  1640.0 

  1330.0 

  1330.0 

  1330.0   
  2017-04-01 00:00 

  2017-07-01 00:00 

  2018-06-01 00:00 

  2019-08-01 00:00 

  2019-09-01 00:00   
  2017-07-01 00:00 

  2018-06-01 00:00 

  2019-08-01 00:00 

  2019-09-01 00:00 

  2019-10-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     RAVR_PAUL All Lines in Service.      2017-03-31 09:29     BPAT62912      2018-06-20 12:08  
  WOCN     298524     BPAT     WOCN          C-CASC_N(BPAT)      9255.0      2018-04-01 00:00      2018-11-01 00:00      Active     TRANSMISSION     PLANNED      ONPATH     BPAT     GCL-OLYMPIA-GRAND COULEE 1 287kV LINE OPERATED AT 230kV     2018-03-26 11:25     BPAT73039      2018-03-26 11:25  
  14 MONTH     279724     BPAT     NOH          NOHANF(BPAT) 
  NOHANF_S>N(BPAT)   
  5100.0 
  5000.0   
  2018-04-01 00:00 
  2018-04-01 00:00   
  2018-11-01 00:00 
  2018-11-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     North of Hanford Spring and Summer 2018 Seasonal LimitationAll Lines in Service.     2017-03-31 09:15     BPAT62909      2018-03-28 09:47  
  RAVR_PAUL     300299     BPAT     RAVR_PAUL          RAVR_PAUL(BPAT) 

  RAVR_PAUL(BPAT)   
  1330.0 

  1330.0   
  2018-05-23 00:00 

  2018-06-01 00:00   
  2018-06-01 00:00 

  2019-06-01 00:00   
  Cancelled     TRANSMISSION     PLANNED      ONPATH     BPAT     ALISSLIM 447     2018-05-11 13:33     BPAT73921      2018-05-14 08:13  
  PAUL_ALSN     300302     BPAT     PAUL_ALSN          PAUL_ALSN(BPAT)      2200.0      2018-05-23 00:00      2019-06-01 00:00      Cancelled     TRANSMISSION     PLANNED      ONPATH     BPAT     ALISSLIM 309     2018-05-11 13:38     BPAT73922      2018-05-14 08:13  
  NWACI PDCI NJD     300311     BPAT     NWACI PDCI NJD          AC_N>S(BPAT) 
  AC_S>N(BPAT) 
  DC_N>S(BPAT) 
  DC_S>N(BPAT) 
  NOJDAY(BPAT)   
  4800.0 
  3675.0 
  3100.0 
  2084.0 
  7800.0   
  2018-06-01 00:00 
  2018-06-01 00:00 
  2018-06-01 00:00 
  2018-06-01 00:00 
  2018-06-01 00:00   
  2018-11-01 00:00 
  2018-11-01 00:00 
  2018-11-01 00:00 
  2018-11-01 00:00 
  2018-11-01 00:00   
  Cancelled     TRANSMISSION     PLANNED      ONPATH     BPAT     ALISSTUDY 792     2018-05-11 15:02     BPAT73926      2018-05-14 08:10  
  SCSTER NOEL     300317     BPAT     SCSTER NOEL          N_ECOL_S>N(BPAT) 
  SCSTER_N>S(BPAT)   
  2721.0 
  3232.0   
  2018-06-01 00:00 
  2018-06-01 00:00   
  2018-11-01 00:00 
  2018-11-01 00:00   
  Cancelled     TRANSMISSION     PLANNED      ONPATH     BPAT     ALISSTUDY 299     2018-05-11 15:18     BPAT73927      2018-05-14 08:09  
  WOG     301070     BPAT     WOG          WOGARR_E>W(BPAT)      2000.0      2018-06-01 00:00      2019-06-01 00:00      Cancelled     TRANSMISSION     PLANNED      ONPATH     BPAT     WOG Seasonal limit UFN (SOL 2200)     2018-05-29 10:23     BPAT74310      2018-05-29 10:34  
  14 MONTH     281618     BPAT     WOCS Summer 2018          C-CASC_S(BPAT)      6870.0      2018-06-01 00:00      2018-11-01 00:00      Active     TRANSMISSION     PLANNED      ONPATH     BPAT     WOCS Summer 2018 Seasonal Limit, All Lines in Service.     2017-05-02 08:14     BPAT63896      2017-09-28 09:23  
  14 MONTH     281620     BPAT     WOCN Summer 2018          C-CASC_N(BPAT)      9320.0      2018-06-01 00:00      2018-11-01 00:00      Active     TRANSMISSION     PLANNED      ONPATH     BPAT     WOCN Summer 2018 Seasonal Limit, All Lines in Service.     2017-05-02 08:17     BPAT63897      2018-03-07 07:14  
  14 MONTH     281623     BPAT     NOH          NOHANF(BPAT) 
  NOHANF_S>N(BPAT)   
  5100.0 
  3885.0   
  2018-06-01 00:00 
  2018-06-01 00:00   
  2018-11-01 00:00 
  2018-11-01 00:00   
  Cancelled     TRANSMISSION     PLANNED      ONPATH     BPAT     North of Hanford Summer 2018 Seasonal Limitation, All Lines in Service     2017-05-02 08:27     BPAT63898      2018-03-28 09:48  
  14 MONTH     281626     BPAT     NOJD          NOJDAY(BPAT)      7800.0      2018-06-01 00:00      2018-11-01 00:00      Active     TRANSMISSION     PLANNED      ONPATH     BPAT     North of John Day Summer 2018 Seasonal Limitation, All Lines in Service.     2017-05-02 08:29     BPAT63899      2017-11-03 09:49  
  14 MONTH     283421     BPAT     NOEL 2018 Summer Seasonal          N_ECOL_S>N(BPAT)      2721.0      2018-06-01 00:00      2018-11-01 00:00      Active     TRANSMISSION     PLANNED      ONPATH     BPAT     North of Echo Lake Summer 2018 Seasonal Limitation, All Lines in Service.     2017-05-30 09:04     BPAT65024      2018-05-14 08:00  
  14 MONTH     283423     BPAT     SOC 2018 Summer Seasonal          SCSTER_N>S(BPAT)      3232.0      2018-06-01 00:00      2018-11-01 00:00      Active     TRANSMISSION     PLANNED      ONPATH     BPAT     South of Custer Summer 2018 Seasonal Limitation, All Lines in Service.     2017-05-30 09:06     BPAT65025      2018-05-14 08:02  
  ST SEASONAL     286764     BPAT     ST_SEASONAL          WOGARR_E>W(BPAT)      2000.0      2018-06-01 00:00      2018-11-01 00:00      Active     TRANSMISSION     PLANNED      ONPATH     BPAT     WOG E>W 2018 Summer Seasonal Limits. (SOL 2200)     2017-07-25 14:18     BPAT67088      2018-03-26 12:10  
  ST SEASONAL     286766     BPAT     ST_SEASONAL          WOGARR_W>E(BPAT) 

  WOGARR_W>E(BPAT)   
  1350.0 

  1245.0   
  2018-06-01 00:00 

  2018-06-07 08:00   
  2018-06-07 08:00 

  2018-11-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     WOG W>E Summer 2018 Seasonal Limits.      2017-07-25 14:20     BPAT67089      2018-06-07 07:00  
  WOG     286768     BPAT     WOG          WOGARR_E>W(BPAT)      2000.0      2018-06-01 00:00      2018-11-01 00:00      Cancelled     TRANSMISSION     PLANNED      ONPATH     BPAT     WOG E>W 2018 Seasonal Limits. (SOL 2200)     2017-07-25 14:23     BPAT67090      2018-03-26 12:10  
  WOG     286770     BPAT     WOG          WOGARR_W>E(BPAT)      1350.0      2018-06-01 00:00      2018-11-01 00:00      Cancelled     TRANSMISSION     PLANNED      ONPATH     BPAT     WOG W>E 2018 Seasonal Limits.     2017-07-25 14:25     BPAT67091      2018-05-29 10:35  
  14 MONTH     276997     BPAT     COI PDCI RATS Spring 2018          AC_N>S(BPAT) 
  AC_S>N(BPAT) 
  DC_N>S(BPAT) 
  DC_S>N(BPAT) 
  RATS_N>S(BPAT) 
  RATS_S>N(BPAT)   
  4800.0 
  3675.0 
  3100.0 
  2084.0 
  300.0 
  220.0   
  2018-06-01 00:00 
  2018-06-01 00:00 
  2018-06-01 00:00 
  2018-06-01 00:00 
  2018-06-01 00:00 
  2018-06-01 00:00   
  2018-11-01 00:00 
  2018-11-01 00:00 
  2018-11-01 00:00 
  2018-11-01 00:00 
  2018-11-01 00:00 
  2018-11-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     COI & PDCI & RATS Summer 2018 Seasonal Limitations All Lines in Service.     2017-02-02 09:07     BPAT61476      2018-05-14 08:06  
  WOG     301271     BPAT               WOGARR_W>E(BPAT)      1245.0      2018-06-06 00:00      2018-11-01 00:00      Active     TRANSMISSION     PLANNED      ONPATH     BPAT     Summer 2018 Seasonal Limitation     2018-06-05 14:57     BPAT74390      2018-06-05 14:57  
  WOCS     301551     BPAT     WOCS          C-CASC_S(BPAT)      5920.0      2018-06-18 09:00      2018-07-26 00:00      Active     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA-PEARL 500/230kV TRANSFORMER 2 (SOL 7010)     2018-06-13 11:30     BPAT74507      2018-06-25 09:32  
  WOCS     301548     BPAT     WOCS          C-CASC_S(BPAT)      6705.0      2018-06-26 08:00      2018-07-26 11:00      Active     TRANSMISSION     PLANNED      ONPATH     BPAT      BPA-OSTRANDER 500kV CAP GROUP 1,2,3. (SOL 6845)     2018-06-13 08:38     BPAT74506      2018-06-25 09:59  
  SCSTER NOEL     301922     BPAT     SCSTER NOEL          N_ECOL_S>N(BPAT) 
  SCSTER_N>S(BPAT)   
  2783.0 
  3146.0   
  2018-07-09 07:00 
  2018-07-09 07:00   
  2018-07-20 16:00 
  2018-07-20 16:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     PSE-MAPLE VALLEY-TALBOT 1 230kV LINE PSE-TRANSFORMERS AT PORTAL WAY, O'BRIEN 1 & 2 S. BREMERTON AND WHITE RIVER 2 BPA-SNOHOMISH-MURRAY 1 230kV LINE (SLIM 319R1)     2018-06-25 07:45     BPAT74637      2018-07-05 09:30  
  NI     300404     BPAT     NI          NI_TOTL_N>S(BPAT) 
  NI_WEST_N>S(BPAT)   
  2600.0 
  2200.0   
  2018-07-12 08:00 
  2018-07-12 08:00   
  2018-07-26 16:00 
  2018-07-26 16:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     BCH-BURRARD-NEWELL 230kV LINE (2L40) BCH-BURRARD-MURRIN 230kV LINE (2L50)     2018-05-14 12:24     BPAT73936      2018-07-06 07:42  
  NWACI PDCI NJD     302152     BPAT     NWACI PDCI NJD          AC_N>S(BPAT) 
  AC_S>N(BPAT) 
  DC_N>S(BPAT) 
  DC_S>N(BPAT) 
  NOJDAY(BPAT)   
  4800.0 
  3675.0 
  3100.0 
  2084.0 
  8070.0   
  2018-07-16 00:00 
  2018-07-16 00:00 
  2018-07-16 00:00 
  2018-07-16 00:00 
  2018-07-16 00:00   
  2018-07-23 00:00 
  2018-07-23 00:00 
  2018-07-23 00:00 
  2018-07-23 00:00 
  2018-07-23 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA-OUTAGE AT VARIOUS LOCATIONS (PACW SOL ON HEMINGWAY-SUMMER LAKE IS W>E 550MW)     2018-07-02 07:06     BPAT74722      2018-07-02 07:06  
  SOALSN     302420     BPAT     SOALSN          SOALSN(BPAT) 
  SOALSN_S>N(BPAT)   
  3080.0 
  1320.0   
  2018-07-16 00:00 
  2018-07-16 00:00   
  2018-07-23 00:00 
  2018-07-23 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     BPAT     VARIOUS LOCATIONS     2018-07-11 13:04     BPAT74844      2018-07-11 14:44  
  WOG     302541     BPAT     WOG          WOGARR_E>W(BPAT)      1952.0      2018-07-17 00:00      2018-07-20 16:00      Active     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA-HATWAI 500/230kV BANK 1 LINE LOSS LOGIC     2018-07-16 07:53     BPAT74885      2018-07-16 07:53  
  WOG     302571     BPAT     WOG          WOGARR_E>W(BPAT)      2000.0      2018-07-17 00:00      2018-07-20 16:00      Active     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA-HATWAI RAS WM-A LLL DWORSHAK 1 LOWER GRANITE 1 & BANK 1 CKT 7F60 RAS WM-B LLL DWORSHAK 1 LOWER GRANITE 1 & BANK 1 CKT 7F98      2018-07-16 14:36     BPAT74897      2018-07-16 14:36  
  RT WOG OUTAGE     302711     BPAT               WOGARR_E>W(BPAT)      2000.0      2018-07-20 00:00      2018-07-20 16:00      Active     TRANSMISSION     FORCED      ONPATH     BPAT     Per RAS, BPA-HATWAI 500/230kV BANK 1 LINE LOSS LOGIC RTS     2018-07-19 19:27     BPAT74961      2018-07-19 19:27  
  RT N. OUTAGE     302714     BPAT               NI_EAST_S>N(BPAT) 
  NI_TOTL_S>N(BPAT) 
  NI_WEST_S>N(BPAT)   
  350.0 
  2500.0 
  2500.0   
  2018-07-20 00:00 
  2018-07-20 00:00 
  2018-07-20 00:00   
  2018-07-21 00:00 
  2018-07-21 00:00 
  2018-07-21 00:00   
  Active     TRANSMISSION     FORCED      ONPATH     BPAT     Updated BCH Limits     2018-07-19 20:26     BPAT74963      2018-07-19 20:26  
  RT N. OUTAGE     302718     BPAT               NI_TOTL_N>S(BPAT) 
  NI_WEST_N>S(BPAT) 

  NI_TOTL_N>S(BPAT) 
  NI_WEST_N>S(BPAT) 

  NI_TOTL_N>S(BPAT) 
  NI_WEST_N>S(BPAT) 

  NI_TOTL_N>S(BPAT) 
  NI_WEST_N>S(BPAT) 

  NI_TOTL_N>S(BPAT) 
  NI_WEST_N>S(BPAT) 

  NI_TOTL_N>S(BPAT) 
  NI_WEST_N>S(BPAT) 

  NI_TOTL_N>S(BPAT) 
  NI_WEST_N>S(BPAT)   
  2350.0 
  1950.0 

  2200.0 
  1800.0 

  2100.0 
  1700.0 

  2050.0 
  1650.0 

  2080.0 
  1680.0 

  2200.0 
  1800.0 

  2400.0 
  2000.0   
  2018-07-20 00:00 
  2018-07-20 00:00 

  2018-07-20 01:00 
  2018-07-20 01:00 

  2018-07-20 02:00 
  2018-07-20 02:00 

  2018-07-20 03:00 
  2018-07-20 03:00 

  2018-07-20 04:00 
  2018-07-20 04:00 

  2018-07-20 05:00 
  2018-07-20 05:00 

  2018-07-20 06:00 
  2018-07-20 06:00   
  2018-07-20 01:00 
  2018-07-20 01:00 

  2018-07-20 02:00 
  2018-07-20 02:00 

  2018-07-20 03:00 
  2018-07-20 03:00 

  2018-07-20 04:00 
  2018-07-20 04:00 

  2018-07-20 05:00 
  2018-07-20 05:00 

  2018-07-20 06:00 
  2018-07-20 06:00 

  2018-07-20 07:00 
  2018-07-20 07:00   
  Active     TRANSMISSION     FORCED      ONPATH     BPAT     Updated BCH Limits     2018-07-19 20:32     BPAT74964      2018-07-19 20:32  
  SCSTER NOEL     302080     BPAT     SCSTER NOEL          N_ECOL_S>N(BPAT) 
  SCSTER_N>S(BPAT)   
  1610.0 
  3039.0   
  2018-07-20 07:00 
  2018-07-20 07:00   
  2018-07-20 15:00 
  2018-07-20 15:00   
  Cancelled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA-SNO-KING 230kV MAIN BUS SECTION 1 PSE-TRANSFORMERS AT PORTAL WAY, O'BRIEN 1 & 2, S. BREMERTON, AND WHITE RIVER 2 (SLIM 320)     2018-06-29 12:50     BPAT74695      2018-07-06 13:07  
  SCSTER NOEL     302372     BPAT     SCSTER NOEL          N_ECOL_S>N(BPAT) 
  SCSTER_N>S(BPAT)   
  2420.0 
  2983.0   
  2018-07-20 07:00 
  2018-07-20 07:00   
  2018-07-20 15:00 
  2018-07-20 15:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA-SNO-KING 230kV MAIN BUS SECTION 1 PSE-TRANSFORMERS AT PORTAL WAY, O'BRIEN 1 & 2 S. BREMERTON AND WHITE RIVER 2 (SLIM 320R2)     2018-07-10 11:55     BPAT74823      2018-07-10 11:55  
  SCSTER NOEL     302414     BPAT     SCSTER NOEL          N_ECOL_S>N(BPAT) 
  SCSTER_N>S(BPAT)   
  2819.0 
  3156.0   
  2018-07-20 16:00 
  2018-07-20 16:00   
  2018-07-24 07:00 
  2018-07-24 07:00   
  Cancelled     TRANSMISSION     PLANNED      ONPATH     BPAT     PSE-MAPLE VALLEY-TALBOT 1 230kV LINE PSE-TRANSFORMERS AT PORTAL WAY, O'BRIEN 1 & 2 S. BREMERTON AND WHITE RIVER 2 (SLIM 318R3)     2018-07-11 12:59     BPAT74842      2018-07-16 14:51  
  SCSTER NOEL     302576     BPAT     SCSTER NOEL          N_ECOL_S>N(BPAT) 
  SCSTER_N>S(BPAT)   
  2819.0 
  3156.0   
  2018-07-20 16:00 
  2018-07-20 16:00   
  2018-08-06 07:00 
  2018-08-06 07:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     PSE-MAPLE VALLEY-TALBOT 1 230kV LINE PSE-TRANSFORMERS AT PORTAL WAY O'BRIEN 1 & 2 S. BREMERTON AND WHITE RIVER 2 (SLIM 327)     2018-07-16 14:54     BPAT74899      2018-07-18 07:18  
  SCSTER NOEL     302411     BPAT     SCSTER NOEL          N_ECOL_S>N(BPAT) 
  SCSTER_N>S(BPAT)   
  2257.0 
  2831.0   
  2018-07-20 19:00 
  2018-07-20 19:00   
  2018-07-21 07:00 
  2018-07-21 07:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     PSE-TRANSFORMERS AT PORTAL WAY, O'BRIEN 1 & 2 S. BREMERTON AND WHITE RIVER 2 BPA-ECHO LAKE-MAPLE VALLEY 1 & 2 500kV LINE (SLIM 325)     2018-07-11 12:55     BPAT74841      2018-07-11 12:55  
  NWACI PDCI NJD     302217     BPAT     NWACI PDCI NJD          AC_N>S(BPAT) 
  AC_S>N(BPAT) 
  DC_N>S(BPAT) 
  DC_S>N(BPAT) 
  NOJDAY(BPAT)   
  4800.0 
  3675.0 
  3100.0 
  2084.0 
  7934.0   
  2018-07-23 00:00 
  2018-07-23 00:00 
  2018-07-23 00:00 
  2018-07-23 00:00 
  2018-07-23 00:00   
  2018-07-30 00:00 
  2018-07-30 00:00 
  2018-07-30 00:00 
  2018-07-30 00:00 
  2018-07-30 00:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA-OUTAGES AT VARIOUS LOCATIONS (PACW SOL ON HEMINGWAY-SUMMER LAKE IS W>E 550MW)     2018-07-05 11:56     BPAT74745      2018-07-05 11:56  
  NWACI     298583     BPAT     NWACI          AC_N>S(BPAT) 
  AC_S>N(BPAT)   
  3180.0 
  3675.0   
  2018-07-23 07:00 
  2018-07-23 07:00   
  2018-09-23 18:00 
  2018-09-23 18:00   
  Cancelled     TRANSMISSION     PLANNED      ONPATH     BPAT     CISO-VACA-TESLA 500kV LINE SERIES CAP BANK SEGMENTS 1 & 2 CISO-MALIN-ROUND MOUNTAIN 1 500kV LINE     2018-03-27 07:22     BPAT73052      2018-05-15 12:34  
  NI     295544     BPAT     NI          NI_TOTL_S>N(BPAT) 
  NI_WEST_S>N(BPAT)   
  2000.0 
  2000.0   
  2018-07-23 08:00 
  2018-07-23 08:00   
  2018-07-25 15:00 
  2018-07-25 15:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA-Wautoma-Knight 1 500kV Line     2018-01-30 07:40     BPAT71410      2018-07-11 07:01  
  SCSTER NOEL     302470     BPAT     SCSTER NOEL          N_ECOL_S>N(BPAT) 
  SCSTER_N>S(BPAT)   
  2496.0 
  2931.0   
  2018-07-23 08:00 
  2018-07-23 08:00   
  2018-07-23 17:00 
  2018-07-23 17:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA-SNO-KING 230kV MAIN BUS SECTION 3 PSE-TRANSFORMERS AT PORTAL WAY O'BRIEN 1 & 2 S. BREMERTON AND WHITE RIVER 2 (SLIM 322)     2018-07-13 07:25     BPAT74861      2018-07-13 07:25  
  NOHANF     302483     BPAT     NOHANF          NOHANF(BPAT) 
  NOHANF_S>N(BPAT)   
  4010.0 
  4958.0   
  2018-07-23 08:00 
  2018-07-23 08:00   
  2018-07-25 15:00 
  2018-07-25 15:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA-WAUTOMA-KNIGHT 1 500kV LINE     2018-07-13 11:16     BPAT74866      2018-07-13 11:16  
  JDW     302612     BPAT     JDW          JDWIND_GEN(BPAT)      650.0      2018-07-23 08:00      2018-07-23 14:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA-JOHN DAY 230kV CAPACITOR GROUP 2 SECTION 1 & 2      2018-07-17 07:12     BPAT74911      2018-07-17 07:12  
  SCSTER NOEL     302328     BPAT     SCSTER NOEL          N_ECOL_S>N(BPAT) 
  SCSTER_N>S(BPAT)   
  2877.0 
  2078.0   
  2018-07-24 07:00 
  2018-07-24 07:00   
  2018-07-27 16:00 
  2018-07-27 16:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA-SNOHOMISH-BOTHELL 1 230kV LINE PSE-TRANSFORMERS AT PORTAL WAY, O"BRIEN 1 & 2 S. BREMERTON AND WHITE RIVER 2 (SLIM 324)     2018-07-09 07:35     BPAT74798      2018-07-09 07:35  
  NWACI PDCI NJD     302531     BPAT     NWACI PDCI NJD          AC_N>S(BPAT) 
  AC_S>N(BPAT) 
  DC_N>S(BPAT) 
  DC_S>N(BPAT) 
  NOJDAY(BPAT)   
  4800.0 
  3675.0 
  3100.0 
  2084.0 
  8210.0   
  2018-07-30 00:00 
  2018-07-30 00:00 
  2018-07-30 00:00 
  2018-07-30 00:00 
  2018-07-30 00:00   
  2018-08-06 00:00 
  2018-08-06 00:00 
  2018-08-06 00:00 
  2018-08-06 00:00 
  2018-08-06 00:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA-OUTAGE AT VARIOUS LOCATIONS (PACW SOL ON HEMINGWAY-SUMMER LAKE IS W>E 550MW)     2018-07-16 07:04     BPAT74882      2018-07-16 07:04  
  WOCS     302479     BPAT     WOCS          C-CASC_S(BPAT)      6450.0      2018-07-30 06:00      2018-07-30 18:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA-KEELER 230kV WEST MAIN BUS (SOL 6940)     2018-07-13 07:33     BPAT74864      2018-07-13 07:33  
  SOALSN     302417     BPAT     SOALSN          SOALSN(BPAT) 
  SOALSN_S>N(BPAT)   
  2590.0 
  1350.0   
  2018-07-30 06:00 
  2018-07-30 06:00   
  2018-07-30 18:00 
  2018-07-30 18:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA-KEELER 230kV WEST MAIN BUS     2018-07-11 13:01     BPAT74843      2018-07-16 12:38  
  WOCS     302481     BPAT     WOCS          C-CASC_S(BPAT)      5140.0      2018-07-30 09:00      2018-08-03 15:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA-MCNARY-ROSS 1 345kV LINE (SOL 6340)     2018-07-13 07:35     BPAT74865      2018-07-13 07:35  
  SOALSN     302476     BPAT     SOALSN          SOALSN(BPAT) 
  SOALSN_S>N(BPAT)   
  3020.0 
  1070.0   
  2018-07-30 09:00 
  2018-07-30 09:00   
  2018-08-03 15:00 
  2018-08-03 15:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA-MCNARY-ROSS 1 345kV LINE     2018-07-13 07:31     BPAT74863      2018-07-16 13:20  
  CLMBIA     302486     BPAT     CLMBIA          CLMBIA_N>S(BPAT)      1050.0      2018-08-02 07:00      2018-08-02 16:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA-BETTAS ROAD-COLUMBIA 1 230kV LINE     2018-07-13 12:01     BPAT74867      2018-07-13 12:01  
  WOCN     302488     BPAT     WOCN          C-CASC_N(BPAT)      8865.0      2018-08-02 07:00      2018-08-02 17:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BOR-OYMPIA-GRAND COUEE 287kV INE AT 230kV BPA-BETTAS ROAD-COUMBIA 1 230kV LINE (SOL 10110)     2018-07-13 12:59     BPAT74868      2018-07-13 12:59  
  SCSTER NOEL     302565     BPAT     SCSTER NOEL          N_ECOL_S>N(BPAT) 
  SCSTER_N>S(BPAT)   
  2880.0 
  2149.0   
  2018-08-02 07:00 
  2018-08-02 07:00   
  2018-08-02 13:00 
  2018-08-02 13:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA-RAVER 500kV SOUTH BUS PSE-TRANSFORMERS AT PORTAL WAY, O'BRIEN 1 & 2 S. BREMERTON AND WHITE RIVER 2 (SLIM 326)     2018-07-16 13:05     BPAT74895      2018-07-16 13:05  
  SCSTER NOEL     302473     BPAT     SCSTER NOEL          N_ECOL_S>N(BPAT) 
  SCSTER_N>S(BPAT)   
  2496.0 
  2931.0   
  2018-08-03 09:00 
  2018-08-03 09:00   
  2018-08-03 16:00 
  2018-08-03 16:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     BPAT     BPA-SNO-KING 230kV MAIN BUS SECTION 3 PSE-TRANSFORMERS AT PORTAL WAY O'BRIEN 1 & 2 S. BREMERTON AND WHITE RIVER 2 (SLIM 322)     2018-07-13 07:28     BPAT74862      2018-07-13 07:28  
CLPT Outages:
CRCM Outages:
  System Conditions     21517     WACM     TOT-2A     TOT-2A     CCI>SHR2(CRCM) 
  CRG>HSP(CRCM) 
  HSP>CRG(CRCM) 
  HSP>SJ345(CRCM) 
  SHR2>CCI(CRCM) 
  SJ345>HSP(CRCM)   
  420.0     420.0     255.4 
  173.6 
  173.6 
  173.6 
  255.4 
  173.6   
  2018-05-05 08:00 
  2018-05-05 08:00 
  2018-05-05 08:00 
  2018-05-05 08:00 
  2018-05-05 08:00 
  2018-05-05 08:00   
  2019-05-05 18:00 
  2019-05-05 18:00 
  2019-05-05 18:00 
  2019-05-05 18:00 
  2019-05-05 18:00 
  2019-05-05 18:00   
  Cancelled     Transmission     Planned      OnPath     CRCM,WACM     (Switch Order: I-18-0004), Series #26     2016-01-28 15:00     WACM8765      2016-05-11 12:15  
  Summer 2018 Limit     33865     WACM     TOT-1A     TOT-1A     BOZ>CRG(CRCM) 
  CRG>BOZ(CRCM) 
  CRG>SWR(CRCM) 
  SWR>CRG(CRCM) 
  SWR>VNL(CRCM) 
  VNL>FGE(CRCM) 
  VNL>SWR(CRCM)   
  395.0     395.0     200.8 
  200.8 
  108.2 
  108.2 
  108.2 
  185.4 
  108.2   
  2018-06-01 00:00 
  2018-06-01 00:00 
  2018-06-01 00:00 
  2018-06-01 00:00 
  2018-06-01 00:00 
  2018-06-01 00:00 
  2018-06-01 00:00   
  2018-10-01 00:00 
  2018-10-01 00:00 
  2018-10-01 00:00 
  2018-10-01 00:00 
  2018-10-01 00:00 
  2018-10-01 00:00 
  2018-10-01 00:00   
  Active     Transmission     Planned      OnPath     CRCM,WACM     TOT-1A Summer Ratings- Maximum Seasonal TTC of 515 MW -RRV     2018-04-25 09:18     WACM11180      2018-04-25 09:18  
  Summer 2018 Limit     33882     WACM     TOT-2A     TOT-2A     CCI>SHR2(CRCM) 
  CRG>HSP(CRCM) 
  HSP>CRG(CRCM) 
  HSP>SJ345(CRCM) 
  SHR2>CCI(CRCM) 
  SJ345>HSP(CRCM)   
  420.0     420.0     197.6 
  134.4 
  134.4 
  134.4 
  197.6 
  134.4   
  2018-06-01 00:00 
  2018-06-01 00:00 
  2018-06-01 00:00 
  2018-06-01 00:00 
  2018-06-01 00:00 
  2018-06-01 00:00   
  2018-11-01 00:00 
  2018-11-01 00:00 
  2018-11-01 00:00 
  2018-11-01 00:00 
  2018-11-01 00:00 
  2018-11-01 00:00   
  Active     Transmission     Planned      OnPath     CRCM,WACM     TOT-2A Summer 2018 Ratings based on 200 MW of SWC Average Load is 345 MW (system intact). CRCM Share will be332 MW. RRV     2018-04-26 08:01     WACM11185      2018-04-26 08:01  
  Summer 2018 Limit     33883     WACM     TOT-5     TOT-5     AU>CRG(CRCM) 
  BLUE>CRG(CRCM) 
  CCW>MIDW(CRCM) 
  CRG>AU(CRCM) 
  MIDW>CCW(CRCM)   
  750.0     750.0     456.8 
  21.8 
  246.5 
  456.8 
  246.5   
  2018-06-01 00:00 
  2018-06-01 00:00 
  2018-06-01 00:00 
  2018-06-01 00:00 
  2018-06-01 00:00   
  2018-11-01 00:00 
  2018-11-01 00:00 
  2018-11-01 00:00 
  2018-11-01 00:00 
  2018-11-01 00:00   
  Active     Transmission     Planned      OnPath     CRCM,WACM     TOT-5 Summer 2018 Rating for system intact is 1680 MW. CRCM Share is 725 MW. RRV     2018-04-26 08:08     WACM11186      2018-04-26 08:09  
  System Conditions     34339     WACM     YTS     YT-SOUTH     YTW>DJ(LAPT)      225.0     225.0     212.0      2018-06-04 09:00      2018-07-11 09:20      Completed     Transmission     Planned      OnPath     BEPW,CRCM,LAPT,WACM     Outage Request C-18-1087. YTS=Series #11.     2018-05-18 07:18     WACM11278      2018-07-11 09:20  
  System Conditions     34675     WACM     TOT-5     TOT-5     AU>CRG(CRCM) 
  BLUE>CRG(CRCM) 
  CCW>MIDW(CRCM) 
  CRG>AU(CRCM) 
  MIDW>CCW(CRCM)   
  750.0     750.0     456.8 
  21.8 
  246.5 
  456.8 
  246.5   
  2018-07-09 06:00 
  2018-07-09 06:00 
  2018-07-09 06:00 
  2018-07-09 06:00 
  2018-07-09 06:00   
  2018-07-09 08:00 
  2018-07-09 08:00 
  2018-07-09 08:00 
  2018-07-09 08:00 
  2018-07-09 08:00   
  Completed     Transmission     Planned      OnPath     CRCM,WACM     Outage Request INFO-18-1846. TOT5/Path 39 = Series #10. Due to Lake Christine fire outage is delayed until further notice.     2018-06-20 07:43     WACM11347      2018-07-09 07:25  
  GLENCANYON2-FLG     34766     CRCM               FLG>GLENCANYON2(CRCM) 
  GLENCANYON2>FLG(CRCM)   
  1494.0 
  1494.0   
  1494.0 
  1494.0   
  746.0 
  746.0   
  2018-07-09 12:00 
  2018-07-09 12:00   
  2018-07-09 13:00 
  2018-07-09 13:00   
  Completed     TRANSMISSION     PLANNED      ONPATH     CRCM,WACM     G-18-1589     2018-07-09 07:02     CRCM11375      2018-07-09 07:02  
  CRG-HSP     34731     CRCM     CRG-HSP          CRG>HSP(CRCM) 
  HSP>CRG(CRCM)   
  170.0 
  170.0   
  170.0 
  170.0   
  0.0 
  0.0   
  2018-07-14 04:00 
  2018-07-14 04:00   
  2018-07-14 10:00 
  2018-07-14 10:00   
  Cancelled     TRANSMISSION     PLANNED      ONPATH     CRCM     Outage Request INFO-18-1975.     2018-07-03 10:36     CRCM11362      2018-07-10 14:50  
  System Conditions     34734     WACM     TOT1A     TOT-1A     BOZ>CRG(CRCM) 
  CRG>BOZ(CRCM) 
  CRG>SWR(CRCM) 
  SWR>CRG(CRCM) 
  SWR>VNL(CRCM) 
  VNL>FGE(CRCM) 
  VNL>SWR(CRCM)   
  395.0     395.0     194.3 
  194.3 
  104.7 
  104.7 
  104.7 
  179.4 
  104.7   
  2018-07-14 04:00 
  2018-07-14 04:00 
  2018-07-14 04:00 
  2018-07-14 04:00 
  2018-07-14 04:00 
  2018-07-14 04:00 
  2018-07-14 04:00   
  2018-07-14 10:00 
  2018-07-14 10:00 
  2018-07-14 10:00 
  2018-07-14 10:00 
  2018-07-14 10:00 
  2018-07-14 10:00 
  2018-07-14 10:00   
  Cancelled     Transmission     Planned      OnPath     CRCM,WACM     Outage Request INFO-18-1975.     2018-07-03 10:38     WACM11363      2018-07-10 14:49  
  CRG-SWR     34936     CRCM     TOT-1A (CRCM),          CRG>SWR(CRCM) 
  SWR>CRG(CRCM)   
  140.0 
  140.0   
  140.0 
  140.0   
  0.0 
  0.0   
  2018-07-16 11:00 
  2018-07-16 11:00   
  2018-07-16 12:00 
  2018-07-16 12:00   
  Completed     TRANSMISSION     FORCED      ONPATH     CRCM,WACM     Outage Request C-18-2205. TOT1A/Path 30=Series #7.     2018-07-16 10:13     CRCM11459      2018-07-16 10:13  
  KAYLHV-SHR2     34840     CRCM     KAYLHV-SHR2          KAYLHV>SHR2(CRCM) 
  SHR2>KAYLHV(CRCM)   
  350.0 
  400.0   
  350.0 
  400.0   
  0.0 
  0.0   
  2018-07-18 10:00 
  2018-07-18 10:00   
  2018-07-18 11:00 
  2018-07-18 11:00   
  Completed     TRANSMISSION     PLANNED      ONPATH     CRCM,WACM     Outage Report INFO-18-2158.      2018-07-10 14:42     CRCM11408      2018-07-10 14:42  
  System Conditions     34964     WACM     TOT-5     TOT-5     AU>CRG(CRCM) 
  BLUE>CRG(CRCM) 
  CCW>MIDW(CRCM) 
  CRG>AU(CRCM) 
  MIDW>CCW(CRCM)   
  750.0     750.0     472.5 
  22.5 
  255.0 
  472.5 
  255.0   
  2018-07-19 07:00 
  2018-07-19 07:00 
  2018-07-19 07:00 
  2018-07-19 07:00 
  2018-07-19 07:00   
  2018-07-19 08:00 
  2018-07-19 08:00 
  2018-07-19 08:00 
  2018-07-19 08:00 
  2018-07-19 08:00   
  Completed     Transmission     Planned      OnPath     CRCM,WACM     Outage Request: INFO-18-2239. TOT5/Path 39=Series #10.     2018-07-19 07:46     WACM11473      2018-07-19 07:46  
  CRG-HSP     34727     CRCM     CRG-HSP          CRG>HSP(CRCM) 
  HSP>CRG(CRCM)   
  170.0 
  170.0   
  170.0 
  170.0   
  0.0 
  0.0   
  2018-07-31 04:00 
  2018-07-31 04:00   
  2018-07-31 10:00 
  2018-07-31 10:00   
  Scheduled     TRANSMISSION     FORCED      ONPATH     CRCM,WACM     Outage Request: INFO-18-1992     2018-07-03 10:27     CRCM11360      2018-07-03 10:27  
  System Conditions     34730     WACM     TOT-1A     TOT-1A     BOZ>CRG(CRCM) 
  CRG>BOZ(CRCM) 
  CRG>SWR(CRCM) 
  SWR>CRG(CRCM) 
  SWR>VNL(CRCM) 
  VNL>FGE(CRCM) 
  VNL>SWR(CRCM)   
  395.0     395.0     194.3 
  194.3 
  104.7 
  104.7 
  104.7 
  179.4 
  104.7   
  2018-07-31 04:00 
  2018-07-31 04:00 
  2018-07-31 04:00 
  2018-07-31 04:00 
  2018-07-31 04:00 
  2018-07-31 04:00 
  2018-07-31 04:00   
  2018-07-31 10:00 
  2018-07-31 10:00 
  2018-07-31 10:00 
  2018-07-31 10:00 
  2018-07-31 10:00 
  2018-07-31 10:00 
  2018-07-31 10:00   
  Scheduled     Transmission     Planned      OnPath     BEPW,CRCM,LAPT,WACM     Outage Request: INFO-18-1992. TOT1/Path 30=Series #4.     2018-07-03 10:32     WACM11361      2018-07-03 10:32  
  AU-CRG     34044     CRCM     TOT-5 (CRCM), AU-CRG          AU>CRG(CRCM) 
  CRG>AU(CRCM)   
  405.1 
  405.1   
  405.1 
  405.1   
  0.0 
  0.0   
  2018-08-06 07:00 
  2018-08-06 07:00   
  2018-08-12 16:00 
  2018-08-12 16:00   
  Scheduled     Transmission     Forced      OnPath     CRCM,WACM     Outage Request ICC-18-1477. TOT5/Path 39=Series #2.     2018-05-01 12:57     CRCM11208      2018-07-10 10:40  
  System Conditions     34828     WACM     TOT-5     TOT-5     AU>CRG(CRCM) 
  BLUE>CRG(CRCM) 
  CCW>MIDW(CRCM) 
  CRG>AU(CRCM) 
  MIDW>CCW(CRCM)   
  750.0     750.0     405.1 
  19.3 
  218.6 
  405.1 
  218.6   
  2018-08-06 07:00 
  2018-08-06 07:00 
  2018-08-06 07:00 
  2018-08-06 07:00 
  2018-08-06 07:00   
  2018-09-07 14:00 
  2018-09-07 14:00 
  2018-09-07 14:00 
  2018-09-07 14:00 
  2018-09-07 14:00   
  Scheduled     Transmission     Planned      OnPath     CRCM,WACM     Outage Request: INFO-18-0684. TOT5/Path 39=Specials Series #41.     2018-07-10 09:31     WACM11398      2018-07-10 09:31  
  System Conditions     34773     WACM     TOT-5     TOT-5     AU>CRG(CRCM) 
  BLUE>CRG(CRCM) 
  CCW>MIDW(CRCM) 
  CRG>AU(CRCM) 
  MIDW>CCW(CRCM)   
  750.0     750.0     472.5 
  22.5 
  255.0 
  472.5 
  255.0   
  2018-08-14 07:00 
  2018-08-14 07:00 
  2018-08-14 07:00 
  2018-08-14 07:00 
  2018-08-14 07:00   
  2018-08-15 15:00 
  2018-08-15 15:00 
  2018-08-15 15:00 
  2018-08-15 15:00 
  2018-08-15 15:00   
  Scheduled     Transmission     Planned      OnPath     CRCM,WACM     Outage Request C-18-1766. TOT5/Path 39=Series #22.     2018-07-09 08:37     WACM11378      2018-07-09 08:37  
  AU-CRG     34834     CRCM     TOT-5 (CRCM), AU-CRG          AU>CRG(CRCM) 
  CRG>AU(CRCM)   
  425.0 
  425.0   
  425.0 
  425.0   
  0.0 
  0.0   
  2018-08-20 06:00 
  2018-08-20 06:00   
  2018-08-24 16:00 
  2018-08-24 16:00   
  Scheduled     TRANSMISSION     FORCED      ONPATH     CRCM,WACM     Outage Request ICC-18-1306. TOT5/Path 39=Series #2.     2018-07-10 11:41     CRCM11404      2018-07-10 11:41  
  SWR-VNL     34929     CRCM     TOT-1A (CRCM),          SWR>VNL(CRCM) 
  VNL>SWR(CRCM)   
  140.0 
  140.0   
  140.0 
  140.0   
  0.0 
  0.0   
  2018-08-20 08:00 
  2018-08-20 08:00   
  2018-08-22 14:00 
  2018-08-22 14:00   
  Cancelled     TRANSMISSION     PLANNED      ONPATH     CRCM     Outage Request:INFO-18-2137. TOT1/Path 30= Series #10     2018-07-16 09:19     CRCM11456      2018-07-16 10:04  
  System Conditions     34775     WACM     TOT-1A     TOT-1A     BOZ>CRG(CRCM) 
  CRG>BOZ(CRCM) 
  CRG>SWR(CRCM) 
  SWR>CRG(CRCM) 
  SWR>VNL(CRCM) 
  VNL>FGE(CRCM) 
  VNL>SWR(CRCM)   
  395.0     395.0     251.5 
  251.5 
  135.5 
  135.5 
  135.5 
  232.2 
  135.5   
  2018-08-20 08:00 
  2018-08-20 08:00 
  2018-08-20 08:00 
  2018-08-20 08:00 
  2018-08-20 08:00 
  2018-08-20 08:00 
  2018-08-20 08:00   
  2018-08-22 14:00 
  2018-08-22 14:00 
  2018-08-22 14:00 
  2018-08-22 14:00 
  2018-08-22 14:00 
  2018-08-22 14:00 
  2018-08-22 14:00   
  Cancelled     Transmission     Planned      OnPath     CRCM,WACM     Outage Request INFO-18-2137. TOT1/Path 30=Series #14-doubled up JS     2018-07-09 10:50     WACM11380      2018-07-16 10:20  
  System Conditions     34935     WACM     TOT-1A     TOT-1A     BOZ>CRG(CRCM) 
  CRG>BOZ(CRCM) 
  CRG>SWR(CRCM) 
  SWR>CRG(CRCM) 
  SWR>VNL(CRCM) 
  VNL>FGE(CRCM) 
  VNL>SWR(CRCM)   
  395.0     395.0     251.5 
  251.5 
  135.5 
  135.5 
  135.5 
  232.2 
  135.5   
  2018-08-20 08:00 
  2018-08-20 08:00 
  2018-08-20 08:00 
  2018-08-20 08:00 
  2018-08-20 08:00 
  2018-08-20 08:00 
  2018-08-20 08:00   
  2018-08-22 14:00 
  2018-08-22 14:00 
  2018-08-22 14:00 
  2018-08-22 14:00 
  2018-08-22 14:00 
  2018-08-22 14:00 
  2018-08-22 14:00   
  Scheduled     Transmission     Planned      OnPath     CRCM,WACM     Outage Request: INFO-18-2137. TOT1A/Path 30=Series #14.     2018-07-16 10:10     WACM11458      2018-07-16 10:10  
  CRG-SWR     34939     CRCM     TOT-1A (CRCM),          CRG>SWR(CRCM) 
  SWR>CRG(CRCM)   
  140.0 
  140.0   
  140.0 
  140.0   
  0.0 
  0.0   
  2018-08-20 09:00 
  2018-08-20 09:00   
  2018-08-30 12:00 
  2018-08-30 12:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     CRCM,WACM     Outage Request C-18-2205 TOT1A/Path 30+Series #7.     2018-07-16 10:18     CRCM11460      2018-07-16 10:18  
  NGU-SLA 115 kv     34902     WACM     TOT-5     TOT-5     AU>CRG(CRCM) 
  BLUE>CRG(CRCM) 
  CCW>MIDW(CRCM) 
  CRG>AU(CRCM) 
  MIDW>CCW(CRCM)   
  750.0     750.0     472.5 
  22.5 
  255.0 
  472.5 
  255.0   
  2018-08-20 10:00 
  2018-08-20 10:00 
  2018-08-20 10:00 
  2018-08-20 10:00 
  2018-08-20 10:00   
  2018-08-25 13:00 
  2018-08-25 13:00 
  2018-08-25 13:00 
  2018-08-25 13:00 
  2018-08-25 13:00   
  Scheduled     Transmission     Planned      OffPath     CRCM,WACM     Outage Request : C-18-0819. TOT5/Path 36 =Series#16.     2018-07-12 10:44     WACM11433      2018-07-12 10:44  
  System Conditions     34702     WACM     TOT-1A     TOT-1A     BOZ>CRG(CRCM) 
  CRG>BOZ(CRCM) 
  CRG>SWR(CRCM) 
  SWR>CRG(CRCM) 
  SWR>VNL(CRCM) 
  VNL>FGE(CRCM) 
  VNL>SWR(CRCM)   
  395.0     395.0     76.0 
  76.0 
  41.0 
  41.0 
  41.0 
  70.2 
  41.0   
  2018-09-14 06:00 
  2018-09-14 06:00 
  2018-09-14 06:00 
  2018-09-14 06:00 
  2018-09-14 06:00 
  2018-09-14 06:00 
  2018-09-14 06:00   
  2018-09-15 16:00 
  2018-09-15 16:00 
  2018-09-15 16:00 
  2018-09-15 16:00 
  2018-09-15 16:00 
  2018-09-15 16:00 
  2018-09-15 16:00   
  Scheduled     Transmission     Planned      OnPath     CRCM,WACM     Outage Request: INFO-18-2083. TOT1A/path 30=Series #3.     2018-06-27 08:10     WACM11358      2018-06-27 08:10  
CSU Outages:
DGT Outages:
EPE Outages:
  WM345-ARROYO345     258308     EPE     WM345-ARROYO345          ARROYO345-WM345(EPE) 
  WM345-ARROYO345(EPE)   
  141.0 
  400.0   
  141.0 
  400.0   
  0.0 
  0.0   
  2018-10-15 09:00 
  2018-10-15 09:00   
  2018-11-02 17:00 
  2018-11-02 17:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     EPE     Scheduled Outage. Path 47 Limits TBD     2018-05-09 08:20     EPE101956      2018-05-11 07:47  
  GREENLEE-HILDALGO     258300     EPE     Greenlee-Hidalgo          GREENLEE345-HIDALGO345(EPE) 
  HIDALGO345-GREENLEE345(EPE)   
  107.0 
  200.0   
  107.0 
  200.0   
  0.0 
  0.0   
  2018-11-26 09:00 
  2018-11-26 09:00   
  2018-12-21 17:00 
  2018-12-21 17:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     EPE     Scheduled Outage. Path 47 Limits TBD     2018-05-09 08:15     EPE101954      2018-05-11 07:47  
IID Outages:
IPCO Outages:
  IDAHO-NORTHWEST     64445     IPCO     SOP 33          NORTHWEST-IDNW(IPCO)      1215.0      1215.0      850.0      2018-07-13 15:19      2018-07-13 16:31      Completed     TRANSMISSION     FORCED      ONPATH     IPCO     Path 14 Limit per AVISTA     2018-07-13 15:20     IPCO29647      2018-07-13 16:31  
  CURTAILMENT     64460     IPCO               LAGRANDE-OTECTAP(IPCO)      350.0      350.0      350.0      2018-07-16 07:46      2018-07-16 09:00      Completed     TRANSMISSION     FORCED      ONPATH     IPCO     LaGrande Path Limit     2018-07-16 07:47     IPCO29650      2018-07-16 07:47  
  NORTH AMPS     64392     IPCO      500kV Garrison-Broadview #2          NW-MT-BPAT.NWMT(IPCO)      125.0      125.0      110.0      2018-07-16 08:00      2018-07-19 17:00      Completed     TRANSMISSION     PLANNED      ONPATH     IPCO     Per Path 18 Operator (NWMT) Request. bpa 500kV Garrison-Broadview #2     2018-07-09 06:05     IPCO29629      2018-07-09 06:05  
  CURTAILMENT     64462     IPCO               LAGRANDE-OTECTAP(IPCO)      350.0      350.0      350.0      2018-07-16 08:31      2018-07-16 10:00      Completed     TRANSMISSION     FORCED      ONPATH     IPCO     LaGrande Path Limit     2018-07-16 08:32     IPCO29651      2018-07-16 08:32  
  LGBP-NPSS     64472     IPCO     LaGrande - North Powder          IDNW-NORTHWEST(IPCO) 
  LAGRANDE-OTECTAP(IPCO) 
  NORTHWEST-IDNW(IPCO) 
  OTECTAP-LAGRANDE(IPCO) 

  IDNW-NORTHWEST(IPCO) 
  LAGRANDE-OTECTAP(IPCO) 
  NORTHWEST-IDNW(IPCO) 
  OTECTAP-LAGRANDE(IPCO) 

  IDNW-NORTHWEST(IPCO) 
  LAGRANDE-OTECTAP(IPCO) 
  NORTHWEST-IDNW(IPCO) 
  OTECTAP-LAGRANDE(IPCO)   
  2175.0 
  350.0 
  1215.0 
  413.0 

  2175.0 
  350.0 
  1215.0 
  413.0 

  2175.0 
  350.0 
  1215.0 
  413.0   
  2175.0 
  350.0 
  1215.0 
  413.0 

  2175.0 
  350.0 
  1215.0 
  413.0 

  2175.0 
  350.0 
  1215.0 
  413.0   
  1970.0 
  50.0 
  920.0 
  50.0 

  1970.0 
  50.0 
  920.0 
  50.0 

  1970.0 
  50.0 
  920.0 
  50.0   
  2018-07-16 11:01 
  2018-07-16 11:01 
  2018-07-16 11:01 
  2018-07-16 11:01 

  2018-07-16 15:00 
  2018-07-16 15:00 
  2018-07-16 15:00 
  2018-07-16 15:00 

  2018-07-16 20:00 
  2018-07-16 20:00 
  2018-07-16 20:00 
  2018-07-16 20:00   
  2018-07-16 15:00 
  2018-07-16 15:00 
  2018-07-16 15:00 
  2018-07-16 15:00 

  2018-07-16 20:00 
  2018-07-16 20:00 
  2018-07-16 20:00 
  2018-07-16 20:00 

  2018-07-16 20:24 
  2018-07-16 20:24 
  2018-07-16 20:24 
  2018-07-16 20:24   
  Completed     TRANSMISSION     FORCED      ONPATH     IPCO     LaGrande Out of Service     2018-07-16 11:02     IPCO29654      2018-07-16 20:24  
  CURTAILMENT     64477     IPCO               LAGRANDE-OTECTAP(IPCO)      350.0      350.0      50.0      2018-07-16 11:37      2018-07-16 13:00      Completed     TRANSMISSION     FORCED      ONPATH     IPCO     LaGrande Path Limit     2018-07-16 11:38     IPCO29655      2018-07-16 11:38  
  CURTAILMENT     64479     IPCO               LAGRANDE-OTECTAP(IPCO)      350.0      350.0      50.0      2018-07-16 11:45      2018-07-16 15:00      Completed     TRANSMISSION     FORCED      ONPATH     IPCO     LaGrande Path Limit     2018-07-16 11:47     IPCO29656      2018-07-16 11:47  
  HMWY-SMLK     64464     IPCO     Hemingway - Summerlake          IDNW-NORTHWEST(IPCO) 
  NORTHWEST-IDNW(IPCO) 
  OBBLPR-BEAST(IPCO) 
  SMLK-TOT75(IPCO) 
  TOTOR-NORTHWEST(IPCO)   
  2175.0 
  1215.0 
  9999.0 
  450.0 
  525.0   
  2175.0 
  1215.0 
  9999.0 
  450.0 
  525.0   
  915.0 
  460.0 
  9999.0 
  0.0 
  400.0   
  2018-07-17 21:00 
  2018-07-17 21:00 
  2018-07-17 21:00 
  2018-07-17 21:00 
  2018-07-17 21:00   
  2018-07-18 04:40 
  2018-07-18 04:40 
  2018-07-18 04:40 
  2018-07-18 04:40 
  2018-07-18 04:40   
  Completed     TRANSMISSION     PLANNED      ONPATH     IPCO     HMWY-SMLK -- Out of Service PAC OUTAGE      2018-07-16 10:20     IPCO29652      2018-07-18 04:40  
  JBSNWEST     64470     IPCO     PAC-HMWY-SMLK 500 KV          JBSN-POP(IPCO)      800.0      800.0      733.0      2018-07-17 21:00      2018-07-18 04:43      Completed     TRANSMISSION     PLANNED      ONPATH     IPCO     Per Path 19 Operator (PAC) Request. PAC-HMWY-SMLK 500 KV     2018-07-16 10:26     IPCO29653      2018-07-18 04:42  
  CURTAILMENT     64528     IPCO               LOLO-NORTHWEST(IPCO)      340.0      340.0      340.0      2018-07-18 00:00      2018-07-18 03:00      Completed     TRANSMISSION     FORCED      ONPATH     IPCO     LOLO Path Limit     2018-07-17 23:31     IPCO29668      2018-07-17 23:31  
  IDAHO-NORTHWEST     64559     IPCO     DCC - LOWER GRANITE-HATWAI NO 1 500KV LINE AND HAT          NORTHWEST-IDNW(IPCO)      1215.0      1215.0      850.0      2018-07-19 07:00      2018-07-19 09:00      Cancelled     TRANSMISSION     PLANNED      ONPATH     IPCO     Path 14 SOP-33 Limit BPA-DCC - LOWER GRANITE-HATWAI NO 1 500KV LINE AND HATWAI-DWORSHAK NO 1 500KV LINE     2018-07-18 12:26     IPCO29678      2018-07-18 14:17  
  JBSNWEST     63363     IPCO     PAC-Jim Bridger: Unit #4 Test          JBSN-POP(IPCO) 

  JBSN-POP(IPCO) 

  JBSN-POP(IPCO) 

  JBSN-POP(IPCO) 

  JBSN-POP(IPCO)   
  800.0 

  800.0 

  800.0 

  800.0 

  800.0   
  800.0 

  800.0 

  800.0 

  800.0 

  800.0   
  716.0 

  716.0 

  716.0 

  716.0 

  716.0   
  2018-07-23 07:00 

  2018-07-24 07:00 

  2018-07-25 07:00 

  2018-07-26 07:00 

  2018-07-27 07:00   
  2018-07-23 14:00 

  2018-07-24 14:00 

  2018-07-25 14:00 

  2018-07-26 14:00 

  2018-07-27 14:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     IPCO     Per Path 19 Operator (PAC) Request Jim Bridger: Unit #4 Test, RELAY     2018-06-07 08:31     IPCO29332      2018-06-07 08:31  
  IDAHO-NORTHWEST     60968     IPCO               IDNW-NORTHWEST(IPCO) 
  NORTHWEST-IDNW(IPCO)   
  2175.0 
  1200.0   
  2175.0 
  1200.0   
  1970.0 
  1040.0   
  2018-08-27 08:00 
  2018-08-27 08:00   
  2018-08-30 16:00 
  2018-08-30 16:00   
  Scheduled     TRANSMISSION     FORCED      ONPATH     IPCO     Path 14 Limit. BPA WORK . POLE REPLACEMENT..***No Transmission Scheduling Impacts ***     2017-12-05 12:31     IPCO28021      2018-04-19 09:46  
  JBSNWEST     61609     IPCO     BURNS SERIES CAPS. 1 AND 2          JBSN-POP(IPCO)      800.0      800.0      700.0      2018-08-27 11:00      2018-08-31 14:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     IPCO     Per Path 19 Operator (PAC) Request PACW CAP INSPECTION AND TESTING.     2018-02-13 08:37     IPCO28369      2018-02-13 08:37  
  TOTBEAST     63633     IPCO               OBBLPR-BEAST(IPCO)      9999.0      9999.0      2500.0      2018-09-01 00:00      2018-10-01 00:00      Cancelled     TRANSMISSION     FORCED      ONPATH     IPCO     Test outage.     2018-06-21 09:09     IPCO29413      2018-06-21 09:10  
  TOTBEAST     60356     IPCO     ONTO C231 SERIES CAPS.          OBBLPR-BEAST(IPCO)      2465.0      2465.0      2325.0      2018-10-01 07:00      2018-11-02 15:00      Cancelled     TRANSMISSION     PLANNED      ONPATH     IPCO     Path 55 or 82 Limit. CAPS CONTROL UPGRADE..***No Transmission Scheduling Impacts ***     2017-10-13 09:54     IPCO27816      2018-06-14 12:45  
  HMWY-SMLK     64271     IPCO     Hemingway - Summerlake          IDNW-NORTHWEST(IPCO) 
  NORTHWEST-IDNW(IPCO) 
  OBBLPR-BEAST(IPCO) 
  SMLK-TOT75(IPCO) 
  TOTOR-NORTHWEST(IPCO)   
  2175.0 
  1200.0 
  9999.0 
  450.0 
  525.0   
  2175.0 
  1200.0 
  9999.0 
  450.0 
  525.0   
  940.0 
  485.0 
  9999.0 
  0.0 
  400.0   
  2018-10-08 08:00 
  2018-10-08 08:00 
  2018-10-08 08:00 
  2018-10-08 08:00 
  2018-10-08 08:00   
  2018-10-12 17:00 
  2018-10-12 17:00 
  2018-10-12 17:00 
  2018-10-12 17:00 
  2018-10-12 17:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     IPCO     HMWY-SMLK -- Out of Service pac outage.***Transmission Scheduling allocations posted to OASIS under the Transmission Outage Allocation file***      2018-07-02 06:00     IPCO29567      2018-07-02 10:22  
LAPT Outages:
  Summer 2018 Limit     33884     WACM     TOT-3 (LAPT)     TOT-3     ARH>AU(LAPT) 
  AU>ARH(LAPT) 
  AU>SCSW(LAPT) 
  DJ>ARH(LAPT) 
  DJ>SGW(LAPT) 
  SCSW>AU(LAPT) 
  SGW>SCSW(LAPT)   
  475.0     475.0     267.8 
  267.8 
  157.3 
  212.5 
  212.5 
  157.3 
  157.3   
  2018-06-01 00:00 
  2018-06-01 00:00 
  2018-06-01 00:00 
  2018-06-01 00:00 
  2018-06-01 00:00 
  2018-06-01 00:00 
  2018-06-01 00:00   
  2018-11-01 00:00 
  2018-11-01 00:00 
  2018-11-01 00:00 
  2018-11-01 00:00 
  2018-11-01 00:00 
  2018-11-01 00:00 
  2018-11-01 00:00   
  Active     Transmission     Planned      OnPath     LAPT,WACM     TOT-3 Summer 2018 Ratings of 1680 MW for system intact (Cell A1). Using Cell A2 with zero DC tie schedule the Limit will be 1557 MW and LAPTs share of transfer is 425 MW. RRV     2018-04-26 08:49     WACM11187      2018-07-03 11:21  
  Summer 2018 Limit     33887     WACM     TOT-4B     TOT-4B     DJ>YTW(LAPT)      230.0     230.0     264.0      2018-06-01 00:00      2018-11-01 00:00      Active     Transmission     Planned      OnPath     LAPT,WACM     TOT-4B Summer 2018 Ratings of 880 MW for system intact. LAPTs share of transfer is 264 MW. RRV     2018-04-26 09:13     WACM11190      2018-04-26 09:16  
  Summer 2018 Limit     33900     WACM     YT South     YT-SOUTH     YTW>DJ(LAPT)      225.0     225.0     222.0      2018-06-01 00:00      2018-11-01 00:00      Active     Transmission     Planned      OnPath     LAPT,WACM     YT South Summer 2018 Ratings of Maximum 622. LAPTs share of transfer capability is 222 MW. RRV     2018-04-26 10:58     WACM11192      2018-04-26 10:58  
  System Conditions     34339     WACM     YTS     YT-SOUTH     YTW>DJ(LAPT)      225.0     225.0     212.0      2018-06-04 09:00      2018-07-11 09:20      Completed     Transmission     Planned      OnPath     BEPW,CRCM,LAPT,WACM     Outage Request C-18-1087. YTS=Series #11.     2018-05-18 07:18     WACM11278      2018-07-11 09:20  
  SCSE-SCSW     34369     LAPT     SCSE-SCSW          SCSE>SCSW(LAPT) 
  SCSW>SCSE(LAPT) 

  SCSE>SCSW(LAPT) 
  SCSW>SCSE(LAPT) 

  SCSE>SCSW(LAPT) 
  SCSW>SCSE(LAPT) 

  SCSE>SCSW(LAPT) 
  SCSW>SCSE(LAPT) 

  SCSE>SCSW(LAPT) 
  SCSW>SCSE(LAPT)   
  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0   
  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0 

  200.0 
  200.0   
  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0 

  0.0 
  0.0   
  2018-06-18 06:00 
  2018-06-18 06:00 

  2018-06-29 16:00 
  2018-06-29 16:00 

  2018-07-02 17:00 
  2018-07-02 17:00 

  2018-07-03 16:00 
  2018-07-03 16:00 

  2018-07-05 16:00 
  2018-07-05 16:00   
  2018-06-29 16:00 
  2018-06-29 16:00 

  2018-07-02 17:00 
  2018-07-02 17:00 

  2018-07-03 16:00 
  2018-07-03 16:00 

  2018-07-05 16:00 
  2018-07-05 16:00 

  2018-07-09 06:30 
  2018-07-09 06:30   
  Completed     TRANSMISSION     FORCED      ONPATH     LAPT     Outage Request C-18-1208.     2018-05-23 08:09     LAPT11284      2018-07-09 06:28  
  LRS-AU     34679     WACM     TOT-3     TOT-3     ARH>AU(LAPT) 
  AU>ARH(LAPT) 
  AU>SCSW(LAPT) 
  DJ>ARH(LAPT) 
  DJ>SGW(LAPT) 
  SCSW>AU(LAPT) 
  SGW>SCSW(LAPT)   
  475.0     475.0     120.3 
  120.3 
  70.7 
  95.5 
  95.5 
  70.7 
  70.7   
  2018-07-09 09:00 
  2018-07-09 09:00 
  2018-07-09 09:00 
  2018-07-09 09:00 
  2018-07-09 09:00 
  2018-07-09 09:00 
  2018-07-09 09:00   
  2018-07-09 14:00 
  2018-07-09 14:00 
  2018-07-09 14:00 
  2018-07-09 14:00 
  2018-07-09 14:00 
  2018-07-09 14:00 
  2018-07-09 14:00   
  Completed     Transmission     Planned      OnPath     LAPT,WACM     Outage Request C-18-1840. TOT3/Path36 =Series #2.     2018-06-20 11:25     WACM11349      2018-07-09 13:10  
  SCSE-SCSW     34796     LAPT     SCSE-SCSW          SCSE>SCSW(LAPT) 
  SCSW>SCSE(LAPT)   
  200.0 
  200.0   
  200.0 
  200.0   
  0.0 
  0.0   
  2018-07-09 15:00 
  2018-07-09 15:00   
  2018-07-09 19:00 
  2018-07-09 19:00   
  Completed     TRANSMISSION     FORCED      ONPATH     LAPT     SCS tripped.     2018-07-09 14:35     LAPT11385      2018-07-09 18:11  
  System Conditions     34827     WACM     TOT-4B     TOT-4B     DJ>YTW(LAPT)      230.0     230.0     219.0      2018-07-16 06:00      2018-07-27 16:00      Active     Transmission     Planned      OnPath     LAPT,WACM     Outage Request INFO-18-1013. TOT4B/Path 38=Series #121.     2018-07-10 09:21     WACM11397      2018-07-10 09:21  
  Yellowtail-Lovel #1 115     34824     WACM     YTS     YT-SOUTH     YTW>DJ(LAPT)      225.0     225.0     153.0      2018-07-16 08:00      2018-07-20 15:00      Active     Transmission     Planned      OnPath     LAPT,WACM     Outage Request C-18-2151. YTS=Series #2     2018-07-10 07:33     WACM11396      2018-07-10 07:33  
  NYUM-SCSW     34769     LAPT     NYUM-SCSW          NYUM>SCSW(LAPT) 
  SCSW>NYUM(LAPT)   
  198.0 
  198.0   
  198.0 
  198.0   
  0.0 
  0.0   
  2018-07-23 08:00 
  2018-07-23 08:00   
  2018-07-26 14:00 
  2018-07-26 14:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     LAPT,WACM     Outage Request C-18-1943. TOT3/Path 36=Series #13.     2018-07-09 08:19     LAPT11376      2018-07-09 08:19  
  System Conditions     34730     WACM     TOT-1A     TOT-1A     BOZ>CRG(CRCM) 
  CRG>BOZ(CRCM) 
  CRG>SWR(CRCM) 
  SWR>CRG(CRCM) 
  SWR>VNL(CRCM) 
  VNL>FGE(CRCM) 
  VNL>SWR(CRCM)   
  395.0     395.0     194.3 
  194.3 
  104.7 
  104.7 
  104.7 
  179.4 
  104.7   
  2018-07-31 04:00 
  2018-07-31 04:00 
  2018-07-31 04:00 
  2018-07-31 04:00 
  2018-07-31 04:00 
  2018-07-31 04:00 
  2018-07-31 04:00   
  2018-07-31 10:00 
  2018-07-31 10:00 
  2018-07-31 10:00 
  2018-07-31 10:00 
  2018-07-31 10:00 
  2018-07-31 10:00 
  2018-07-31 10:00   
  Scheduled     Transmission     Planned      OnPath     BEPW,CRCM,LAPT,WACM     Outage Request: INFO-18-1992. TOT1/Path 30=Series #4.     2018-07-03 10:32     WACM11361      2018-07-03 10:32  
  System Conditions     34932     WACM     TOT4B     TOT-4B     DJ>YTW(LAPT)      230.0     230.0     233.0      2018-08-06 07:00      2018-08-07 11:00      Scheduled     Transmission     Planned      OnPath     LAPT,WACM     Outage Request INFO-18-2206. TOT4B/Path 38=Series #108.     2018-07-16 09:21     WACM11457      2018-07-16 09:21  
  System Conditions     34356     WACM     TOT4B     TOT-4B     DJ>YTW(LAPT)      230.0     230.0     219.0      2018-08-13 06:00      2018-08-14 16:00      Scheduled     Transmission     Planned      OnPath     LAPT,WACM     Outage Request ICC-18-1737. TOT4B/Path 38=Series #131.     2018-05-22 11:41     WACM11283      2018-05-22 11:41  
  System Conditions     34697     WACM     TOT4B     TOT-4B     DJ>YTW(LAPT)      230.0     230.0     214.0      2018-08-15 05:00      2018-08-16 15:00      Scheduled     Transmission     Planned      OnPath     LAPT,WACM     Outage Request:INFO-18-2057. TOT4B/Path 38=Curve#107.     2018-06-26 07:07     WACM11357      2018-06-26 07:07  
  System Conditions     34696     WACM     TOT-4B     TOT-4B     DJ>YTW(LAPT)      230.0     230.0     193.0      2018-08-17 05:00      2018-08-18 15:00      Scheduled     Transmission     Planned      OnPath     LAPT,WACM     Outage Request INFO-18-2058. TOT4B/Path 38 =Curve #106.     2018-06-26 07:02     WACM11356      2018-06-26 07:02  
  System Conditions     34832     WACM     TOT4B     TOT-4B     DJ>YTW(LAPT)      230.0     230.0     233.0      2018-08-20 06:00      2018-08-26 16:00      Scheduled     Transmission     Planned      OnPath     LAPT,WACM     Outage Request INFO-18-1554. TOT4B/Path 38=Series 103.     2018-07-10 10:34     WACM11402      2018-07-10 10:34  
  System Conditions     34831     WACM     TOT-4B     TOT-4B     DJ>YTW(LAPT)      230.0     230.0     233.0      2018-08-27 06:00      2018-08-27 16:00      Scheduled     Transmission     Planned      OnPath     LAPT,WACM     Outage Request INFO-18-1567. TOT4B/Path 38=Series #103.     2018-07-10 10:31     WACM11401      2018-07-10 10:31  
  System Conditions     34830     WACM     TOT-4B     TOT-4B     DJ>YTW(LAPT)      230.0     230.0     204.0      2018-08-28 06:00      2018-08-28 16:00      Scheduled     Transmission     Planned      OnPath     LAPT,WACM     Outage Request INFO-18-1569. TOT4B/Path 38=Series #105.     2018-07-10 10:28     WACM11400      2018-07-10 10:28  
  System Conditions     34898     WACM     TOT-4B     TOT-4B     DJ>YTW(LAPT)      230.0     230.0     220.0      2018-09-13 06:00      2018-09-13 16:00      Scheduled     Transmission     Planned      OnPath     LAPT,WACM     Outage Request INFO-18-2174. TOT4B/Path 38=Series #116.     2018-07-12 07:27     WACM11431      2018-07-12 07:27  
  System Conditions     34927     WACM     TOT4B     TOT-4B     DJ>YTW(LAPT)      230.0     230.0     220.0      2018-09-13 07:00      2018-09-13 13:00      Scheduled     Transmission     Planned      OnPath     LAPT,WACM     Outage Request: C-18-2187. TOT4B/Path 38=Series #116.     2018-07-16 07:48     WACM11454      2018-07-16 07:48  
  AU-KU1B 345/230/13.8 Xfmr     34942     WACM     TOT3     TOT-3     ARH>AU(LAPT) 
  AU>ARH(LAPT) 
  AU>SCSW(LAPT) 
  DJ>ARH(LAPT) 
  DJ>SGW(LAPT) 
  SCSW>AU(LAPT) 
  SGW>SCSW(LAPT)   
  475.0     475.0     217.3 
  217.3 
  127.7 
  172.5 
  172.5 
  127.7 
  127.7   
  2018-09-17 12:00 
  2018-09-17 12:00 
  2018-09-17 12:00 
  2018-09-17 12:00 
  2018-09-17 12:00 
  2018-09-17 12:00 
  2018-09-17 12:00   
  2018-11-16 16:00 
  2018-11-16 16:00 
  2018-11-16 16:00 
  2018-11-16 16:00 
  2018-11-16 16:00 
  2018-11-16 16:00 
  2018-11-16 16:00   
  Scheduled     Transmission     Planned      OnPath     LAPT,WACM     Outage Request C-18=2200. TOT3/Path 36=Series #28.     2018-07-16 10:28     WACM11461      2018-07-16 10:28  
LDWP Outages:
  PATH 49 / EOR     112253     LDWP               MED5-WW(LDWP) 
  WW-MED5(LDWP)   
  365.0 
  365.0   
  365.0 
  365.0   
  346.0 
  346.0   
  2018-01-30 00:00 
  2018-01-30 00:00   
  2018-12-31 18:00 
  2018-12-31 18:00   
  Active     TRANSMISSION     PLANNED      ONPATH     LDWP     WW-MD5 2018/01/26 18:08 BID 27858 LIBERTY: 230KV PHASE SHIFTER (FORCED OUT). TROUBLESHOOT & REPAIR CAUSE OF RELAY. FS     2018-01-29 10:56     LDWP45227      2018-01-29 11:02  
  PATH 49 / EOR     114450     LDWP               CRY-NAV(LDWP) 
  NAV-CRY(LDWP)   
  0.0 
  0.0   
  0.0 
  0.0   
  1933.0 
  1933.0   
  2018-06-03 13:25 
  2018-06-03 13:25   
  2018-12-31 23:59 
  2018-12-31 23:59   
  Active     TRANSMISSION     PLANNED      ONPATH     LDWP     NAV-MCC Liberty Phase Shifter out only     2018-06-03 13:25     LDWP45712      2018-06-04 08:57  
  NWOR     114906     LDWP               NWOR (E-W)(LDWP) 
  NWOR (W-E)(LDWP)   
  0.0 
  0.0   
  0.0 
  0.0   
  2578.0 
  2648.0   
  2018-07-14 21:00 
  2018-07-14 21:00   
  2018-07-20 15:00 
  2018-07-20 15:00   
  Active     TRANSMISSION     PLANNED      ONPATH     LDWP     NWOR 2018/07/12 36463 MCCULLOUGH SS: MCCULLOUGH-VICTORVILLE 2 LINE SERIES CAPACITORS ONLY AT MCCULLOUGH (FORCED OUT) . INSPECT AND REPAIR CAUSE OF RELAY. SL     2018-07-12 13:12     LDWP45877      2018-07-14 11:05  
  PATH 27 / INT DC     114989     LDWP               INT DC (NE-SW)(LDWP) 
  INT DC (SW-NE)(LDWP) 

  INT DC (NE-SW)(LDWP) 
  INT DC (SW-NE)(LDWP) 

  INT DC (NE-SW)(LDWP) 
  INT DC (SW-NE)(LDWP) 

  INT DC (NE-SW)(LDWP) 
  INT DC (SW-NE)(LDWP)   
  2400.0 
  1400.0 

  2400.0 
  1400.0 

  2400.0 
  1400.0 

  2400.0 
  1400.0   
  2400.0 
  1400.0 

  2400.0 
  1400.0 

  2400.0 
  1400.0 

  2400.0 
  1400.0   
  1250.0 
  1250.0 

  1250.0 
  1250.0 

  1250.0 
  1250.0 

  1250.0 
  1250.0   
  2018-07-18 00:00 
  2018-07-18 00:00 

  2018-07-19 16:00 
  2018-07-19 16:00 

  2018-07-19 17:00 
  2018-07-19 17:00 

  2018-07-20 18:00 
  2018-07-20 18:00   
  2018-07-19 16:00 
  2018-07-19 16:00 

  2018-07-19 17:00 
  2018-07-19 17:00 

  2018-07-20 18:00 
  2018-07-20 18:00 

  2018-07-22 18:00 
  2018-07-22 18:00   
  Active     TRANSMISSION     PLANNED      ONPATH     LDWP     INT DC 2018/07/17 02:33 BIDS 36552 INTERMOUNTAIN GS UNIT 1. CLEAR HARDENED ASH FROM BOTTOM ASH HOPPER. SO.     2018-07-17 15:05     LDWP45897      2018-07-19 08:42  
  LA-SYL     114710     LDWP               SYL-LA(LDWP)      2200.0      2200.0      2050.0      2018-07-19 06:00      2018-07-20 18:00      Active     TRANSMISSION     FORCED      ONPATH     LDWP     LA-SYL 2018/07/05 13:57 BID 36329 SYLMAR-NORTHRIDGE 1 230KV LINE (OUT). TO CUTOVER RTU FOR SAS II UPGRADE FUNCTION TEST CONTROLS, VERIFYMETERING, AND TEST RELAYS & TRIP CBS AT RS-J END ONLY. FS.     2018-07-05 14:19     LDWP45809      2018-07-05 14:19  
  NWOR     114978     LDWP               NWOR (E-W)(LDWP) 
  NWOR (W-E)(LDWP)   
  0.0 
  0.0   
  0.0 
  0.0   
  2578.0 
  2648.0   
  2018-07-19 19:00 
  2018-07-19 19:00   
  2018-07-20 15:00 
  2018-07-20 15:00   
  Active     TRANSMISSION     PLANNED      ONPATH     LDWP     NWOR 2018/07/12 36463 MCCULLOUGH SS: MCCULLOUGH-VICTORVILLE 2 LINE SERIES CAPACITORS ONLY AT MCCULLOUGH (FORCED OUT) . INSPECT AND REPAIR CAUSE OF RELAY. SL/FS.     2018-07-17 13:22     LDWP45892      2018-07-17 13:22  
  LA-SYL     114713     LDWP               AIR-LA(LDWP) 
  LA-AIR(LDWP)   
  360.0 
  360.0   
  360.0 
  360.0   
  210.0 
  210.0   
  2018-07-21 07:00 
  2018-07-21 07:00   
  2018-07-21 12:00 
  2018-07-21 12:00   
  Scheduled     TRANSMISSION     FORCED      ONPATH     LDWP     AIR-LA 2018/07/05 14:31 BID 36229 AIRWAY RS: 230KV BUS 1 / BANK 2 / STATION SERVICE #2 / AIRWAY-KELLOGG 2 69KV CIRCUIT (-OUT-); [WASH DEENERGIZED]. WASH DE-ENERGIZED. FS.     2018-07-05 14:45     LDWP45810      2018-07-05 14:45  
  VIC-LA     114716     LDWP               LA-VIC(LDWP) 
  VIC-LA(LDWP)   
  4350.0 
  4350.0   
  4350.0 
  4350.0   
  4200.0 
  4200.0   
  2018-07-21 07:00 
  2018-07-21 07:00   
  2018-07-21 12:00 
  2018-07-21 12:00   
  Scheduled     TRANSMISSION     FORCED      ONPATH     LDWP     VIC-LA 2018/07/05 14:30 BID 36231 AIRWAY RS, RINALDI-AIRWAY 2 230KV LINE (-OUT-); [INCLUDES 230KV CB'S E-21 & E-23]; [(WASH DE-ENERGIZED]. WASH DE-ENERGIZED. FS.     2018-07-05 14:51     LDWP45811      2018-07-05 14:51  
  LA-SYL     114719     LDWP               AIR-LA(LDWP) 
  LA-AIR(LDWP)   
  360.0 
  360.0   
  360.0 
  360.0   
  210.0 
  210.0   
  2018-07-21 12:00 
  2018-07-21 12:00   
  2018-07-21 16:00 
  2018-07-21 16:00   
  Scheduled     TRANSMISSION     FORCED      ONPATH     LDWP     AIR-LA 2018/07/05 14:43 BID 36282 AIRWAY RS: BANK 3 / STATION SERVICE #3 / AIRWAY-KELLOGG 3 69KV CIRCUIT (-OUT-); [INCLUDING 230KV CB'S E-32 & E-33]; (WASH DE-ENERGIZED). (-OUT-); WASH DE-ENERGIZED. FS.     2018-07-05 14:59     LDWP45812      2018-07-05 14:59  
  VIC-LA     114725     LDWP               LA-VIC(LDWP) 
  VIC-LA(LDWP)   
  4350.0 
  4350.0   
  4350.0 
  4350.0   
  4200.0 
  4200.0   
  2018-07-21 12:00 
  2018-07-21 12:00   
  2018-07-21 16:00 
  2018-07-21 16:00   
  Scheduled     TRANSMISSION     FORCED      ONPATH     LDWP     VIC-LA 2018/07/05 14:45 BID 36278 AIRWAY RS: RINALDI-AIRWAY 1 230KV LINE (-OUT-); [INCLUDES 230KV CB'S E-12 & E-13 @ AWY-RS] ; (WASH DEENERGIZED). WASH DE-ENERGIZED. FS.     2018-07-05 15:13     LDWP45814      2018-07-05 15:13  
  LA-SYL     114722     LDWP               AIR-LA(LDWP) 
  LA-AIR(LDWP)   
  360.0 
  360.0   
  360.0 
  360.0   
  210.0 
  210.0   
  2018-07-21 16:00 
  2018-07-21 16:00   
  2018-07-21 18:00 
  2018-07-21 18:00   
  Scheduled     TRANSMISSION     FORCED      ONPATH     LDWP     AIR-LA 2018/07/05 14:47 BID 36282 AIRWAY RS: BANK 3 / STATION SERVICE #3 / AIRWAY-KELLOGG 3 69KV CIRCUIT (-OUT-); [INCLUDING 230KV CB'S E-32 & E-33]; (WASH DE-ENERGIZED). (-OUT-); WASH DE-ENERGIZED. FS.     2018-07-05 15:06     LDWP45813      2018-07-05 15:06  
  NWOR     114879     LDWP               NWOR (E-W)(LDWP) 
  NWOR (W-E)(LDWP)   
  2592.0 
  2662.0   
  2592.0 
  2662.0   
  2500.0 
  2570.0   
  2018-07-23 05:00 
  2018-07-23 05:00   
  2018-08-02 17:00 
  2018-08-02 17:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     LDWP     NWOR 2018/07/10 08:43 BID 36484 LUGO-PISGAH #1 220KV LINE (OUT). LINE WORK. SL.     2018-07-10 09:39     LDWP45869      2018-07-10 09:39  
  NWOR     114882     LDWP               NWOR (E-W)(LDWP) 
  NWOR (W-E)(LDWP)   
  2592.0 
  2662.0   
  2592.0 
  2662.0   
  1928.0 
  1998.0   
  2018-07-25 20:00 
  2018-07-25 20:00   
  2018-07-26 07:00 
  2018-07-26 07:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     LDWP     NWOR 2018/07/10 09:21 BID 36378 (DAY 1 OF 2 DAYS) ELDORADO-MOHAVE 500KV LINE (OUT) [SCE NO. ELD7213]. CB REPLACEMENT. SL.     2018-07-10 09:55     LDWP45870      2018-07-10 09:55  
  NWOR     114885     LDWP               NWOR (E-W)(LDWP) 
  NWOR (W-E)(LDWP)   
  2592.0 
  2662.0   
  2592.0 
  2662.0   
  1928.0 
  1998.0   
  2018-07-26 20:00 
  2018-07-26 20:00   
  2018-07-27 07:00 
  2018-07-27 07:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     LDWP     NWOR 2018/07/10 09:21 BID 36378 (DAY 2 OF 2 DAYS) ELDORADO-MOHAVE 500KV LINE (OUT) [SCE NO. ELD7213]. CB REPLACEMENT. SL.     2018-07-10 09:58     LDWP45871      2018-07-10 09:58  
  NWOR     114953     LDWP               NWOR (E-W)(LDWP) 
  NWOR (W-E)(LDWP)   
  0.0 
  0.0   
  0.0 
  0.0   
  1412.0 
  1482.0   
  2018-07-27 06:00 
  2018-07-27 06:00   
  2018-07-27 07:00 
  2018-07-27 07:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     LDWP     NWOR 2018/07/16 08:37 BIDS 36522 MCCULLOUGH-VICTORVILLE 1 500KV LINE (OUT-WORK AT VIC -SS). TO ASSEMBLE LINKAGE ON MCC-VIC 1 500KV SHUNT REACTOR CIRCUITSWITCHER( TO CONVERT TO DISCONNECTS). SO.     2018-07-16 14:47     LDWP45883      2018-07-16 14:47  
  NWOR     114956     LDWP               NWOR (E-W)(LDWP) 
  NWOR (W-E)(LDWP)   
  0.0 
  0.0   
  0.0 
  0.0   
  1983.0 
  2053.0   
  2018-07-27 07:00 
  2018-07-27 07:00   
  2018-07-27 19:00 
  2018-07-27 19:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     LDWP     NWOR 2018/07/16 08:37 BIDS 36522 MCCULLOUGH-VICTORVILLE 1 500KV LINE (OUT-WORK AT VIC -SS). TO ASSEMBLE LINKAGE ON MCC-VIC 1 500KV SHUNT REACTOR CIRCUITSWITCHER( TO CONVERT TO DISCONNECTS). SO.     2018-07-16 15:06     LDWP45884      2018-07-16 15:06  
  NWOR     114959     LDWP               NWOR (E-W)(LDWP) 
  NWOR (W-E)(LDWP)   
  0.0 
  0.0   
  0.0 
  0.0   
  1893.0 
  2053.0   
  2018-07-28 06:00 
  2018-07-28 06:00   
  2018-07-28 19:00 
  2018-07-28 19:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     LDWP     NWOR 2018/07/16 08:37 BIDS 36522 MCCULLOUGH-VICTORVILLE 1 500KV LINE (OUT-WORK AT VIC -SS). TO ASSEMBLE LINKAGE ON MCC-VIC 1 500KV SHUNT REACTOR CIRCUITSWITCHER( TO CONVERT TO DISCONNECTS). SO.     2018-07-16 15:25     LDWP45885      2018-07-16 15:25  
  NWOR     114962     LDWP               NWOR (E-W)(LDWP) 
  NWOR (W-E)(LDWP)   
  0.0 
  0.0   
  0.0 
  0.0   
  1983.0 
  2053.0   
  2018-07-29 06:00 
  2018-07-29 06:00   
  2018-07-29 19:00 
  2018-07-29 19:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     LDWP     NWOR 2018/07/16 08:37 BIDS 36522 MCCULLOUGH-VICTORVILLE 1 500KV LINE (OUT-WORK AT VIC -SS). TO ASSEMBLE LINKAGE ON MCC-VIC 1 500KV SHUNT REACTOR CIRCUITSWITCHER( TO CONVERT TO DISCONNECTS). SO.     2018-07-16 15:35     LDWP45886      2018-07-16 15:35  
MATL Outages:
NEVP Outages:
  PATH 49 RE-RATE     251584     NEVP     PATH 49          CRY500-NA500(NEVP) 
  NA500-CRY500(NEVP) 

  CRY500-NA500(NEVP) 
  NA500-CRY500(NEVP) 

  CRY500-NA500(NEVP) 
  NA500-CRY500(NEVP)   
  522.0 
  522.0 

  522.0 
  522.0 

  522.0 
  522.0   
  522.0 
  522.0 

  522.0 
  522.0 

  522.0 
  522.0   
  505.0 
  505.0 

  522.0 
  522.0 

  505.0 
  505.0   
  2018-03-02 13:20 
  2018-03-02 13:20 

  2018-04-02 10:05 
  2018-04-02 10:05 

  2018-04-05 15:50 
  2018-04-05 15:50   
  2018-04-02 10:05 
  2018-04-02 10:05 

  2018-04-05 15:50 
  2018-04-05 15:50 

  2019-01-01 00:00 
  2019-01-01 00:00   
  Active     TRANSMISSION     PLANNED      ONPATH     NEVP     LIBERTY PHASE SHIFTER OOS     2018-03-02 13:26     NEVP99132      2018-06-21 11:22  
  SILVERPEAK 501     262364     NEVP               NVEN-SILVERPEAK55(NEVP) 
  SILVERPEAK55-NVEN(NEVP) 

  NVEN-SILVERPEAK55(NEVP) 
  SILVERPEAK55-NVEN(NEVP)   
  17.0 
  13.0 

  17.0 
  13.0   
  17.0 
  13.0 

  17.0 
  13.0   
  10.0 
  10.0 

  0.0 
  0.0   
  2018-07-11 15:15 
  2018-07-11 15:15 

  2018-07-17 13:00 
  2018-07-17 13:00   
  2018-07-17 13:00 
  2018-07-17 13:00 

  2018-07-17 14:40 
  2018-07-17 14:40   
  Terminated     TRANSMISSION     FORCED      ONPATH     NEVP     501 and 502 OOS     2018-07-11 15:19     NEVP103872      2018-07-17 14:44  
  Ftsage to Hilltop OOS     262524     NEVP               HILLTOP345-NVEN(NEVP) 
  NVEN-HILLTOP345(NEVP) 
  NVEN-NORTHSYS(NEVP) 

  HILLTOP345-NVEN(NEVP) 
  NVEN-HILLTOP345(NEVP) 
  NVEN-NORTHSYS(NEVP) 

  HILLTOP345-NVEN(NEVP) 
  NVEN-HILLTOP345(NEVP) 
  NVEN-NORTHSYS(NEVP) 

  HILLTOP345-NVEN(NEVP) 
  NVEN-HILLTOP345(NEVP) 
  NVEN-NORTHSYS(NEVP) 

  HILLTOP345-NVEN(NEVP) 
  NVEN-HILLTOP345(NEVP) 
  NVEN-NORTHSYS(NEVP)   
  300.0 
  270.0 
  1042.0 

  300.0 
  270.0 
  1042.0 

  300.0 
  270.0 
  1042.0 

  300.0 
  270.0 
  1042.0 

  300.0 
  270.0 
  1042.0   
  300.0 
  270.0 
  1042.0 

  300.0 
  270.0 
  1042.0 

  300.0 
  270.0 
  1042.0 

  300.0 
  270.0 
  1042.0 

  300.0 
  270.0 
  1042.0   
  0.0 
  0.0 
  908.0 

  0.0 
  0.0 
  908.0 

  0.0 
  0.0 
  908.0 

  0.0 
  0.0 
  908.0 

  0.0 
  0.0 
  908.0   
  2018-07-16 04:54 
  2018-07-16 04:54 
  2018-07-16 04:54 

  2018-07-16 06:00 
  2018-07-16 06:00 
  2018-07-16 06:00 

  2018-07-16 10:00 
  2018-07-16 10:00 
  2018-07-16 10:00 

  2018-07-16 12:00 
  2018-07-16 12:00 
  2018-07-16 12:00 

  2018-07-16 14:00 
  2018-07-16 14:00 
  2018-07-16 14:00   
  2018-07-16 06:00 
  2018-07-16 06:00 
  2018-07-16 06:00 

  2018-07-16 10:00 
  2018-07-16 10:00 
  2018-07-16 10:00 

  2018-07-16 12:00 
  2018-07-16 12:00 
  2018-07-16 12:00 

  2018-07-16 14:00 
  2018-07-16 14:00 
  2018-07-16 14:00 

  2018-07-16 17:36 
  2018-07-16 17:36 
  2018-07-16 17:36   
  Completed     TRANSMISSION     FORCED      ONPATH     NEVP     FTSage-Hilltop345 relayed OOS     2018-07-16 04:59     NEVP103943      2018-07-16 17:35  
  SPAULDING/SUMMIT 60KV     261340     NEVP     PATH 24          SUMMIT120-WEST.NVEN(NEVP) 
  WEST.NVEN-SUMMIT120(NEVP)   
  100.0 
  60.0   
  100.0 
  60.0   
  100.0 
  60.0   
  2018-07-17 07:00 
  2018-07-17 07:00   
  2018-07-17 18:00 
  2018-07-17 18:00   
  Completed     TRANSMISSION     PLANNED      ONPATH     NEVP     SERVE PG&E STRANDED LOAD APPROX. 6 MW COMPASS #28199     2018-06-25 08:47     NEVP103494      2018-06-25 08:47  
  SPAULDING/SUMMIT 60KV     261343     NEVP     PATH 24          SUMMIT120-WEST.NVEN(NEVP) 
  WEST.NVEN-SUMMIT120(NEVP)   
  100.0 
  60.0   
  100.0 
  60.0   
  100.0 
  60.0   
  2018-07-26 07:00 
  2018-07-26 07:00   
  2018-07-26 18:00 
  2018-07-26 18:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     NEVP     SERVE PG&E STRANDED LOAD APPROX. 4 MW COMPASS #28198     2018-06-25 08:52     NEVP103495      2018-06-25 08:52  
NWMT Outages:
  230kV MATL Radial     6527     NWMT     230kV MATL Radial          GTFALLSNWMT-MATL.NWMT(NWMT) 
  MATL.NWMT-GTFALLSNWMT(NWMT)   
  325.0 
  300.0   
  325.0 
  300.0   
  189.0 
  189.0   
  2018-07-21 08:00 
  2018-07-21 08:00   
  2018-07-22 16:00 
  2018-07-22 16:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     NWMT     AltaLink Outage Request: 230kV MATL Radial; Emergency BC-AB tie line outage     2018-07-18 10:41     NWMT1675      2018-07-18 10:41  
  230kV Ovando-Landers Fork     6523     NWMT     230kV Ovando-Landers Fork          GTFALLSNWMT-NWMT.SYSTEM(NWMT) 

  GTFALLSNWMT-NWMT.SYSTEM(NWMT) 

  GTFALLSNWMT-NWMT.SYSTEM(NWMT)   
  495.0 

  495.0 

  495.0   
  495.0 

  495.0 

  495.0   
  200.0 

  200.0 

  200.0   
  2018-07-25 08:00 

  2018-07-26 08:00 

  2018-07-27 08:00   
  2018-07-25 15:00 

  2018-07-26 15:00 

  2018-07-27 15:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     NWMT     NWMT Outage Request: 230kV Ovando-Landers Fork; Adding relay for 230-004 PCB     2018-07-13 10:31     NWMT1673      2018-07-13 10:31  
PGE Outages:
  TROJAN TO PGE     58670     PGE     SOA Path          SOALSN(PGE)      855.0      855.0      775.0      2018-07-20 00:00      2018-07-22 00:00      Active     TRANSMISSION     PLANNED      ONPATH     PGE     Reduction of SOA N-S Capacity declared by BPAT     2018-07-18 15:03     PGE33277      2018-07-18 15:03  
  TROJAN TO PGE     58676     PGE     SOA Path          SOALSN(PGE)      855.0      855.0      775.0      2018-07-22 00:00      2018-07-24 00:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     PGE     Reduction of SOA N-S Capacity declared by BPAT     2018-07-19 15:06     PGE33282      2018-07-19 15:06  
PNM Outages:
  PATH 48 FW LINE REDUCTION     262341     PNM     FW line Fourcorne345-Rio Puerco 345          FOURCORNER345-WM345(PNM)      2032.0      2032.0      925.0      2018-10-08 08:00      2018-10-14 16:00      Cancelled     NO IMPACT CCO HOUR     PLANNED      ONPATH     PNM     NNM Import Restrictions due to the FW line outage to replace 5-pole Structures. NNMI reduced by 54.5 percent     2018-07-11 09:40     PNM103862      2018-07-11 09:45  
  PATH 48 FW LINE REDUCTION     262344     PNM     FW line Fourcorne345-Rio Puerco 345          FOURCORNER345-WM345(PNM)      2032.0      2032.0      925.0      2018-10-08 08:00      2018-10-14 16:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     PNM     NNM Import Restrictions due to the FW line outage to replace 5-pole Structures. NNMI reduced by 54.5 percent     2018-07-11 09:50     PNM103863      2018-07-11 09:50  
  PATH 48 LINE REDUCTION     258317     PNM     West Mesa-Arroyo 345kV           FOURCORNER345-WM345(PNM) 

  FOURCORNER345-WM345(PNM)   
  2032.0 

  2032.0   
  2032.0 

  2032.0   
  1808.0 

  1808.0   
  2018-10-15 09:00 

  2018-11-01 00:00   
  2018-11-01 00:00 

  2018-11-02 17:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     PNM     NNMI line reduction due to repair structures and conductor on the line. NNMI reduced by 11 percent.     2018-05-09 09:50     PNM101963      2018-05-09 09:52  
  PATH 48 WM230-115 XFMR     249927     PNM     West Mesa T1 200 MVA XFMR          FOURCORNER345-WM345(PNM)      2032.0      2032.0      1254.0      2018-10-18 08:00      2018-10-19 16:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     PNM     NNM Import Restrictions due to the WM230-115 XFMR T1 NERC Breaker Timing tesing. NNMI reduced by 38 percent     2018-02-09 13:39     PNM98522      2018-02-09 13:39  
  PATH 48 OJ LINE REDUCTION     262346     PNM     JICARILLA TO OJO 345 KV LINE          FOURCORNER345-WM345(PNM) 
  OJO345-SJ345(PNM) 
  SJ345-OJO345(PNM)   
  2032.0 
  203.0 
  2032.0   
  2032.0 
  203.0 
  2032.0   
  1959.0 
  0.0 
  0.0   
  2018-11-13 08:00 
  2018-11-13 08:00 
  2018-11-13 08:00   
  2018-11-19 16:00 
  2018-11-19 16:00 
  2018-11-19 16:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     PNM     SJ345-OJO345 LINE REDUCTION DUE TO REPLACEMENT OF 5-POLE STRUCTURE ,REDUCING PATH 48 BY PERCENT 3.6%     2018-07-11 10:09     PNM103864      2018-07-11 10:09  
  GREENLEE345-HIDALGO345     258319     PNM     GREENLEE345-HIDALGO345          GREENLEE345-HIDALGO345(PNM) 
  HIDALGO345-GREENLEE345(PNM)   
  160.0 
  300.0   
  160.0 
  300.0   
  0.0 
  0.0   
  2018-11-26 09:00 
  2018-11-26 09:00   
  2018-12-21 17:00 
  2018-12-21 17:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     PNM     GREENLEE345-HIDALGO345 LINE REDUCTION DUE TO Replacement of Line protection Relaying.     2018-05-09 10:25     PNM101964      2018-05-09 10:25  
  PATH 48 WM230-115 XFMR     249923     PNM     West Mesa T2 200 MVA XFMR          FOURCORNER345-WM345(PNM)      2019.0      2019.0      1246.0      2018-12-03 08:00      2018-12-03 16:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     PNM     NNM Import Restrictions due to the WM230-115 XFMR T2 NERC Breaker Timing tesing. NNMI reduced by 38 percent     2018-02-09 13:30     PNM98521      2018-02-09 13:30  
PPW Outages:
  PPW 134513     6123     PPW     Prospect Central: 69 kV Bus 1, T-3069,70,71 then 69 kV Bus 2          HYDROGEN-PACW(PPW)      9999.0      9999.0      9999.0      2018-05-23 08:00      2018-07-20 15:30      Active     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Repair Sw. 3R106; Repair Sw. 3R137; Repair Sw. 3R187. Note:Prospect 1,3 & 4 will be offline.-For duration of work on Sw 3R106 total generation at Prospect limited to 20 MW (scheduled from 0800-1200)-No additional restrictions from 1230-1600.. Path(Impact):HYDROGEN-PACW (9999). *115kV,Continuous,Include Weekends*     2018-05-21 09:04     134513     2018-06-04 19:47  
  PPW 135664     6165     PPW     Lemolo 2: 115/12 kV Xfmr T3029,30,31          HYDROGEN-PACW(PPW)      9999.0      9999.0      0.0      2018-07-11 08:00      2018-07-27 15:30      Active     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:GSU Maintenance. Note:Lemolo 2 unit generation unavailable. Path(Impact):HYDROGEN-PACW (9999). *Continuous,Include Weekends*     2018-06-18 15:49     135664     2018-07-11 08:21  
  PPW 132109     6087     PPW     Jim Bridger-Mustang 230 kV line          JBSN-WYOCENTRAL(PPW) 
  WAPAEAST-WAPANORTH(PPW) 
  WYOCENTRAL-JBSN(PPW) 
  WYOEAST-WYOCENTRAL(PPW)   
  600.0 
  170.0 
  600.0 
  950.0   
  600.0 
  170.0 
  600.0 
  950.0   
  400.0 
  147.0 
  400.0 
  755.0   
  2018-07-16 06:00 
  2018-07-16 06:00 
  2018-07-16 06:00 
  2018-07-16 06:00   
  2018-07-27 16:00 
  2018-07-27 16:00 
  2018-07-27 16:00 
  2018-07-27 16:00   
  Active     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:A-Condition Insulator Replacement. Note:4A/4B Curve 121. WAPAEAST-WAPANORTH = 219. WYOEAST-WYOCENTRAL (4A) = 755. 4B Limit = 857.-JBSN-WYOC & WYOC-JBSN = 400. Potential Real Time Impact to Jim Bridger Generation.-Great Divide will be radial from WAPA Spence via Mustang. Network Load Service Arrangements may be required.. Path(Impact):WYOEAST-WYOCENTRAL(195)WYOCENTRAL-JBSN(200)JBSN-WYOCENTRAL(200)WAPAEAST-WAPANORTH (23). *230kV,Continuous,Include Weekends*     2018-05-07 09:47     132109     2018-07-11 19:52  
  PPW 131467     5923     PPW     Rolling Hills Wind Collector: 34 kV Circuit #6          WINDGEN-PACE(PPW)      9999.0      9999.0      9999.0      2018-07-16 06:00      2018-07-16 13:00      TERMINATED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Wind Turbine DTA Maintenance. Note:Rolling Hills circuit #6 wind generation will be unavailable (25.5 MW). Path(Impact):WIND GEN-PACE(9999). *34.5kV,Continuous,Include Weekends*     2018-02-23 12:48     131467     2018-07-16 14:32  
  PPW 136588     6192     PPW     Latigo-Three Buttes 230 kV line & Three Buttes (Duke Energy): Entire Farm          WINDGEN-PACE(PPW)      9999.0      9999.0      9999.0      2018-07-16 07:00      2018-07-19 16:00      TERMINATED     TRANSMISSION     PLANNED      ONPATH     PPW     Customer Request:Issue a Terminal Clearance at Latigo for Full Three Buttes (Campbell Hill) Site Outage. Note:Three Buttes Generation unavailable (99 mw).. Path(Impact):WIND GEN-PACE(9999). *230kV,Continuous,Include Weekends*     2018-07-13 11:35     136588     2018-07-19 11:19  
  PPW 136447     6190     PPW     WAPA Yellowtail-WAPA Lovell #1 115 kV line          YTP-WYONORTH(PPW)      400.0      400.0      272.0      2018-07-16 08:00      2018-07-20 15:00      Active     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Replace Cross Arms. Note:YTS to Series #1, 425 MW's. LAPT = 153 MW's, PACE = 272 MW's. Path(Impact):YTP-WYONORTH(128). *115kV,Continuous,Include Weekends*     2018-07-10 08:52     136447     2018-07-10 10:26  
  PPW 131466     5922     PPW     Rolling Hills Wind Collector: 34 kV Circuit #1          WINDGEN-PACE(PPW)      9999.0      9999.0      0.0      2018-07-17 06:00      2018-07-17 13:00      Completed     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Wind Turbine DTA Maintenance. Note:Rolling Hills circuit #1 wind generation will be unavailable (22 MW). Path(Impact):WIND GEN-PACE(9999). *34.5kV,Continuous,Include Weekends*     2018-02-23 12:39     131466     2018-06-10 19:32  
  PPW 136477     6193     PPW     Hemingway-Summer Lake 500 kV line (Summer Lake Sw 4952)          H500-SMLK(PPW) 
  JBSN-JB345(PPW) 
  PACW-NTLOAD(PPW) 
  SMLK-H500(PPW)   
  1500.0 
  1600.0 
  9999.0 
  100.0   
  1500.0 
  1600.0 
  9999.0 
  100.0   
  1500.0 
  1600.0 
  9999.0 
  100.0   
  2018-07-17 21:00 
  2018-07-17 21:00 
  2018-07-17 21:00 
  2018-07-17 21:00   
  2018-07-18 09:00 
  2018-07-18 09:00 
  2018-07-18 09:00 
  2018-07-18 09:00   
  TERMINATED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:BPA DCC to issue a Terminal Clearance at Summer Lake; IPCo to issue a Terminal Clearance at Hemingway; Sw 4952 Repair. Note:H500-SMLK & SMLK-H500 = 0.-JBSN-JB345 = 2200. PacifiCorp = 1467. IPCo = 733.-Network Load Service Arrangements may be required for Southern Oregon Load.. Path(Impact):JBSN-JB345(133)PACW NTLOAD(9999)SMLK-H500(100)H500-SMLK(1500). *500kV,Continuous,Include Weekends*     2018-07-16 09:21     136477     2018-07-18 04:41  
  PPW 131455     5916     PPW     Glenrock Wind Collector: 34 kV Circuit #1          WINDGEN-PACE(PPW)      9999.0      9999.0      0.0      2018-07-18 06:00      2018-07-18 13:00      Completed     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Wind Turbine DTA Maintenance. Note:Circuit #1 Generation unavailable (23 MW).. Path(Impact):WIND GEN-PACE(9999). *34.5kV,Daily,Include Weekends*     2018-02-23 11:48     131455     2018-06-10 23:19  
  PPW 132582     5986     PPW     BPA Jones Canyon: Cap Group 1/Section 2          WINDGEN-PACW(PPW) 

  WINDGEN-PACW(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  2018-07-18 08:00 

  2018-07-19 15:00   
  2018-07-19 15:00 

  2018-07-20 15:00   
  TERMINATED     TRANSMISSION     PLANNED      ONPATH     PPW     Other Utility Request:Diagnostic Service; Leaning Juniper Restricted. Note:Leaning Juniper restricted to 83 MW. Path(Impact):WIND GEN-PACW(9999). *230kV,Continuous,Include Weekends*     2018-03-22 12:58     132582     2018-07-19 15:28  
  PPW 136643     6197     PPW     Gadsby: CB 31 (Unit #1), Gadsby-Jordan 46kV line including Gadsby: CB 52 and 46kV North Bus          THERMALGEN-PACE(PPW)      9999.0      9999.0      9999.0      2018-07-18 21:00      2018-07-19 07:30      TERMINATED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Switch 23A failed. This is to reinstall North to East bus jumper, make 23A repairs, and to replace bad insulators. The work will restore the 46kv bus to normal.. Path(Impact):THERMAL GEN-PACE(9999). *46kV,Continuous,Include Weekends*     2018-07-18 20:55     136643     2018-07-19 11:13  
  PPW 131471     5925     PPW     Rolling Hills Wind Collector: 34 kV Circuit #2, 34 kV Circuit #3          WINDGEN-PACE(PPW)      9999.0      9999.0      9999.0      2018-07-19 06:00      2018-07-19 13:00      TERMINATED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Wind Turbine DTA Maintenance. Note:Rolling Hills circuit #2 (17 MW) and circuit #3 (12 MW) wind generation will be unavailable.. Path(Impact):WIND GEN-PACE(9999). *34.5kV,Continuous,Include Weekends*     2018-02-23 12:59     131471     2018-07-19 12:08  
  PPW 131454     5915     PPW     Glenrock Wind Collector: 34 kV Circuit #5          WINDGEN-PACE(PPW)      9999.0      9999.0      0.0      2018-07-20 06:00      2018-07-20 13:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Wind Turbine DTA Maintenance. Note:Circuit #5 Generation unavailable (12 MW).. Path(Impact):WIND GEN-PACE(9999). *34.5kV,Daily,Include Weekends*     2018-02-23 11:45     131454     2018-06-13 05:57  
  PPW 131464     5921     PPW     Rolling Hills Wind Collector: 34 kV Circuit #5          WINDGEN-PACE(PPW)      9999.0      9999.0      0.0      2018-07-20 06:00      2018-07-20 13:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Wind Turbine DTA Maintenance. Note:Rolling Hills circuit #5 wind generation will be unavailable (18 MW). Path(Impact):WIND GEN-PACE(9999). *34.5kV,Continuous,Include Weekends*     2018-02-23 12:31     131464     2018-06-10 19:41  
  PPW 136242     6184     PPW     Leaning Juniper: CB 1K11, (Entire Farm Outage)          WINDGEN-PACW(PPW)      9999.0      9999.0      9999.0      2018-07-20 08:00      2018-07-24 14:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Maintenance on Breaker 1K11.. Note:Leaning Juniper Generation will not be available.. Path(Impact):WIND GEN-PACW(0). *230kV,Continuous,Include Weekends*     2018-07-05 09:47     136242     2018-07-08 04:10  
  PPW 132818     6054     PPW     Merwin-BPA Cardwell 115 kV line          HYDROGEN-PACW(PPW)      9999.0      9999.0      9999.0      2018-07-23 06:00      2018-07-27 18:00      CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:To Relocate Line Into Ariel; BPA to Issue Terminal Clearance at BPA Cardwell; Cowlitz to Issue Terminal Clearance at Ariel. Note:Maximum Generating capability at Merwin/Yale is 162 mw (Summer) and 210 mw (Winter). *PCC-706. Path(Impact):HYDROGEN-PACW (9999). *115kV,Continuous,Include Weekends*     2018-04-18 14:09     132818     2018-07-13 19:24  
  PPW 133502     6056     PPW     Merwin: 115 kV Bus 'C', Merwin-BPA Cardwell 115 kV line          HYDROGEN-PACW(PPW)      9999.0      9999.0      0.0      2018-07-23 06:00      2018-08-01 18:30      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:To pull in conductors over bus to 1/1 on Kalama line and 2/1 on Lewis River line. Cutover New Line Section from Ariel to Merwin.; BPA to Issue Terminal Clearance at BPA Cardwell; Cowlitz to Issue Terminal Clearance at Ariel. Note:Maximum Generating capability at Merwin/Yale is 162 mw (Summer) and 210 mw (Winter). *PCC-706. Path(Impact):HYDROGEN-PACW (19998). *115kV,Continuous,Include Weekends*     2018-04-18 14:30     133502     2018-07-13 19:21  
  PPW 135196     6152     PPW     BPA Fairview-Isthmus 230 kV line          PACW-NTLOAD(PPW)      9999.0      9999.0      0.0      2018-07-23 08:30      2018-07-26 16:30      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:BPA MCC to issue a Terminal Clearance at Fairview; Pole Change Out 4/009L. Note:Load normally fed from Isthmus source will now be fed from BPA Fairview 115 kV (approx. 35 additional MW). Network load service may be required.. Path(Impact):PACW NTLOAD(9999). *230kV,Continuous,Include Weekends*     2018-06-07 15:05     135196     2018-06-07 16:00  
  PPW 136718     6194     PPW     Goodnoe Hills: 34 kV Collector #1 (4Y21)          WINDGEN-PACW(PPW)      9999.0      9999.0      0.0      2018-07-26 08:00      2018-07-26 17:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Replace failed padmount transformer.. Note:Collector #1 Generation unavailable (26 MW).. Path(Impact):WIND GEN-PACW(9999). *34.5kV,Continuous,Include Weekends*     2018-07-17 14:37     136718     2018-07-20 00:16  
  PPW 136719     6195     PPW     Goodnoe Hills: 34 kV Collector #4 (4Y24)          WINDGEN-PACW(PPW)      9999.0      9999.0      0.0      2018-07-26 08:00      2018-07-26 17:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Replace failed padmount transformer at G-71.. Note:Collector #1 Generation unavailable (26 MW).-Collector #4 Generation unavailable (18 mw).. Path(Impact):WIND GEN-PACW(9999). *34.5kV,Continuous,Include Weekends*     2018-07-17 14:42     136719     2018-07-20 00:18  
  PPW 132640     5988     PPW     Atlantic City-Rock Springs 230 kV line          TOT4B-WYONORTH(PPW) 
  WAPAEAST-WAPANORTH(PPW) 
  WYOEAST-TOT4B(PPW) 
  WYOEAST-WYOCENTRAL(PPW)   
  638.0 
  170.0 
  638.0 
  950.0   
  638.0 
  170.0 
  638.0 
  950.0   
  573.0 
  155.0 
  573.0 
  735.0   
  2018-07-30 06:00 
  2018-07-30 06:00 
  2018-07-30 06:00 
  2018-07-30 06:00   
  2018-08-07 16:00 
  2018-08-07 16:00 
  2018-08-07 16:00 
  2018-08-07 16:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:A condition maintenance. Note:4A/4B Curve 117. WAPA E/N = 227. WYOE-WYOC (4A) = 735. WYOEAST-TOT4B & TOT4B-WYONORTH = 573. 4B Limit = 800.. Path(Impact):WYOEAST-WYOCENTRAL(215)WAPAEAST-WAPANORTH (15)TOT4B-WYONORTH(65)WYOEAST-TOT4B(65). *230kV,Continuous,Include Weekends*     2018-03-23 14:19     132640     2018-07-02 17:05  
  PPW 133285     6025     PPW     BPA Troutdale: 230 kV Main Bus - East Section including CB A126 & A128 and -Troutdale-BPA Troutdale          GRESHAM-TROUTDALE(PPW) 
  TROUTDALE-GRESHAM(PPW)   
  548.0 
  548.0   
  548.0 
  548.0   
  402.0 
  402.0   
  2018-07-30 07:00 
  2018-07-30 07:00   
  2018-07-30 14:30 
  2018-07-30 14:30   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Separate CB A126 & A128 From Main Bus. Note:GRSM-TROUT & TROUT-GRSM = 402.. Path(Impact):GRESHAM-TROUTDALE(146)TROUTDALE-GRESHAM(146). *230kV,Continuous,Include Weekends*     2018-04-10 10:02     133285     2018-04-10 10:02  
  PPW 135475     6177     PPW     Blue Rim-South Trona section of the Firehole Monument 230 kV line          TRONA-NUT(PPW) 
  TRONA-WYOCENTRAL(PPW) 
  WYOCENTRAL-TRONA(PPW)   
  475.0 
  640.0 
  640.0   
  475.0 
  640.0 
  640.0   
  213.0 
  424.0 
  424.0   
  2018-07-30 07:00 
  2018-07-30 07:00 
  2018-07-30 07:00   
  2018-07-31 15:00 
  2018-07-31 15:00 
  2018-07-31 15:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Replace Idler Arms/Insulators. Note:TRONA-NUT = 213.-TRONA-WYOCENTRAL & WYOCENTRAL-TRONA = 424 Summer/560 Winter.. Path(Impact):TRONA-WYOCENTRAL(216)WYOCENTRAL-TRONA(216)TRONA-NUT(262). *230kV,Continuous,Include Weekends*     2018-07-02 15:08     135475     2018-07-02 15:31  
  PPW 135534     6178     PPW     Mansface-Blue Rim section of the Firehole-Monument 230 kV line          TRONA-NUT(PPW) 
  TRONA-WYOCENTRAL(PPW) 
  WYOCENTRAL-TRONA(PPW)   
  475.0 
  640.0 
  640.0   
  475.0 
  640.0 
  640.0   
  213.0 
  424.0 
  424.0   
  2018-08-01 07:00 
  2018-08-01 07:00 
  2018-08-01 07:00   
  2018-08-02 15:00 
  2018-08-02 15:00 
  2018-08-02 15:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Re-insulate Structure. Note:TRONA-NUT = 213.-TRONA-WYOCENTRAL & WYOCENTRAL-TRONA = 424 Summer/560 Winter.. Path(Impact):TRONA-WYOCENTRAL(216)WYOCENTRAL-TRONA(216)TRONA-NUT(262). *230kV,Continuous,Include Weekends*     2018-07-02 15:11     135534     2018-07-02 15:11  
  PPW 136720     6196     PPW     Knott-PGE Tabor section of the Columbia-PGE Tabor-Knott 57 kV line          PACW-NTLOAD(PPW) 

  PACW-NTLOAD(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  0.0 

  0.0   
  2018-08-01 20:00 

  2018-08-02 20:00   
  2018-08-02 06:00 

  2018-08-03 06:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Install New Pole. Note:Owens Illinois will be served radially from PGE Tabor (~6 MW). Network load arrangements may be required.. Path(Impact):PACW NTLOAD(9999). *57kV,Daily,Include Weekends*     2018-07-17 15:32     136720     2018-07-19 09:33  
  PPW 136153     6179     PPW     South Trona-Monument section of the Firehole-Monument 230 kV line          TRONA-NUT(PPW) 
  TRONA-WYOCENTRAL(PPW) 
  WYOCENTRAL-TRONA(PPW)   
  475.0 
  640.0 
  640.0   
  475.0 
  640.0 
  640.0   
  278.0 
  424.0 
  424.0   
  2018-08-03 06:00 
  2018-08-03 06:00 
  2018-08-03 06:00   
  2018-08-03 15:00 
  2018-08-03 15:00 
  2018-08-03 15:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Replace DE Assemblies. Note:TRONA-NUT = 278.-TRONA-WYOCENTRAL & WYOCENTRAL-TRONA = 424 Summer/560 Winter.. Path(Impact):TRONA-WYOCENTRAL(216)WYOCENTRAL-TRONA(216)TRONA-NUT(197). *230kV,Continuous,Include Weekends*     2018-07-02 15:16     136153     2018-07-02 15:16  
  PPW 132820     6051     PPW     Merwin-Ariel section of the Merwin-BPA Cardwell 115 kV line          HYDROGEN-PACW(PPW) 

  HYDROGEN-PACW(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  2018-08-06 06:00 

  2018-08-08 18:00   
  2018-08-08 18:00 

  2018-08-10 18:00   
  CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Cutover New Line Section from Ariel to Hwy 503. Note:Maximum Generating capability at Merwin/Yale is 162 MW (Summer) and 210 MW (Winter).. Path(Impact):HYDROGEN-PACW (9999). *115kV,Continuous,Include Weekends*     2018-04-18 13:54     132820     2018-07-13 19:26  
  PPW 135227     6139     PPW     Ariel-BPA Cardwell section of the Merwin-BPA Cardwell 115 kV line          HYDROGEN-PACW(PPW)      9999.0      9999.0      9999.0      2018-08-06 06:30      2018-08-08 18:00      CANCELLED     TRANSMISSION     PLANNED      ONPATH     PPW     Construction:To cutover new Ariel-Hwy 503 line section. Note:Maximum Generating capability at Merwin/Yale is 162 mw (Summer) and 210 mw (Winter). *PCC-706. Path(Impact):HYDROGEN-PACW (9999). *115kV,Continuous,Include Weekends*     2018-06-06 09:30     135227     2018-07-13 19:28  
  PPW 127441     6039     PPW     BPA Ross-Woodland Tap section of the BPA Ross-Woodland Tap-BPA Lexington 230 kV line          HYDROGEN-PACW(PPW) 

  HYDROGEN-PACW(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  0.0 

  9999.0   
  2018-08-06 08:00 

  2018-08-13 08:00   
  2018-08-10 16:00 

  2018-08-17 16:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Other Utility Request:Re-Sag Between 19/2 and 20/3 for Impairment at 19/4. Note:Swift generation will be restricted to 0, while switching at the beginning and end of the outage, line SW's at tap are deadline switching only.. Path(Impact):HYDROGEN-PACW (9999). *230kV,Continuous,Include Weekends*     2018-04-13 15:24     127441     2018-04-23 15:41  
  PPW 136417     6189     PPW     Toketee Plant: 115/7.2 kV T2989,90,91          HYDROGEN-PACW(PPW)      9999.0      9999.0      0.0      2018-08-07 08:00      2018-08-09 15:30      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Repair Nitrogen leak on GSU. Note:Toketee Unit 1 generation unavailable. Path(Impact):HYDROGEN-PACW (9999). *115kV,Continuous,Include Weekends*     2018-07-10 07:59     136417     2018-07-10 07:59  
  PPW 132646     6088     PPW     Wyopo-Atlantic City section of the Riverton-Atlantic City 230 kV line          TOT4B-WYONORTH(PPW) 
  WAPAEAST-WAPANORTH(PPW) 
  WYOEAST-TOT4B(PPW) 
  WYOEAST-WYOCENTRAL(PPW)   
  638.0 
  170.0 
  638.0 
  950.0   
  638.0 
  170.0 
  638.0 
  950.0   
  573.0 
  155.0 
  573.0 
  735.0   
  2018-08-08 06:00 
  2018-08-08 06:00 
  2018-08-08 06:00 
  2018-08-08 06:00   
  2018-08-11 16:00 
  2018-08-11 16:00 
  2018-08-11 16:00 
  2018-08-11 16:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:A condition maintenance. Note:4A/4B Curve 117. WAPAEAST-WAPANORTH (Wheel) = 227. WYOEAST-WYOCENTRAL (4A) = 735. WYOEAST-TOT4B & TOT4B-WYONORTH = 573. 4B Limit = 800.. Path(Impact):WYOEAST-WYOCENTRAL(215)WAPAEAST-WAPANORTH (15)TOT4B-WYONORTH(65)WYOEAST-TOT4B(65). *230kV,Continuous,Include Weekends*     2018-05-07 10:00     132646     2018-07-18 14:58  
  PPW 132894     6089     PPW     Mustang-WAPA Spence 230 kV line          JBSN-WYOCENTRAL(PPW) 
  WAPAEAST-WAPANORTH(PPW) 
  WYOCENTRAL-JBSN(PPW) 
  WYOEAST-WYOCENTRAL(PPW)   
  600.0 
  170.0 
  600.0 
  950.0   
  600.0 
  170.0 
  600.0 
  950.0   
  400.0 
  147.0 
  400.0 
  755.0   
  2018-08-13 06:00 
  2018-08-13 06:00 
  2018-08-13 06:00 
  2018-08-13 06:00   
  2018-08-14 16:00 
  2018-08-14 16:00 
  2018-08-14 16:00 
  2018-08-14 16:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:A condition maintenance. Note:4A/4B Curve 121. WAPAEAST-WAPANORTH = 219. WYOEAST-WYOCENTRAL (4A) = 755. 4B Limit = 857.-JBSN-WYOC & WYOC-JBSN = 400. Potential Real Time Impact to Jim Bridger Generation.-Great Divide will be radial from WAPA Spence via Mustang. Network Load Service Arrangements may be required.. Path(Impact):WYOEAST-WYOCENTRAL(195)WYOCENTRAL-JBSN(200)JBSN-WYOCENTRAL(200)WAPAEAST-WAPANORTH (23). *230kV,Continuous,Include Weekends*     2018-05-07 11:17     132894     2018-05-22 13:23  
  PPW 131571     5949     PPW     Diamond Hill-EWEB McKenzie section of the BPA Alvey-Diamond Hill 230 kV line          PACW-NTLOAD(PPW) 

  PACW-NTLOAD(PPW) 

  PACW-NTLOAD(PPW) 

  PACW-NTLOAD(PPW)   
  9999.0 

  9999.0 

  9999.0 

  9999.0   
  9999.0 

  9999.0 

  9999.0 

  9999.0   
  0.0 

  0.0 

  0.0 

  0.0   
  2018-08-13 06:00 

  2018-08-14 06:00 

  2018-08-15 06:00 

  2018-08-16 06:00   
  2018-08-13 18:30 

  2018-08-14 18:30 

  2018-08-15 18:30 

  2018-08-16 18:30   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Structure replacements; EWEB to issue a Terminal Clearance at McKenzie. Note:Network Load Service must be arranged for EWEB McKenzie.-Eliminates ability to move Network Load Service from Alvey to Gresham. Eliminates C&T Point to Point Service from Troutdale to Summer Lake.-Murder creek load will be served from BPA Albany-Salem source. Path(Impact):PACW NTLOAD(9999). *230kV,Daily,Include Weekends*     2018-03-01 12:41     131571     2018-03-01 12:41  
  PPW 132904     6090     PPW     Latham-Platte 230 kV line          WAPAEAST-WAPANORTH(PPW) 
  WYOEAST-WYOCENTRAL(PPW)   
  170.0 
  950.0   
  170.0 
  950.0   
  142.0 
  692.0   
  2018-08-15 06:00 
  2018-08-15 06:00   
  2018-08-16 16:00 
  2018-08-16 16:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:A Condition Maintenance. Note:4A/4B Curve 107. WAPAEAST-WAPANORTH (Wheel) = 214. WYOEAST-WYOCENTRAL (4A) = 692. 4B Limit = 875.-Pioneer, Foote Creek, High Plains/McFadden Ridge, Seven Mile Hill & Dunlap Wind restricted to a combined total of 375 mw.-Potential Additional Real Time Miners Area Wind Generation restriction.. Path(Impact):WYOEAST-WYOCENTRAL(258)WAPAEAST-WAPANORTH (28). *230kV,Continuous,Include Weekends*     2018-05-07 13:23     132904     2018-05-07 13:23  
  PPW 132905     6091     PPW     Platte-Miners-Standpipe 230 kV line          WAPAEAST-WAPANORTH(PPW) 
  WYOEAST-WYOCENTRAL(PPW)   
  170.0 
  950.0   
  170.0 
  950.0   
  121.0 
  574.0   
  2018-08-17 06:00 
  2018-08-17 06:00   
  2018-08-18 16:00 
  2018-08-18 16:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:A Condition Repairs. Note:4A/4B Curve 106. WAPAEAST-WAPANORTH (Wheel) = 193. WYOEAST-WYOCENTRAL (4A) = 574. 4B Limit = 865.-Pioneer, Foote Creek, High Plains/McFadden Ridge, Seven Mile Hill & Dunlap Wind restricted to a combined total of 375 mw.-Potential Additional Real Time Miners Area Wind Generation restriction.. Path(Impact):WYOEAST-WYOCENTRAL(376)WAPAEAST-WAPANORTH (49). *230kV,Continuous,Include Weekends*     2018-05-07 13:53     132905     2018-05-07 13:53  
  PPW 131572     5948     PPW     BPA Alvey-EWEB McKenzie section of the BPA Alvey-Diamond Hill 230 kV line          PACW-NTLOAD(PPW)      9999.0      9999.0      0.0      2018-08-17 06:00      2018-08-17 18:30      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Arm Replacements; BPA to Issue Terminal Clearance at Alvey. Note:Eliminates ability to move Network Load Service from Alvey to Gresham. Eliminates C&T Point to Point Service from Troutdale to Summer Lake.-Murder creek load will be served from BPA Albany-Salem source. Path(Impact):PACW NTLOAD(9999). *230kV,Daily,Include Weekends*     2018-03-01 12:37     131572     2018-03-01 12:37  
  PPW 133287     6026     PPW     BPA Troutdale: 230 kV Main Bus - East Section including CB A126 & A128 and -Troutdale-BPA Troutdale          GRESHAM-TROUTDALE(PPW) 
  TROUTDALE-GRESHAM(PPW)   
  548.0 
  548.0   
  548.0 
  548.0   
  402.0 
  402.0   
  2018-08-17 09:30 
  2018-08-17 09:30   
  2018-08-17 16:30 
  2018-08-17 16:30   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Reconnect CB A126 & A128 To Main Bus. Note:GRSM-TROUT & TROUT-GRSM = 402.. Path(Impact):GRESHAM-TROUTDALE(146)TROUTDALE-GRESHAM(146). *230kV,Continuous,Include Weekends*     2018-04-10 10:03     133287     2018-04-10 10:03  
  PPW 131573     5947     PPW     Fry-Calapooya section of the Diamond Hill-Fry 230 kV line          PACW-NTLOAD(PPW) 

  PACW-NTLOAD(PPW) 

  PACW-NTLOAD(PPW) 

  PACW-NTLOAD(PPW)   
  9999.0 

  9999.0 

  9999.0 

  9999.0   
  9999.0 

  9999.0 

  9999.0 

  9999.0   
  0.0 

  0.0 

  0.0 

  0.0   
  2018-08-20 06:00 

  2018-08-21 06:00 

  2018-08-22 06:00 

  2018-08-23 06:00   
  2018-08-20 18:30 

  2018-08-21 18:30 

  2018-08-22 18:30 

  2018-08-23 18:30   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Structure and Arm Replacements. Note:Network Load Service must be arranged for Calapooya, Diamond Hill & EWEB McKenzie.-Eliminates ability to move Network Load Service from Alvey to Gresham. Eliminates C&T Point to Point Service from Troutdale to Summer Lake.-Murder creek load will be served from BPA Albany-Salem source. Path(Impact):PACW NTLOAD(9999). *230kV,Daily,Include Weekends*     2018-03-01 12:32     131573     2018-03-01 12:32  
  PPW 132906     6093     PPW     Amasa-Difficulty 230 kV line          WAPAEAST-WAPANORTH(PPW) 
  WYOEAST-WYOCENTRAL(PPW)   
  170.0 
  950.0   
  170.0 
  950.0   
  161.0 
  920.0   
  2018-08-20 06:00 
  2018-08-20 06:00   
  2018-08-26 16:00 
  2018-08-26 16:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:A condition Maintenance. Note:4A/4B Curve 103. WAPAEAST-WAPANORTH (Wheel) = 233. WYOEAST-WYOCENTRAL (4A) = 920.-Foote Creek, High Plains/McFadden Ridge, Seven Mile Hill & Dunlap Wind restricted to a combined total of 375 mw.-Potential Additional Real Time Miners Area Wind Generation restriction.. Path(Impact):WYOEAST-WYOCENTRAL(30)WAPAEAST-WAPANORTH (9). *230kV,Continuous,Include Weekends*     2018-05-07 15:55     132906     2018-05-09 10:45  
  PPW 131574     5946     PPW     Calapooya-Diamond Hill section of the Diamond Hill-Fry 230 kV line          PACW-NTLOAD(PPW) 

  PACW-NTLOAD(PPW) 

  PACW-NTLOAD(PPW) 

  PACW-NTLOAD(PPW) 

  PACW-NTLOAD(PPW)   
  9999.0 

  9999.0 

  9999.0 

  9999.0 

  9999.0   
  9999.0 

  9999.0 

  9999.0 

  9999.0 

  9999.0   
  0.0 

  0.0 

  0.0 

  0.0 

  0.0   
  2018-08-24 06:00 

  2018-08-25 06:00 

  2018-08-26 06:00 

  2018-08-27 06:00 

  2018-08-28 06:00   
  2018-08-24 18:30 

  2018-08-25 18:30 

  2018-08-26 18:30 

  2018-08-27 18:30 

  2018-08-28 18:30   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Structure and Arm Replacements. Note:Network Load Service must be arranged for Diamond Hill & EWEB McKenzie. Eliminates ability to move Network Load Service from Alvey to Gresham. Eliminates ESM Point to Point Service from Troutdale to Summer Lake.-Murder creek load will be served from BPA Albany-Salem source. Path(Impact):PACW NTLOAD(9999). *230kV,Daily,Include Weekends*     2018-03-01 12:30     131574     2018-03-01 12:30  
  PPW 133504     6055     PPW     Merwin-BPA Cardwell 115 kV line          HYDROGEN-PACW(PPW)      9999.0      9999.0      0.0      2018-08-27 06:00      2018-08-29 18:30      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Construction:Relocate Line Position; BPA to Issue Terminal Clearance at BPA Cardwell; Cowlitz to Issue Terminal Clearance at Ariel. Note:Maximum Generating capability at Merwin/Yale is 162 mw (Summer) and 210 mw (Winter). *PCC-706. Path(Impact):HYDROGEN-PACW (9999). *115kV,Continuous,Include Weekends*     2018-04-18 14:11     133504     2018-04-18 15:08  
  PPW 132910     6095     PPW     Difficulty-Shirley Basin 230 kV line          WAPAEAST-WAPANORTH(PPW) 
  WYOEAST-WYOCENTRAL(PPW)   
  170.0 
  950.0   
  170.0 
  950.0   
  161.0 
  920.0   
  2018-08-27 06:00 
  2018-08-27 06:00   
  2018-08-27 16:00 
  2018-08-27 16:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:A Condition Repair. Note:4A/4B Curve 103. WAPAEAST-WAPANORTH (Wheel) = 233. WYOEAST-WYOCENTRAL (4A) = 920.-Foote Creek, High Plains/McFadden Ridge, Seven Mile Hill & Dunlap Wind restricted to a combined total of 375 mw.-Potential Additional Real Time Miners Area Wind Generation restriction.. Path(Impact):WYOEAST-WYOCENTRAL(30)WAPAEAST-WAPANORTH (9). *230kV,Continuous,Include Weekends*     2018-05-08 08:47     132910     2018-05-17 16:33  
  PPW 128221     5806     PPW     BPA McNary-Roundup #1 230 kV line          PACW-NTLOAD(PPW)      9999.0      9999.0      0.0      2018-08-27 08:00      2018-08-30 16:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Pole Replacement. Note:Pendleton Area 69 kV load will be served from IPCo La Grande source. Network Load Service Arrangements may be required.. Path(Impact):PACW NTLOAD(9999). *230kV,Continuous,Include Weekends*     2017-12-08 09:31     128221      2017-12-08 09:31  
  PPW 129444     6000     PPW     Muddy Creek-Mountain Wind 138 kV line          WINDGEN-PACE(PPW)      9999.0      9999.0      0.0      2018-08-27 08:30      2018-08-30 14:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:WECC Maintenance, Test Relays. Note:Mountain Wind will be offline (60 MW). Path(Impact):WIND GEN-PACE(9999). *138kV,Continuous,Include Weekends*     2018-03-29 07:57     129444     2018-03-29 07:57  
  PPW 129742     5872     PPW     Burns: Series Cap Segment #1, Series Cap Segment #2          JBSN-JB345(PPW)      1600.0      1600.0      1600.0      2018-08-27 11:00      2018-08-31 14:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Cap Inspection and Testing. Note:JBSN-JB345 = 2100. PacifiCorp = 1400. IPCo = 700. -. Path(Impact):JBSN-JB345(200). *500kV,Continuous,Include Weekends*     2018-01-24 15:03     129742     2018-05-04 07:03  
  PPW 132911     6096     PPW     Freezeout-Standpipe 230 kV line          WAPAEAST-WAPANORTH(PPW) 
  WYOEAST-WYOCENTRAL(PPW)   
  170.0 
  950.0   
  170.0 
  950.0   
  132.0 
  813.0   
  2018-08-28 06:00 
  2018-08-28 06:00   
  2018-08-28 16:00 
  2018-08-28 16:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:A Condition Repair. Note:4A/4B 105. WAPAEAST-WAPANORTH (Wheel) = 204. WYOEAST-WYOCENTRAL (4A) = 813. 4B Limit = 864.-Potential Additional Real Time Miners Area Wind Generation restriction.-WAPA INFO 18-1569.. Path(Impact):WYOEAST-WYOCENTRAL(137)WAPAEAST-WAPANORTH (38). *230kV,Continuous,Include Weekends*     2018-05-08 09:06     132911     2018-05-17 16:31  
  PPW 134615     6120     PPW     Leaning Juniper: Total Plant Restriction          WINDGEN-PACW(PPW)      9999.0      9999.0      0.0      2018-08-28 08:00      2018-08-28 16:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Other Utility Request:Jones Canyon Sw Repair. Note:Leaning Juniper Wind Restricted to 66 MW Max.. Path(Impact):WIND GEN-PACW(9999). *Continuous,Include Weekends*     2018-05-17 16:28     134615     2018-05-17 16:28  
  PPW 132915     6097     PPW     Jim Bridger-Rock Springs 230 kV line          JBSN-WYOCENTRAL(PPW) 
  THERMALGEN-PACE(PPW) 
  WYOCENTRAL-JBSN(PPW)   
  600.0 
  9999.0 
  600.0   
  600.0 
  9999.0 
  600.0   
  400.0 
  0.0 
  400.0   
  2018-08-29 06:00 
  2018-08-29 06:00 
  2018-08-29 06:00   
  2018-09-02 16:00 
  2018-09-02 16:00 
  2018-09-02 16:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:A condition Maintenance. Note:No Impact to 4A/4B or WAPA E/N with one of two parallel lines out of service between Jim Bridger & Rock Springs. -JBSN-WYOC & WYOC-JBSN = 400. Potential Real Time Impact to Jim Bridger Generation.. Path(Impact):WYOCENTRAL-JBSN(200)JBSN-WYOCENTRAL(200)THERMAL GEN-PACE(9999). *230kV,Continuous,Include Weekends*     2018-05-08 09:27     132915     2018-05-08 09:27  
  PPW 136234     6183     PPW     Thermopolis: 230/115 kV Bank #2 (T3735)          TOT4B-WYONORTH(PPW) 
  WAPAEAST-WAPANORTH(PPW) 
  WYOEAST-TOT4B(PPW) 
  WYOEAST-WYOCENTRAL(PPW)   
  638.0 
  170.0 
  638.0 
  950.0   
  638.0 
  170.0 
  638.0 
  950.0   
  543.0 
  145.0 
  543.0 
  945.0   
  2018-08-29 07:00 
  2018-08-29 07:00 
  2018-08-29 07:00 
  2018-08-29 07:00   
  2018-08-31 12:00 
  2018-08-31 12:00 
  2018-08-31 12:00 
  2018-08-31 12:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:PACW to Issue a Clearance for Arrestor Replacement. Note:4A/4B Curve 114. WAPA E/N = 217. WYOE-WYOC (4A) = 945. WYOEAST-TOT4B & TOT4B-WYONORTH = 543. 4B Limit = 760.-Yellowtail South to be determined by WAPA.. Path(Impact):WYOEAST-WYOCENTRAL(5)WAPAEAST-WAPANORTH (25)TOT4B-WYONORTH(95)WYOEAST-TOT4B(95). *230kV,Continuous,Include Weekends*     2018-07-05 08:26     136234     2018-07-05 08:26  
  PPW 133500     6072     PPW     Merwin-Chelatchie Tap section of the Merwin-Yale 115 kV line          HYDROGEN-PACW(PPW) 

  HYDROGEN-PACW(PPW)   
  9999.0 

  9999.0   
  9999.0 

  9999.0   
  9999.0 

  0.0   
  2018-05-21 06:30 

  2018-09-04 06:30   
  2018-05-25 18:30 

  2018-09-07 18:30   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Construction:Substation Improvements. Note:Yale Generation unavailable (170 mw).. Path(Impact):HYDROGEN-PACW (9999). *115kV,Continuous,Return Weekends*     2018-04-25 07:30     133500     2018-05-03 10:10  
  PPW 133288     6027     PPW     BPA Troutdale: 230 kV Main Bus - East Section including CB A118 & A122 and -Troutdale-BPA Troutdale          GRESHAM-TROUTDALE(PPW) 
  TROUTDALE-GRESHAM(PPW)   
  548.0 
  548.0   
  548.0 
  548.0   
  402.0 
  402.0   
  2018-09-04 07:00 
  2018-09-04 07:00   
  2018-09-04 14:00 
  2018-09-04 14:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Separate CB A118 & A122 From Main Bus. Note:GRSM-TROUT & TROUT-GRSM = 402.. Path(Impact):GRESHAM-TROUTDALE(146)TROUTDALE-GRESHAM(146). *230kV,Continuous,Include Weekends*     2018-04-10 10:05     133288     2018-04-10 10:05  
  PPW 132956     6099     PPW     Echo Springs-Latham section of the Point of Rocks-Latham 230 kV line          WAPAEAST-WAPANORTH(PPW) 
  WYOEAST-WYOCENTRAL(PPW)   
  170.0 
  950.0   
  170.0 
  950.0   
  142.0 
  692.0   
  2018-09-06 06:00 
  2018-09-06 06:00   
  2018-09-06 15:00 
  2018-09-06 15:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:A Condition Repair. Note:4A/4B Curve 107. WAPAEAST-WAPANORTH (Wheel) = 214. WYOEAST-WYOCENTRAL (4A) = 692. 4B Limit = 875.-Pioneer, Foote Creek, High Plains/McFadden Ridge, Seven Mile Hill & Dunlap Wind restricted to a combined total of 375 mw..-Potential Additional Real Time Miners Area Wind Generation restriction.. Path(Impact):WYOEAST-WYOCENTRAL(258)WAPAEAST-WAPANORTH (28). *230kV,Continuous,Include Weekends*     2018-05-08 13:28     132956     2018-06-04 09:06  
  PPW 132959     6101     PPW     Casper-Riverton 230 kV line          TOT4B-WYONORTH(PPW) 
  WAPAEAST-WAPANORTH(PPW) 
  WYOEAST-TOT4B(PPW) 
  WYOEAST-WYOCENTRAL(PPW)   
  638.0 
  170.0 
  638.0 
  950.0   
  638.0 
  170.0 
  638.0 
  950.0   
  591.0 
  137.0 
  591.0 
  717.0   
  2018-09-10 06:00 
  2018-09-10 06:00 
  2018-09-10 06:00 
  2018-09-10 06:00   
  2018-09-12 16:00 
  2018-09-12 16:00 
  2018-09-12 16:00 
  2018-09-12 16:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:A condition arm replacement. Note:4A/4B Curve 118. WAPAEAST-WAPANORTH (Wheel) = 209. WYOEAST-WYOCENTRAL (4A) = 717. WYOEAST-TOT4B & TOT4B-WYONORTH = 591. 4B Limit = 800.. Path(Impact):WYOEAST-WYOCENTRAL(233)WAPAEAST-WAPANORTH (33)TOT4B-WYONORTH(47)WYOEAST-TOT4B(47). *230kV,Continuous,Include Weekends*     2018-05-08 13:40     132959     2018-05-09 10:25  
  PPW 131651     5941     PPW     BPA Salem-Dallas section of the BPA Salem-Monpac 115 kV line          PACW-NTLOAD(PPW)      9999.0      9999.0      0.0      2018-09-10 07:00      2018-09-15 17:30      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Structure and Insulator Replacements. Note:Network Load Service may need to arranged for Dallas & Independence via Monpac. (Monpac Sw 2M88 will be closed & Dallas Sw 2M150 will be open)-. Path(Impact):PACW NTLOAD(9999). *115kV,Continuous,Include Weekends*     2018-03-01 08:47     131651     2018-03-01 14:18  
  PPW 132960     6103     PPW     Riverton-Thermopolis 230 kV line          TOT4B-WYONORTH(PPW) 
  WAPAEAST-WAPANORTH(PPW) 
  WYOEAST-TOT4B(PPW) 
  WYOEAST-WYOCENTRAL(PPW)   
  638.0 
  170.0 
  638.0 
  950.0   
  638.0 
  170.0 
  638.0 
  950.0   
  589.0 
  148.0 
  589.0 
  888.0   
  2018-09-13 06:00 
  2018-09-13 06:00 
  2018-09-13 06:00 
  2018-09-13 06:00   
  2018-09-13 16:00 
  2018-09-13 16:00 
  2018-09-13 16:00 
  2018-09-13 16:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:A Condition Arm Replacement; PACE to Issue a Clearance to WAPA for Installing Aerial Marker Balls. Note:4A/4B Curve 116. WAPAEAST-WAPANORTH (Wheel) = 220. WYOEAST-WYOCENTRAL (4A) = 888. WYOEAST-TOT4B & TOT4B-WYONORTH = 589. 4B Limit = 809.. Path(Impact):WYOEAST-WYOCENTRAL(62)WAPAEAST-WAPANORTH (22)TOT4B-WYONORTH(49)WYOEAST-TOT4B(49). *230kV,Continuous,Include Weekends*     2018-05-08 13:53     132960     2018-07-17 15:38  
  PPW 132963     6104     PPW     Buffalo-MDU Sheridan 230 kV line          PACE-NTLOAD(PPW)      9999.0      9999.0      0.0      2018-09-17 06:00      2018-09-21 16:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:A condition Arm Replacement. Note:Alternate Transmission Arrangements may required for WyoDak Area Generation or to serve PacifiCorp Load.-No 4A/4B or WAPA Wheel impact as long as Sheridan is tied through to WyoDak via Tongue River.. Path(Impact):PACE NTLOAD(9999). *230kV,Continuous,Include Weekends*     2018-05-08 15:28     132963     2018-05-09 10:26  
  PPW 131653     5942     PPW     Dallas-Monpac section of the BPA Salem-Monpac 115 kV line          PACW-NTLOAD(PPW)      9999.0      9999.0      0.0      2018-09-17 07:00      2018-09-19 17:30      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Insulator Replacements. Note:Network Load Service may need to arranged for Independence via Monpac. (Monpac Sw 2M88 will be closed & Monpac Sw 2M139 and Dallas Sw 2M149 will be open). Path(Impact):PACW NTLOAD(9999). *115kV,Continuous,Include Weekends*     2018-03-01 08:50     131653     2018-03-01 14:17  
  PPW 130214     5874     PPW     PGE Bethel-Parrish Gap 230 kV line          BETHEL-PACW(PPW) 
  PACW-PACW.PGE(PPW) 
  PACW.PGE-PACW(PPW) 

  BETHEL-PACW(PPW) 
  PACW-PACW.PGE(PPW) 
  PACW.PGE-PACW(PPW) 

  BETHEL-PACW(PPW) 
  PACW-PACW.PGE(PPW) 
  PACW.PGE-PACW(PPW) 

  BETHEL-PACW(PPW) 
  PACW-PACW.PGE(PPW) 
  PACW.PGE-PACW(PPW)   
  0.0 
  320.0 
  320.0 

  0.0 
  320.0 
  320.0 

  0.0 
  320.0 
  320.0 

  0.0 
  320.0 
  320.0   
  0.0 
  320.0 
  320.0 

  0.0 
  320.0 
  320.0 

  0.0 
  320.0 
  320.0 

  0.0 
  320.0 
  320.0   
  0.0 
  320.0 
  320.0 

  0.0 
  320.0 
  320.0 

  0.0 
  320.0 
  320.0 

  0.0 
  159.0 
  159.0   
  2018-04-02 08:00 
  2018-04-02 08:00 
  2018-04-02 08:00 

  2018-05-14 08:00 
  2018-05-14 08:00 
  2018-05-14 08:00 

  2018-05-23 08:00 
  2018-05-23 08:00 
  2018-05-23 08:00 

  2018-09-17 08:00 
  2018-09-17 08:00 
  2018-09-17 08:00   
  2018-04-20 16:00 
  2018-04-20 16:00 
  2018-04-20 16:00 

  2018-05-23 08:00 
  2018-05-23 08:00 
  2018-05-23 08:00 

  2018-06-01 16:00 
  2018-06-01 16:00 
  2018-06-01 16:00 

  2018-10-05 16:00 
  2018-10-05 16:00 
  2018-10-05 16:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:PAC to Issue Terminal Clearance at Parrish for PGE Installation of CT for New EIM Metering; PGE to Issue Terminal Clearance at Bethel; Repair Broken Cross-Arm. Note:BETHEL-PACW = 0. PACW-BETHEL = Parrish Gap Load.-PACW-PGE.PACW & PACW.PGE-PACW = 159 Summer/149 Winter-Eliminates Network Load Service from Troutdale to Fry. Elminates C&T Point to Point Service from Troutdale to Summer Lake.. Path(Impact):BETHEL-PACW(402)PACW-PACW.PGE(161)PACW.PGE-PACW(161). *230kV,Continuous,Include Weekends*     2018-01-24 15:20     130214     2018-04-12 09:35  
  PPW 136804     6198     PPW     Big Grassy-Jefferson 161 kV line (Jefferson - Idaho: CB 163)          PACE-NTLOAD(PPW)      9999.0      9999.0      0.0      2018-09-17 08:00      2018-10-12 15:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Change Out Line and Bus Switches and Bypass Switch to CB 163 at Jefferson. Note:Big Grassy 69 kV Load will be served by NWE from Millcreek via Dillon/Dell. Network Load Service Arrangements may be required.-Any path restrictions are to be determined by NWE.. Path(Impact):PACE NTLOAD(9999). *161kV,Continuous,Include Weekends*     2018-07-19 14:23     136804     2018-07-19 14:24  
  PPW 131654     5940     PPW     Goshen-EPUD Creswell section of the BPA Alvey-Martin Creek 115 kV line          PACW-NTLOAD(PPW)      9999.0      9999.0      0.0      2018-09-20 07:00      2018-09-20 17:30      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Reframes. Note:Village Green load will be served from BPA Martin Creek substation. Network load service may be required.. Path(Impact):PACW NTLOAD(9999). *115kV,Continuous,Include Weekends*     2018-03-01 08:37     131654     2018-03-01 08:57  
  PPW 133289     6028     PPW     BPA Troutdale: 230 kV Main Bus - East Section including CB A118 & A122 and -Troutdale-BPA Troutdale          GRESHAM-TROUTDALE(PPW) 
  TROUTDALE-GRESHAM(PPW)   
  548.0 
  548.0   
  548.0 
  548.0   
  402.0 
  402.0   
  2018-09-21 10:00 
  2018-09-21 10:00   
  2018-09-21 16:30 
  2018-09-21 16:30   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Reconnect CB A118 & A122 To Main Bus. Note:GRSM-TROUT & TROUT-GRSM = 402.. Path(Impact):GRESHAM-TROUTDALE(146)TROUTDALE-GRESHAM(146). *230kV,Continuous,Include Weekends*     2018-04-10 10:06     133289     2018-04-10 10:06  
  PPW 132965     6105     PPW     Kaycee-Midwest section of the Buffalo-Claim Jumper 230 kV line          TOT4B-WYONORTH(PPW) 
  WAPAEAST-WAPANORTH(PPW) 
  WYOEAST-TOT4B(PPW) 
  WYOEAST-WYOCENTRAL(PPW)   
  638.0 
  170.0 
  638.0 
  950.0   
  638.0 
  170.0 
  638.0 
  950.0   
  600.0 
  145.0 
  600.0 
  945.0   
  2018-09-24 06:00 
  2018-09-24 06:00 
  2018-09-24 06:00 
  2018-09-24 06:00   
  2018-09-25 16:00 
  2018-09-25 16:00 
  2018-09-25 16:00 
  2018-09-25 16:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:A Condition Maintenance. Note:4A/4B Curve 119. WAPAEAST-WAPANORTH (Wheel) = 217. WYOEAST-WYOCENTRAL (4A) = 945. WYOEAST-TOT4B & TOT4B-WYONORTH = 600. 4B Limit = 817.. Path(Impact):WYOEAST-WYOCENTRAL(5)WAPAEAST-WAPANORTH (25)TOT4B-WYONORTH(38)WYOEAST-TOT4B(38). *230kV,Continuous,Include Weekends*     2018-05-09 08:22     132965     2018-05-17 16:32  
  PPW 131655     5939     PPW     EPUD Creswell-Village Green section of the BPA Alvey-BPA Martin Creek 115 kV line          PACW-NTLOAD(PPW)      9999.0      9999.0      0.0      2018-09-24 07:00      2018-09-26 17:30      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Reframes. Note:Village Green load will be served from BPA Martine Creek. Network load service may be required.. Path(Impact):PACW NTLOAD(9999). *115kV,Continuous,Include Weekends*     2018-03-01 08:24     131655     2018-03-01 08:52  
  PPW 131718     5967     PPW     Union Gap-BPA Midway 230 kV line mitigated with -Hopland-Union Gap section of the BPA Moxee-Union Ga          MIDWAY230-PACW(PPW) 
  PACW-MIDWAY230(PPW) 
  PACW-NTLOAD(PPW) 

  MIDWAY230-PACW(PPW) 
  PACW-MIDWAY230(PPW) 
  PACW-NTLOAD(PPW) 

  MIDWAY230-PACW(PPW) 
  PACW-MIDWAY230(PPW) 
  PACW-NTLOAD(PPW) 

  MIDWAY230-PACW(PPW) 
  PACW-MIDWAY230(PPW) 
  PACW-NTLOAD(PPW) 

  MIDWAY230-PACW(PPW) 
  PACW-MIDWAY230(PPW) 
  PACW-NTLOAD(PPW) 

  MIDWAY230-PACW(PPW) 
  PACW-MIDWAY230(PPW) 
  PACW-NTLOAD(PPW) 

  MIDWAY230-PACW(PPW) 
  PACW-MIDWAY230(PPW) 
  PACW-NTLOAD(PPW) 

  MIDWAY230-PACW(PPW) 
  PACW-MIDWAY230(PPW) 
  PACW-NTLOAD(PPW) 

  MIDWAY230-PACW(PPW) 
  PACW-MIDWAY230(PPW) 
  PACW-NTLOAD(PPW) 

  MIDWAY230-PACW(PPW) 
  PACW-MIDWAY230(PPW) 
  PACW-NTLOAD(PPW)   
  150.0 
  150.0 
  9999.0 

  150.0 
  150.0 
  9999.0 

  150.0 
  150.0 
  9999.0 

  150.0 
  150.0 
  9999.0 

  150.0 
  150.0 
  9999.0 

  150.0 
  150.0 
  9999.0 

  150.0 
  150.0 
  9999.0 

  150.0 
  150.0 
  9999.0 

  150.0 
  150.0 
  9999.0 

  150.0 
  150.0 
  9999.0   
  150.0 
  150.0 
  9999.0 

  150.0 
  150.0 
  9999.0 

  150.0 
  150.0 
  9999.0 

  150.0 
  150.0 
  9999.0 

  150.0 
  150.0 
  9999.0 

  150.0 
  150.0 
  9999.0 

  150.0 
  150.0 
  9999.0 

  150.0 
  150.0 
  9999.0 

  150.0 
  150.0 
  9999.0 

  150.0 
  150.0 
  9999.0   
  150.0 
  150.0 
  9999.0 

  150.0 
  150.0 
  9999.0 

  150.0 
  150.0 
  9999.0 

  150.0 
  150.0 
  9999.0 

  150.0 
  150.0 
  9999.0 

  0.0 
  0.0 
  0.0 

  0.0 
  0.0 
  0.0 

  0.0 
  0.0 
  0.0 

  0.0 
  0.0 
  0.0 

  0.0 
  0.0 
  0.0   
  2018-05-14 08:00 
  2018-05-14 08:00 
  2018-05-14 08:00 

  2018-05-15 08:00 
  2018-05-15 08:00 
  2018-05-15 08:00 

  2018-05-16 08:00 
  2018-05-16 08:00 
  2018-05-16 08:00 

  2018-05-17 08:00 
  2018-05-17 08:00 
  2018-05-17 08:00 

  2018-05-18 08:00 
  2018-05-18 08:00 
  2018-05-18 08:00 

  2018-09-24 08:00 
  2018-09-24 08:00 
  2018-09-24 08:00 

  2018-09-25 08:00 
  2018-09-25 08:00 
  2018-09-25 08:00 

  2018-09-26 08:00 
  2018-09-26 08:00 
  2018-09-26 08:00 

  2018-09-27 08:00 
  2018-09-27 08:00 
  2018-09-27 08:00 

  2018-09-28 08:00 
  2018-09-28 08:00 
  2018-09-28 08:00   
  2018-05-14 17:00 
  2018-05-14 17:00 
  2018-05-14 17:00 

  2018-05-15 17:00 
  2018-05-15 17:00 
  2018-05-15 17:00 

  2018-05-16 17:00 
  2018-05-16 17:00 
  2018-05-16 17:00 

  2018-05-17 17:00 
  2018-05-17 17:00 
  2018-05-17 17:00 

  2018-05-18 17:00 
  2018-05-18 17:00 
  2018-05-18 17:00 

  2018-09-24 17:00 
  2018-09-24 17:00 
  2018-09-24 17:00 

  2018-09-25 17:00 
  2018-09-25 17:00 
  2018-09-25 17:00 

  2018-09-26 17:00 
  2018-09-26 17:00 
  2018-09-26 17:00 

  2018-09-27 17:00 
  2018-09-27 17:00 
  2018-09-27 17:00 

  2018-09-28 17:00 
  2018-09-28 17:00 
  2018-09-28 17:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:BPA to issue a Terminal Clearance at Midway A998 Terminal; Transferring and Replacing 3 Pole Structure 3/17; Transfer Hopland to BPA Moxee source. Note:MIDW2-PACW & PACW-MIDW2 = 0.-Hopland will be fed radially from BPA Moxee source, network load service may be required.-Reduces Yakima Area Load Service Capability. Path(Impact):MIDWAY230-PACW(150)PACW-MIDWAY230(150)PACW NTLOAD(9999). *230kV,Daily,Include Weekends*     2018-03-09 11:29     131718     2018-05-02 15:27  
  PPW 135197     6137     PPW     BPA Ross-Woodland Tap-BPA Lexington 230 kV line including-Swift #2-Woodland Tap 230 kV line          HYDROGEN-PACW(PPW) 
  PACW-WOODLANDTAP(PPW) 
  WOODLANDTAP-PACW(PPW)   
  9999.0 
  370.0 
  370.0   
  9999.0 
  370.0 
  370.0   
  0.0 
  0.0 
  0.0   
  2018-09-24 08:00 
  2018-09-24 08:00 
  2018-09-24 08:00   
  2018-09-30 16:30 
  2018-09-30 16:30 
  2018-09-30 16:30   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Other Utility Request:Replace Disconnects A1010, A1008, & A1009. Note:Swift #1 & #2 Generation unavailable (333 mw).-PACW-WOODLANDTAP & WOODLANDTAP-PACW = 0.. Path(Impact):HYDROGEN-PACW (9999)PACW-WOODLANDTAP(370)WOODLANDTAP-PACW(370). *230kV,Continuous,Include Weekends*     2018-06-05 13:57     135197     2018-06-15 15:38  
  PPW 131007     5905     PPW     Sheridan-Yellowtail 230 kV line          TOT4B-WYONORTH(PPW) 
  WAPAEAST-WAPANORTH(PPW) 
  WYOEAST-TOT4B(PPW) 
  WYOEAST-WYOCENTRAL(PPW) 

  TOT4B-WYONORTH(PPW) 
  WAPAEAST-WAPANORTH(PPW) 
  WYOEAST-TOT4B(PPW) 
  WYOEAST-WYOCENTRAL(PPW)   
  638.0 
  170.0 
  638.0 
  950.0 

  638.0 
  170.0 
  638.0 
  950.0   
  638.0 
  170.0 
  638.0 
  950.0 

  638.0 
  170.0 
  638.0 
  950.0   
  638.0 
  170.0 
  638.0 
  950.0 

  508.0 
  102.0 
  508.0 
  930.0   
  2018-05-01 06:00 
  2018-05-01 06:00 
  2018-05-01 06:00 
  2018-05-01 06:00 

  2018-10-01 06:00 
  2018-10-01 06:00 
  2018-10-01 06:00 
  2018-10-01 06:00   
  2018-05-29 16:30 
  2018-05-29 16:30 
  2018-05-29 16:30 
  2018-05-29 16:30 

  2018-10-29 16:30 
  2018-10-29 16:30 
  2018-10-29 16:30 
  2018-10-29 16:30   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:24 A Condition Structure Replacements. Note:4A/4B Curve 109. WAPAEAST-WAPANORTH (Wheel) = 174. WYOEAST-WYOCENTRAL (4A) = 930. WYOEAST-TOT4B & TOT4B-WYONORTH = 508. 4B Limit = 682. -Yellowtail South limit to be determined by WAPA.. Path(Impact):WYOEAST-WYOCENTRAL(20)WAPAEAST-WAPANORTH (68)TOT4B-WYONORTH(130)WYOEAST-TOT4B(130). *230kV,Continuous,Include Weekends*     2018-02-14 15:31     131007     2018-03-23 08:57  
  PPW 120995     5459     PPW     BPA McNary-Roundup #1 230 kV line          PACW-NTLOAD(PPW)      9999.0      9999.0      0.0      2018-10-04 07:30      2018-10-05 16:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:Fiber Replacement. Note:Pendleton Area 69 kV load will be served from IPCo La Grande source. Network Load Service Arrangements may be required.. Path(Impact):PACW NTLOAD(9999). *230kV,Continuous,Include Weekends*     2017-07-06 13:37     120995      2017-07-06 13:37  
  PPW 122729     5541     PPW     BPA McNary-Dalreed section of the BPA McNary-Jones Canyon 230 kV line (Morrow Flat-Dalreed section)          PACW-NTLOAD(PPW) 
  WINDGEN-PACW(PPW)   
  9999.0 
  9999.0   
  9999.0 
  9999.0   
  0.0 
  0.0   
  2018-10-08 06:30 
  2018-10-08 06:30   
  2018-10-08 17:00 
  2018-10-08 17:00   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Other Utility Request:Fiber Replacement Within Boardman Substation Bay 4 Tower 1/1.. Note:Dalreed will be radial from BPA Jones Canyon. Network Load Service Arrangements may be required. Leaning Juniper Generation must be off line before switching the BPA Jones Canyon-Dalreed line section out of service and again before switching it back in service. During the line outage, Leaning Juniper Generation is restricted to 40 mw.. Path(Impact):WIND GEN-PACW(9999)PACW NTLOAD(9999). *230kV,Continuous,Include Weekends*     2017-08-10 09:37     122729      2017-08-10 09:43  
  PPW 134311     6151     PPW     Hemingway-Summer Lake 500 kV line          H500-SMLK(PPW) 
  JBSN-JB345(PPW) 
  PACW-NTLOAD(PPW) 
  SMLK-H500(PPW) 

  H500-SMLK(PPW) 
  JBSN-JB345(PPW) 
  PACW-NTLOAD(PPW) 
  SMLK-H500(PPW)   
  1500.0 
  1600.0 
  9999.0 
  100.0 

  1500.0 
  1600.0 
  9999.0 
  100.0   
  1500.0 
  1600.0 
  9999.0 
  100.0 

  1500.0 
  1600.0 
  9999.0 
  100.0   
  1500.0 
  1600.0 
  9999.0 
  100.0 

  0.0 
  1467.0 
  0.0 
  0.0   
  2018-10-01 08:00 
  2018-10-01 08:00 
  2018-10-01 08:00 
  2018-10-01 08:00 

  2018-10-08 08:00 
  2018-10-08 08:00 
  2018-10-08 08:00 
  2018-10-08 08:00   
  2018-10-05 16:30 
  2018-10-05 16:30 
  2018-10-05 16:30 
  2018-10-05 16:30 

  2018-10-12 16:30 
  2018-10-12 16:30 
  2018-10-12 16:30 
  2018-10-12 16:30   
  SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Maintenance:BPA DCC to issue a Terminal Clearance at Summer Lake; IPCo to issue a Terminal Clearance at Hemingway; Insulator Washing and Bird Deflector Installation. Note:H500-SMLK & SMLK-H500 = 0.-JBSN-JB345 = 2200. PacifiCorp = 1467. IPCo = 733.-Network Load Service Arrangements may be required for Southern Oregon Load.. Path(Impact):JBSN-JB345(133)PACW NTLOAD(9999)SMLK-H500(100)H500-SMLK(1500). *500kV,Continuous,Include Weekends*     2018-06-07 15:01     134311     2018-06-29 10:36  
  PPW 129257     5842     PPW     Three Mile Canyon: CB 4K2          WINDGEN-PACW(PPW)      9999.0      9999.0      0.0      2018-10-19 08:00      2018-10-19 16:00      SCHEDULED     TRANSMISSION     PLANNED      ONPATH     PPW     Customer Request:Grid Operator to Issue a Terminal Clearance for Three Mile Canyon Wind Farm Transformer Maintenance. Note:Three Mile Canyon Wind Generation will not be available.. Path(Impact):WIND GEN-PACW(9999). *34.5kV,Continuous,Include Weekends*     2018-01-04 14:11     129257      2018-01-04 14:12  
PRPA Outages:
  CRAIG - AULT (PLANNED)     64421     PRPA     Craig-Ault 345kV line          AU-CRG(PRPA) 
  CRG-AU(PRPA) 
  CRG-HDN(PRPA) 
  HDN-BLUE(PRPA)   
  151.0 
  190.0 
  0.0 
  0.0   
  151.0 
  190.0 
  0.0 
  0.0   
  0.0 
  0.0 
  66.0 
  66.0   
  2018-08-06 07:00 
  2018-08-06 07:00 
  2018-08-06 07:00 
  2018-08-06 07:00   
  2018-08-12 17:00 
  2018-08-12 17:00 
  2018-08-12 17:00 
  2018-08-12 17:00   
  Scheduled     TRANSMISSION     PLANNED      TOT 5     PRPA     Craig-Ault Planned Outage     2018-07-12 09:00     PRPA29639      2018-07-12 09:00  
  TOT-5 OUTAGE (PLANNED)     64431     PRPA     Craig-Hayden #2 230kV line          AU-CRG(PRPA) 
  CRG-AU(PRPA)   
  151.0 
  190.0   
  151.0 
  190.0   
  150.0 
  117.0   
  2018-08-14 08:00 
  2018-08-14 08:00   
  2018-08-15 16:00 
  2018-08-15 16:00   
  Scheduled     TRANSMISSION     PLANNED      TOT 5     PRPA     Craig-Hayden #2 230kV line     2018-07-12 09:57     PRPA29641      2018-07-12 09:57  
  CRAIG - AULT (PLANNED)     64426     PRPA     Craig-Ault 345kV line          AU-CRG(PRPA) 
  CRG-AU(PRPA) 
  CRG-HDN(PRPA) 
  HDN-BLUE(PRPA)   
  151.0 
  190.0 
  0.0 
  0.0   
  151.0 
  190.0 
  0.0 
  0.0   
  0.0 
  0.0 
  66.0 
  66.0   
  2018-08-20 07:00 
  2018-08-20 07:00 
  2018-08-20 07:00 
  2018-08-20 07:00   
  2018-08-24 17:00 
  2018-08-24 17:00 
  2018-08-24 17:00 
  2018-08-24 17:00   
  Scheduled     TRANSMISSION     PLANNED      TOT 5     PRPA     Craig-Ault Planned Outage     2018-07-12 09:25     PRPA29640      2018-07-12 09:25  
PSCO Outages:
  TOT 2A RESTRICTION     58017     PSCO     Nucla Offline          TOT2AN-TOT2AS(PSCO) 
  TOT2AS-TOT2AN(PSCO) 

  TOT2AN-TOT2AS(PSCO) 
  TOT2AS-TOT2AN(PSCO) 

  TOT2AN-TOT2AS(PSCO) 
  TOT2AS-TOT2AN(PSCO) 

  TOT2AN-TOT2AS(PSCO) 
  TOT2AS-TOT2AN(PSCO) 

  TOT2AN-TOT2AS(PSCO) 
  TOT2AS-TOT2AN(PSCO) 

  TOT2AN-TOT2AS(PSCO) 
  TOT2AS-TOT2AN(PSCO) 

  TOT2AN-TOT2AS(PSCO) 
  TOT2AS-TOT2AN(PSCO)   
  60.0 
  200.0 

  60.0 
  200.0 

  60.0 
  200.0 

  60.0 
  200.0 

  60.0 
  200.0 

  60.0 
  200.0 

  60.0 
  200.0   
  60.0 
  200.0 

  60.0 
  200.0 

  60.0 
  200.0 

  60.0 
  200.0 

  60.0 
  200.0 

  60.0 
  200.0 

  60.0 
  200.0   
  0.0 
  100.0 

  0.0 
  100.0 

  20.0 
  150.0 

  0.0 
  150.0 

  20.0 
  150.0 

  0.0 
  150.0 

  0.0 
  150.0   
  2017-05-03 23:00 
  2017-05-03 23:00 

  2017-12-31 23:00 
  2017-12-31 23:00 

  2018-06-01 11:09 
  2018-06-01 11:09 

  2018-06-18 21:00 
  2018-06-18 21:00 

  2018-06-19 23:00 
  2018-06-19 23:00 

  2018-06-20 21:21 
  2018-06-20 21:21 

  2018-06-27 09:35 
  2018-06-27 09:35   
  2017-12-31 23:00 
  2017-12-31 23:00 

  2018-06-01 11:09 
  2018-06-01 11:09 

  2018-06-18 21:00 
  2018-06-18 21:00 

  2018-06-19 23:00 
  2018-06-19 23:00 

  2018-06-20 21:21 
  2018-06-20 21:21 

  2018-06-27 09:35 
  2018-06-27 09:35 

  2018-12-31 23:00 
  2018-12-31 23:00   
  Active     TRANSMISSION     PLANNED      ONPATH     PSCO     Nucla will be Offline thru the end off the year, limiting TOT 2A. Limit is dynamic     2017-05-03 17:00     PSCO26856      2018-06-27 09:36  
  PAWNEE AREA GENERATION     63281     PSCO     Multiple Transmission Lines          GENERATOR-PSCO(PSCO)      9999.0      9999.0      9999.0      2018-06-04 06:00      2018-07-28 20:00      Active     TRANSMISSION     PLANNED      ONPATH     PSCO     Pawnee Area Generation (Limon, Cedar Point, Logan, Pawnee, Manchief and Brush Units) limited to 1700 Mw Max.     2018-06-01 13:46     PSCO29295      2018-06-26 16:15  
  COMANCHE AREA GENERATION     63283     PSCO     Multiple Transmission Lines          GENERATOR-PSCO(PSCO)      9999.0      9999.0      9999.0      2018-06-04 06:00      2018-07-28 20:00      Active     TRANSMISSION     PLANNED      ONPATH     PSCO     Comanche Area Generation (Coma Units 1,2 &3, Coma Solar, FVAL, Lamar DC Tie Imports(exports subtract from total), Golden West and COLG/TWIN wind) limited to 2100 Mw Max.     2018-06-01 13:51     PSCO29296      2018-06-01 13:51  
  DENVER METRO GENERATION     63285     PSCO     Multiple Transmission Lines          GENERATOR-PSCO(PSCO)      9999.0      9999.0      9999.0      2018-06-04 14:00      2018-07-28 20:00      Active     TRANSMISSION     PLANNED      ONPATH     PSCO     Metro Area Generation (Cherokee 5,6&7 and Arapahoe Units) limited to a MINIMUM of 400 Mw total.     2018-06-01 13:55     PSCO29297      2018-06-22 14:22  
  CHEROKEE #4 GEN     63662     PSCO     Cherokee 4          GENERATOR-PSCO(PSCO)      9999.0      9999.0      9999.0      2018-06-26 16:00      2018-09-15 18:00      Active     TRANSMISSION     PLANNED      ONPATH     PSCO     Due to transmission constraint Cherokee 4 is a must run at a minimum of 200MW.     2018-06-22 14:23     PSCO29424      2018-06-22 14:24  
  TOT 5 RESTRICTION     64300     PSCO     5785 WOLC-COOL line outage          TOT5W-TOT5E(PSCO)      480.0      480.0      268.0      2018-07-09 07:00      2018-07-27 18:00      Cancelled     TRANSMISSION     PLANNED      ONPATH     PSCO     TOT 5 restriction due to 5785 WOLC-COOL line outage. PSCo share 268MWs     2018-07-03 12:48     PSCO29580      2018-07-06 14:58  
  LAMAR-BOONE     64437     PSCO     Lamar-Boone          LAMR230-BOON(PSCO) 

  LAMR230-BOON(PSCO)   
  196.0 

  196.0   
  196.0 

  196.0   
  196.0 

  196.0   
  2018-07-12 22:00 

  2018-07-16 07:56   
  2018-07-12 23:00 

  2028-07-12 23:00   
  Active     TRANSMISSION     FORCED      ONPATH     PSCO     Due to transmission utilization of the line, the LAMR230-BOON transmission line will be limited at times to a value between 0 MW and 196 MW E-W.     2018-07-12 21:40     PSCO29643      2018-07-16 07:56  
  MISSILE SITE GENERATION     64350     PSCO               GENERATOR-PSCO(PSCO)      9999.0      9999.0      9999.0      2018-07-30 08:00      2018-10-31 20:00      Scheduled     GENERATION     FORCED      ONPATH     PSCO     Limon 1,2,3 Wind Gen, CEPT Wind, Titan Solar & Rush Creek 1 limited to 1100MWs total into MSST     2018-07-05 14:58     PSCO29610      2018-07-16 11:41  
  PAWNEE AREA GENERATION     64356     PSCO     PAWN, MANC, Logan, Brush and MSST generation          GENERATOR-PSCO(PSCO)      9999.0      9999.0      9999.0      2018-07-30 08:00      2018-10-31 23:00      Scheduled     GENERATION     FORCED      ONPATH     PSCO     PAWN, MANC, Logan, Brush and MSST generation limited to 1980MW total     2018-07-05 15:07     PSCO29613      2018-07-05 15:07  
PSEI Outages:
  TPWR-PSEI limitation     83901     PSEI     Breaker 825 CT rating limitation          PSEI.SYSTEM-TPWR.STAR(PSEI) 
  TPWR.STAR-PSEI.SYSTEM(PSEI)   
  240.0 
  240.0   
  240.0 
  240.0   
  228.0 
  228.0   
  2010-11-01 15:00 
  2010-11-01 15:00   
  2030-11-01 00:00 
  2030-11-01 00:00   
  Active     TRANSMISSION     FORCED      ONPATH     PSEI     Breaker 825 has CT rating limiting transfers both directions to 228 MWs     2010-11-01 14:52     PSEI38337      2010-11-01 14:52  
  NewRevised CENT-PSEI     84264     PSEI     Centralia-Tono path          CENTRALIA-PSEI.SYSTEM(PSEI)      400.0      400.0      398.0      2010-11-08 16:00      2030-01-01 00:00      Active     TRANSMISSION     FORCED      ONPATH     PSEI     CT's in the Tono transformer have a rating factor of 1.0 so should be limited to 398 MVA on the Tono banks (2000:5 CT ratio) with the current metering.     2010-11-08 15:44     PSEI38514      2010-11-08 15:44  
  JD-COB Uprate 2011     98437     PSEI     Pacific AC Intertie          JOHNDAY-COB(PSEI)      400.0      0.0      350.0      2011-08-01 00:00      2040-01-01 00:00      Active     TRANSMISSION     PLANNED      ONPATH     PSEI     BPAT is path operator - determines OTC and PSEIs share - uprate project complete, posting 350 MW year round for forward sales     2011-07-27 17:06     PSEI44671      2011-07-27 17:06  
  JD-COB Upgrade     100195     PSEI     Pacific AC Intertie          JOHNDAY-COB(PSEI)      400.0      0.0      400.0      2011-10-01 00:00      2041-10-01 00:00      Active     TRANSMISSION     PLANNED      ONPATH     PSEI     BPAT completed upgrade project - PSEI management determined PSEIs share 400 year around     2011-08-30 14:22     PSEI45364      2011-08-30 14:22  
  New PSEI-SUMAS TTC     106292     PSEI     City of Sumas          PSEI.SYSTEM-SUMAS(PSEI)      7.0      0.0      10.0      2012-01-01 00:00      2028-10-01 00:00      Active     TRANSMISSION     PLANNED      ONPATH     PSEI     Studies associated with Network Service to this load show increased capacity to serve load     2011-11-18 14:04     PSEI47219      2011-11-18 14:04  
  LongTerm PSEI-BCUS Adjust     112594     PSEI     Westside Northern Intertie          PSEI.SYSTEM-BC.US.BORDER(PSEI)      200.0      200.0      193.0      2013-01-01 00:00      2023-12-31 00:00      Active     Transmission     Planned      OnPath     PSEI     BPAT is path operator - determines OTC and PSEIs share. BPAT applying a margin to South to North rating.     2012-03-12 11:36     PSEI48922      2012-03-13 13:13  
  CENTRALIA-PSEI.SYSTEM     170800     PSEI     Tono          CENTRALIA-PSEI.SYSTEM(PSEI)      400.0      0.0      400.0      2014-11-26 12:00      2040-11-26 00:00      Active     TRANSMISSION     PLANNED      ONPATH     PSEI     contract limit     2014-11-26 10:47     PSEI70549      2014-11-26 10:47  
SMD1 Outages:
  MLN-RND MT #1 500KV     132179     BANC     MLN-RDM #1 7/23-9/23          COTP N-S(BANC) 
  COTP S-N(BANC)   
  4800.0 
  3675.0   
  4800.0 
  3675.0   
  3180.0 
  3675.0   
  2018-07-23 07:00 
  2018-07-23 07:00   
  2018-09-23 18:00 
  2018-09-23 18:00   
  Cancelled     TRANSMISSION     PLANNED      ONPATH     BANC,SMD1,TANC     COI N>S 3180 MW, S>N 3675 MW. Vaca-Tesla 500KV Line Series Cap Bank seg 1&2 in conjunction with MLN-RDM #1 500KV line. CISO work, replace insulators     2018-03-27 20:59     BANC51388      2018-06-06 10:45  
  TABLE MTN 500kV SC4     131033     BANC     TABLE MTN SERIES CAP SC4          COTP N-S(BANC)      4800.0      4800.0      4654.0      2018-09-04 06:00      2018-11-05 06:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     BANC,SMD1,TANC     COI N>S 4654MWs: TBM Series CAP SC4 cleared to allow replacement of Series CAP SC4.     2017-12-18 18:39     BANC51197      2018-04-16 23:31  
  TRY/TES 230KV TIE     131545     BANC     TES/TRY 230kV Tie limited to 657MW, 18-00679,TES-T          S-TESLA230-TRY230(BANC) 
  S-TRY230-TESLA230(BANC)   
  1314.0 
  1314.0   
  1314.0 
  1314.0   
  657.0 
  657.0   
  2018-09-14 07:00 
  2018-09-14 07:00   
  2018-09-14 16:00 
  2018-09-14 16:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     BANC,SMD1,TANC     TES/TRY 230kV Tie limited to 657MW, 18-00679,TES-TRY #1-230kV Line OOS     2018-02-14 10:34     BANC51293      2018-02-14 10:34  
  TRY-LLL 230KV LINE     131529     BANC     LLL/TES limited to Zero exports, 80MW Imports, 18-          S-LLL115-NP15(BANC) 
  S-NP15-LLL115(BANC)   
  120.0 
  120.0   
  120.0 
  120.0   
  0.0 
  80.0   
  2018-09-25 06:00 
  2018-09-25 06:00   
  2018-09-25 12:00 
  2018-09-25 12:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     BANC,SMD1,TANC     LLL/TES limited to Zero exports, 80MW Imports, 18-00664, TRY-LLL 230kV Line OOS-WASH     2018-02-14 06:11     BANC51288      2018-02-14 06:11  
  HUR TIE LIMIT     131503     SMD1     HUR/TRY tie limited to 1106, 18-000663, HUR-TRY #2          HUR230-SMUD.LIMIT(SMD1) 
  SMUD.SYSTEM-HUR230(SMD1)   
  1499.0 
  1499.0   
  1499.0 
  1499.0   
  1106.0 
  1106.0   
  2018-09-25 07:00 
  2018-09-25 07:00   
  2018-09-25 12:00 
  2018-09-25 12:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     SMD1     HUR/TRY tie limited to 1106, 18-000663, HUR-TRY #2 OOS,      2018-02-13 14:46     SMD151283      2018-02-13 14:46  
  HUR TIE LIMIT     131532     SMD1     HUR/TRY Tie limited to 1142MW, 18-00668, HUR-TRY #          HUR230-SMUD.LIMIT(SMD1) 
  SMUD.SYSTEM-HUR230(SMD1)   
  1499.0 
  1499.0   
  1499.0 
  1499.0   
  1142.0 
  1142.0   
  2018-09-25 12:00 
  2018-09-25 12:00   
  2018-09-25 17:00 
  2018-09-25 17:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     SMD1     HUR/TRY Tie limited to 1142MW, 18-00668, HUR-TRY #1-230kV Line OOS     2018-02-14 07:09     SMD151289      2018-02-14 07:09  
  TRY/TES 230KV TIE     131548     BANC     TES-TRY #1 #2 230kV Lines          S-TESLA230-TRY230(BANC) 
  S-TRY230-TESLA230(BANC)   
  1314.0 
  1314.0   
  1314.0 
  1314.0   
  0.0 
  0.0   
  2018-09-26 04:00 
  2018-09-26 04:00   
  2018-09-26 10:00 
  2018-09-26 10:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     BANC,SMD1,TANC     TES-TRY #1 & #2 230kV Lines OOS; TES/TRY Tie from 1314 MW to zero. TRY STA WASH DAY 3     2018-02-14 14:08     BANC51294      2018-02-14 14:08  
  JOHN DAY-GRIZZLY #1 500KV     133491     BANC     BPA -JOHN DAY-GRIZZLY 1 500kv Line          COTP N-S(BANC) 
  COTP S-N(BANC)   
  4800.0 
  3675.0   
  4800.0 
  3675.0   
  2300.0 
  2450.0   
  2018-10-01 09:00 
  2018-10-01 09:00   
  2018-10-05 17:00 
  2018-10-05 17:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     BANC,SMD1,TANC     BPA John Day-Grizzly 1 500kv Line, replace static line N>S 2300MW, S>N 2450MW     2018-06-27 18:13     BANC51535      2018-06-27 18:13  
  HUR TIE LIMIT     133697     SMD1     HUR-TRY #1 230kV           HUR230-SMUD.LIMIT(SMD1) 
  SMUD.SYSTEM-HUR230(SMD1)   
  1499.0 
  1499.0   
  1499.0 
  1499.0   
  1142.0 
  1142.0   
  2018-10-19 08:30 
  2018-10-19 08:30   
  2018-10-22 16:00 
  2018-10-22 16:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     SMD1     HUR-TRY #1 230kV OOS; SMUD/WASN HUR TIE 1499/1142MW     2018-07-12 08:04     SMD151556      2018-07-12 08:04  
  HUR TIE LIMIT     133701     SMD1     HUR-TRY #2 230kV line          HUR230-SMUD.LIMIT(SMD1) 
  SMUD.SYSTEM-HUR230(SMD1)   
  1499.0 
  1499.0   
  1499.0 
  1499.0   
  1106.0 
  1106.0   
  2018-10-26 08:00 
  2018-10-26 08:00   
  2018-10-29 16:00 
  2018-10-29 16:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     SMD1     HUR-TRY #2 230kV OOS; SMUD HUR TIE 1499/1106 MW     2018-07-12 11:07     SMD151557      2018-07-12 11:07  
SPPC Outages:
SRP Outages:
  Liberty -Peacock345     261187     SRP     Liberty-Peacock345          CRYSTAL500-NAVAJO500(SRP) 
  NAVAJO500-CRYSTAL500(SRP)   
  350.0 
  350.0   
  350.0 
  350.0   
  338.0 
  338.0   
  2018-06-25 07:00 
  2018-06-25 07:00   
  2018-06-28 15:00 
  2018-06-28 15:00   
  Completed     TRANSMISSION     PLANNED      ONPATH     SRP     Scheduled Maintenance     2018-06-22 09:31     SRP103409      2018-06-22 09:31  
  Silver King Xfrmr # 4     261523     SRP     Silver King 500/230kV Transformer #4          CORONADO500-SILVERKIN500(SRP) 
  SILVERKIN500-CORONADO500(SRP)   
  1494.0 
  1364.0   
  1494.0 
  1364.0   
  1347.0 
  1347.0   
  2018-07-03 02:00 
  2018-07-03 02:00   
  2018-07-03 06:00 
  2018-07-03 06:00   
  Completed     TRANSMISSION     PLANNED      ONPATH     SRP     Scheduled Maintenance      2018-06-28 11:29     SRP103588      2018-06-28 11:29  
  NAVAJO - CRYSTAL 500KV     261809     SRP               MEAD500-PERKINS500(SRP)      349.0      349.0      290.0      2018-07-08 15:17      2018-07-08 15:48      Completed     TRANSMISSION     FORCED      ONPATH     SRP          2018-07-08 15:16     SRP103752      2018-07-08 15:58  
  PV EAST DERATE     261834     SRP     Palo Verde          C1-PALOVERDE500(SRP) 
  JOA - PV OUT(SRP) 
  PALOVERDE500-C1(SRP) 
  PALOVERDE500-PINALWEST500(SRP) 
  PALOVERDE500-RUDD500(SRP) 
  PINALWEST500-PALOVERDE500(SRP) 
  PV - JOA OUT(SRP) 
  PV EAST TOTAL(SRP) 
  RUDD500-PALOVERDE500(SRP) 

  C1-PALOVERDE500(SRP) 
  JOA - PV OUT(SRP) 
  PALOVERDE500-C1(SRP) 
  PALOVERDE500-PINALWEST500(SRP) 
  PALOVERDE500-RUDD500(SRP) 
  PINALWEST500-PALOVERDE500(SRP) 
  PV - JOA OUT(SRP) 
  PV EAST TOTAL(SRP) 
  RUDD500-PALOVERDE500(SRP) 

  C1-JOJOBA500(SRP) 
  C1-PALOVERDE500(SRP) 
  JOA - PV OUT(SRP) 
  JOJOBA500-C1(SRP) 
  PALOVERDE500-C1(SRP) 
  PALOVERDE500-PINALWEST500(SRP) 
  PALOVERDE500-RUDD500(SRP) 
  PINALWEST500-PALOVERDE500(SRP) 
  PV - JOA OUT(SRP) 
  PV EAST TOTAL(SRP) 
  RUDD500-PALOVERDE500(SRP)   
  2312.0 
  9999.0 
  2312.0 
  720.0 
  1081.0 
  720.0 
  9999.0 
  11321.0 
  1081.0 

  2312.0 
  9999.0 
  2312.0 
  720.0 
  1081.0 
  720.0 
  9999.0 
  11321.0 
  1081.0 

  1206.0 
  2312.0 
  9999.0 
  1206.0 
  2312.0 
  720.0 
  1081.0 
  720.0 
  9999.0 
  11321.0 
  1081.0   
  2312.0 
  9999.0 
  2312.0 
  720.0 
  1081.0 
  720.0 
  9999.0 
  11321.0 
  1081.0 

  2312.0 
  9999.0 
  2312.0 
  720.0 
  1081.0 
  720.0 
  9999.0 
  11321.0 
  1081.0 

  1206.0 
  2312.0 
  9999.0 
  1206.0 
  2312.0 
  720.0 
  1081.0 
  720.0 
  9999.0 
  11321.0 
  1081.0   
  2312.0 
  0.0 
  2312.0 
  720.0 
  1081.0 
  720.0 
  0.0 
  11321.0 
  1081.0 

  2312.0 
  0.0 
  2312.0 
  720.0 
  1081.0 
  720.0 
  0.0 
  11321.0 
  1081.0 

  0.0 
  2312.0 
  1943.0 
  0.0 
  2312.0 
  606.0 
  939.0 
  606.0 
  1943.0 
  9514.0 
  939.0   
  2018-07-09 00:13 
  2018-07-09 00:13 
  2018-07-09 00:13 
  2018-07-09 00:13 
  2018-07-09 00:13 
  2018-07-09 00:13 
  2018-07-09 00:13 
  2018-07-09 00:13 
  2018-07-09 00:13 

  2018-07-09 02:00 
  2018-07-09 02:00 
  2018-07-09 02:00 
  2018-07-09 02:00 
  2018-07-09 02:00 
  2018-07-09 02:00 
  2018-07-09 02:00 
  2018-07-09 02:00 
  2018-07-09 02:00 

  2018-07-09 05:38 
  2018-07-09 05:38 
  2018-07-09 05:38 
  2018-07-09 05:38 
  2018-07-09 05:38 
  2018-07-09 05:38 
  2018-07-09 05:38 
  2018-07-09 05:38 
  2018-07-09 05:38 
  2018-07-09 05:38 
  2018-07-09 05:38   
  2018-07-09 02:00 
  2018-07-09 02:00 
  2018-07-09 02:00 
  2018-07-09 02:00 
  2018-07-09 02:00 
  2018-07-09 02:00 
  2018-07-09 02:00 
  2018-07-09 02:00 
  2018-07-09 02:00 

  2018-07-09 05:38 
  2018-07-09 05:38 
  2018-07-09 05:38 
  2018-07-09 05:38 
  2018-07-09 05:38 
  2018-07-09 05:38 
  2018-07-09 05:38 
  2018-07-09 05:38 
  2018-07-09 05:38 

  2018-07-09 12:10 
  2018-07-09 12:10 
  2018-07-09 12:10 
  2018-07-09 12:10 
  2018-07-09 12:10 
  2018-07-09 12:10 
  2018-07-09 12:10 
  2018-07-09 12:10 
  2018-07-09 12:10 
  2018-07-09 12:10 
  2018-07-09 12:10   
  Completed     TRANSMISSION     FORCED      ONPATH     SRP     THIS OUTAGE IS BEING REPLACED WITH CORRECTED OUTAGE SRP EVENT ID 103792...NEWLY ENTERED OUTAGE. CALL 602-236-4348 WITH QUESTIONS.     2018-07-09 00:14     SRP103764      2018-07-09 12:15  
  Hassayampa-Jojoba 500kv     261990     SRP     HASSAYAMPA-JOJOBA 500KV LINE OUTAGE          C1-JOJOBA500(SRP) 
  JOA - PV OUT(SRP) 
  JOJOBA500-C1(SRP) 
  PALOVERDE500-PINALWEST500(SRP) 
  PALOVERDE500-RUDD500(SRP) 
  PINALWEST500-PALOVERDE500(SRP) 
  PV - JOA OUT(SRP) 
  PV EAST TOTAL(SRP) 
  RUDD500-PALOVERDE500(SRP) 

  C1-JOJOBA500(SRP) 
  JOA - PV OUT(SRP) 
  JOJOBA500-C1(SRP) 
  PALOVERDE500-PINALWEST500(SRP) 
  PALOVERDE500-RUDD500(SRP) 
  PINALWEST500-PALOVERDE500(SRP) 
  PV - JOA OUT(SRP) 
  PV EAST TOTAL(SRP) 
  RUDD500-PALOVERDE500(SRP) 

  C1-JOJOBA500(SRP) 
  JOA - PV OUT(SRP) 
  JOJOBA500-C1(SRP) 
  PALOVERDE500-PINALWEST500(SRP) 
  PALOVERDE500-RUDD500(SRP) 
  PINALWEST500-PALOVERDE500(SRP) 
  PV - JOA OUT(SRP) 
  PV EAST TOTAL(SRP) 
  RUDD500-PALOVERDE500(SRP) 

  C1-JOJOBA500(SRP) 
  JOA - PV OUT(SRP) 
  JOJOBA500-C1(SRP) 
  PALOVERDE500-PINALWEST500(SRP) 
  PALOVERDE500-RUDD500(SRP) 
  PINALWEST500-PALOVERDE500(SRP) 
  PV - JOA OUT(SRP) 
  PV EAST TOTAL(SRP) 
  RUDD500-PALOVERDE500(SRP) 

  C1-JOJOBA500(SRP) 
  JOA - PV OUT(SRP) 
  JOJOBA500-C1(SRP) 
  PALOVERDE500-PINALWEST500(SRP) 
  PALOVERDE500-RUDD500(SRP) 
  PINALWEST500-PALOVERDE500(SRP) 
  PV - JOA OUT(SRP) 
  PV EAST TOTAL(SRP) 
  RUDD500-PALOVERDE500(SRP) 

  C1-JOJOBA500(SRP) 
  JOA - PV OUT(SRP) 
  JOJOBA500-C1(SRP) 
  PALOVERDE500-PINALWEST500(SRP) 
  PALOVERDE500-RUDD500(SRP) 
  PINALWEST500-PALOVERDE500(SRP) 
  PV - JOA OUT(SRP) 
  PV EAST TOTAL(SRP) 
  RUDD500-PALOVERDE500(SRP)   
  1206.0 
  9999.0 
  1206.0 
  720.0 
  1081.0 
  720.0 
  9999.0 
  11321.0 
  1081.0 

  1206.0 
  9999.0 
  1206.0 
  720.0 
  1081.0 
  720.0 
  9999.0 
  11321.0 
  1081.0 

  1206.0 
  9999.0 
  1206.0 
  720.0 
  1081.0 
  720.0 
  9999.0 
  11321.0 
  1081.0 

  1206.0 
  9999.0 
  1206.0 
  720.0 
  1081.0 
  720.0 
  9999.0 
  11321.0 
  1081.0 

  1206.0 
  9999.0 
  1206.0 
  720.0 
  1081.0 
  720.0 
  9999.0 
  11321.0 
  1081.0 

  1206.0 
  9999.0 
  1206.0 
  720.0 
  1081.0 
  720.0 
  9999.0 
  11321.0 
  1081.0   
  1206.0 
  9999.0 
  1206.0 
  720.0 
  1081.0 
  720.0 
  9999.0 
  11321.0 
  1081.0 

  1206.0 
  9999.0 
  1206.0 
  720.0 
  1081.0 
  720.0 
  9999.0 
  11321.0 
  1081.0 

  1206.0 
  9999.0 
  1206.0 
  720.0 
  1081.0 
  720.0 
  9999.0 
  11321.0 
  1081.0 

  1206.0 
  9999.0 
  1206.0 
  720.0 
  1081.0 
  720.0 
  9999.0 
  11321.0 
  1081.0 

  1206.0 
  9999.0 
  1206.0 
  720.0 
  1081.0 
  720.0 
  9999.0 
  11321.0 
  1081.0 

  1206.0 
  9999.0 
  1206.0 
  720.0 
  1081.0 
  720.0 
  9999.0 
  11321.0 
  1081.0   
  0.0 
  1789.0 
  0.0 
  558.0 
  865.0 
  558.0 
  1789.0 
  8760.0 
  865.0 

  0.0 
  2106.0 
  0.0 
  656.0 
  985.0 
  656.0 
  2106.0 
  10312.0 
  985.0 

  0.0 
  2106.0 
  0.0 
  656.0 
  985.0 
  656.0 
  2106.0 
  10312.0 
  985.0 

  0.0 
  1789.0 
  0.0 
  656.0 
  985.0 
  656.0 
  1789.0 
  10312.0 
  985.0 

  0.0 
  2106.0 
  0.0 
  656.0 
  1018.0 
  656.0 
  2106.0 
  10312.0 
  1018.0 

  0.0 
  2106.0 
  0.0 
  656.0 
  1018.0 
  656.0 
  2106.0 
  10312.0 
  1018.0   
  2018-07-09 12:00 
  2018-07-09 12:00 
  2018-07-09 12:00 
  2018-07-09 12:00 
  2018-07-09 12:00 
  2018-07-09 12:00 
  2018-07-09 12:00 
  2018-07-09 12:00 
  2018-07-09 12:00 

  2018-07-09 16:00 
  2018-07-09 16:00 
  2018-07-09 16:00 
  2018-07-09 16:00 
  2018-07-09 16:00 
  2018-07-09 16:00 
  2018-07-09 16:00 
  2018-07-09 16:00 
  2018-07-09 16:00 

  2018-07-10 08:00 
  2018-07-10 08:00 
  2018-07-10 08:00 
  2018-07-10 08:00 
  2018-07-10 08:00 
  2018-07-10 08:00 
  2018-07-10 08:00 
  2018-07-10 08:00 
  2018-07-10 08:00 

  2018-07-10 12:00 
  2018-07-10 12:00 
  2018-07-10 12:00 
  2018-07-10 12:00 
  2018-07-10 12:00 
  2018-07-10 12:00 
  2018-07-10 12:00 
  2018-07-10 12:00 
  2018-07-10 12:00 

  2018-07-10 14:00 
  2018-07-10 14:00 
  2018-07-10 14:00 
  2018-07-10 14:00 
  2018-07-10 14:00 
  2018-07-10 14:00 
  2018-07-10 14:00 
  2018-07-10 14:00 
  2018-07-10 14:00 

  2018-07-10 15:00 
  2018-07-10 15:00 
  2018-07-10 15:00 
  2018-07-10 15:00 
  2018-07-10 15:00 
  2018-07-10 15:00 
  2018-07-10 15:00 
  2018-07-10 15:00 
  2018-07-10 15:00   
  2018-07-09 16:00 
  2018-07-09 16:00 
  2018-07-09 16:00 
  2018-07-09 16:00 
  2018-07-09 16:00 
  2018-07-09 16:00 
  2018-07-09 16:00 
  2018-07-09 16:00 
  2018-07-09 16:00 

  2018-07-10 08:00 
  2018-07-10 08:00 
  2018-07-10 08:00 
  2018-07-10 08:00 
  2018-07-10 08:00 
  2018-07-10 08:00 
  2018-07-10 08:00 
  2018-07-10 08:00 
  2018-07-10 08:00 

  2018-07-10 12:00 
  2018-07-10 12:00 
  2018-07-10 12:00 
  2018-07-10 12:00 
  2018-07-10 12:00 
  2018-07-10 12:00 
  2018-07-10 12:00 
  2018-07-10 12:00 
  2018-07-10 12:00 

  2018-07-10 14:00 
  2018-07-10 14:00 
  2018-07-10 14:00 
  2018-07-10 14:00 
  2018-07-10 14:00 
  2018-07-10 14:00 
  2018-07-10 14:00 
  2018-07-10 14:00 
  2018-07-10 14:00 

  2018-07-10 15:00 
  2018-07-10 15:00 
  2018-07-10 15:00 
  2018-07-10 15:00 
  2018-07-10 15:00 
  2018-07-10 15:00 
  2018-07-10 15:00 
  2018-07-10 15:00 
  2018-07-10 15:00 

  2018-07-16 14:05 
  2018-07-16 14:05 
  2018-07-16 14:05 
  2018-07-16 14:05 
  2018-07-16 14:05 
  2018-07-16 14:05 
  2018-07-16 14:05 
  2018-07-16 14:05 
  2018-07-16 14:05   
  Completed     TRANSMISSION     FORCED      ONPATH     SRP     Hassayampa-Jojoba Line in Service @ 13:55     2018-07-09 11:56     SRP103792      2018-07-16 14:07  
SWTC Outages:
TANC Outages:
  MLN-RND MT #1 500KV     132179     BANC     MLN-RDM #1 7/23-9/23          COTP N-S(BANC) 
  COTP S-N(BANC)   
  4800.0 
  3675.0   
  4800.0 
  3675.0   
  3180.0 
  3675.0   
  2018-07-23 07:00 
  2018-07-23 07:00   
  2018-09-23 18:00 
  2018-09-23 18:00   
  Cancelled     TRANSMISSION     PLANNED      ONPATH     BANC,SMD1,TANC     COI N>S 3180 MW, S>N 3675 MW. Vaca-Tesla 500KV Line Series Cap Bank seg 1&2 in conjunction with MLN-RDM #1 500KV line. CISO work, replace insulators     2018-03-27 20:59     BANC51388      2018-06-06 10:45  
  TABLE MTN 500kV SC4     131033     BANC     TABLE MTN SERIES CAP SC4          COTP N-S(BANC)      4800.0      4800.0      4654.0      2018-09-04 06:00      2018-11-05 06:00      Scheduled     TRANSMISSION     PLANNED      ONPATH     BANC,SMD1,TANC     COI N>S 4654MWs: TBM Series CAP SC4 cleared to allow replacement of Series CAP SC4.     2017-12-18 18:39     BANC51197      2018-04-16 23:31  
  TRY/TES 230KV TIE     131545     BANC     TES/TRY 230kV Tie limited to 657MW, 18-00679,TES-T          S-TESLA230-TRY230(BANC) 
  S-TRY230-TESLA230(BANC)   
  1314.0 
  1314.0   
  1314.0 
  1314.0   
  657.0 
  657.0   
  2018-09-14 07:00 
  2018-09-14 07:00   
  2018-09-14 16:00 
  2018-09-14 16:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     BANC,SMD1,TANC     TES/TRY 230kV Tie limited to 657MW, 18-00679,TES-TRY #1-230kV Line OOS     2018-02-14 10:34     BANC51293      2018-02-14 10:34  
  TRY-LLL 230KV LINE     131529     BANC     LLL/TES limited to Zero exports, 80MW Imports, 18-          S-LLL115-NP15(BANC) 
  S-NP15-LLL115(BANC)   
  120.0 
  120.0   
  120.0 
  120.0   
  0.0 
  80.0   
  2018-09-25 06:00 
  2018-09-25 06:00   
  2018-09-25 12:00 
  2018-09-25 12:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     BANC,SMD1,TANC     LLL/TES limited to Zero exports, 80MW Imports, 18-00664, TRY-LLL 230kV Line OOS-WASH     2018-02-14 06:11     BANC51288      2018-02-14 06:11  
  TRY/TES 230KV TIE     131548     BANC     TES-TRY #1 #2 230kV Lines          S-TESLA230-TRY230(BANC) 
  S-TRY230-TESLA230(BANC)   
  1314.0 
  1314.0   
  1314.0 
  1314.0   
  0.0 
  0.0   
  2018-09-26 04:00 
  2018-09-26 04:00   
  2018-09-26 10:00 
  2018-09-26 10:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     BANC,SMD1,TANC     TES-TRY #1 & #2 230kV Lines OOS; TES/TRY Tie from 1314 MW to zero. TRY STA WASH DAY 3     2018-02-14 14:08     BANC51294      2018-02-14 14:08  
  JOHN DAY-GRIZZLY #1 500KV     133491     BANC     BPA -JOHN DAY-GRIZZLY 1 500kv Line          COTP N-S(BANC) 
  COTP S-N(BANC)   
  4800.0 
  3675.0   
  4800.0 
  3675.0   
  2300.0 
  2450.0   
  2018-10-01 09:00 
  2018-10-01 09:00   
  2018-10-05 17:00 
  2018-10-05 17:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     BANC,SMD1,TANC     BPA John Day-Grizzly 1 500kv Line, replace static line N>S 2300MW, S>N 2450MW     2018-06-27 18:13     BANC51535      2018-06-27 18:13  
TEPC Outages:
TPWT Outages:
TSGT Outages:
  TOT 2 GEN NOTIFICATION     230147     TSGT     TOT 2 GENERATION RESTRICTION          CRG-SJ345(TSGT) 
  SJ345-CRG(TSGT) 

  CRG-SJ345(TSGT) 
  SJ345-CRG(TSGT) 

  CRG-SJ345(TSGT) 
  SJ345-CRG(TSGT)   
  0.0 
  46.0 

  0.0 
  50.0 

  135.0 
  70.0   
  135.0 
  70.0 

  135.0 
  70.0 

  135.0 
  70.0   
  0.0 
  50.0 

  0.0 
  50.0 

  0.0 
  50.0   
  2017-05-04 06:00 
  2017-05-04 06:00 

  2017-12-31 09:00 
  2017-12-31 09:00 

  2018-12-31 09:00 
  2018-12-31 09:00   
  2017-12-31 09:00 
  2017-12-31 09:00 

  2018-12-31 09:00 
  2018-12-31 09:00 

  2022-12-31 09:00 
  2022-12-31 09:00   
  Active     GENERATION     FORCED      ONPATH     TSGT     *OUTAGE HAS BEEN EXTENDED** TOT2A GENERATION NOTIFICATION WILL IMPACT TOT2A TTC, DEPENDING ON SYSTEM OPERATING CONDITIONS.     2017-04-21 12:18     TSGT91272      2018-02-21 16:38  
  MONTROSE-NUCLA 115KV LINE     185254     TSGT     MONTROSE-NUCLA 115KV LINE          CRG-SJ345(TSGT) 
  SJ345-CRG(TSGT) 
  TSGTWEST-TSGTWEST(TSGT) 

  CRG-SJ345(TSGT) 
  SJ345-CRG(TSGT) 
  TSGTWEST-TSGTWEST(TSGT) 

  CRG-SJ345(TSGT) 
  SJ345-CRG(TSGT) 
  TSGTWEST-TSGTWEST(TSGT) 

  CRG-SJ345(TSGT) 
  SJ345-CRG(TSGT) 
  TSGTWEST-TSGTWEST(TSGT)   
  0.0 
  50.0 
  0.0 

  0.0 
  50.0 
  0.0 

  0.0 
  50.0 
  0.0 

  0.0 
  50.0 
  0.0   
  135.0 
  70.0 
  0.0 

  135.0 
  70.0 
  0.0 

  135.0 
  70.0 
  0.0 

  135.0 
  70.0 
  0.0   
  0.0 
  36.0 
  0.0 

  0.0 
  50.0 
  0.0 

  0.0 
  32.0 
  0.0 

  0.0 
  50.0 
  0.0   
  2017-10-02 08:00 
  2017-10-02 08:00 
  2017-10-02 08:00 

  2017-10-16 13:00 
  2017-10-16 13:00 
  2017-10-16 13:00 

  2018-01-03 06:00 
  2018-01-03 06:00 
  2018-01-03 06:00 

  2018-01-16 08:00 
  2018-01-16 08:00 
  2018-01-16 08:00   
  2017-10-16 13:00 
  2017-10-16 13:00 
  2017-10-16 13:00 

  2018-01-03 06:00 
  2018-01-03 06:00 
  2018-01-03 06:00 

  2018-01-16 08:00 
  2018-01-16 08:00 
  2018-01-16 08:00 

  2018-10-16 19:00 
  2018-10-16 19:00 
  2018-10-16 19:00   
  Active     TRANSMISSION     PLANNED      ONPATH     TSGT     ~MONTROSE-NUCLA 115KV LINE TTC HAS BEEN UPDATED~**MONTROSE-NUCLA 115KV LINE OUTAGE HAS BEEN RESCHEDULED TO OCT 2017**MONTROSE-NUCLA 115KV LINE OUTAGE WILL AFFECT TOT2A TTC, EXACT LIMIT TBD.     2015-06-30 09:43     TSGT75642      2018-01-16 07:49  
  GLADE TAP - COYOTE GULCH     247137     TSGT     GLADE TAP - COYOTE GULCH          CGUL-GLADE115(TSGT) 
  GLADE115-CGUL(TSGT) 

  CGUL-GLADE115(TSGT) 
  GLADE115-CGUL(TSGT)   
  86.0 
  86.0 

  86.0 
  86.0   
  86.0 
  86.0 

  86.0 
  86.0   
  0.0 
  0.0 

  0.0 
  0.0   
  2018-01-02 10:00 
  2018-01-02 10:00 

  2018-03-02 11:00 
  2018-03-02 11:00   
  2018-03-02 11:00 
  2018-03-02 11:00 

  2018-12-31 11:00 
  2018-12-31 11:00   
  Active     TRANSMISSION     FORCED      ONPATH     TSGT     GLADE TAP - COYOTE GULCH 115KV OUTAGE WILL IMPACT TSGT TTC ON PATH. COYOTE GULCH WILL BE RADIALLY FED FROM HESPERUS.     2018-01-02 10:00     TSGT97602      2018-01-03 12:18  
  OAKDALE-WALSENBURG 115KV     261547     TSGT     OAKDALE-WALSENBURG 115KV          TSGTSOUTH-TSGTSOUTH(TSGT) 

  TSGTSOUTH-TSGTSOUTH(TSGT) 

  TSGTSOUTH-TSGTSOUTH(TSGT)   
  0.0 

  0.0 

  0.0   
  0.0 

  0.0 

  0.0   
  0.0 

  0.0 

  0.0   
  2018-06-29 09:00 

  2018-07-03 18:00 

  2018-07-05 18:00   
  2018-07-03 18:00 

  2018-07-05 18:00 

  2018-07-07 14:00   
  Completed     TRANSMISSION     FORCED      ONPATH     TSGT     OAKDALE-WALSENBURG 115KV LINE OUTAGE WILL CAUSE MEMBER LOAD AT SPANISH PEAKS AND MONZANO TAP TO BE DROPPED.     2018-06-29 08:26     TSGT103601      2018-07-07 13:36  
  BASALT - COOLEY MESA 230     261742     TSGT     BASALT - COOLEY MESA 230          CRG-TOT5GW(TSGT) 
  TOT5GW-CRG(TSGT) 

  CRG-TOT5GW(TSGT) 
  TOT5GW-CRG(TSGT) 

  CRG-TOT5GW(TSGT) 
  TOT5GW-CRG(TSGT)   
  260.0 
  210.0 

  260.0 
  210.0 

  260.0 
  210.0   
  260.0 
  210.0 

  260.0 
  210.0 

  260.0 
  210.0   
  227.0 
  210.0 

  260.0 
  210.0 

  260.0 
  210.0   
  2018-07-06 09:30 
  2018-07-06 09:30 

  2018-07-07 07:00 
  2018-07-07 07:00 

  2018-07-11 18:00 
  2018-07-11 18:00   
  2018-07-07 07:00 
  2018-07-07 07:00 

  2018-07-11 18:00 
  2018-07-11 18:00 

  2018-07-20 18:00 
  2018-07-20 18:00   
  Active     TRANSMISSION     FORCED      ONPATH     TSGT     BASALT - COOLEY MESA 230KV OUTAGE FORCED OUTAGE WILL IMPACT TSGT TOT 5 TTC.     2018-07-06 09:21     TSGT103720      2018-07-11 17:18  
  HIDALGO - TURQUOISE 115KV     260854     TSGT     HIDALGO - TURQUOISE 115KV          TSGTSOUTH-TSGTSOUTH(TSGT)      0.0      0.0      0.0      2018-07-09 08:00      2018-07-20 01:00      Completed     TRANSMISSION     PLANNED      ONPATH     TSGT     HIDALGO - TURQUOISE 115KV WILL NOT HAVE AN IMPACT ON TSGT DEPENDING ON SYSTEM CONDITIONS      2018-06-14 16:52     TSGT103263      2018-06-14 16:52  
  LRS-AULT 345KV LINE     261023     TSGT     LRS-AULT 345KV LINE          AU-TOT3GS(TSGT) 
  DJ-LRS230(TSGT) 
  LRS-LRS230(TSGT) 
  LRS-TOT3GS(TSGT) 
  LRS230-DJ(TSGT) 
  LRS230-LRS(TSGT) 
  LRS230-SGW(TSGT) 
  SCSW-SGW(TSGT) 
  SGW-LRS230(TSGT) 
  SGW-SCSW(TSGT) 
  STY-TOT3GS(TSGT) 
  TOT3GS-AU(TSGT) 
  TOT3GS-LRS(TSGT) 
  TOT3GS-STY(TSGT)   
  289.0 
  150.0 
  247.0 
  400.0 
  200.0 
  173.0 
  138.0 
  88.0 
  138.0 
  88.0 
  203.0 
  289.0 
  443.0 
  203.0   
  289.0 
  150.0 
  247.0 
  400.0 
  200.0 
  173.0 
  138.0 
  88.0 
  138.0 
  88.0 
  203.0 
  289.0 
  443.0 
  203.0   
  0.0 
  130.0 
  215.0 
  170.0 
  94.0 
  112.0 
  134.0 
  82.0 
  134.0 
  82.0 
  177.0 
  0.0 
  170.0 
  177.0   
  2018-07-09 10:00 
  2018-07-09 10:00 
  2018-07-09 10:00 
  2018-07-09 10:00 
  2018-07-09 10:00 
  2018-07-09 10:00 
  2018-07-09 10:00 
  2018-07-09 10:00 
  2018-07-09 10:00 
  2018-07-09 10:00 
  2018-07-09 10:00 
  2018-07-09 10:00 
  2018-07-09 10:00 
  2018-07-09 10:00   
  2018-07-09 15:00 
  2018-07-09 15:00 
  2018-07-09 15:00 
  2018-07-09 15:00 
  2018-07-09 15:00 
  2018-07-09 15:00 
  2018-07-09 15:00 
  2018-07-09 15:00 
  2018-07-09 15:00 
  2018-07-09 15:00 
  2018-07-09 15:00 
  2018-07-09 15:00 
  2018-07-09 15:00 
  2018-07-09 15:00   
  Completed     TRANSMISSION     PLANNED      ONPATH     TSGT     LRS-AULT 345KV LINE OUTAGE WILL IMPACT TSGT TOT3 TTC. DUE TO THIS TOT BEING DYNAMIC, VALUES MAY VARY.     2018-06-20 10:19     TSGT103347      2018-07-09 14:44  
  LA JUNTA 115KV     260846     TSGT     LA JUNTA 115KV          BOON115-LAJU(TSGT)      80.0      80.0      0.0      2018-07-10 09:00      2018-07-10 14:00      Completed     TRANSMISSION     FORCED      ONPATH     TSGT     LA JUNTA 115KV WILL HAVE A IMPACT ON TSGT. SE LAMAR, WALSH, VILAS, WILLOW CREEK LOAD WILL BE RADIAL FEED FROM LAMAR.      2018-06-14 16:16     TSGT103258      2018-07-10 13:33  
  SAN LUIS VALLEY-WAVERLY     261003     TSGT     SAN LUIS VALLEY-WAVERLY 115KV LINE          TSGTSOUTH-TSGTSOUTH(TSGT)      0.0      0.0      0.0      2018-07-10 10:00      2018-07-12 12:00      Completed     TRANSMISSION     PLANNED      ONPATH     TSGT     SAN LUIS VALLEY-WAVERLY 115KV LINE WILL CAUSE STANLEY TO BE RADIAL FROM PLAZA.     2018-06-19 16:25     TSGT103335      2018-07-12 11:55  
  ARCHER 230/115KV XFMR     260969     TSGT     ARCHER 230/115KV KV1A XFMR          LRS-TOT3GS(TSGT) 
  TOT3GS-LRS(TSGT)   
  400.0 
  443.0   
  400.0 
  443.0   
  328.0 
  328.0   
  2018-07-11 07:00 
  2018-07-11 07:00   
  2018-07-11 17:00 
  2018-07-11 17:00   
  Cancelled     TRANSMISSION     PLANNED      ONPATH     TSGT     **RE-SCHEDULED TO 7/11 WITH THE SAME START AND END TIMES.** ARCHER 230/115KV KV1A XFMR OUTAGE MAY HAVE A SLIGHT IMPACT ON TSGT TOT 3 TTC, DEPENDING ON SYSTEM OPERATING CONDITIONS.     2018-06-18 17:17     TSGT103321      2018-07-09 15:13  
  LA JUNTA 115KV     260833     TSGT     LA JUNTA 115KV           LAMR115-WILC(TSGT) 
  TSGTEAST-TSGTEAST(TSGT) 
  WILC-LAMR115(TSGT)   
  108.0 
  0.0 
  108.0   
  108.0 
  0.0 
  108.0   
  0.0 
  0.0 
  0.0   
  2018-07-11 09:00 
  2018-07-11 09:00 
  2018-07-11 09:00   
  2018-07-11 17:00 
  2018-07-11 17:00 
  2018-07-11 17:00   
  Cancelled     TRANSMISSION     PLANNED      ONPATH     TSGT     LA JUNTA 115KV WILL HAVE IMPACT ON TSGT TTC. SE LAMAR, WALSH, VILAS, WILOW CREEK LOADS WILL BE RADIAL FEED FROM LAMAR & CITY OF LAJUNTA WILL BE RADIAL FEED FROM BOON.     2018-06-14 15:56     TSGT103255      2018-06-14 16:07  
  LA JUNTA 115KV     260840     TSGT     LA JUNTA 115KV           LAJU-LAMS(TSGT) 
  LAMS-LAJU(TSGT) 
  LAMS-WILC(TSGT) 
  WILC-LAMS(TSGT)   
  108.0 
  108.0 
  108.0 
  108.0   
  108.0 
  108.0 
  108.0 
  108.0   
  0.0 
  0.0 
  0.0 
  0.0   
  2018-07-11 09:00 
  2018-07-11 09:00 
  2018-07-11 09:00 
  2018-07-11 09:00   
  2018-07-11 17:00 
  2018-07-11 17:00 
  2018-07-11 17:00 
  2018-07-11 17:00   
  Completed     TRANSMISSION     PLANNED      ONPATH     TSGT     LA JUNTA 115KV WILL HAVE IMPACT ON TSGT TTC. SE LAMAR, WALSH, VILAS, WILOW CREEK LOADS WILL BE RADIAL FEED FROM LAMAR & CITY OF LAJUNTA WILL BE RADIAL FEED FROM BOON.     2018-06-14 16:09     TSGT103256      2018-06-14 16:09  
  FOUR CORNERS-RIO PUERCO     262377     TSGT     FOUR CORNERS-RIO PUERCO 345KV           TSGTSOUTH-TSGTSOUTH(TSGT)      0.0      0.0      0.0      2018-07-11 19:09      2018-07-12 03:00      Completed     TRANSMISSION     FORCED      ONPATH     TSGT     FOUR CORNERS-RIO PUERCO 345KV WILL IMPACT TSGT FIRM NMMI IMPORTS CAPABILITY OF THE NNMI TRANSMISSION OWNERS DURING THIS OUTAGE . THE NNMI OWNERS WILL BE REDUCED BY 45.7% DEPENDING ON SYSTEM CONDITIONS      2018-07-11 19:09     TSGT103878      2018-07-12 02:03  
  SPRINGERVILLE-MACHO SP     262450     TSGT     SPRINGERVILLE-MACHO SPRINGS 345KV           TSGTSOUTH-TSGTSOUTH(TSGT) 

  TSGTSOUTH-TSGTSOUTH(TSGT)   
  0.0 

  0.0   
  0.0 

  0.0   
  0.0 

  0.0   
  2018-07-12 22:14 

  2018-07-12 23:00   
  2018-07-12 23:00 

  2018-07-13 03:00   
  Completed     TRANSMISSION     FORCED      ONPATH     TSGT     SPRINGERVILLE-MACHO SPRINGS 345KV WILL NOT HAVE AN IMPACT ON TSGT TTC, TSGT SNMI (PATH 47) IMPORTS WILL BE REDUCED TO 57.6% DEPENDING ON SYSTEM CONDITIONS      2018-07-12 22:17     TSGT103890      2018-07-13 01:29  
  SAN YSIDRO 69KV     262465     TSGT     SAN YSIDRO 69KV          TSGTSOUTH-TSGTSOUTH(TSGT) 

  TSGTSOUTH-TSGTSOUTH(TSGT)   
  0.0 

  0.0   
  0.0 

  0.0   
  0.0 

  0.0   
  2018-07-13 01:40 

  2018-07-13 12:00   
  2018-07-13 12:00 

  2018-07-13 14:00   
  Completed     TRANSMISSION     FORCED      ONPATH     TSGT     SAN YSIDRO 69KV FORCED OUTAGE MAY IMPACT TSGT TTC DEPENING ON SYSTEM CONDITIONS      2018-07-13 01:42     TSGT103895      2018-07-13 14:10  
  MEEKER-RIFLE 138KV     261405     TSGT     MEEKER-RIFLE 138KV          BOZ-CRG(TSGT) 
  CALRIDGE-CRG(TSGT) 
  CRG-BOZ(TSGT) 
  CRG-CALRIDGE(TSGT) 

  BOZ-CRG(TSGT) 
  CALRIDGE-CRG(TSGT) 
  CRG-BOZ(TSGT) 
  CRG-CALRIDGE(TSGT) 

  BOZ-CRG(TSGT) 
  CALRIDGE-CRG(TSGT) 
  CRG-BOZ(TSGT) 
  CRG-CALRIDGE(TSGT)   
  29.0 
  105.0 
  29.0 
  105.0 

  29.0 
  105.0 
  29.0 
  105.0 

  29.0 
  105.0 
  29.0 
  105.0   
  29.0 
  105.0 
  29.0 
  105.0 

  29.0 
  105.0 
  29.0 
  105.0 

  29.0 
  105.0 
  29.0 
  105.0   
  29.0 
  105.0 
  29.0 
  105.0 

  29.0 
  105.0 
  29.0 
  105.0 

  29.0 
  105.0 
  29.0 
  105.0   
  2018-07-16 08:00 
  2018-07-16 08:00 
  2018-07-16 08:00 
  2018-07-16 08:00 

  2018-07-17 08:00 
  2018-07-17 08:00 
  2018-07-17 08:00 
  2018-07-17 08:00 

  2018-07-18 08:00 
  2018-07-18 08:00 
  2018-07-18 08:00 
  2018-07-18 08:00   
  2018-07-16 18:00 
  2018-07-16 18:00 
  2018-07-16 18:00 
  2018-07-16 18:00 

  2018-07-17 18:00 
  2018-07-17 18:00 
  2018-07-17 18:00 
  2018-07-17 18:00 

  2018-07-18 18:00 
  2018-07-18 18:00 
  2018-07-18 18:00 
  2018-07-18 18:00   
  Completed     TRANSMISSION     PLANNED      OFFPATH     TSGT     MEEKER-RIFLE 138KV OUTAGE SHOULD HAVE NO IMPACT ON TSGT TOT1 TTC.     2018-06-26 17:01     TSGT103537      2018-06-26 17:01  
  MIRACLE MILE-MEDICINE BOW     260984     TSGT     MIRACLE MILE-MEDICINE BOW-SNOWY RANGE 115KV LINE          TSGTNORTH-TSGTNORTH(TSGT)      0.0      0.0      0.0      2018-07-16 10:00      2018-07-26 17:00      Active     TRANSMISSION     PLANNED      OFFPATH     TSGT     MIRACLE MILE-MEDICINE BOW-SNOWY RANGE 115KV LINE OUTAGE WILL NOT IMPACT TSGT TTC. MEDICINE BOW-OASIS (MAY)AND KARAMIE LOADS WILL BE RADIAL FROM SNOWY RANGE DURING THIS OUTAGE.     2018-06-18 17:46     TSGT103323      2018-06-18 17:46  
  RIVERTON-PILOT BUTTE 115     262290     TSGT     RIVERTON-PILOT BUTTE 115KV LINE          TSGTNORTH-TSGTNORTH(TSGT)      0.0      0.0      0.0      2018-07-17 08:00      2018-07-17 13:00      Completed     TRANSMISSION     PLANNED      ONPATH     TSGT     RIVERTON-PILOT BUTTE 115KV LINE WILL CAUSE WIND RIVER TO BE RADIAL FROM PILOT BUTTE.     2018-07-10 15:44     TSGT103844      2018-07-10 15:44  
  HERNANDEZ 115KV     261212     TSGT     HERNANDEZ 115KV           HERN-TAOS(TSGT) 
  TAOS-HERN(TSGT)   
  145.0 
  159.0   
  145.0 
  159.0   
  0.0 
  0.0   
  2018-07-17 09:00 
  2018-07-17 09:00   
  2018-07-17 18:00 
  2018-07-17 18:00   
  Cancelled     TRANSMISSION     PLANNED      ONPATH     TSGT     *INCORRECTLY POSTED* HERNANDEZ 115KV WILL HAVE AN IMPACT ON TSGT. OUTAGE SHOULD NOT IMPACT THE NNMI (PATH 48) DELIVERIES DEPENDING ON SYSTEM CONDITIONS      2018-06-22 15:38     TSGT103420      2018-06-26 08:55  
  ARCHER 230/115 KV1A     262650     TSGT     ARCHER 230/115 KV1A          LRS-TOT3GS(TSGT) 
  TOT3GS-LRS(TSGT) 

  LRS-TOT3GS(TSGT) 
  TOT3GS-LRS(TSGT) 

  LRS-TOT3GS(TSGT) 
  TOT3GS-LRS(TSGT)   
  400.0 
  400.0 

  400.0 
  400.0 

  400.0 
  400.0   
  400.0 
  400.0 

  400.0 
  400.0 

  400.0 
  400.0   
  350.0 
  350.0 

  350.0 
  350.0 

  350.0 
  350.0   
  2018-07-18 09:49 
  2018-07-18 09:49 

  2018-07-18 19:00 
  2018-07-18 19:00 

  2018-07-19 19:00 
  2018-07-19 19:00   
  2018-07-18 19:00 
  2018-07-18 19:00 

  2018-07-19 19:00 
  2018-07-19 19:00 

  2018-07-24 17:00 
  2018-07-24 17:00   
  Active     TRANSMISSION     PLANNED      ONPATH     TSGT     ARCHER 230/115 KV1A OUTAGE WILL HAVE AN IMPACT ON TSGT TTC ON TOT 3. TTC TBD      2018-07-18 09:53     TSGT103982      2018-07-19 08:44  
  SIDNEY-SPRING CANYON 230     262205     TSGT     SIDNEY-SPRING CANYON 230KV LINE          LRS-TOT3GS(TSGT) 
  SCSW-SPCY(TSGT) 
  SPCY-SCSW(TSGT) 
  TOT3GS-LRS(TSGT)   
  400.0 
  0.0 
  0.0 
  443.0   
  400.0 
  0.0 
  0.0 
  443.0   
  346.0 
  0.0 
  0.0 
  346.0   
  2018-07-23 09:00 
  2018-07-23 09:00 
  2018-07-23 09:00 
  2018-07-23 09:00   
  2018-07-26 16:00 
  2018-07-26 16:00 
  2018-07-26 16:00 
  2018-07-26 16:00   
  Cancelled     TRANSMISSION     PLANNED      ONPATH     TSGT     SIDNEY-SPRING CANYON 230KV LINE OUTAGE WILL IMPACT TSGT TOT3 TTC.     2018-07-10 09:17     TSGT103833      2018-07-10 16:55  
  SIDNEY-SPRING CANYON 230K     261877     TSGT     SIDNEY-SPRING CANYON 230K          LRS-TOT3GS(TSGT) 
  SCSW-SPCY(TSGT) 
  SPCY-SCSW(TSGT) 
  TOT3GS-LRS(TSGT)   
  400.0 
  0.0 
  0.0 
  443.0   
  400.0 
  0.0 
  0.0 
  443.0   
  346.0 
  0.0 
  0.0 
  346.0   
  2018-07-23 09:00 
  2018-07-23 09:00 
  2018-07-23 09:00 
  2018-07-23 09:00   
  2018-07-26 16:00 
  2018-07-26 16:00 
  2018-07-26 16:00 
  2018-07-26 16:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     TSGT     SIDNEY-SPRING CANYON 230K OUTAGE WILL IMPACT TSGT TOT3 TTC.     2018-07-09 07:24     TSGT103771      2018-07-10 16:54  
  CURECANTI 230/115KV XFRMR     260204     TSGT     CURECANTI 230/115KV XFRMR KZ1A          CRG-SJ345(TSGT) 
  CRG-TOT5GW(TSGT) 
  SJ345-CRG(TSGT) 
  TOT5GW-CRG(TSGT)   
  135.0 
  260.0 
  70.0 
  210.0   
  135.0 
  260.0 
  70.0 
  210.0   
  0.0 
  260.0 
  50.0 
  210.0   
  2018-07-23 10:00 
  2018-07-23 10:00 
  2018-07-23 10:00 
  2018-07-23 10:00   
  2018-07-27 17:00 
  2018-07-27 17:00 
  2018-07-27 17:00 
  2018-07-27 17:00   
  Scheduled     TRANSMISSION     PLANNED      ONPATH     TSGT     CURECANTI 230/115KV XFRMR OUTAGE SHOULD NOT HAVE ANY ADDITIONAL IMPACT TO TSGT TOT 2A TTC. FURTHERMORE, TSGT TOT 5 TTC SHOULD NOT HAVE AN IMPACT AS WELL DEPENDING ON SYSTEM OPERATING CONDITIONS.     2018-06-06 08:05     TSGT103012      2018-06-06 08:05  
  BLACK FOREST TAP-BLACK SQ     262313     TSGT     BLACK FOREST TAP-BLACK SQUIRREL-MONUMENT 115KV           TSGTEAST-TSGTEAST(TSGT)