Combined wesTTrans Transmission Outages Apr 18, 2024 |
Outage Name |
Outage Id |
Company | Facility | Flow Gate |
Segment | Original TTC In |
Original TTC Out |
New TTC |
Start Time (PS) | Stop Time (PS) | Status | Outage Category |
Outage Type |
Path Impact |
Report TPs |
Comments | Creation Time (PS) | Event ID | Last Updated (PS) |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
AVAT Outages: | |||||||||||||||||||
HATWAI 500-230 XFMR | 120758 | AVAT | HATWAI 500-230 XFMR | AVA.SYS-LOLO(AVAT) AVA.WEST-DRYCREEK(AVAT) AVA.WEST-MIDC(AVAT) AVA.WEST-WALLAWALLA(AVAT) |
400.0 240.0 600.0 240.0 |
400.0 240.0 600.0 240.0 |
0.0 0.0 360.0 0.0 |
2024-04-22 08:00 2024-04-22 08:00 2024-04-22 08:00 2024-04-22 08:00 |
2024-04-22 15:00 2024-04-22 15:00 2024-04-22 15:00 2024-04-22 15:00 |
Scheduled | TRANSMISSION | PLANNED | ONPATH | AVAT | **BPA OUTAGE**LTC maintenance w/ manufacturer Rep. on 500/230kV Bank#1. Also, 230 kV Main Bus OOS to replace jumper on VT. | 2024-04-15 09:08 | AVAT50518 | 2024-04-15 09:08 | |
AZPS Outages: | |||||||||||||||||||
BEPW Outages: | |||||||||||||||||||
SGE-SGW | 58539 | BEPW | SGE>SGW | SGE>SGW(BEPW) SGW>SGE(BEPW) SGE>SGW(BEPW) SGW>SGE(BEPW) SGE>SGW(BEPW) SGW>SGE(BEPW) |
110.0 110.0 110.0 110.0 110.0 110.0 |
110.0 110.0 110.0 110.0 110.0 110.0 |
0.0 0.0 0.0 0.0 0.0 0.0 |
2023-07-27 23:00 2023-07-27 23:00 2023-08-04 16:00 2023-08-04 16:00 2023-09-30 16:00 2023-09-30 16:00 |
2023-08-04 16:00 2023-08-04 16:00 2023-09-30 16:00 2023-09-30 16:00 2024-08-31 16:00 2024-08-31 16:00 |
Active | TRANSMISSION | FORCED | ONPATH | BEPW,WACM | SGE DC Tie unavailable due to forced outage. | 2023-07-27 23:04 | BEPW17765 | 2023-08-31 15:45 | |
Winter 2023/24 Limit | 58933 | WACM | TOT-3 (BEPW) | TOT 3 BASIN (BEPW) | AU>LRS(BEPW) KEOT>LRS(BEPW) LRS>AU(BEPW) LRS>KEOT(BEPW) |
722.0 | 722.0 | 308.7 181.3 308.7 181.3 |
2023-11-01 00:00 2023-11-01 00:00 2023-11-01 00:00 2023-11-01 00:00 |
2024-06-01 10:00 2024-06-01 10:00 2024-06-01 10:00 2024-06-01 10:00 |
Active | Transmission | Planned | OnPath | BEPW,WACM | TOT-3 Winter 2023/24 Ratings of 1862 MW for system intact (Cell A1). Using Cell A2 with zero DC tie schedule the Limit will be 1577 MW and BEPWs share of transfer is 490 MW. JK. | 2023-09-27 13:16 | WACM17892 | 2023-11-14 05:38 |
System Conditions | 60283 | WACM | TOT-3 | TOT-3 | ARH>AU(LAPT) AU>ARH(LAPT) AU>SCSW(LAPT) SCSW>AU(LAPT) |
509.0 | 509.0 | 139.2 139.2 81.8 81.8 |
2024-03-23 07:00 2024-03-23 07:00 2024-03-23 07:00 2024-03-23 07:00 |
2024-05-10 14:00 2024-05-10 14:00 2024-05-10 14:00 2024-05-10 14:00 |
Active | Transmission | Planned | OffPath | BEPW,LAPT,WACM | C-24-0522; TOT-3 to series 10 | 2024-02-07 00:06 | WACM18218 | 2024-03-22 17:20 |
System Conditions | 60767 | WACM | TOT-3 BASIN (BEPW) | TOT 3 BASIN (BEPW) | AU>LRS(BEPW) KEOT>LRS(BEPW) LRS>AU(BEPW) LRS>KEOT(BEPW) |
722.0 | 722.0 | 171.4 100.6 171.4 100.6 |
2024-03-23 07:00 2024-03-23 07:00 2024-03-23 07:00 2024-03-23 07:00 |
2024-05-10 14:00 2024-05-10 14:00 2024-05-10 14:00 2024-05-10 14:00 |
Active | Transmission | Planned | OffPath | BEPW,LAPT,WACM | C-24-0522; TOT-3 to series 10 | 2024-03-22 15:49 | WACM18351 | 2024-03-22 17:19 |
System Conditions | 59955 | WACM | TOT-3 (BEPW) | TOT 3 BASIN (BEPW) | AU>LRS(BEPW) KEOT>LRS(BEPW) LRS>AU(BEPW) LRS>KEOT(BEPW) |
722.0 | 722.0 | 328.2 192.8 328.2 192.8 |
2024-03-25 07:00 2024-03-25 07:00 2024-03-25 07:00 2024-03-25 07:00 |
2024-04-04 22:00 2024-04-04 22:00 2024-04-04 22:00 2024-04-04 22:00 |
Completed | Transmission | Planned | OffPath | BEPW,WACM | INFO-24-0261. TOT-3 to series 16. | 2024-01-11 05:15 | WACM18151 | 2024-04-04 21:39 |
AU-LRS | 60831 | BEPW | TOT-3 (BASIN), LRS>AU 345 kV | AU>LRS(BEPW) LRS>AU(BEPW) AU>LRS(BEPW) LRS>AU(BEPW) |
0.0 0.0 0.0 0.0 |
0.0 0.0 0.0 0.0 |
0.0 0.0 0.0 0.0 |
2024-04-02 07:00 2024-04-02 07:00 2024-04-04 18:00 2024-04-04 18:00 |
2024-04-04 18:00 2024-04-04 18:00 2024-04-04 21:29 2024-04-04 21:29 |
Completed | TRANSMISSION | PLANNED | ONPATH | BEPW,LAPT,WACM | C-24-0916/0919; Series 2; Concurrent with C-24-0522 and INFO-24-0261.. | 2024-03-28 18:05 | BEPW18381 | 2024-04-04 21:29 | |
System Conditions | 60829 | WACM | TOT-3 | TOT-3 | ARH>AU(LAPT) AU>ARH(LAPT) AU>SCSW(LAPT) SCSW>AU(LAPT) |
509.0 | 509.0 | 115.9 115.9 68.1 68.1 |
2024-04-02 07:00 2024-04-02 07:00 2024-04-02 07:00 2024-04-02 07:00 |
2024-04-04 22:00 2024-04-04 22:00 2024-04-04 22:00 2024-04-04 22:00 |
Completed | Transmission | Planned | OnPath | BEPW,LAPT,WACM | C-24-0916/0919; Series 2; Concurrent with C-24-0522 and INFO-24-0261 | 2024-03-28 18:02 | WACM18379 | 2024-04-04 21:30 |
System Conditions | 60830 | WACM | TOT-3 BASIN (BEPW) | TOT 3 BASIN (BEPW) | AU>LRS(BEPW) KEOT>LRS(BEPW) LRS>AU(BEPW) LRS>KEOT(BEPW) |
722.0 | 722.0 | 148.7 87.3 148.7 87.3 |
2024-04-02 07:00 2024-04-02 07:00 2024-04-02 07:00 2024-04-02 07:00 |
2024-04-04 22:00 2024-04-04 22:00 2024-04-04 22:00 2024-04-04 22:00 |
Completed | Transmission | Planned | OnPath | BEPW,LAPT,WACM | C-24-0916/0919; Series 2; Concurrent with C-24-0522 and INFO-24-0261 | 2024-03-28 18:04 | WACM18380 | 2024-04-04 21:30 |
System Conditions | 60691 | WACM | TOT-3 (Basin) | TOT 3 BASIN (BEPW) | AU>LRS(BEPW) KEOT>LRS(BEPW) LRS>AU(BEPW) LRS>KEOT(BEPW) |
722.0 | 722.0 | 242.6 142.5 242.6 142.5 |
2024-04-22 07:00 2024-04-22 07:00 2024-04-22 07:00 2024-04-22 07:00 |
2024-05-23 16:00 2024-05-23 16:00 2024-05-23 16:00 2024-05-23 16:00 |
Scheduled | Transmission | Planned | OnPath | BEPW,WACM | ICC-24-0020 & ICC-24-0023. TOT-3 to series 32 (due to dual outage) [C-24-0702 04/24/2024 through 04/25/2024] | 2024-03-14 23:51 | WACM18301 | 2024-03-15 18:29 |
System Conditions | 60631 | WACM | TOT-5 | TOT-5 | AU>CRG(CRCM) BLUE>CRG(CRCM) CCW>MIDW(CRCM) CRG>AU(CRCM) MIDW>CCW(CRCM) |
750.0 | 750.0 | 472.5 22.5 255.0 472.5 255.0 |
2024-06-22 07:00 2024-06-22 07:00 2024-06-22 07:00 2024-06-22 07:00 2024-06-22 07:00 |
2024-06-22 15:00 2024-06-22 15:00 2024-06-22 15:00 2024-06-22 15:00 2024-06-22 15:00 |
Scheduled | Transmission | Planned | OffPath | BEPW,CRCM,LAPT,WACM | INFO-24-0763;Series 34 (TOT5 Limit 1500MW) | 2024-03-08 21:41 | WACM18275 | 2024-03-08 21:47 |
DJ-LRS230 | 60116 | BEPW | TOT-3 (BASIN), DJ-LRS230 | DJ>LRS230(BEPW) LRS230>DJ(BEPW) |
223.0 227.0 |
223.0 227.0 |
0.0 0.0 |
2024-09-03 07:00 2024-09-03 07:00 |
2024-09-13 15:00 2024-09-13 15:00 |
Scheduled | Transmission | Forced | OnPath | BEPW,LAPT,WACM | ICC-24-0290; Series 9 | 2024-01-18 21:38 | BEPW18180 | 2024-03-12 03:56 | |
System Conditions | 60114 | WACM | TOT-3 | TOT-3 | ARH>AU(LAPT) AU>ARH(LAPT) AU>SCSW(LAPT) SCSW>AU(LAPT) |
509.0 | 509.0 | 176.4 176.4 103.6 103.6 |
2024-09-03 07:00 2024-09-03 07:00 2024-09-03 07:00 2024-09-03 07:00 |
2024-09-13 15:00 2024-09-13 15:00 2024-09-13 15:00 2024-09-13 15:00 |
Scheduled | Transmission | Planned | OnPath | BEPW,LAPT,WACM | ICC-24-0290; Series 9 | 2024-01-18 21:36 | WACM18178 | 2024-01-18 21:36 |
System Conditions | 60115 | WACM | TOT-3 BASIN (BEPW) | TOT 3 BASIN (BEPW) | AU>LRS(BEPW) KEOT>LRS(BEPW) LRS>AU(BEPW) LRS>KEOT(BEPW) |
722.0 | 722.0 | 226.2 132.8 226.2 132.8 |
2024-09-03 07:00 2024-09-03 07:00 2024-09-03 07:00 2024-09-03 07:00 |
2024-09-13 15:00 2024-09-13 15:00 2024-09-13 15:00 2024-09-13 15:00 |
Scheduled | Transmission | Planned | OnPath | BEPW,LAPT,WACM | ICC-24-0290; Series 9 | 2024-01-18 21:37 | WACM18179 | 2024-01-18 21:37 |
AU-LRS | 60597 | BEPW | TOT-3 (BASIN), LRS>AU 345 kV | AU>LRS(BEPW) LRS>AU(BEPW) |
0.0 0.0 |
0.0 0.0 |
0.0 0.0 |
2024-09-16 10:00 2024-09-16 10:00 |
2024-11-19 15:00 2024-11-19 15:00 |
Scheduled | TRANSMISSION | PLANNED | ONPATH | BEPW,WACM | C-24-0742 | 2024-03-06 19:29 | BEPW18269 | 2024-03-06 19:29 | |
System Conditions | 60596 | WACM | TOT 3 BASIN (BEPW) | TOT 3 BASIN (BEPW) | AU>LRS(BEPW) KEOT>LRS(BEPW) LRS>AU(BEPW) LRS>KEOT(BEPW) |
722.0 | 722.0 | 160.0 94.0 160.0 94.0 |
2024-09-16 10:00 2024-09-16 10:00 2024-09-16 10:00 2024-09-16 10:00 |
2024-11-19 15:00 2024-11-19 15:00 2024-11-19 15:00 2024-11-19 15:00 |
Scheduled | Transmission | Planned | OnPath | BEPW,WACM | C-24-0742, TOT-3 to series 2. | 2024-03-06 19:26 | WACM18268 | 2024-03-06 19:26 |
TOT-3 | 60595 | WACM | TOT-3 | TOT-3 | ARH>AU(LAPT) AU>ARH(LAPT) AU>SCSW(LAPT) SCSW>AU(LAPT) |
509.0 | 509.0 | 125.4 125.4 73.6 73.6 |
2024-09-16 10:00 2024-09-16 10:00 2024-09-16 10:00 2024-09-16 10:00 |
2024-11-19 15:00 2024-11-19 15:00 2024-11-19 15:00 2024-11-19 15:00 |
Scheduled | Transmission | Planned | OnPath | BEPW,WACM | C-24-0742; TOT-3 to series 2. | 2024-03-06 19:22 | WACM18267 | 2024-03-06 19:22 |
System Conditions | 60665 | WACM | TOT-5 | TOT-5 | AU>CRG(CRCM) BLUE>CRG(CRCM) CCW>MIDW(CRCM) CRG>AU(CRCM) MIDW>CCW(CRCM) |
750.0 | 750.0 | 472.5 22.5 255.0 472.5 255.0 |
2024-09-26 07:00 2024-09-26 07:00 2024-09-26 07:00 2024-09-26 07:00 2024-09-26 07:00 |
2024-09-28 14:00 2024-09-28 14:00 2024-09-28 14:00 2024-09-28 14:00 2024-09-28 14:00 |
Scheduled | Transmission | Planned | OffPath | BEPW,LAPT,WACM | INFO-24-0779; TOT-5 to series 10. | 2024-03-11 17:34 | WACM18291 | 2024-03-11 17:34 |
BHBE Outages: | |||||||||||||||||||
111253 | 117819 | BHBE | NSS1-WYO 69kv line | WY69-WYODAK(BHBE) | 325.0 | 325.0 | 210.0 | 2024-04-29 08:00 | 2024-05-03 14:00 | Scheduled | TRANSMISSION | FORCED | ONPATH | BHBE | NSS1-WYO 69kv line | 2024-03-04 13:02 | BHBE49830 | 2024-03-04 13:02 | |
BHBE 112399 | 119686 | BHBE | NSS 1-WYODAK 69 KV LINE: NSS 1 BKR 6X20, NSS 1 BKR 6X24, NSS 1 BKR 6X28, NSS 1 BKR 6X34, NSS 1 BKR | 0.0 | 0.0 | 0.0 | 2024-05-13 08:00 | 2024-05-17 14:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | BHBE | Maintenance and Construction. Note: The NSS 1- WYO 69kv line will be OOS during the switch replacement of NSS 1 SW 6x27.. Path: WY69-WYODAK(115) | 2024-03-22 13:08 | 112399 | 2024-03-22 13:08 | ||
BHBE 112400 | 119687 | BHBE | NSS 1-NSS 2 69 KV LINE: NSS 1 BKR 6X28, NSS 1 BKR 6X38, NSS 1 SW 6X40, NSS 1-NSS 2 69 KV LINE | 0.0 | 0.0 | 0.0 | 2024-05-21 08:00 | 2024-05-24 14:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | BHBE | Maintenance and Construction. Note: Replacement of SW 6X40 (4 of 5). Path: WY69-WYODAK(115) | 2024-03-22 13:19 | 112400 | 2024-03-22 13:19 | ||
BHBE 111431 | 115317 | BHBE | RCDC TIE TRANSMISSION CONSTRAINTS OASIS Posting: RCWest to RCEast = 100mw | 0.0 | 0.0 | 0.0 | 2024-07-09 07:00 | 2024-07-19 17:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | BHBE | SOL Mitigation (Thermal). Note: SOL Mitigation for Osage-Teckla 230 Line outage. RCEAST Tie W to E Limit is 100 MW.. Path: RCWEST-RCEAST(100) | 2024-01-11 11:56 | 111431 | 2024-03-09 09:16 | ||
BHBE 111370 | 115301 | BHBE | OSAGE-TECKLA 230KV LINE: OSAGE-TECKLA 230KV LINE | 0.0 | 0.0 | 0.0 | 2024-07-09 08:00 | 2024-07-19 16:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | BHBE | Maintenance and Construction. Note: Hazard Remediation. Path: RC-WYODAK(721), WYODAK-RC(721) | 2024-01-10 10:15 | 111370 | 2024-03-09 09:15 | ||
BHCT Outages: | |||||||||||||||||||
BHCT 105901 | 117850 | BHCT | CANON CITY-SKALA 115 KV LINE: CANON CITY-SKALA 115 KV LINE | BHCE-CCW(BHCT) CCW-BHCE(BHCT) |
323.0 323.0 |
323.0 323.0 |
221.0 221.0 |
2024-03-26 09:00 2024-03-26 09:00 |
2024-10-08 14:00 2024-10-08 14:00 |
ACTIVE | TRANSMISSION | PLANNED | ONPATH | BHCT | Maintenance and Construction. Note: Canon City-Skala 115 kV Line out of service for full rebuild.. Path: BHCE-CCW(112), CCW-BHCE(112) | 2024-03-06 10:33 | 105901 | 2024-03-26 13:59 | |
BPAT Outages: | |||||||||||||||||||
COI | 2483 | BPAT | COI Path Rating | AC_N>S(BPAT) AC_S>N(BPAT) AC_N>S(BPAT) AC_S>N(BPAT) AC_N>S(BPAT) AC_S>N(BPAT) AC_N>S(BPAT) AC_S>N(BPAT) AC_N>S(BPAT) AC_S>N(BPAT) AC_N>S(BPAT) AC_S>N(BPAT) |
4800.0 3675.0 4800.0 3675.0 4800.0 3675.0 4800.0 3675.0 4800.0 1400.0 4800.0 3675.0 |
2007-11-23 12:00 2007-11-23 12:00 2010-01-01 00:00 2010-01-01 00:00 2010-11-17 00:00 2010-11-17 00:00 2012-03-01 00:00 2012-03-01 00:00 2022-12-20 00:00 2022-12-20 00:00 2023-01-05 13:00 2023-01-05 13:00 |
2010-01-01 00:00 2010-01-01 00:00 2010-11-17 00:00 2010-11-17 00:00 2012-03-01 00:00 2012-03-01 00:00 2022-12-20 00:00 2022-12-20 00:00 2023-01-05 13:00 2023-01-05 13:00 2033-01-01 00:00 2033-01-01 00:00 |
Active | TRANSMISSION | PLANNED | ONPATH | BPAT | Path Rating | 2007-11-23 12:40 | BPAT2116 | 2023-01-05 12:39 | |||
PDCI | 2477 | BPAT | PDCI_Path_Rating | DC_N>S(BPAT) DC_S>N(BPAT) DC_N>S(BPAT) DC_S>N(BPAT) DC_N>S(BPAT) DC_S>N(BPAT) DC_N>S(BPAT) DC_S>N(BPAT) DC_N>S(BPAT) DC_S>N(BPAT) DC_N>S(BPAT) DC_S>N(BPAT) |
2990.0 2084.0 2990.0 2084.0 2990.0 2084.0 3100.0 1904.0 3100.0 1904.0 3100.0 1904.0 |
2007-11-23 13:00 2007-11-23 13:00 2010-01-01 00:00 2010-01-01 00:00 2012-03-01 00:00 2012-03-01 00:00 2017-12-12 00:00 2017-12-12 00:00 2026-01-01 00:00 2026-01-01 00:00 2028-01-01 00:00 2028-01-01 00:00 |
2010-01-01 00:00 2010-01-01 00:00 2012-03-01 00:00 2012-03-01 00:00 2017-12-12 00:00 2017-12-12 00:00 2026-01-01 00:00 2026-01-01 00:00 2028-01-01 00:00 2028-01-01 00:00 2033-01-01 00:00 2033-01-01 00:00 |
Active | TRANSMISSION | PLANNED | ONPATH | BPAT | Path Rating | 2007-11-23 12:16 | BPAT2114 | 2023-08-21 10:46 | |||
LAGR | 2642 | BPAT | LAGR_Path_Rating | LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) |
413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 |
2007-11-23 17:00 2007-11-23 17:00 2010-01-01 00:00 2010-01-01 00:00 2012-03-01 00:00 2012-03-01 00:00 2023-01-01 00:00 2023-01-01 00:00 2024-01-01 00:00 2024-01-01 00:00 2025-01-01 00:00 2025-01-01 00:00 2026-01-01 00:00 2026-01-01 00:00 2028-01-01 00:00 2028-01-01 00:00 |
2010-01-01 00:00 2010-01-01 00:00 2012-03-01 00:00 2012-03-01 00:00 2023-01-01 00:00 2023-01-01 00:00 2024-01-01 00:00 2024-01-01 00:00 2025-01-01 00:00 2025-01-01 00:00 2026-01-01 00:00 2026-01-01 00:00 2028-01-01 00:00 2028-01-01 00:00 2033-01-01 00:00 2033-01-01 00:00 |
Active | TRANSMISSION | PLANNED | ONPATH | BPAT | Path Rating | 2007-11-23 15:34 | BPAT2145 | 2023-08-21 10:51 | |||
WOG | 2798 | BPAT | WOG_Path_Rating | WOGARR_E>W(BPAT) WOGARR_E>W(BPAT) WOGARR_E>W(BPAT) WOGARR_E>W(BPAT) WOGARR_E>W(BPAT) WOGARR_E>W(BPAT) WOGARR_E>W(BPAT) |
2000.0 2000.0 2000.0 2200.0 2200.0 2200.0 2200.0 |
2007-11-23 19:00 2010-01-01 00:00 2012-03-01 00:00 2019-08-15 00:00 2019-10-01 14:00 2019-10-09 10:00 2028-01-01 00:00 |
2010-01-01 00:00 2012-03-01 00:00 2019-08-15 00:00 2019-10-01 14:00 2019-10-09 10:00 2028-01-01 00:00 2033-01-01 00:00 |
Active | TRANSMISSION | PLANNED | ONPATH | BPAT | Path Rating | 2007-11-23 18:09 | BPAT2182 | 2023-08-21 10:47 | |||
WOG | 2810 | BPAT | WOG_Path_Rating_W-E | WOGARR_W>E(BPAT) WOGARR_W>E(BPAT) WOGARR_W>E(BPAT) WOGARR_W>E(BPAT) WOGARR_W>E(BPAT) WOGARR_W>E(BPAT) WOGARR_W>E(BPAT) |
1350.0 1350.0 1350.0 1350.0 1350.0 1350.0 1350.0 |
2007-11-23 19:00 2009-08-21 08:00 2010-01-01 00:00 2012-03-01 00:00 2019-10-01 14:00 2019-10-09 10:00 2028-01-01 00:00 |
2009-08-21 08:00 2010-01-01 00:00 2012-03-01 00:00 2019-10-01 14:00 2019-10-09 10:00 2028-01-01 00:00 2033-01-01 00:00 |
Active | TRANSMISSION | PLANNED | ONPATH | BPAT | Path Rating | 2007-11-23 18:53 | BPAT2186 | 2023-08-21 10:47 | |||
RATS | 2847 | BPAT | RATS_Path_Rating | RATS_N>S(BPAT) RATS_S>N(BPAT) RATS_N>S(BPAT) RATS_S>N(BPAT) RATS_N>S(BPAT) RATS_S>N(BPAT) RATS_N>S(BPAT) RATS_S>N(BPAT) RATS_N>S(BPAT) RATS_S>N(BPAT) RATS_N>S(BPAT) RATS_S>N(BPAT) |
300.0 300.0 300.0 300.0 300.0 300.0 300.0 300.0 300.0 300.0 300.0 300.0 |
2007-11-28 00:00 2007-11-28 00:00 2010-01-01 00:00 2010-01-01 00:00 2012-03-01 00:00 2012-03-01 00:00 2023-01-01 00:00 2023-01-01 00:00 2026-01-01 00:00 2026-01-01 00:00 2028-01-01 00:00 2028-01-01 00:00 |
2010-01-01 00:00 2010-01-01 00:00 2012-03-01 00:00 2012-03-01 00:00 2023-01-01 00:00 2023-01-01 00:00 2026-01-01 00:00 2026-01-01 00:00 2028-01-01 00:00 2028-01-01 00:00 2033-01-01 00:00 2033-01-01 00:00 |
Active | TRANSMISSION | PLANNED | ONPATH | BPAT | Path Rating | 2007-11-26 09:09 | BPAT2191 | 2023-08-21 10:46 | |||
WOH | 48745 | BPAT | WOH_Path Rating | WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) |
4250.0 4250.0 4250.0 4250.0 4250.0 4250.0 |
2008-11-01 00:00 2010-01-01 00:00 2012-03-01 00:00 2019-10-01 14:00 2019-10-09 09:00 2028-01-01 00:00 |
2010-01-01 00:00 2012-03-01 00:00 2019-10-01 14:00 2019-10-09 09:00 2028-01-01 00:00 2033-01-01 00:00 |
Active | TRANSMISSION | PLANNED | ONPATH | BPAT | West of Hatwai Path Rating | 2008-10-08 15:30 | BPAT7061 | 2023-08-21 11:02 | |||
JDW | 152758 | BPAT | JDW_Path_Limit | JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) |
1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 |
2011-03-15 09:00 2012-03-01 00:00 2023-01-01 00:00 2024-01-01 00:00 2025-01-01 00:00 2026-01-01 00:00 2028-01-01 00:00 |
2012-03-01 00:00 2023-01-01 00:00 2024-01-01 00:00 2025-01-01 00:00 2026-01-01 00:00 2028-01-01 00:00 2033-01-01 00:00 |
Active | TRANSMISSION | PLANNED | ONPATH | BPAT | Long term limit | 2011-03-15 08:44 | BPAT22259 | 2023-08-21 10:50 | |||
RCW | 152760 | BPAT | RCW_Path_Limit | ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) |
1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 |
2011-03-15 09:00 2012-03-01 00:00 2023-01-01 00:00 2024-01-01 00:00 2025-01-01 00:00 2026-01-01 00:00 2028-01-01 00:00 |
2012-03-01 00:00 2023-01-01 00:00 2024-01-01 00:00 2025-01-01 00:00 2026-01-01 00:00 2028-01-01 00:00 2033-01-01 00:00 |
Active | TRANSMISSION | PLANNED | ONPATH | BPAT | Long term limit | 2011-03-15 08:46 | BPAT22260 | 2023-08-21 10:50 | |||
14_Month | 173144 | BPAT | LAG_All_Lines_in_Service | LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) LAGR_E>W(BPAT) LAGR_W>E(BPAT) |
413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 413.0 350.0 |
2011-11-01 00:00 2011-11-01 00:00 2012-05-01 00:00 2012-05-01 00:00 2012-06-01 00:00 2012-06-01 00:00 2012-11-01 00:00 2012-11-01 00:00 2014-02-01 00:00 2014-02-01 00:00 2014-03-01 00:00 2014-03-01 00:00 2014-04-01 00:00 2014-04-01 00:00 2014-05-01 00:00 2014-05-01 00:00 2014-06-01 00:00 2014-06-01 00:00 2014-07-01 00:00 2014-07-01 00:00 2014-08-01 00:00 2014-08-01 00:00 2015-10-01 00:00 2015-10-01 00:00 2015-11-01 00:00 2015-11-01 00:00 2015-12-01 00:00 2015-12-01 00:00 2015-12-01 12:00 2015-12-01 12:00 2017-02-01 00:00 2017-02-01 00:00 2017-03-01 00:00 2017-03-01 00:00 2017-04-01 00:00 2017-04-01 00:00 2017-05-01 00:00 2017-05-01 00:00 2017-06-01 00:00 2017-06-01 00:00 2017-07-01 00:00 2017-07-01 00:00 2017-08-01 00:00 2017-08-01 00:00 2017-09-01 00:00 2017-09-01 00:00 2017-10-01 00:00 2017-10-01 00:00 2017-11-01 00:00 2017-11-01 00:00 2017-11-30 23:00 2017-11-30 23:00 2018-01-01 00:00 2018-01-01 00:00 2018-02-01 00:00 2018-02-01 00:00 2018-03-01 00:00 2018-03-01 00:00 2018-04-01 00:00 2018-04-01 00:00 2018-05-01 00:00 2018-05-01 00:00 2018-06-01 00:00 2018-06-01 00:00 2018-07-01 00:00 2018-07-01 00:00 2018-08-01 00:00 2018-08-01 00:00 2018-09-01 00:00 2018-09-01 00:00 2018-10-01 00:00 2018-10-01 00:00 2018-11-01 00:00 2018-11-01 00:00 2018-12-01 00:00 2018-12-01 00:00 2019-01-01 00:00 2019-01-01 00:00 2019-02-01 00:00 2019-02-01 00:00 2019-03-01 00:00 2019-03-01 00:00 2019-04-01 00:00 2019-04-01 00:00 2019-05-01 00:00 2019-05-01 00:00 2019-06-01 00:00 2019-06-01 00:00 2019-07-01 00:00 2019-07-01 00:00 2019-08-01 00:00 2019-08-01 00:00 2019-09-01 00:00 2019-09-01 00:00 2019-10-01 00:00 2019-10-01 00:00 2019-11-01 00:00 2019-11-01 00:00 2019-12-01 00:00 2019-12-01 00:00 2020-01-01 00:00 2020-01-01 00:00 2020-03-01 00:00 2020-03-01 00:00 2020-04-01 00:00 2020-04-01 00:00 2020-05-01 00:00 2020-05-01 00:00 2020-06-01 00:00 2020-06-01 00:00 2020-07-01 00:00 2020-07-01 00:00 2020-08-01 00:00 2020-08-01 00:00 2020-09-01 00:00 2020-09-01 00:00 2020-10-01 00:00 2020-10-01 00:00 2020-11-01 00:00 2020-11-01 00:00 2020-12-01 00:00 2020-12-01 00:00 2021-02-01 00:00 2021-02-01 00:00 2021-03-01 00:00 2021-03-01 00:00 2021-04-01 00:00 2021-04-01 00:00 2021-05-01 00:00 2021-05-01 00:00 2021-06-01 00:00 2021-06-01 00:00 2021-07-01 00:00 2021-07-01 00:00 2021-08-01 00:00 2021-08-01 00:00 2021-09-01 00:00 2021-09-01 00:00 2021-10-01 00:00 2021-10-01 00:00 2021-11-01 00:00 2021-11-01 00:00 2021-12-01 00:00 2021-12-01 00:00 2022-01-01 00:00 2022-01-01 00:00 2022-02-01 00:00 2022-02-01 00:00 2022-03-01 00:00 2022-03-01 00:00 2022-04-01 00:00 2022-04-01 00:00 2022-05-01 00:00 2022-05-01 00:00 2022-06-01 00:00 2022-06-01 00:00 2022-07-01 00:00 2022-07-01 00:00 2022-08-01 00:00 2022-08-01 00:00 2022-09-01 00:00 2022-09-01 00:00 2022-10-01 00:00 2022-10-01 00:00 2022-11-01 00:00 2022-11-01 00:00 2022-12-01 00:00 2022-12-01 00:00 2023-01-01 00:00 2023-01-01 00:00 2023-02-01 00:00 2023-02-01 00:00 2023-03-01 00:00 2023-03-01 00:00 2023-04-01 00:00 2023-04-01 00:00 2023-05-01 00:00 2023-05-01 00:00 2023-06-01 00:00 2023-06-01 00:00 2023-07-01 00:00 2023-07-01 00:00 2023-08-01 00:00 2023-08-01 00:00 2023-09-01 00:00 2023-09-01 00:00 2023-10-01 00:00 2023-10-01 00:00 2023-11-01 00:00 2023-11-01 00:00 2023-12-01 00:00 2023-12-01 00:00 2024-01-01 00:00 2024-01-01 00:00 2024-02-01 00:00 2024-02-01 00:00 2024-03-01 00:00 2024-03-01 00:00 2024-04-01 00:00 2024-04-01 00:00 2024-05-01 00:00 2024-05-01 00:00 2024-06-01 00:00 2024-06-01 00:00 2024-07-01 00:00 2024-07-01 00:00 2024-08-01 00:00 2024-08-01 00:00 2024-09-01 00:00 2024-09-01 00:00 2024-10-01 00:00 2024-10-01 00:00 2024-11-01 00:00 2024-11-01 00:00 2024-12-01 00:00 2024-12-01 00:00 2025-01-01 00:00 2025-01-01 00:00 2025-02-01 00:00 2025-02-01 00:00 2025-03-01 00:00 2025-03-01 00:00 2025-04-01 00:00 2025-04-01 00:00 2025-05-01 00:00 2025-05-01 00:00 2025-06-01 00:00 2025-06-01 00:00 |
2012-05-01 00:00 2012-05-01 00:00 2012-06-01 00:00 2012-06-01 00:00 2012-11-01 00:00 2012-11-01 00:00 2014-02-01 00:00 2014-02-01 00:00 2014-03-01 00:00 2014-03-01 00:00 2014-04-01 00:00 2014-04-01 00:00 2014-05-01 00:00 2014-05-01 00:00 2014-06-01 00:00 2014-06-01 00:00 2014-07-01 00:00 2014-07-01 00:00 2014-08-01 00:00 2014-08-01 00:00 2015-10-01 00:00 2015-10-01 00:00 2015-11-01 00:00 2015-11-01 00:00 2015-12-01 00:00 2015-12-01 00:00 2015-12-01 12:00 2015-12-01 12:00 2017-02-01 00:00 2017-02-01 00:00 2017-03-01 00:00 2017-03-01 00:00 2017-04-01 00:00 2017-04-01 00:00 2017-05-01 00:00 2017-05-01 00:00 2017-06-01 00:00 2017-06-01 00:00 2017-07-01 00:00 2017-07-01 00:00 2017-08-01 00:00 2017-08-01 00:00 2017-09-01 00:00 2017-09-01 00:00 2017-10-01 00:00 2017-10-01 00:00 2017-11-01 00:00 2017-11-01 00:00 2017-11-30 23:00 2017-11-30 23:00 2018-01-01 00:00 2018-01-01 00:00 2018-02-01 00:00 2018-02-01 00:00 2018-03-01 00:00 2018-03-01 00:00 2018-04-01 00:00 2018-04-01 00:00 2018-05-01 00:00 2018-05-01 00:00 2018-06-01 00:00 2018-06-01 00:00 2018-07-01 00:00 2018-07-01 00:00 2018-08-01 00:00 2018-08-01 00:00 2018-09-01 00:00 2018-09-01 00:00 2018-10-01 00:00 2018-10-01 00:00 2018-11-01 00:00 2018-11-01 00:00 2018-12-01 00:00 2018-12-01 00:00 2019-01-01 00:00 2019-01-01 00:00 2019-02-01 00:00 2019-02-01 00:00 2019-03-01 00:00 2019-03-01 00:00 2019-04-01 00:00 2019-04-01 00:00 2019-05-01 00:00 2019-05-01 00:00 2019-06-01 00:00 2019-06-01 00:00 2019-07-01 00:00 2019-07-01 00:00 2019-08-01 00:00 2019-08-01 00:00 2019-09-01 00:00 2019-09-01 00:00 2019-10-01 00:00 2019-10-01 00:00 2019-11-01 00:00 2019-11-01 00:00 2019-12-01 00:00 2019-12-01 00:00 2020-01-01 00:00 2020-01-01 00:00 2020-03-01 00:00 2020-03-01 00:00 2020-04-01 00:00 2020-04-01 00:00 2020-05-01 00:00 2020-05-01 00:00 2020-06-01 00:00 2020-06-01 00:00 2020-07-01 00:00 2020-07-01 00:00 2020-08-01 00:00 2020-08-01 00:00 2020-09-01 00:00 2020-09-01 00:00 2020-10-01 00:00 2020-10-01 00:00 2020-11-01 00:00 2020-11-01 00:00 2020-12-01 00:00 2020-12-01 00:00 2021-02-01 00:00 2021-02-01 00:00 2021-03-01 00:00 2021-03-01 00:00 2021-04-01 00:00 2021-04-01 00:00 2021-05-01 00:00 2021-05-01 00:00 2021-06-01 00:00 2021-06-01 00:00 2021-07-01 00:00 2021-07-01 00:00 2021-08-01 00:00 2021-08-01 00:00 2021-09-01 00:00 2021-09-01 00:00 2021-10-01 00:00 2021-10-01 00:00 2021-11-01 00:00 2021-11-01 00:00 2021-12-01 00:00 2021-12-01 00:00 2022-01-01 00:00 2022-01-01 00:00 2022-02-01 00:00 2022-02-01 00:00 2022-03-01 00:00 2022-03-01 00:00 2022-04-01 00:00 2022-04-01 00:00 2022-05-01 00:00 2022-05-01 00:00 2022-06-01 00:00 2022-06-01 00:00 2022-07-01 00:00 2022-07-01 00:00 2022-08-01 00:00 2022-08-01 00:00 2022-09-01 00:00 2022-09-01 00:00 2022-10-01 00:00 2022-10-01 00:00 2022-11-01 00:00 2022-11-01 00:00 2022-12-01 00:00 2022-12-01 00:00 2023-01-01 00:00 2023-01-01 00:00 2023-02-01 00:00 2023-02-01 00:00 2023-03-01 00:00 2023-03-01 00:00 2023-04-01 00:00 2023-04-01 00:00 2023-05-01 00:00 2023-05-01 00:00 2023-06-01 00:00 2023-06-01 00:00 2023-07-01 00:00 2023-07-01 00:00 2023-08-01 00:00 2023-08-01 00:00 2023-09-01 00:00 2023-09-01 00:00 2023-10-01 00:00 2023-10-01 00:00 2023-11-01 00:00 2023-11-01 00:00 2023-12-01 00:00 2023-12-01 00:00 2024-01-01 00:00 2024-01-01 00:00 2024-02-01 00:00 2024-02-01 00:00 2024-03-01 00:00 2024-03-01 00:00 2024-04-01 00:00 2024-04-01 00:00 2024-05-01 00:00 2024-05-01 00:00 2024-06-01 00:00 2024-06-01 00:00 2024-07-01 00:00 2024-07-01 00:00 2024-08-01 00:00 2024-08-01 00:00 2024-09-01 00:00 2024-09-01 00:00 2024-10-01 00:00 2024-10-01 00:00 2024-11-01 00:00 2024-11-01 00:00 2024-12-01 00:00 2024-12-01 00:00 2025-01-01 00:00 2025-01-01 00:00 2025-02-01 00:00 2025-02-01 00:00 2025-03-01 00:00 2025-03-01 00:00 2025-04-01 00:00 2025-04-01 00:00 2025-05-01 00:00 2025-05-01 00:00 2025-06-01 00:00 2025-06-01 00:00 2025-07-01 00:00 2025-07-01 00:00 |
Active | TRANSMISSION | PLANNED | ONPATH | BPAT | LaGrande -All Lines in Service (Year Round) | 2011-10-21 14:38 | BPAT25449 | 2024-03-27 11:25 | |||
14_Month | 173147 | BPAT | RCW_All_Lines_in_Service | ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) ROCKCK_GEN(BPAT) |
1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 |
2011-11-01 00:00 2012-05-01 00:00 2012-11-01 00:00 2014-02-01 00:00 2014-03-01 00:00 2014-04-01 00:00 2014-05-01 00:00 2014-06-01 00:00 2014-07-01 00:00 2014-08-01 00:00 2015-10-01 00:00 2015-11-01 00:00 2015-12-01 00:00 2015-12-01 12:00 2017-02-01 00:00 2017-03-01 00:00 2017-04-01 00:00 2017-05-01 00:00 2017-06-01 00:00 2017-07-01 00:00 2017-08-01 00:00 2017-09-01 00:00 2017-10-01 00:00 2017-11-01 00:00 2017-11-30 23:00 2017-12-30 00:00 2018-01-01 00:00 2018-02-01 00:00 2018-03-01 00:00 2018-04-01 00:00 2018-05-01 00:00 2018-06-01 00:00 2018-07-01 00:00 2018-08-01 00:00 2018-10-01 00:00 2018-11-01 00:00 2018-12-01 00:00 2019-01-01 00:00 2019-02-01 00:00 2019-03-01 00:00 2019-04-01 00:00 2019-05-01 00:00 2019-06-01 00:00 2019-07-01 00:00 2019-08-01 00:00 2019-09-01 00:00 2019-10-01 00:00 2019-11-01 00:00 2019-12-01 00:00 2020-01-01 00:00 2020-03-01 00:00 2020-04-01 00:00 2020-05-01 00:00 2020-06-01 00:00 2020-07-01 00:00 2020-08-01 00:00 2020-09-01 00:00 2020-10-01 00:00 2020-11-01 00:00 2020-12-01 00:00 2021-02-01 00:00 2021-03-01 00:00 2021-04-01 00:00 2021-05-01 00:00 2021-06-01 00:00 2021-07-01 00:00 2021-08-01 00:00 2021-09-01 00:00 2021-10-01 00:00 2021-11-01 00:00 2021-12-01 00:00 2022-01-01 00:00 2022-02-01 00:00 2022-03-01 00:00 2022-04-01 00:00 2022-05-01 00:00 2022-06-01 00:00 2022-07-01 00:00 2022-08-01 00:00 2022-09-01 00:00 2022-10-01 00:00 2022-11-01 00:00 2022-12-01 00:00 2023-01-01 00:00 2023-02-01 00:00 2023-03-01 00:00 2023-04-01 00:00 2023-05-01 00:00 2023-06-01 00:00 2023-07-01 00:00 2023-08-01 00:00 2023-09-01 00:00 2023-10-01 00:00 2023-11-01 00:00 2023-12-01 00:00 2024-01-01 00:00 2024-02-01 00:00 2024-03-01 00:00 2024-04-01 00:00 2024-05-01 00:00 2024-06-01 00:00 2024-07-01 00:00 2024-08-01 00:00 2024-09-01 00:00 2024-10-01 00:00 2024-11-01 00:00 2024-12-01 00:00 2025-01-01 00:00 2025-02-01 00:00 2025-03-01 00:00 2025-04-01 00:00 2025-05-01 00:00 2025-06-01 00:00 |
2012-05-01 00:00 2012-11-01 00:00 2014-02-01 00:00 2014-03-01 00:00 2014-04-01 00:00 2014-05-01 00:00 2014-06-01 00:00 2014-07-01 00:00 2014-08-01 00:00 2015-10-01 00:00 2015-11-01 00:00 2015-12-01 00:00 2015-12-01 12:00 2017-02-01 00:00 2017-03-01 00:00 2017-04-01 00:00 2017-05-01 00:00 2017-06-01 00:00 2017-07-01 00:00 2017-08-01 00:00 2017-09-01 00:00 2017-10-01 00:00 2017-11-01 00:00 2017-11-30 23:00 2017-12-30 00:00 2018-01-01 00:00 2018-02-01 00:00 2018-03-01 00:00 2018-04-01 00:00 2018-05-01 00:00 2018-06-01 00:00 2018-07-01 00:00 2018-08-01 00:00 2018-10-01 00:00 2018-11-01 00:00 2018-12-01 00:00 2019-01-01 00:00 2019-02-01 00:00 2019-03-01 00:00 2019-04-01 00:00 2019-05-01 00:00 2019-06-01 00:00 2019-07-01 00:00 2019-08-01 00:00 2019-09-01 00:00 2019-10-01 00:00 2019-11-01 00:00 2019-12-01 00:00 2020-01-01 00:00 2020-03-01 00:00 2020-04-01 00:00 2020-05-01 00:00 2020-06-01 00:00 2020-07-01 00:00 2020-08-01 00:00 2020-09-01 00:00 2020-10-01 00:00 2020-11-01 00:00 2020-12-01 00:00 2021-02-01 00:00 2021-03-01 00:00 2021-04-01 00:00 2021-05-01 00:00 2021-06-01 00:00 2021-07-01 00:00 2021-08-01 00:00 2021-09-01 00:00 2021-10-01 00:00 2021-11-01 00:00 2021-12-01 00:00 2022-01-01 00:00 2022-02-01 00:00 2022-03-01 00:00 2022-04-01 00:00 2022-05-01 00:00 2022-06-01 00:00 2022-07-01 00:00 2022-08-01 00:00 2022-09-01 00:00 2022-10-01 00:00 2022-11-01 00:00 2022-12-01 00:00 2023-01-01 00:00 2023-02-01 00:00 2023-03-01 00:00 2023-04-01 00:00 2023-05-01 00:00 2023-06-01 00:00 2023-07-01 00:00 2023-08-01 00:00 2023-09-01 00:00 2023-10-01 00:00 2023-11-01 00:00 2023-12-01 00:00 2024-01-01 00:00 2024-02-01 00:00 2024-03-01 00:00 2024-04-01 00:00 2024-05-01 00:00 2024-06-01 00:00 2024-07-01 00:00 2024-08-01 00:00 2024-09-01 00:00 2024-10-01 00:00 2024-11-01 00:00 2024-12-01 00:00 2025-01-01 00:00 2025-02-01 00:00 2025-03-01 00:00 2025-04-01 00:00 2025-05-01 00:00 2025-06-01 00:00 2025-07-01 00:00 |
Active | TRANSMISSION | PLANNED | ONPATH | BPAT | Rock Creek - All Lines in Service (Year Round) | 2011-10-21 14:39 | BPAT25450 | 2024-03-27 11:24 | |||
14_Month | 173150 | BPAT | JDW_All_Lines_in_Service | JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) JDWIND_GEN(BPAT) |
1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1200.0 1255.0 1255.0 1255.0 1255.0 1255.0 1255.0 1255.0 1255.0 1255.0 1255.0 1255.0 1255.0 1255.0 1255.0 1255.0 1255.0 1255.0 1255.0 1255.0 1255.0 1255.0 1255.0 1255.0 1255.0 1255.0 |
2011-11-01 00:00 2012-05-01 00:00 2012-11-01 00:00 2014-02-01 00:00 2014-03-01 00:00 2014-04-01 00:00 2014-05-01 00:00 2014-06-01 00:00 2014-07-01 00:00 2014-08-01 00:00 2015-10-01 00:00 2015-11-01 00:00 2015-12-01 00:00 2015-12-01 12:00 2017-02-01 00:00 2017-03-01 00:00 2017-04-01 00:00 2017-05-01 00:00 2017-06-01 00:00 2017-07-01 00:00 2017-08-01 00:00 2017-09-01 00:00 2017-10-01 00:00 2017-11-01 00:00 2017-11-30 23:00 2018-01-01 00:00 2018-02-01 00:00 2018-03-01 00:00 2018-04-01 00:00 2018-05-01 00:00 2018-06-01 00:00 2018-07-01 00:00 2018-08-01 00:00 2018-10-01 00:00 2018-11-01 00:00 2018-12-01 00:00 2019-01-01 00:00 2019-02-01 00:00 2019-03-01 00:00 2019-04-01 00:00 2019-05-01 00:00 2019-06-01 00:00 2019-07-01 00:00 2019-08-01 00:00 2019-09-01 00:00 2019-10-01 00:00 2019-11-01 00:00 2019-12-01 00:00 2020-01-01 00:00 2020-03-01 00:00 2020-04-01 00:00 2020-05-01 00:00 2020-06-01 00:00 2020-07-01 00:00 2020-08-01 00:00 2020-09-01 00:00 2020-10-01 00:00 2020-11-01 00:00 2020-12-01 00:00 2021-02-01 00:00 2021-03-01 00:00 2021-04-01 00:00 2021-05-01 00:00 2021-06-01 00:00 2021-07-01 00:00 2021-08-01 00:00 2021-09-01 00:00 2021-10-01 00:00 2021-11-01 00:00 2021-12-01 00:00 2022-01-01 00:00 2022-02-01 00:00 2022-03-01 00:00 2022-04-01 00:00 2022-04-07 00:00 2023-07-01 00:00 2023-08-01 00:00 2023-09-01 00:00 2023-10-01 00:00 2023-11-01 00:00 2023-12-01 00:00 2024-01-01 00:00 2024-02-01 00:00 2024-03-01 00:00 2024-04-01 00:00 2024-05-01 00:00 2024-06-01 00:00 2024-07-01 00:00 2024-08-01 00:00 2024-09-01 00:00 2024-10-01 00:00 2024-11-01 00:00 2024-12-01 00:00 2025-01-01 00:00 2025-02-01 00:00 2025-03-01 00:00 2025-04-01 00:00 2025-05-01 00:00 2025-06-01 00:00 |
2012-05-01 00:00 2012-11-01 00:00 2014-02-01 00:00 2014-03-01 00:00 2014-04-01 00:00 2014-05-01 00:00 2014-06-01 00:00 2014-07-01 00:00 2014-08-01 00:00 2015-10-01 00:00 2015-11-01 00:00 2015-12-01 00:00 2015-12-01 12:00 2017-02-01 00:00 2017-03-01 00:00 2017-04-01 00:00 2017-05-01 00:00 2017-06-01 00:00 2017-07-01 00:00 2017-08-01 00:00 2017-09-01 00:00 2017-10-01 00:00 2017-11-01 00:00 2017-11-30 23:00 2018-01-01 00:00 2018-02-01 00:00 2018-03-01 00:00 2018-04-01 00:00 2018-05-01 00:00 2018-06-01 00:00 2018-07-01 00:00 2018-08-01 00:00 2018-10-01 00:00 2018-11-01 00:00 2018-12-01 00:00 2019-01-01 00:00 2019-02-01 00:00 2019-03-01 00:00 2019-04-01 00:00 2019-05-01 00:00 2019-06-01 00:00 2019-07-01 00:00 2019-08-01 00:00 2019-09-01 00:00 2019-10-01 00:00 2019-11-01 00:00 2019-12-01 00:00 2020-01-01 00:00 2020-03-01 00:00 2020-04-01 00:00 2020-05-01 00:00 2020-06-01 00:00 2020-07-01 00:00 2020-08-01 00:00 2020-09-01 00:00 2020-10-01 00:00 2020-11-01 00:00 2020-12-01 00:00 2021-02-01 00:00 2021-03-01 00:00 2021-04-01 00:00 2021-05-01 00:00 2021-06-01 00:00 2021-07-01 00:00 2021-08-01 00:00 2021-09-01 00:00 2021-10-01 00:00 2021-11-01 00:00 2021-12-01 00:00 2022-01-01 00:00 2022-02-01 00:00 2022-03-01 00:00 2022-04-01 00:00 2022-04-07 00:00 2023-07-01 00:00 2023-08-01 00:00 2023-09-01 00:00 2023-10-01 00:00 2023-11-01 00:00 2023-12-01 00:00 2024-01-01 00:00 2024-02-01 00:00 2024-03-01 00:00 2024-04-01 00:00 2024-05-01 00:00 2024-06-01 00:00 2024-07-01 00:00 2024-08-01 00:00 2024-09-01 00:00 2024-10-01 00:00 2024-11-01 00:00 2024-12-01 00:00 2025-01-01 00:00 2025-02-01 00:00 2025-03-01 00:00 2025-04-01 00:00 2025-05-01 00:00 2025-06-01 00:00 2025-07-01 00:00 |
Active | TRANSMISSION | PLANNED | ONPATH | BPAT | John Day Wind - All Lines in Service (Year Round) | 2011-10-21 14:41 | BPAT25451 | 2024-03-27 11:23 | |||
WOCN | 181812 | BPAT | WOCN_LT | C-CASC_N(BPAT) | 10000.0 | 2012-03-01 09:00 | 2032-01-01 00:00 | Cancelled | TRANSMISSION | PLANNED | ONPATH | BPAT | WOCN long-term limit | 2012-02-29 14:15 | BPAT26934 | 2012-02-29 14:15 | |||
14_Month | 185758 | BPAT | WOM_All_Lines_in_Service | WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) |
4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 4500.0 |
2012-04-01 00:00 2012-05-01 00:00 2012-06-01 00:00 2012-11-01 00:00 2013-03-01 00:00 2014-06-01 00:00 2014-07-01 00:00 2014-08-01 00:00 2015-10-01 00:00 2015-11-01 00:00 2015-12-01 00:00 2015-12-01 12:00 2017-02-01 00:00 2017-03-01 00:00 2017-04-01 00:00 2017-05-01 00:00 2017-06-01 00:00 2017-07-01 00:00 2017-08-01 00:00 2017-09-01 00:00 2017-10-01 00:00 2017-11-01 00:00 2017-11-30 23:00 2018-01-01 00:00 2018-02-01 00:00 2018-03-01 00:00 2018-04-01 00:00 2018-05-01 00:00 2018-06-01 00:00 2018-07-01 00:00 2018-08-01 00:00 2018-10-01 00:00 2018-11-01 00:00 2018-12-01 00:00 2019-01-01 00:00 2019-02-01 00:00 2019-03-01 00:00 2019-04-01 00:00 2019-05-01 00:00 2019-06-01 00:00 2019-07-01 00:00 2019-08-01 00:00 2019-09-01 00:00 2019-10-01 00:00 2019-11-01 00:00 2019-12-01 00:00 2020-01-01 00:00 2020-03-01 00:00 2020-04-01 00:00 2020-05-01 00:00 2020-06-01 00:00 2020-07-01 00:00 2020-08-01 00:00 2020-09-01 00:00 2020-10-01 00:00 2020-11-01 00:00 2020-12-01 00:00 2021-02-01 00:00 2021-03-01 00:00 2021-04-01 00:00 2021-05-01 00:00 2021-06-01 00:00 2021-07-01 00:00 2021-08-01 00:00 2021-09-01 00:00 2021-10-01 00:00 2021-11-01 00:00 2021-12-01 00:00 2022-01-01 00:00 2022-02-01 00:00 2022-03-01 00:00 2022-04-01 00:00 2022-05-01 00:00 2022-06-01 00:00 2022-07-01 00:00 2022-08-01 00:00 2022-09-01 00:00 2022-10-01 00:00 2022-11-01 00:00 2022-12-01 00:00 2023-01-01 00:00 2023-02-01 00:00 2023-03-01 00:00 2023-04-01 00:00 2023-05-01 00:00 2023-06-01 00:00 2023-07-01 00:00 2023-08-01 00:00 2023-09-01 00:00 2023-10-01 00:00 2023-11-01 00:00 2023-12-01 00:00 2024-01-01 00:00 2024-02-01 00:00 2024-03-01 00:00 2024-04-01 00:00 2024-05-01 00:00 2024-06-01 00:00 2024-07-01 00:00 2024-08-01 00:00 2024-09-01 00:00 2024-10-01 00:00 2024-11-01 00:00 2024-12-01 00:00 2025-01-01 00:00 2025-02-01 00:00 2025-03-01 00:00 2025-04-01 00:00 2025-05-01 00:00 2025-06-01 00:00 |
2012-05-01 00:00 2012-06-01 00:00 2012-11-01 00:00 2013-03-01 00:00 2014-06-01 00:00 2014-07-01 00:00 2014-08-01 00:00 2015-10-01 00:00 2015-11-01 00:00 2015-12-01 00:00 2015-12-01 12:00 2017-02-01 00:00 2017-03-01 00:00 2017-04-01 00:00 2017-05-01 00:00 2017-06-01 00:00 2017-07-01 00:00 2017-08-01 00:00 2017-09-01 00:00 2017-10-01 00:00 2017-11-01 00:00 2017-11-30 23:00 2018-01-01 00:00 2018-02-01 00:00 2018-03-01 00:00 2018-04-01 00:00 2018-05-01 00:00 2018-06-01 00:00 2018-07-01 00:00 2018-08-01 00:00 2018-10-01 00:00 2018-11-01 00:00 2018-12-01 00:00 2019-01-01 00:00 2019-02-01 00:00 2019-03-01 00:00 2019-04-01 00:00 2019-05-01 00:00 2019-06-01 00:00 2019-07-01 00:00 2019-08-01 00:00 2019-09-01 00:00 2019-10-01 00:00 2019-11-01 00:00 2019-12-01 00:00 2020-01-01 00:00 2020-03-01 00:00 2020-04-01 00:00 2020-05-01 00:00 2020-06-01 00:00 2020-07-01 00:00 2020-08-01 00:00 2020-09-01 00:00 2020-10-01 00:00 2020-11-01 00:00 2020-12-01 00:00 2021-02-01 00:00 2021-03-01 00:00 2021-04-01 00:00 2021-05-01 00:00 2021-06-01 00:00 2021-07-01 00:00 2021-08-01 00:00 2021-09-01 00:00 2021-10-01 00:00 2021-11-01 00:00 2021-12-01 00:00 2022-01-01 00:00 2022-02-01 00:00 2022-03-01 00:00 2022-04-01 00:00 2022-05-01 00:00 2022-06-01 00:00 2022-07-01 00:00 2022-08-01 00:00 2022-09-01 00:00 2022-10-01 00:00 2022-11-01 00:00 2022-12-01 00:00 2023-01-01 00:00 2023-02-01 00:00 2023-03-01 00:00 2023-04-01 00:00 2023-05-01 00:00 2023-06-01 00:00 2023-07-01 00:00 2023-08-01 00:00 2023-09-01 00:00 2023-10-01 00:00 2023-11-01 00:00 2023-12-01 00:00 2024-01-01 00:00 2024-02-01 00:00 2024-03-01 00:00 2024-04-01 00:00 2024-05-01 00:00 2024-06-01 00:00 2024-07-01 00:00 2024-08-01 00:00 2024-09-01 00:00 2024-10-01 00:00 2024-11-01 00:00 2024-12-01 00:00 2025-01-01 00:00 2025-02-01 00:00 2025-03-01 00:00 2025-04-01 00:00 2025-05-01 00:00 2025-06-01 00:00 2025-07-01 00:00 |
Active | TRANSMISSION | PLANNED | ONPATH | BPAT | West of McNary - All Lines in Service (Year Round) | 2012-03-29 12:34 | BPAT27351 | 2024-03-27 11:46 | |||
14_Month | 191688 | BPAT | WOH_All_lines_in_service | WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) WOH_E>W(BPAT) |
4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 4275.0 |
2012-06-01 08:00 2012-11-01 00:00 2014-02-01 00:00 2014-03-01 00:00 2014-04-01 00:00 2014-05-01 00:00 2014-06-01 00:00 2014-07-01 00:00 2014-08-01 00:00 2015-10-01 00:00 2015-11-01 00:00 2015-12-01 00:00 2015-12-01 12:00 2017-02-01 00:00 2017-03-01 00:00 2017-04-01 00:00 2017-05-01 00:00 2017-06-01 00:00 2017-07-01 00:00 2017-08-01 00:00 2017-09-01 00:00 2017-10-01 00:00 2017-11-01 00:00 2017-11-30 23:00 2018-01-01 00:00 2018-02-01 00:00 2018-03-01 00:00 2018-04-01 00:00 2018-05-01 00:00 2018-06-01 00:00 2018-07-01 00:00 2018-08-01 00:00 2018-10-01 00:00 2018-11-01 00:00 2018-12-01 00:00 2019-01-01 00:00 2019-02-01 00:00 2019-03-01 00:00 2019-04-01 00:00 2019-05-01 00:00 2019-06-01 00:00 2019-07-01 00:00 2019-08-01 00:00 2019-09-01 00:00 2019-10-01 00:00 2019-10-01 14:00 2019-10-09 09:00 2020-12-01 00:00 2021-02-01 00:00 2021-03-01 00:00 2021-04-01 00:00 2021-05-01 00:00 2021-06-01 00:00 2021-07-01 00:00 2021-08-01 00:00 2021-09-01 00:00 2021-10-01 00:00 2021-11-01 00:00 2021-12-01 00:00 2022-01-01 00:00 2022-02-01 00:00 2022-03-01 00:00 2022-04-01 00:00 2022-05-01 00:00 2022-06-01 00:00 2022-07-01 00:00 2022-08-01 00:00 2022-09-01 00:00 2022-10-01 00:00 2022-11-01 00:00 2022-12-01 00:00 2023-01-01 00:00 2023-02-01 00:00 2023-03-01 00:00 2023-04-01 00:00 2023-05-01 00:00 2023-06-01 00:00 2023-07-01 00:00 2023-08-01 00:00 2023-09-01 00:00 2023-10-01 00:00 2023-11-01 00:00 2023-12-01 00:00 2024-01-01 00:00 2024-02-01 00:00 2024-03-01 00:00 2024-04-01 00:00 2024-05-01 00:00 2024-06-01 00:00 2024-07-01 00:00 2024-08-01 00:00 2024-09-01 00:00 2024-10-01 00:00 2024-11-01 00:00 2024-12-01 00:00 2025-01-01 00:00 2025-02-01 00:00 2025-03-01 00:00 2025-04-01 00:00 2025-05-01 00:00 2025-06-01 00:00 |
2012-11-01 00:00 2014-02-01 00:00 2014-03-01 00:00 2014-04-01 00:00 2014-05-01 00:00 2014-06-01 00:00 2014-07-01 00:00 2014-08-01 00:00 2015-10-01 00:00 2015-11-01 00:00 2015-12-01 00:00 2015-12-01 12:00 2017-02-01 00:00 2017-03-01 00:00 2017-04-01 00:00 2017-05-01 00:00 2017-06-01 00:00 2017-07-01 00:00 2017-08-01 00:00 2017-09-01 00:00 2017-10-01 00:00 2017-11-01 00:00 2017-11-30 23:00 2018-01-01 00:00 2018-02-01 00:00 2018-03-01 00:00 2018-04-01 00:00 2018-05-01 00:00 2018-06-01 00:00 2018-07-01 00:00 2018-08-01 00:00 2018-10-01 00:00 2018-11-01 00:00 2018-12-01 00:00 2019-01-01 00:00 2019-02-01 00:00 2019-03-01 00:00 2019-04-01 00:00 2019-05-01 00:00 2019-06-01 00:00 2019-07-01 00:00 2019-08-01 00:00 2019-09-01 00:00 2019-10-01 00:00 2019-10-01 14:00 2019-10-09 09:00 2020-12-01 00:00 2021-02-01 00:00 2021-03-01 00:00 2021-04-01 00:00 2021-05-01 00:00 2021-06-01 00:00 2021-07-01 00:00 2021-08-01 00:00 2021-09-01 00:00 2021-10-01 00:00 2021-11-01 00:00 2021-12-01 00:00 2022-01-01 00:00 2022-02-01 00:00 2022-03-01 00:00 2022-04-01 00:00 2022-05-01 00:00 2022-06-01 00:00 2022-07-01 00:00 2022-08-01 00:00 2022-09-01 00:00 2022-10-01 00:00 2022-11-01 00:00 2022-12-01 00:00 2023-01-01 00:00 2023-02-01 00:00 2023-03-01 00:00 2023-04-01 00:00 2023-05-01 00:00 2023-06-01 00:00 2023-07-01 00:00 2023-08-01 00:00 2023-09-01 00:00 2023-10-01 00:00 2023-11-01 00:00 2023-12-01 00:00 2024-01-01 00:00 2024-02-01 00:00 2024-03-01 00:00 2024-04-01 00:00 2024-05-01 00:00 2024-06-01 00:00 2024-07-01 00:00 2024-08-01 00:00 2024-09-01 00:00 2024-10-01 00:00 2024-11-01 00:00 2024-12-01 00:00 2025-01-01 00:00 2025-02-01 00:00 2025-03-01 00:00 2025-04-01 00:00 2025-05-01 00:00 2025-06-01 00:00 2025-07-01 00:00 |
Active | TRANSMISSION | PLANNED | ONPATH | BPAT | West of Hatwai - All Lines in Service (Year Round) | 2012-05-30 07:33 | BPAT28676 | 2024-03-27 11:51 | |||
14_Month | 203317 | BPAT | SOB_All_Lines_in_Service | SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) SBNDRY_N>S(BPAT) |
1350.0 1350.0 1350.0 1350.0 1350.0 1350.0 1350.0 1350.0 1350.0 1350.0 1350.0 1350.0 1350.0 1350.0 1350.0 1350.0 1350.0 1350.0 1350.0 1350.0 1350.0 1350.0 1350.0 1350.0 1350.0 1350.0 1350.0 1350.0 1350.0 1350.0 1350.0 1350.0 1350.0 1350.0 1350.0 1350.0 1350.0 1350.0 1350.0 1350.0 1350.0 1350.0 1350.0 1350.0 1350.0 1350.0 1350.0 1350.0 1350.0 1350.0 1350.0 1350.0 1350.0 1350.0 1350.0 1350.0 1350.0 1350.0 1350.0 1350.0 1350.0 1350.0 1350.0 1350.0 1350.0 1350.0 1350.0 1350.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 |
2012-11-01 09:00 2014-02-01 00:00 2014-03-01 00:00 2014-04-01 00:00 2014-05-01 00:00 2014-06-01 00:00 2014-07-01 00:00 2014-08-01 00:00 2014-09-01 00:00 2014-10-01 00:00 2014-11-01 00:00 2014-12-01 00:00 2015-01-01 00:00 2015-02-01 00:00 2015-03-01 00:00 2015-04-01 00:00 2015-05-01 00:00 2015-06-01 00:00 2015-07-01 00:00 2015-08-01 00:00 2015-09-01 00:00 2015-11-01 00:00 2015-12-01 00:00 2015-12-01 12:00 2017-02-01 00:00 2017-03-01 00:00 2017-04-01 00:00 2017-05-01 00:00 2017-06-01 00:00 2017-07-01 00:00 2017-08-01 00:00 2017-09-01 00:00 2017-10-01 00:00 2017-11-01 00:00 2017-11-30 23:00 2018-01-01 00:00 2018-02-01 00:00 2018-03-01 00:00 2018-04-01 00:00 2018-05-01 00:00 2018-06-01 00:00 2018-07-01 00:00 2018-08-01 00:00 2018-10-01 00:00 2018-11-01 00:00 2018-12-01 00:00 2019-01-01 00:00 2019-02-01 00:00 2019-03-01 00:00 2019-04-01 00:00 2019-05-01 00:00 2019-06-01 00:00 2019-07-01 00:00 2019-08-01 00:00 2019-09-01 00:00 2019-10-01 00:00 2019-11-01 00:00 2019-12-01 00:00 2020-01-01 00:00 2020-03-01 00:00 2020-04-01 00:00 2020-05-01 00:00 2020-06-01 00:00 2020-07-01 00:00 2020-08-01 00:00 2020-09-01 00:00 2020-10-01 00:00 2020-11-01 00:00 2020-11-18 00:00 2022-03-01 00:00 2022-04-01 00:00 2022-05-01 00:00 2022-06-01 00:00 2022-07-01 00:00 2022-08-01 00:00 2022-09-01 00:00 2022-10-01 00:00 2022-11-01 00:00 2022-12-01 00:00 2023-01-01 00:00 2023-02-01 00:00 2023-03-01 00:00 2023-04-01 00:00 2023-05-01 00:00 2023-06-01 00:00 2023-07-01 00:00 2023-08-01 00:00 2023-09-01 00:00 2023-10-01 00:00 2023-11-01 00:00 2023-12-01 00:00 2024-01-01 00:00 2024-02-01 00:00 2024-03-01 00:00 2024-04-01 00:00 2024-05-01 00:00 2024-06-01 00:00 2024-07-01 00:00 2024-08-01 00:00 2024-09-01 00:00 2024-10-01 00:00 2024-11-01 00:00 2024-12-01 00:00 2025-01-01 00:00 2025-02-01 00:00 2025-03-01 00:00 2025-04-01 00:00 2025-05-01 00:00 2025-06-01 00:00 |
2014-02-01 00:00 2014-03-01 00:00 2014-04-01 00:00 2014-05-01 00:00 2014-06-01 00:00 2014-07-01 00:00 2014-08-01 00:00 2014-09-01 00:00 2014-10-01 00:00 2014-11-01 00:00 2014-12-01 00:00 2015-01-01 00:00 2015-02-01 00:00 2015-03-01 00:00 2015-04-01 00:00 2015-05-01 00:00 2015-06-01 00:00 2015-07-01 00:00 2015-08-01 00:00 2015-09-01 00:00 2015-11-01 00:00 2015-12-01 00:00 2015-12-01 12:00 2017-02-01 00:00 2017-03-01 00:00 2017-04-01 00:00 2017-05-01 00:00 2017-06-01 00:00 2017-07-01 00:00 2017-08-01 00:00 2017-09-01 00:00 2017-10-01 00:00 2017-11-01 00:00 2017-11-30 23:00 2018-01-01 00:00 2018-02-01 00:00 2018-03-01 00:00 2018-04-01 00:00 2018-05-01 00:00 2018-06-01 00:00 2018-07-01 00:00 2018-08-01 00:00 2018-10-01 00:00 2018-11-01 00:00 2018-12-01 00:00 2019-01-01 00:00 2019-02-01 00:00 2019-03-01 00:00 2019-04-01 00:00 2019-05-01 00:00 2019-06-01 00:00 2019-07-01 00:00 2019-08-01 00:00 2019-09-01 00:00 2019-10-01 00:00 2019-11-01 00:00 2019-12-01 00:00 2020-01-01 00:00 2020-03-01 00:00 2020-04-01 00:00 2020-05-01 00:00 2020-06-01 00:00 2020-07-01 00:00 2020-08-01 00:00 2020-09-01 00:00 2020-10-01 00:00 2020-11-01 00:00 2020-11-18 00:00 2022-03-01 00:00 2022-04-01 00:00 2022-05-01 00:00 2022-06-01 00:00 2022-07-01 00:00 2022-08-01 00:00 2022-09-01 00:00 2022-10-01 00:00 2022-11-01 00:00 2022-12-01 00:00 2023-01-01 00:00 2023-02-01 00:00 2023-03-01 00:00 2023-04-01 00:00 2023-05-01 00:00 2023-06-01 00:00 2023-07-01 00:00 2023-08-01 00:00 2023-09-01 00:00 2023-10-01 00:00 2023-11-01 00:00 2023-12-01 00:00 2024-01-01 00:00 2024-02-01 00:00 2024-03-01 00:00 2024-04-01 00:00 2024-05-01 00:00 2024-06-01 00:00 2024-07-01 00:00 2024-08-01 00:00 2024-09-01 00:00 2024-10-01 00:00 2024-11-01 00:00 2024-12-01 00:00 2025-01-01 00:00 2025-02-01 00:00 2025-03-01 00:00 2025-04-01 00:00 2025-05-01 00:00 2025-06-01 00:00 2025-07-01 00:00 |
Active | TRANSMISSION | PLANNED | ONPATH | BPAT | South of Boundary - All Lines in Service (Year Round) | 2012-10-25 14:00 | BPAT31256 | 2024-03-27 11:48 | |||
14_Month | 210658 | BPAT | WOJD_All_Lines_in_Service | WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) |
3750.0 3750.0 3750.0 3750.0 3750.0 3750.0 3750.0 3750.0 3750.0 3750.0 3750.0 3750.0 3750.0 3750.0 3750.0 3750.0 3750.0 3750.0 3750.0 3750.0 3750.0 3750.0 3750.0 3750.0 3750.0 3750.0 3750.0 3750.0 3750.0 3750.0 3750.0 3750.0 3750.0 3750.0 3750.0 4350.0 4350.0 4350.0 4350.0 4350.0 4350.0 4350.0 4350.0 4350.0 4350.0 4350.0 4350.0 4350.0 4350.0 4350.0 4350.0 4350.0 4350.0 4350.0 4350.0 4350.0 4350.0 4350.0 4350.0 4350.0 4350.0 4350.0 4350.0 4350.0 4350.0 4350.0 4350.0 4350.0 4350.0 4350.0 4350.0 4350.0 4350.0 4350.0 4350.0 4350.0 4350.0 4350.0 4350.0 4350.0 4350.0 4350.0 4350.0 4350.0 4350.0 4350.0 4350.0 4350.0 4350.0 4350.0 4350.0 4350.0 4350.0 4350.0 |
2013-02-21 00:00 2013-03-01 00:00 2014-06-01 00:00 2014-07-01 00:00 2014-08-01 00:00 2015-08-27 09:00 2016-12-01 00:00 2017-01-01 00:00 2017-02-01 00:00 2017-03-01 00:00 2017-04-01 00:00 2017-05-01 00:00 2017-06-01 00:00 2017-07-01 00:00 2017-08-01 00:00 2017-09-01 00:00 2017-10-01 00:00 2017-11-01 00:00 2017-11-30 23:00 2018-01-01 00:00 2018-02-01 00:00 2018-03-01 00:00 2018-04-01 00:00 2018-05-01 00:00 2018-06-01 00:00 2018-07-01 00:00 2018-08-01 00:00 2018-10-01 00:00 2018-11-01 00:00 2018-12-01 00:00 2019-01-01 00:00 2019-02-01 00:00 2019-03-01 00:00 2019-04-01 00:00 2019-05-01 00:00 2019-06-01 00:00 2020-08-01 00:00 2020-09-01 00:00 2020-10-01 00:00 2020-11-01 00:00 2020-12-01 00:00 2021-02-01 00:00 2021-03-01 00:00 2021-04-01 00:00 2021-05-01 00:00 2021-06-01 00:00 2021-07-01 00:00 2021-08-01 00:00 2021-09-01 00:00 2021-10-01 00:00 2021-11-01 00:00 2021-12-01 00:00 2022-01-01 00:00 2022-02-01 00:00 2022-03-01 00:00 2022-04-01 00:00 2022-05-01 00:00 2022-06-01 00:00 2022-07-01 00:00 2022-08-01 00:00 2022-09-01 00:00 2022-10-01 00:00 2022-11-01 00:00 2022-12-01 00:00 2023-01-01 00:00 2023-02-01 00:00 2023-03-01 00:00 2023-04-01 00:00 2023-05-01 00:00 2023-06-01 00:00 2023-07-01 00:00 2023-08-01 00:00 2023-09-01 00:00 2023-10-01 00:00 2023-11-01 00:00 2023-12-01 00:00 2024-01-01 00:00 2024-02-01 00:00 2024-03-01 00:00 2024-04-01 00:00 2024-05-01 00:00 2024-06-01 00:00 2024-07-01 00:00 2024-08-01 00:00 2024-09-01 00:00 2024-10-01 00:00 2024-11-01 00:00 2024-12-01 00:00 2025-01-01 00:00 2025-02-01 00:00 2025-03-01 00:00 2025-04-01 00:00 2025-05-01 00:00 2025-06-01 00:00 |
2013-03-01 00:00 2014-06-01 00:00 2014-07-01 00:00 2014-08-01 00:00 2015-08-27 09:00 2016-12-01 00:00 2017-01-01 00:00 2017-02-01 00:00 2017-03-01 00:00 2017-04-01 00:00 2017-05-01 00:00 2017-06-01 00:00 2017-07-01 00:00 2017-08-01 00:00 2017-09-01 00:00 2017-10-01 00:00 2017-11-01 00:00 2017-11-30 23:00 2018-01-01 00:00 2018-02-01 00:00 2018-03-01 00:00 2018-04-01 00:00 2018-05-01 00:00 2018-06-01 00:00 2018-07-01 00:00 2018-08-01 00:00 2018-10-01 00:00 2018-11-01 00:00 2018-12-01 00:00 2019-01-01 00:00 2019-02-01 00:00 2019-03-01 00:00 2019-04-01 00:00 2019-05-01 00:00 2019-06-01 00:00 2020-08-01 00:00 2020-09-01 00:00 2020-10-01 00:00 2020-11-01 00:00 2020-12-01 00:00 2021-02-01 00:00 2021-03-01 00:00 2021-04-01 00:00 2021-05-01 00:00 2021-06-01 00:00 2021-07-01 00:00 2021-08-01 00:00 2021-09-01 00:00 2021-10-01 00:00 2021-11-01 00:00 2021-12-01 00:00 2022-01-01 00:00 2022-02-01 00:00 2022-03-01 00:00 2022-04-01 00:00 2022-05-01 00:00 2022-06-01 00:00 2022-07-01 00:00 2022-08-01 00:00 2022-09-01 00:00 2022-10-01 00:00 2022-11-01 00:00 2022-12-01 00:00 2023-01-01 00:00 2023-02-01 00:00 2023-03-01 00:00 2023-04-01 00:00 2023-05-01 00:00 2023-06-01 00:00 2023-07-01 00:00 2023-08-01 00:00 2023-09-01 00:00 2023-10-01 00:00 2023-11-01 00:00 2023-12-01 00:00 2024-01-01 00:00 2024-02-01 00:00 2024-03-01 00:00 2024-04-01 00:00 2024-05-01 00:00 2024-06-01 00:00 2024-07-01 00:00 2024-08-01 00:00 2024-09-01 00:00 2024-10-01 00:00 2024-11-01 00:00 2024-12-01 00:00 2025-01-01 00:00 2025-02-01 00:00 2025-03-01 00:00 2025-04-01 00:00 2025-05-01 00:00 2025-06-01 00:00 2025-07-01 00:00 |
Active | TRANSMISSION | PLANNED | ONPATH | BPAT | West of John Day - All Lines in Service (Year Round) | 2013-02-19 10:46 | BPAT33076 | 2024-03-27 11:47 | |||
14_Month | 215522 | BPAT | WNAPM_All_lines_in_service | WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) WANAPM_N>S(BPAT) |
750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 750.0 |
2013-06-04 00:00 2014-08-01 00:00 2015-08-27 14:00 2015-11-23 11:00 2016-03-24 11:00 2016-05-26 10:00 2016-06-24 15:00 2016-08-04 08:00 2016-08-26 13:00 2016-10-05 15:00 2016-11-07 14:00 2017-01-03 14:00 2017-03-03 14:00 2017-05-02 15:00 2017-06-28 14:00 2017-07-26 14:00 2017-08-28 14:00 2017-09-28 15:00 2019-01-01 00:00 2019-02-01 00:00 2019-03-01 00:00 2019-04-01 00:00 2019-05-01 00:00 2019-06-01 00:00 2019-07-01 00:00 2019-08-01 00:00 2019-09-01 00:00 2019-10-01 00:00 2019-10-01 13:00 2019-10-09 10:00 2020-12-01 00:00 2021-02-01 00:00 2021-03-01 00:00 2021-04-01 00:00 2021-05-01 00:00 2021-06-01 00:00 2021-07-01 00:00 2021-08-01 00:00 2021-09-01 00:00 2021-10-01 00:00 2021-11-01 00:00 2021-12-01 00:00 2022-01-01 00:00 2022-02-01 00:00 2022-03-01 00:00 2022-04-01 00:00 2022-05-01 00:00 2022-06-01 00:00 2022-07-01 00:00 2022-08-01 00:00 2022-09-01 00:00 2022-10-01 00:00 2022-11-01 00:00 2022-12-01 00:00 2023-01-01 00:00 2023-02-01 00:00 2023-03-01 00:00 2023-04-01 00:00 2023-05-01 00:00 2023-06-01 00:00 2023-07-01 00:00 2023-08-01 00:00 2023-09-01 00:00 2023-10-01 00:00 2023-11-01 00:00 2023-12-01 00:00 2024-01-01 00:00 2024-02-01 00:00 2024-03-01 00:00 2024-04-01 00:00 2024-05-01 00:00 2024-06-01 00:00 2024-07-01 00:00 2024-08-01 00:00 2024-09-01 00:00 2024-10-01 00:00 2024-11-01 00:00 2024-12-01 00:00 2025-01-01 00:00 2025-02-01 00:00 2025-03-01 00:00 2025-04-01 00:00 2025-05-01 00:00 2025-06-01 00:00 |
2014-08-01 00:00 2015-08-27 14:00 2015-11-23 11:00 2016-03-24 11:00 2016-05-26 10:00 2016-06-24 15:00 2016-08-04 08:00 2016-08-26 13:00 2016-10-05 15:00 2016-11-07 14:00 2017-01-03 14:00 2017-03-03 14:00 2017-05-02 15:00 2017-06-28 14:00 2017-07-26 14:00 2017-08-28 14:00 2017-09-28 15:00 2019-01-01 00:00 2019-02-01 00:00 2019-03-01 00:00 2019-04-01 00:00 2019-05-01 00:00 2019-06-01 00:00 2019-07-01 00:00 2019-08-01 00:00 2019-09-01 00:00 2019-10-01 00:00 2019-10-01 13:00 2019-10-09 10:00 2020-12-01 00:00 2021-02-01 00:00 2021-03-01 00:00 2021-04-01 00:00 2021-05-01 00:00 2021-06-01 00:00 2021-07-01 00:00 2021-08-01 00:00 2021-09-01 00:00 2021-10-01 00:00 2021-11-01 00:00 2021-12-01 00:00 2022-01-01 00:00 2022-02-01 00:00 2022-03-01 00:00 2022-04-01 00:00 2022-05-01 00:00 2022-06-01 00:00 2022-07-01 00:00 2022-08-01 00:00 2022-09-01 00:00 2022-10-01 00:00 2022-11-01 00:00 2022-12-01 00:00 2023-01-01 00:00 2023-02-01 00:00 2023-03-01 00:00 2023-04-01 00:00 2023-05-01 00:00 2023-06-01 00:00 2023-07-01 00:00 2023-08-01 00:00 2023-09-01 00:00 2023-10-01 00:00 2023-11-01 00:00 2023-12-01 00:00 2024-01-01 00:00 2024-02-01 00:00 2024-03-01 00:00 2024-04-01 00:00 2024-05-01 00:00 2024-06-01 00:00 2024-07-01 00:00 2024-08-01 00:00 2024-09-01 00:00 2024-10-01 00:00 2024-11-01 00:00 2024-12-01 00:00 2025-01-01 00:00 2025-02-01 00:00 2025-03-01 00:00 2025-04-01 00:00 2025-05-01 00:00 2025-06-01 00:00 2025-07-01 00:00 |
Active | TRANSMISSION | PLANNED | ONPATH | BPAT | Wanapum Injection - All Lines in Service (Year Round) | 2013-05-31 09:59 | BPAT34494 | 2024-03-27 11:49 | |||
SCSTER NOEL | 241257 | BPAT | SOC NOEL Long Term | N_ECOL_S>N(BPAT) SCSTER_N>S(BPAT) SCSTER_N>S(BPAT) N_ECOL_S>N(BPAT) N_ECOL_S>N(BPAT) N_ECOL_S>N(BPAT) SCSTER_N>S(BPAT) |
2800.0 1850.0 1880.0 2800.0 2800.0 2800.0 1880.0 |
2015-11-01 00:00 2015-11-01 00:00 2019-09-20 00:00 2025-01-01 00:00 2026-01-01 00:00 2028-01-01 00:00 2028-01-01 00:00 |
2025-01-01 00:00 2019-09-20 00:00 2028-01-01 00:00 2026-01-01 00:00 2028-01-01 00:00 2033-01-01 00:00 2033-01-01 00:00 |
Active | TRANSMISSION | PLANNED | ONPATH | BPAT | SCSTER & N_ECOL Long-term limit | 2015-01-30 10:54 | BPAT44295 | 2023-08-21 10:54 | |||
NOHANF | 241268 | BPAT | North of Hanford | NOHANF(BPAT) NOHANF(BPAT) NOHANF(BPAT) NOHANF(BPAT) |
4450.0 4450.0 4450.0 4450.0 |
2015-11-01 00:00 2025-01-01 13:00 2026-01-01 00:00 2028-01-01 00:00 |
2025-01-01 13:00 2026-01-01 00:00 2028-01-01 00:00 2033-01-01 00:00 |
Active | TRANSMISSION | PLANNED | ONPATH | BPAT | NOHANF Long-term limit | 2015-01-30 11:06 | BPAT44298 | 2023-08-21 10:55 | |||
WOMCNY | 255118 | BPAT | West of McNary LT Rating | WOMCNY(BPAT) WOMCNY(BPAT) WOMCNY(BPAT) |
4500.0 4500.0 4500.0 |
2015-11-02 00:00 2026-01-01 00:00 2028-01-01 00:00 |
2026-01-01 00:00 2028-01-01 00:00 2033-01-01 00:00 |
Active | TRANSMISSION | PLANNED | ONPATH | BPAT | West of McNary Long-Term Limit. | 2015-10-27 10:32 | BPAT51473 | 2023-08-21 10:58 | |||
WOJD | 255121 | BPAT | West of John Day Long-Term Limit | WOJD_E>W(BPAT) WOJD_E>W(BPAT) WOJD_E>W(BPAT) |
4300.0 4350.0 4350.0 |
2015-11-02 00:00 2019-11-13 15:00 2028-01-01 00:00 |
2019-11-13 15:00 2028-01-01 00:00 2033-01-01 00:00 |
Active | TRANSMISSION | PLANNED | ONPATH | BPAT | West of John Day Long Term Limit. | 2015-10-27 10:35 | BPAT51474 | 2023-08-21 10:59 | |||
WOSLATT | 255124 | BPAT | West of Slatt Path Rating | WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) |
4200.0 4200.0 4200.0 |
2015-11-02 00:00 2026-01-01 00:00 2028-01-01 00:00 |
2026-01-01 00:00 2028-01-01 00:00 2033-01-01 00:00 |
Active | TRANSMISSION | PLANNED | ONPATH | BPAT | West of Slatt Long-term Limit. | 2015-10-27 10:37 | BPAT51475 | 2023-08-21 11:02 | |||
RAVR_PAUL | 255209 | BPAT | Raver -Paul LT Rating | RAVR_PAUL(BPAT) RAVR_PAUL(BPAT) RAVR_PAUL(BPAT) |
1450.0 1450.0 1450.0 |
2015-11-02 00:00 2026-01-01 00:00 2028-01-01 00:00 |
2026-01-01 00:00 2028-01-01 00:00 2033-01-01 00:00 |
Active | TRANSMISSION | PLANNED | ONPATH | BPAT | Raver-Paul Long-term Limit. | 2015-10-27 14:00 | BPAT51479 | 2023-08-21 10:57 | |||
SOALSN | 255215 | BPAT | South of Allston Path Rating | SOALSN(BPAT) SOALSN(BPAT) SOALSN(BPAT) |
2950.0 3100.0 3200.0 |
2015-11-02 00:00 2022-05-05 00:00 2023-08-29 00:00 |
2022-05-05 00:00 2023-08-29 00:00 2033-01-01 00:00 |
Active | TRANSMISSION | PLANNED | ONPATH | BPAT | South of Allston Long-term Limit. | 2015-10-27 14:05 | BPAT51481 | 2023-08-28 12:08 | |||
W_LOMO | 255224 | BPAT | West of LOMO Path Rating | W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) |
4200.0 4200.0 4200.0 |
2015-11-02 00:00 2026-01-01 00:00 2028-01-01 00:00 |
2026-01-01 00:00 2028-01-01 00:00 2033-01-01 00:00 |
Active | TRANSMISSION | PLANNED | ONPATH | BPAT | West of Lower Monumental Long-term Limit. | 2015-10-27 14:15 | BPAT51482 | 2023-08-21 11:01 | |||
WOCS | 255230 | BPAT | West of Cascades South Path Rating | C-CASC_S(BPAT) C-CASC_S(BPAT) C-CASC_S(BPAT) |
7500.0 7500.0 7500.0 |
2015-11-02 00:00 2026-01-01 00:00 2028-01-01 00:00 |
2026-01-01 00:00 2028-01-01 00:00 2033-01-01 00:00 |
Active | TRANSMISSION | PLANNED | ONPATH | BPAT | West of Cascades South Long-term Limit. | 2015-10-27 14:21 | BPAT51484 | 2023-08-21 10:53 | |||
14 MONTH | 255188 | BPAT | Northern Intertie ALIS | NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_WEST_N>S(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) |
400.0 400.0 3150.0 2000.0 2850.0 2000.0 400.0 400.0 3150.0 2000.0 2850.0 2000.0 400.0 400.0 3150.0 2000.0 2850.0 2000.0 400.0 400.0 3150.0 2000.0 2850.0 2000.0 400.0 400.0 3150.0 2000.0 2850.0 2000.0 400.0 400.0 3150.0 2000.0 2850.0 2000.0 400.0 400.0 3150.0 2000.0 2850.0 2000.0 400.0 400.0 3150.0 2000.0 2850.0 2000.0 400.0 400.0 3150.0 2000.0 2850.0 2000.0 400.0 400.0 3150.0 2000.0 2850.0 2000.0 400.0 400.0 3150.0 2000.0 2850.0 2000.0 400.0 400.0 3150.0 2000.0 2850.0 2000.0 400.0 400.0 3150.0 2000.0 2850.0 2000.0 400.0 400.0 3150.0 2000.0 2850.0 2000.0 400.0 400.0 3150.0 2000.0 2850.0 2000.0 400.0 400.0 3150.0 2000.0 2850.0 2000.0 400.0 400.0 3150.0 2000.0 2850.0 2000.0 400.0 400.0 3150.0 2000.0 2850.0 2000.0 400.0 400.0 3150.0 2000.0 2850.0 2000.0 400.0 400.0 3150.0 2000.0 2850.0 2000.0 400.0 400.0 3150.0 2000.0 2850.0 2000.0 400.0 400.0 3150.0 2000.0 2850.0 2000.0 400.0 400.0 3150.0 2500.0 2850.0 2500.0 400.0 400.0 3150.0 2850.0 400.0 400.0 3150.0 2500.0 2850.0 2500.0 400.0 400.0 3150.0 2500.0 2850.0 2500.0 400.0 400.0 3150.0 2500.0 2850.0 2500.0 400.0 400.0 3150.0 2500.0 2850.0 2500.0 400.0 400.0 3150.0 2500.0 2850.0 2500.0 400.0 400.0 3150.0 2500.0 2850.0 2500.0 400.0 400.0 3150.0 2500.0 2850.0 2500.0 400.0 400.0 3150.0 2500.0 2850.0 2500.0 400.0 400.0 3150.0 2500.0 2850.0 2500.0 400.0 400.0 3150.0 2500.0 2850.0 2500.0 400.0 400.0 3150.0 2500.0 2850.0 2500.0 400.0 400.0 3150.0 2500.0 2850.0 2500.0 400.0 400.0 3150.0 2500.0 2850.0 2500.0 400.0 400.0 3150.0 2500.0 2850.0 2500.0 400.0 400.0 3150.0 2500.0 2850.0 2500.0 400.0 400.0 3150.0 2500.0 2850.0 2500.0 400.0 400.0 3150.0 2500.0 2850.0 2500.0 400.0 400.0 3150.0 2500.0 2850.0 2500.0 400.0 400.0 3150.0 2500.0 2850.0 2500.0 400.0 400.0 3150.0 2500.0 2850.0 2500.0 400.0 400.0 3150.0 2500.0 2850.0 2500.0 400.0 400.0 3150.0 2500.0 2850.0 2500.0 400.0 400.0 3150.0 2500.0 2850.0 2500.0 400.0 400.0 3150.0 2500.0 2850.0 2500.0 400.0 400.0 3150.0 2500.0 2850.0 2500.0 400.0 400.0 3150.0 2500.0 2850.0 2500.0 400.0 400.0 3150.0 2500.0 2850.0 2500.0 400.0 400.0 3150.0 2500.0 2850.0 2500.0 400.0 400.0 3150.0 2500.0 2850.0 2500.0 400.0 400.0 3150.0 2500.0 2850.0 2500.0 400.0 400.0 3150.0 2500.0 2850.0 2500.0 400.0 400.0 3150.0 2500.0 2850.0 2500.0 400.0 400.0 3150.0 2500.0 2850.0 2500.0 400.0 400.0 3150.0 2500.0 2850.0 2500.0 400.0 400.0 3150.0 2500.0 2850.0 2500.0 400.0 400.0 3150.0 2500.0 2850.0 2500.0 400.0 400.0 3150.0 2500.0 2850.0 2500.0 400.0 400.0 3150.0 2500.0 2850.0 2500.0 400.0 400.0 3150.0 2500.0 2850.0 2500.0 400.0 400.0 3150.0 2500.0 2850.0 2500.0 400.0 400.0 3150.0 2500.0 2850.0 2500.0 400.0 400.0 3150.0 2500.0 2850.0 2500.0 400.0 400.0 3150.0 2500.0 2850.0 2500.0 400.0 400.0 3150.0 2500.0 2850.0 2500.0 400.0 400.0 3150.0 2500.0 2850.0 2500.0 400.0 400.0 3150.0 2500.0 2850.0 2500.0 400.0 400.0 3150.0 2500.0 2850.0 2500.0 400.0 400.0 3150.0 2500.0 2850.0 2500.0 400.0 400.0 3150.0 2500.0 2850.0 2500.0 400.0 400.0 3150.0 2500.0 2850.0 2500.0 400.0 400.0 3150.0 2500.0 2850.0 2500.0 400.0 400.0 3150.0 2500.0 2850.0 2500.0 400.0 400.0 3150.0 2500.0 2850.0 2500.0 400.0 400.0 3150.0 2500.0 2850.0 2500.0 400.0 400.0 3150.0 2500.0 2850.0 2500.0 400.0 400.0 3150.0 2500.0 2850.0 2500.0 400.0 400.0 3150.0 2500.0 2850.0 2500.0 400.0 400.0 3150.0 2500.0 2850.0 2500.0 400.0 400.0 3150.0 2500.0 2850.0 2500.0 400.0 400.0 3150.0 2500.0 2850.0 2500.0 400.0 400.0 3150.0 2500.0 2850.0 2500.0 400.0 400.0 3150.0 2500.0 2850.0 2500.0 400.0 400.0 3150.0 2500.0 2850.0 2500.0 400.0 400.0 3150.0 2500.0 2850.0 2500.0 400.0 400.0 3150.0 2500.0 2850.0 2500.0 |
2015-11-04 00:00 2015-11-04 00:00 2015-11-04 00:00 2015-11-04 00:00 2015-11-04 00:00 2015-11-04 00:00 2017-02-01 00:00 2017-02-01 00:00 2017-02-01 00:00 2017-02-01 00:00 2017-02-01 00:00 2017-02-01 00:00 2017-03-01 00:00 2017-03-01 00:00 2017-03-01 00:00 2017-03-01 00:00 2017-03-01 00:00 2017-03-01 00:00 2017-04-01 00:00 2017-04-01 00:00 2017-04-01 00:00 2017-04-01 00:00 2017-04-01 00:00 2017-04-01 00:00 2017-05-01 00:00 2017-05-01 00:00 2017-05-01 00:00 2017-05-01 00:00 2017-05-01 00:00 2017-05-01 00:00 2017-06-01 00:00 2017-06-01 00:00 2017-06-01 00:00 2017-06-01 00:00 2017-06-01 00:00 2017-06-01 00:00 2017-07-01 00:00 2017-07-01 00:00 2017-07-01 00:00 2017-07-01 00:00 2017-07-01 00:00 2017-07-01 00:00 2017-08-01 00:00 2017-08-01 00:00 2017-08-01 00:00 2017-08-01 00:00 2017-08-01 00:00 2017-08-01 00:00 2017-09-01 00:00 2017-09-01 00:00 2017-09-01 00:00 2017-09-01 00:00 2017-09-01 00:00 2017-09-01 00:00 2017-10-01 00:00 2017-10-01 00:00 2017-10-01 00:00 2017-10-01 00:00 2017-10-01 00:00 2017-10-01 00:00 2017-11-01 00:00 2017-11-01 00:00 2017-11-01 00:00 2017-11-01 00:00 2017-11-01 00:00 2017-11-01 00:00 2017-11-30 23:00 2017-11-30 23:00 2017-11-30 23:00 2017-11-30 23:00 2017-11-30 23:00 2017-11-30 23:00 2017-12-31 23:00 2017-12-31 23:00 2017-12-31 23:00 2017-12-31 23:00 2017-12-31 23:00 2017-12-31 23:00 2018-01-01 00:00 2018-01-01 00:00 2018-01-01 00:00 2018-01-01 00:00 2018-01-01 00:00 2018-01-01 00:00 2018-02-01 00:00 2018-02-01 00:00 2018-02-01 00:00 2018-02-01 00:00 2018-02-01 00:00 2018-02-01 00:00 2018-03-01 00:00 2018-03-01 00:00 2018-03-01 00:00 2018-03-01 00:00 2018-03-01 00:00 2018-03-01 00:00 2018-04-01 00:00 2018-04-01 00:00 2018-04-01 00:00 2018-04-01 00:00 2018-04-01 00:00 2018-04-01 00:00 2018-05-01 00:00 2018-05-01 00:00 2018-05-01 00:00 2018-05-01 00:00 2018-05-01 00:00 2018-05-01 00:00 2018-06-01 00:00 2018-06-01 00:00 2018-06-01 00:00 2018-06-01 00:00 2018-06-01 00:00 2018-06-01 00:00 2018-07-01 00:00 2018-07-01 00:00 2018-07-01 00:00 2018-07-01 00:00 2018-07-01 00:00 2018-07-01 00:00 2018-08-01 00:00 2018-08-01 00:00 2018-08-01 00:00 2018-08-01 00:00 2018-08-01 00:00 2018-08-01 00:00 2018-10-01 00:00 2018-10-01 00:00 2018-10-01 00:00 2018-10-01 00:00 2018-10-01 00:00 2018-10-01 00:00 2018-11-01 00:00 2018-11-01 00:00 2018-11-01 00:00 2018-11-01 00:00 2018-11-01 00:00 2018-11-01 00:00 2019-11-01 00:00 2019-11-01 00:00 2019-11-01 00:00 2019-11-01 00:00 2019-12-01 00:00 2019-12-01 00:00 2019-12-01 00:00 2019-12-01 00:00 2019-12-01 00:00 2019-12-01 00:00 2020-01-01 00:00 2020-01-01 00:00 2020-01-01 00:00 2020-01-01 00:00 2020-01-01 00:00 2020-01-01 00:00 2020-03-01 00:00 2020-03-01 00:00 2020-03-01 00:00 2020-03-01 00:00 2020-03-01 00:00 2020-03-01 00:00 2020-04-01 00:00 2020-04-01 00:00 2020-04-01 00:00 2020-04-01 00:00 2020-04-01 00:00 2020-04-01 00:00 2020-05-01 00:00 2020-05-01 00:00 2020-05-01 00:00 2020-05-01 00:00 2020-05-01 00:00 2020-05-01 00:00 2020-06-01 00:00 2020-06-01 00:00 2020-06-01 00:00 2020-06-01 00:00 2020-06-01 00:00 2020-06-01 00:00 2020-07-01 00:00 2020-07-01 00:00 2020-07-01 00:00 2020-07-01 00:00 2020-07-01 00:00 2020-07-01 00:00 2020-08-01 00:00 2020-08-01 00:00 2020-08-01 00:00 2020-08-01 00:00 2020-08-01 00:00 2020-08-01 00:00 2020-09-01 00:00 2020-09-01 00:00 2020-09-01 00:00 2020-09-01 00:00 2020-09-01 00:00 2020-09-01 00:00 2020-10-01 00:00 2020-10-01 00:00 2020-10-01 00:00 2020-10-01 00:00 2020-10-01 00:00 2020-10-01 00:00 2020-11-01 00:00 2020-11-01 00:00 2020-11-01 00:00 2020-11-01 00:00 2020-11-01 00:00 2020-11-01 00:00 2020-12-01 00:00 2020-12-01 00:00 2020-12-01 00:00 2020-12-01 00:00 2020-12-01 00:00 2020-12-01 00:00 2021-02-01 00:00 2021-02-01 00:00 2021-02-01 00:00 2021-02-01 00:00 2021-02-01 00:00 2021-02-01 00:00 2021-03-01 00:00 2021-03-01 00:00 2021-03-01 00:00 2021-03-01 00:00 2021-03-01 00:00 2021-03-01 00:00 2021-04-01 00:00 2021-04-01 00:00 2021-04-01 00:00 2021-04-01 00:00 2021-04-01 00:00 2021-04-01 00:00 2021-05-01 00:00 2021-05-01 00:00 2021-05-01 00:00 2021-05-01 00:00 2021-05-01 00:00 2021-05-01 00:00 2021-06-01 00:00 2021-06-01 00:00 2021-06-01 00:00 2021-06-01 00:00 2021-06-01 00:00 2021-06-01 00:00 2021-07-01 00:00 2021-07-01 00:00 2021-07-01 00:00 2021-07-01 00:00 2021-07-01 00:00 2021-07-01 00:00 2021-08-01 00:00 2021-08-01 00:00 2021-08-01 00:00 2021-08-01 00:00 2021-08-01 00:00 2021-08-01 00:00 2021-09-01 00:00 2021-09-01 00:00 2021-09-01 00:00 2021-09-01 00:00 2021-09-01 00:00 2021-09-01 00:00 2021-10-01 00:00 2021-10-01 00:00 2021-10-01 00:00 2021-10-01 00:00 2021-10-01 00:00 2021-10-01 00:00 2021-11-01 00:00 2021-11-01 00:00 2021-11-01 00:00 2021-11-01 00:00 2021-11-01 00:00 2021-11-01 00:00 2021-12-01 00:00 2021-12-01 00:00 2021-12-01 00:00 2021-12-01 00:00 2021-12-01 00:00 2021-12-01 00:00 2022-01-01 00:00 2022-01-01 00:00 2022-01-01 00:00 2022-01-01 00:00 2022-01-01 00:00 2022-01-01 00:00 2022-02-01 00:00 2022-02-01 00:00 2022-02-01 00:00 2022-02-01 00:00 2022-02-01 00:00 2022-02-01 00:00 2022-03-01 00:00 2022-03-01 00:00 2022-03-01 00:00 2022-03-01 00:00 2022-03-01 00:00 2022-03-01 00:00 2022-04-01 00:00 2022-04-01 00:00 2022-04-01 00:00 2022-04-01 00:00 2022-04-01 00:00 2022-04-01 00:00 2022-05-01 00:00 2022-05-01 00:00 2022-05-01 00:00 2022-05-01 00:00 2022-05-01 00:00 2022-05-01 00:00 2022-06-01 00:00 2022-06-01 00:00 2022-06-01 00:00 2022-06-01 00:00 2022-06-01 00:00 2022-06-01 00:00 2022-07-01 00:00 2022-07-01 00:00 2022-07-01 00:00 2022-07-01 00:00 2022-07-01 00:00 2022-07-01 00:00 2022-08-01 00:00 2022-08-01 00:00 2022-08-01 00:00 2022-08-01 00:00 2022-08-01 00:00 2022-08-01 00:00 2022-09-01 00:00 2022-09-01 00:00 2022-09-01 00:00 2022-09-01 00:00 2022-09-01 00:00 2022-09-01 00:00 2022-10-01 00:00 2022-10-01 00:00 2022-10-01 00:00 2022-10-01 00:00 2022-10-01 00:00 2022-10-01 00:00 2022-11-01 00:00 2022-11-01 00:00 2022-11-01 00:00 2022-11-01 00:00 2022-11-01 00:00 2022-11-01 00:00 2022-12-01 00:00 2022-12-01 00:00 2022-12-01 00:00 2022-12-01 00:00 2022-12-01 00:00 2022-12-01 00:00 2023-01-01 00:00 2023-01-01 00:00 2023-01-01 00:00 2023-01-01 00:00 2023-01-01 00:00 2023-01-01 00:00 2023-02-01 00:00 2023-02-01 00:00 2023-02-01 00:00 2023-02-01 00:00 2023-02-01 00:00 2023-02-01 00:00 2023-03-01 00:00 2023-03-01 00:00 2023-03-01 00:00 2023-03-01 00:00 2023-03-01 00:00 2023-03-01 00:00 2023-04-01 00:00 2023-04-01 00:00 2023-04-01 00:00 2023-04-01 00:00 2023-04-01 00:00 2023-04-01 00:00 2023-05-01 00:00 2023-05-01 00:00 2023-05-01 00:00 2023-05-01 00:00 2023-05-01 00:00 2023-05-01 00:00 2023-06-01 00:00 2023-06-01 00:00 2023-06-01 00:00 2023-06-01 00:00 2023-06-01 00:00 2023-06-01 00:00 2023-07-01 00:00 2023-07-01 00:00 2023-07-01 00:00 2023-07-01 00:00 2023-07-01 00:00 2023-07-01 00:00 2023-08-01 00:00 2023-08-01 00:00 2023-08-01 00:00 2023-08-01 00:00 2023-08-01 00:00 2023-08-01 00:00 2023-09-01 00:00 2023-09-01 00:00 2023-09-01 00:00 2023-09-01 00:00 2023-09-01 00:00 2023-09-01 00:00 2023-10-01 00:00 2023-10-01 00:00 2023-10-01 00:00 2023-10-01 00:00 2023-10-01 00:00 2023-10-01 00:00 2023-11-01 00:00 2023-11-01 00:00 2023-11-01 00:00 2023-11-01 00:00 2023-11-01 00:00 2023-11-01 00:00 2023-12-01 00:00 2023-12-01 00:00 2023-12-01 00:00 2023-12-01 00:00 2023-12-01 00:00 2023-12-01 00:00 2024-01-01 00:00 2024-01-01 00:00 2024-01-01 00:00 2024-01-01 00:00 2024-01-01 00:00 2024-01-01 00:00 2024-02-01 00:00 2024-02-01 00:00 2024-02-01 00:00 2024-02-01 00:00 2024-02-01 00:00 2024-02-01 00:00 2024-03-01 00:00 2024-03-01 00:00 2024-03-01 00:00 2024-03-01 00:00 2024-03-01 00:00 2024-03-01 00:00 2024-04-01 00:00 2024-04-01 00:00 2024-04-01 00:00 2024-04-01 00:00 2024-04-01 00:00 2024-04-01 00:00 2024-05-01 00:00 2024-05-01 00:00 2024-05-01 00:00 2024-05-01 00:00 2024-05-01 00:00 2024-05-01 00:00 2024-06-01 00:00 2024-06-01 00:00 2024-06-01 00:00 2024-06-01 00:00 2024-06-01 00:00 2024-06-01 00:00 2024-07-01 00:00 2024-07-01 00:00 2024-07-01 00:00 2024-07-01 00:00 2024-07-01 00:00 2024-07-01 00:00 2024-08-01 00:00 2024-08-01 00:00 2024-08-01 00:00 2024-08-01 00:00 2024-08-01 00:00 2024-08-01 00:00 2024-09-01 00:00 2024-09-01 00:00 2024-09-01 00:00 2024-09-01 00:00 2024-09-01 00:00 2024-09-01 00:00 2024-10-01 00:00 2024-10-01 00:00 2024-10-01 00:00 2024-10-01 00:00 2024-10-01 00:00 2024-10-01 00:00 2024-11-01 00:00 2024-11-01 00:00 2024-11-01 00:00 2024-11-01 00:00 2024-11-01 00:00 2024-11-01 00:00 2024-12-01 00:00 2024-12-01 00:00 2024-12-01 00:00 2024-12-01 00:00 2024-12-01 00:00 2024-12-01 00:00 2025-01-01 00:00 2025-01-01 00:00 2025-01-01 00:00 2025-01-01 00:00 2025-01-01 00:00 2025-01-01 00:00 2025-02-01 00:00 2025-02-01 00:00 2025-02-01 00:00 2025-02-01 00:00 2025-02-01 00:00 2025-02-01 00:00 2025-03-01 00:00 2025-03-01 00:00 2025-03-01 00:00 2025-03-01 00:00 2025-03-01 00:00 2025-03-01 00:00 2025-04-01 00:00 2025-04-01 00:00 2025-04-01 00:00 2025-04-01 00:00 2025-04-01 00:00 2025-04-01 00:00 2025-05-01 00:00 2025-05-01 00:00 2025-05-01 00:00 2025-05-01 00:00 2025-05-01 00:00 2025-05-01 00:00 2025-06-01 00:00 2025-06-01 00:00 2025-06-01 00:00 2025-06-01 00:00 2025-06-01 00:00 2025-06-01 00:00 |
2017-02-01 00:00 2017-02-01 00:00 2017-02-01 00:00 2017-02-01 00:00 2017-02-01 00:00 2017-02-01 00:00 2017-03-01 00:00 2017-03-01 00:00 2017-03-01 00:00 2017-03-01 00:00 2017-03-01 00:00 2017-03-01 00:00 2017-04-01 00:00 2017-04-01 00:00 2017-04-01 00:00 2017-04-01 00:00 2017-04-01 00:00 2017-04-01 00:00 2017-05-01 00:00 2017-05-01 00:00 2017-05-01 00:00 2017-05-01 00:00 2017-05-01 00:00 2017-05-01 00:00 2017-06-01 00:00 2017-06-01 00:00 2017-06-01 00:00 2017-06-01 00:00 2017-06-01 00:00 2017-06-01 00:00 2017-07-01 00:00 2017-07-01 00:00 2017-07-01 00:00 2017-07-01 00:00 2017-07-01 00:00 2017-07-01 00:00 2017-08-01 00:00 2017-08-01 00:00 2017-08-01 00:00 2017-08-01 00:00 2017-08-01 00:00 2017-08-01 00:00 2017-09-01 00:00 2017-09-01 00:00 2017-09-01 00:00 2017-09-01 00:00 2017-09-01 00:00 2017-09-01 00:00 2017-10-01 00:00 2017-10-01 00:00 2017-10-01 00:00 2017-10-01 00:00 2017-10-01 00:00 2017-10-01 00:00 2017-11-01 00:00 2017-11-01 00:00 2017-11-01 00:00 2017-11-01 00:00 2017-11-01 00:00 2017-11-01 00:00 2017-11-30 23:00 2017-11-30 23:00 2017-11-30 23:00 2017-11-30 23:00 2017-11-30 23:00 2017-11-30 23:00 2017-12-31 23:00 2017-12-31 23:00 2017-12-31 23:00 2017-12-31 23:00 2017-12-31 23:00 2017-12-31 23:00 2018-01-01 00:00 2018-01-01 00:00 2018-01-01 00:00 2018-01-01 00:00 2018-01-01 00:00 2018-01-01 00:00 2018-02-01 00:00 2018-02-01 00:00 2018-02-01 00:00 2018-02-01 00:00 2018-02-01 00:00 2018-02-01 00:00 2018-03-01 00:00 2018-03-01 00:00 2018-03-01 00:00 2018-03-01 00:00 2018-03-01 00:00 2018-03-01 00:00 2018-04-01 00:00 2018-04-01 00:00 2018-04-01 00:00 2018-04-01 00:00 2018-04-01 00:00 2018-04-01 00:00 2018-05-01 00:00 2018-05-01 00:00 2018-05-01 00:00 2018-05-01 00:00 2018-05-01 00:00 2018-05-01 00:00 2018-06-01 00:00 2018-06-01 00:00 2018-06-01 00:00 2018-06-01 00:00 2018-06-01 00:00 2018-06-01 00:00 2018-07-01 00:00 2018-07-01 00:00 2018-07-01 00:00 2018-07-01 00:00 2018-07-01 00:00 2018-07-01 00:00 2018-08-01 00:00 2018-08-01 00:00 2018-08-01 00:00 2018-08-01 00:00 2018-08-01 00:00 2018-08-01 00:00 2018-10-01 00:00 2018-10-01 00:00 2018-10-01 00:00 2018-10-01 00:00 2018-10-01 00:00 2018-10-01 00:00 2018-11-01 00:00 2018-11-01 00:00 2018-11-01 00:00 2018-11-01 00:00 2018-11-01 00:00 2018-11-01 00:00 2019-11-01 00:00 2019-11-01 00:00 2019-11-01 00:00 2019-12-01 00:00 2019-11-01 00:00 2019-12-01 00:00 2019-12-01 00:00 2019-12-01 00:00 2019-12-01 00:00 2019-12-01 00:00 2020-01-01 00:00 2020-01-01 00:00 2020-01-01 00:00 2020-01-01 00:00 2020-01-01 00:00 2020-01-01 00:00 2020-03-01 00:00 2020-03-01 00:00 2020-03-01 00:00 2020-03-01 00:00 2020-03-01 00:00 2020-03-01 00:00 2020-04-01 00:00 2020-04-01 00:00 2020-04-01 00:00 2020-04-01 00:00 2020-04-01 00:00 2020-04-01 00:00 2020-05-01 00:00 2020-05-01 00:00 2020-05-01 00:00 2020-05-01 00:00 2020-05-01 00:00 2020-05-01 00:00 2020-06-01 00:00 2020-06-01 00:00 2020-06-01 00:00 2020-06-01 00:00 2020-06-01 00:00 2020-06-01 00:00 2020-07-01 00:00 2020-07-01 00:00 2020-07-01 00:00 2020-07-01 00:00 2020-07-01 00:00 2020-07-01 00:00 2020-08-01 00:00 2020-08-01 00:00 2020-08-01 00:00 2020-08-01 00:00 2020-08-01 00:00 2020-08-01 00:00 2020-09-01 00:00 2020-09-01 00:00 2020-09-01 00:00 2020-09-01 00:00 2020-09-01 00:00 2020-09-01 00:00 2020-10-01 00:00 2020-10-01 00:00 2020-10-01 00:00 2020-10-01 00:00 2020-10-01 00:00 2020-10-01 00:00 2020-11-01 00:00 2020-11-01 00:00 2020-11-01 00:00 2020-11-01 00:00 2020-11-01 00:00 2020-11-01 00:00 2020-12-01 00:00 2020-12-01 00:00 2020-12-01 00:00 2020-12-01 00:00 2020-12-01 00:00 2020-12-01 00:00 2021-02-01 00:00 2021-02-01 00:00 2021-02-01 00:00 2021-02-01 00:00 2021-02-01 00:00 2021-02-01 00:00 2021-03-01 00:00 2021-03-01 00:00 2021-03-01 00:00 2021-03-01 00:00 2021-03-01 00:00 2021-03-01 00:00 2021-04-01 00:00 2021-04-01 00:00 2021-04-01 00:00 2021-04-01 00:00 2021-04-01 00:00 2021-04-01 00:00 2021-05-01 00:00 2021-05-01 00:00 2021-05-01 00:00 2021-05-01 00:00 2021-05-01 00:00 2021-05-01 00:00 2021-06-01 00:00 2021-06-01 00:00 2021-06-01 00:00 2021-06-01 00:00 2021-06-01 00:00 2021-06-01 00:00 2021-07-01 00:00 2021-07-01 00:00 2021-07-01 00:00 2021-07-01 00:00 2021-07-01 00:00 2021-07-01 00:00 2021-08-01 00:00 2021-08-01 00:00 2021-08-01 00:00 2021-08-01 00:00 2021-08-01 00:00 2021-08-01 00:00 2021-09-01 00:00 2021-09-01 00:00 2021-09-01 00:00 2021-09-01 00:00 2021-09-01 00:00 2021-09-01 00:00 2021-10-01 00:00 2021-10-01 00:00 2021-10-01 00:00 2021-10-01 00:00 2021-10-01 00:00 2021-10-01 00:00 2021-11-01 00:00 2021-11-01 00:00 2021-11-01 00:00 2021-11-01 00:00 2021-11-01 00:00 2021-11-01 00:00 2021-12-01 00:00 2021-12-01 00:00 2021-12-01 00:00 2021-12-01 00:00 2021-12-01 00:00 2021-12-01 00:00 2022-01-01 00:00 2022-01-01 00:00 2022-01-01 00:00 2022-01-01 00:00 2022-01-01 00:00 2022-01-01 00:00 2022-02-01 00:00 2022-02-01 00:00 2022-02-01 00:00 2022-02-01 00:00 2022-02-01 00:00 2022-02-01 00:00 2022-03-01 00:00 2022-03-01 00:00 2022-03-01 00:00 2022-03-01 00:00 2022-03-01 00:00 2022-03-01 00:00 2022-04-01 00:00 2022-04-01 00:00 2022-04-01 00:00 2022-04-01 00:00 2022-04-01 00:00 2022-04-01 00:00 2022-05-01 00:00 2022-05-01 00:00 2022-05-01 00:00 2022-05-01 00:00 2022-05-01 00:00 2022-05-01 00:00 2022-06-01 00:00 2022-06-01 00:00 2022-06-01 00:00 2022-06-01 00:00 2022-06-01 00:00 2022-06-01 00:00 2022-07-01 00:00 2022-07-01 00:00 2022-07-01 00:00 2022-07-01 00:00 2022-07-01 00:00 2022-07-01 00:00 2022-08-01 00:00 2022-08-01 00:00 2022-08-01 00:00 2022-08-01 00:00 2022-08-01 00:00 2022-08-01 00:00 2022-09-01 00:00 2022-09-01 00:00 2022-09-01 00:00 2022-09-01 00:00 2022-09-01 00:00 2022-09-01 00:00 2022-10-01 00:00 2022-10-01 00:00 2022-10-01 00:00 2022-10-01 00:00 2022-10-01 00:00 2022-10-01 00:00 2022-11-01 00:00 2022-11-01 00:00 2022-11-01 00:00 2022-11-01 00:00 2022-11-01 00:00 2022-11-01 00:00 2022-12-01 00:00 2022-12-01 00:00 2022-12-01 00:00 2022-12-01 00:00 2022-12-01 00:00 2022-12-01 00:00 2023-01-01 00:00 2023-01-01 00:00 2023-01-01 00:00 2023-01-01 00:00 2023-01-01 00:00 2023-01-01 00:00 2023-02-01 00:00 2023-02-01 00:00 2023-02-01 00:00 2023-02-01 00:00 2023-02-01 00:00 2023-02-01 00:00 2023-03-01 00:00 2023-03-01 00:00 2023-03-01 00:00 2023-03-01 00:00 2023-03-01 00:00 2023-03-01 00:00 2023-04-01 00:00 2023-04-01 00:00 2023-04-01 00:00 2023-04-01 00:00 2023-04-01 00:00 2023-04-01 00:00 2023-05-01 00:00 2023-05-01 00:00 2023-05-01 00:00 2023-05-01 00:00 2023-05-01 00:00 2023-05-01 00:00 2023-06-01 00:00 2023-06-01 00:00 2023-06-01 00:00 2023-06-01 00:00 2023-06-01 00:00 2023-06-01 00:00 2023-07-01 00:00 2023-07-01 00:00 2023-07-01 00:00 2023-07-01 00:00 2023-07-01 00:00 2023-07-01 00:00 2023-08-01 00:00 2023-08-01 00:00 2023-08-01 00:00 2023-08-01 00:00 2023-08-01 00:00 2023-08-01 00:00 2023-09-01 00:00 2023-09-01 00:00 2023-09-01 00:00 2023-09-01 00:00 2023-09-01 00:00 2023-09-01 00:00 2023-10-01 00:00 2023-10-01 00:00 2023-10-01 00:00 2023-10-01 00:00 2023-10-01 00:00 2023-10-01 00:00 2023-11-01 00:00 2023-11-01 00:00 2023-11-01 00:00 2023-11-01 00:00 2023-11-01 00:00 2023-11-01 00:00 2023-12-01 00:00 2023-12-01 00:00 2023-12-01 00:00 2023-12-01 00:00 2023-12-01 00:00 2023-12-01 00:00 2024-01-01 00:00 2024-01-01 00:00 2024-01-01 00:00 2024-01-01 00:00 2024-01-01 00:00 2024-01-01 00:00 2024-02-01 00:00 2024-02-01 00:00 2024-02-01 00:00 2024-02-01 00:00 2024-02-01 00:00 2024-02-01 00:00 2024-03-01 00:00 2024-03-01 00:00 2024-03-01 00:00 2024-03-01 00:00 2024-03-01 00:00 2024-03-01 00:00 2024-04-01 00:00 2024-04-01 00:00 2024-04-01 00:00 2024-04-01 00:00 2024-04-01 00:00 2024-04-01 00:00 2024-05-01 00:00 2024-05-01 00:00 2024-05-01 00:00 2024-05-01 00:00 2024-05-01 00:00 2024-05-01 00:00 2024-06-01 00:00 2024-06-01 00:00 2024-06-01 00:00 2024-06-01 00:00 2024-06-01 00:00 2024-06-01 00:00 2024-07-01 00:00 2024-07-01 00:00 2024-07-01 00:00 2024-07-01 00:00 2024-07-01 00:00 2024-07-01 00:00 2024-08-01 00:00 2024-08-01 00:00 2024-08-01 00:00 2024-08-01 00:00 2024-08-01 00:00 2024-08-01 00:00 2024-09-01 00:00 2024-09-01 00:00 2024-09-01 00:00 2024-09-01 00:00 2024-09-01 00:00 2024-09-01 00:00 2024-10-01 00:00 2024-10-01 00:00 2024-10-01 00:00 2024-10-01 00:00 2024-10-01 00:00 2024-10-01 00:00 2024-11-01 00:00 2024-11-01 00:00 2024-11-01 00:00 2024-11-01 00:00 2024-11-01 00:00 2024-11-01 00:00 2024-12-01 00:00 2024-12-01 00:00 2024-12-01 00:00 2024-12-01 00:00 2024-12-01 00:00 2024-12-01 00:00 2025-01-01 00:00 2025-01-01 00:00 2025-01-01 00:00 2025-01-01 00:00 2025-01-01 00:00 2025-01-01 00:00 2025-02-01 00:00 2025-02-01 00:00 2025-02-01 00:00 2025-02-01 00:00 2025-02-01 00:00 2025-02-01 00:00 2025-03-01 00:00 2025-03-01 00:00 2025-03-01 00:00 2025-03-01 00:00 2025-03-01 00:00 2025-03-01 00:00 2025-04-01 00:00 2025-04-01 00:00 2025-04-01 00:00 2025-04-01 00:00 2025-04-01 00:00 2025-04-01 00:00 2025-05-01 00:00 2025-05-01 00:00 2025-05-01 00:00 2025-05-01 00:00 2025-05-01 00:00 2025-05-01 00:00 2025-06-01 00:00 2025-06-01 00:00 2025-06-01 00:00 2025-06-01 00:00 2025-06-01 00:00 2025-06-01 00:00 2025-07-01 00:00 2025-07-01 00:00 2025-07-01 00:00 2025-07-01 00:00 2025-07-01 00:00 2025-07-01 00:00 |
Active | TRANSMISSION | PLANNED | ONPATH | BPAT | Northern Intertie -All Lines in Service (Year Round) | 2015-10-27 11:37 | BPAT51477 | 2024-03-27 11:21 | |||
WOCN | 255892 | BPAT | West of Cascades North Path Rating | C-CASC_N(BPAT) C-CASC_N(BPAT) C-CASC_N(BPAT) |
10700.0 10700.0 10700.0 |
2015-11-10 00:00 2019-10-01 14:00 2028-01-01 00:00 |
2019-10-01 14:00 2028-01-01 00:00 2033-01-01 00:00 |
Active | TRANSMISSION | PLANNED | ONPATH | BPAT | West of Cascades North Long-term Limit. | 2015-11-09 10:26 | BPAT51802 | 2023-08-21 10:53 | |||
14 MONTH | 260712 | BPAT | West of LOMO E>W All Lines in Service | W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) W_LOMO_E>W(BPAT) |
4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 |
2016-03-17 00:00 2017-06-01 00:00 2017-07-01 00:00 2017-08-01 00:00 2017-09-01 00:00 2017-10-01 00:00 2017-11-01 00:00 2017-11-30 23:00 2018-01-01 00:00 2018-02-01 00:00 2018-03-01 00:00 2018-04-01 00:00 2018-05-01 00:00 2018-06-01 00:00 2018-07-01 00:00 2018-08-01 00:00 2018-10-01 00:00 2018-11-01 00:00 2018-12-01 00:00 2019-01-01 00:00 2019-02-01 00:00 2019-03-01 00:00 2019-04-01 00:00 2019-05-01 00:00 2019-06-01 00:00 2019-07-01 00:00 2019-08-01 00:00 2019-09-01 00:00 2019-10-01 00:00 2019-11-01 00:00 2019-12-01 00:00 2020-01-01 00:00 2020-03-01 00:00 2020-04-01 00:00 2020-05-01 00:00 2020-06-01 00:00 2020-07-01 00:00 2020-08-01 00:00 2020-09-01 00:00 2020-10-01 00:00 2020-11-01 00:00 2020-12-01 00:00 2021-02-01 00:00 2021-03-01 00:00 2021-04-01 00:00 2021-05-01 00:00 2021-06-01 00:00 2021-07-01 00:00 2021-08-01 00:00 2021-09-01 00:00 2021-10-01 00:00 2021-11-01 00:00 2021-12-01 00:00 2022-01-01 00:00 2022-02-01 00:00 2022-03-01 00:00 2022-04-01 00:00 2022-05-01 00:00 2022-06-01 00:00 2022-07-01 00:00 2022-08-01 00:00 2022-09-01 00:00 2022-10-01 00:00 2022-11-01 00:00 2022-12-01 00:00 2023-01-01 00:00 2023-02-01 00:00 2023-03-01 00:00 2023-04-01 00:00 2023-05-01 00:00 2023-06-01 00:00 2023-07-01 00:00 2023-08-01 00:00 2023-09-01 00:00 2023-10-01 00:00 2023-11-01 00:00 2023-12-01 00:00 2024-01-01 00:00 2024-02-01 00:00 2024-03-01 00:00 2024-04-01 00:00 2024-05-01 00:00 2024-06-01 00:00 2024-07-01 00:00 2024-08-01 00:00 2024-09-01 00:00 2024-10-01 00:00 2024-11-01 00:00 2024-12-01 00:00 2025-01-01 00:00 2025-02-01 00:00 2025-03-01 00:00 2025-04-01 00:00 2025-05-01 00:00 2025-06-01 00:00 |
2017-06-01 00:00 2017-07-01 00:00 2017-08-01 00:00 2017-09-01 00:00 2017-10-01 00:00 2017-11-01 00:00 2017-11-30 23:00 2018-01-01 00:00 2018-02-01 00:00 2018-03-01 00:00 2018-04-01 00:00 2018-05-01 00:00 2018-06-01 00:00 2018-07-01 00:00 2018-08-01 00:00 2018-10-01 00:00 2018-11-01 00:00 2018-12-01 00:00 2019-01-01 00:00 2019-02-01 00:00 2019-03-01 00:00 2019-04-01 00:00 2019-05-01 00:00 2019-06-01 00:00 2019-07-01 00:00 2019-08-01 00:00 2019-09-01 00:00 2019-10-01 00:00 2019-11-01 00:00 2019-12-01 00:00 2020-01-01 00:00 2020-03-01 00:00 2020-04-01 00:00 2020-05-01 00:00 2020-06-01 00:00 2020-07-01 00:00 2020-08-01 00:00 2020-09-01 00:00 2020-10-01 00:00 2020-11-01 00:00 2020-12-01 00:00 2021-02-01 00:00 2021-03-01 00:00 2021-04-01 00:00 2021-05-01 00:00 2021-06-01 00:00 2021-07-01 00:00 2021-08-01 00:00 2021-09-01 00:00 2021-10-01 00:00 2021-11-01 00:00 2021-12-01 00:00 2022-01-01 00:00 2022-02-01 00:00 2022-03-01 00:00 2022-04-01 00:00 2022-05-01 00:00 2022-06-01 00:00 2022-07-01 00:00 2022-08-01 00:00 2022-09-01 00:00 2022-10-01 00:00 2022-11-01 00:00 2022-12-01 00:00 2023-01-01 00:00 2023-02-01 00:00 2023-03-01 00:00 2023-04-01 00:00 2023-05-01 00:00 2023-06-01 00:00 2023-07-01 00:00 2023-08-01 00:00 2023-09-01 00:00 2023-10-01 00:00 2023-11-01 00:00 2023-12-01 00:00 2024-01-01 00:00 2024-02-01 00:00 2024-03-01 00:00 2024-04-01 00:00 2024-05-01 00:00 2024-06-01 00:00 2024-07-01 00:00 2024-08-01 00:00 2024-09-01 00:00 2024-10-01 00:00 2024-11-01 00:00 2024-12-01 00:00 2025-01-01 00:00 2025-02-01 00:00 2025-03-01 00:00 2025-04-01 00:00 2025-05-01 00:00 2025-06-01 00:00 2025-07-01 00:00 |
Active | TRANSMISSION | PLANNED | ONPATH | BPAT | West of LOMO - All Lines in Service (Year Round) | 2016-03-16 13:36 | BPAT53767 | 2024-03-27 11:50 | |||
14 MONTH | 261306 | BPAT | Columbia Injection ALIS | CLMBIA_N>S(BPAT) CLMBIA_N>S(BPAT) CLMBIA_N>S(BPAT) CLMBIA_N>S(BPAT) CLMBIA_N>S(BPAT) CLMBIA_N>S(BPAT) CLMBIA_N>S(BPAT) CLMBIA_N>S(BPAT) CLMBIA_N>S(BPAT) CLMBIA_N>S(BPAT) CLMBIA_N>S(BPAT) CLMBIA_N>S(BPAT) CLMBIA_N>S(BPAT) CLMBIA_N>S(BPAT) CLMBIA_N>S(BPAT) CLMBIA_N>S(BPAT) CLMBIA_N>S(BPAT) CLMBIA_N>S(BPAT) CLMBIA_N>S(BPAT) CLMBIA_N>S(BPAT) CLMBIA_N>S(BPAT) CLMBIA_N>S(BPAT) CLMBIA_N>S(BPAT) CLMBIA_N>S(BPAT) CLMBIA_N>S(BPAT) CLMBIA_N>S(BPAT) CLMBIA_N>S(BPAT) CLMBIA_N>S(BPAT) CLMBIA_N>S(BPAT) CLMBIA_N>S(BPAT) CLMBIA_N>S(BPAT) CLMBIA_N>S(BPAT) CLMBIA_N>S(BPAT) CLMBIA_N>S(BPAT) CLMBIA_N>S(BPAT) CLMBIA_N>S(BPAT) CLMBIA_N>S(BPAT) CLMBIA_N>S(BPAT) CLMBIA_N>S(BPAT) CLMBIA_N>S(BPAT) CLMBIA_N>S(BPAT) CLMBIA_N>S(BPAT) CLMBIA_N>S(BPAT) CLMBIA_N>S(BPAT) CLMBIA_N>S(BPAT) CLMBIA_N>S(BPAT) CLMBIA_N>S(BPAT) CLMBIA_N>S(BPAT) CLMBIA_N>S(BPAT) CLMBIA_N>S(BPAT) CLMBIA_N>S(BPAT) CLMBIA_N>S(BPAT) CLMBIA_N>S(BPAT) CLMBIA_N>S(BPAT) CLMBIA_N>S(BPAT) CLMBIA_N>S(BPAT) CLMBIA_N>S(BPAT) CLMBIA_N>S(BPAT) CLMBIA_N>S(BPAT) CLMBIA_N>S(BPAT) CLMBIA_N>S(BPAT) CLMBIA_N>S(BPAT) CLMBIA_N>S(BPAT) CLMBIA_N>S(BPAT) CLMBIA_N>S(BPAT) CLMBIA_N>S(BPAT) CLMBIA_N>S(BPAT) CLMBIA_N>S(BPAT) CLMBIA_N>S(BPAT) |
1100.0 1100.0 1100.0 1100.0 1100.0 1100.0 1100.0 1100.0 1100.0 1100.0 1100.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 1300.0 |
2016-04-02 00:00 2016-05-26 10:00 2017-05-02 15:00 2017-06-05 10:00 2017-11-28 14:00 2017-12-20 12:00 2017-12-20 13:00 2018-02-28 17:00 2018-04-19 15:00 2018-05-14 11:00 2018-05-14 13:00 2018-06-01 00:00 2018-08-10 14:00 2019-10-01 00:00 2019-10-01 13:00 2019-10-09 10:00 2019-11-22 09:00 2021-03-01 00:00 2021-04-01 00:00 2021-05-01 00:00 2021-06-01 00:00 2021-07-01 00:00 2021-08-01 00:00 2021-09-01 00:00 2021-10-01 00:00 2021-11-01 00:00 2021-12-01 00:00 2022-01-01 00:00 2022-02-01 00:00 2022-03-01 00:00 2022-04-01 00:00 2022-05-01 00:00 2022-06-01 00:00 2022-07-01 00:00 2022-08-01 00:00 2022-09-01 00:00 2022-10-01 00:00 2022-11-01 00:00 2022-12-01 00:00 2023-01-01 00:00 2023-02-01 00:00 2023-03-01 00:00 2023-04-01 00:00 2023-05-01 00:00 2023-06-01 00:00 2023-07-01 00:00 2023-08-01 00:00 2023-09-01 00:00 2023-10-01 00:00 2023-11-01 00:00 2023-12-01 00:00 2024-01-01 00:00 2024-02-01 00:00 2024-03-01 00:00 2024-04-01 00:00 2024-05-01 00:00 2024-06-01 00:00 2024-07-01 00:00 2024-08-01 00:00 2024-09-01 00:00 2024-10-01 00:00 2024-11-01 00:00 2024-12-01 00:00 2025-01-01 00:00 2025-02-01 00:00 2025-03-01 00:00 2025-04-01 00:00 2025-05-01 00:00 2025-06-01 00:00 |
2016-05-26 10:00 2017-05-02 15:00 2017-06-05 10:00 2017-11-28 14:00 2017-12-20 12:00 2017-12-20 13:00 2018-02-28 17:00 2018-04-19 15:00 2018-05-14 11:00 2018-05-14 13:00 2018-06-01 00:00 2018-08-10 14:00 2019-10-01 00:00 2019-10-01 13:00 2019-10-09 10:00 2019-11-22 09:00 2021-03-01 00:00 2021-04-01 00:00 2021-05-01 00:00 2021-06-01 00:00 2021-07-01 00:00 2021-08-01 00:00 2021-09-01 00:00 2021-10-01 00:00 2021-11-01 00:00 2021-12-01 00:00 2022-01-01 00:00 2022-02-01 00:00 2022-03-01 00:00 2022-04-01 00:00 2022-05-01 00:00 2022-06-01 00:00 2022-07-01 00:00 2022-08-01 00:00 2022-09-01 00:00 2022-10-01 00:00 2022-11-01 00:00 2022-12-01 00:00 2023-01-01 00:00 2023-02-01 00:00 2023-03-01 00:00 2023-04-01 00:00 2023-05-01 00:00 2023-06-01 00:00 2023-07-01 00:00 2023-08-01 00:00 2023-09-01 00:00 2023-10-01 00:00 2023-11-01 00:00 2023-12-01 00:00 2024-01-01 00:00 2024-02-01 00:00 2024-03-01 00:00 2024-04-01 00:00 2024-05-01 00:00 2024-06-01 00:00 2024-07-01 00:00 2024-08-01 00:00 2024-09-01 00:00 2024-10-01 00:00 2024-11-01 00:00 2024-12-01 00:00 2025-01-01 00:00 2025-02-01 00:00 2025-03-01 00:00 2025-04-01 00:00 2025-05-01 00:00 2025-06-01 00:00 2025-07-01 00:00 |
Active | TRANSMISSION | PLANNED | ONPATH | BPAT | Columbia Injection All Lines in Service. (Year Round) | 2016-04-01 14:58 | BPAT53960 | 2024-03-27 11:50 | |||
14 MONTH | 262981 | BPAT | West of Slatt ALIS | WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) WOSLATT(BPAT) |
4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4200.0 4600.0 4600.0 4600.0 4600.0 4600.0 4600.0 4600.0 4600.0 4600.0 4600.0 4600.0 4600.0 4600.0 4600.0 4600.0 4600.0 4600.0 4600.0 4600.0 4600.0 4600.0 4600.0 4600.0 4600.0 4600.0 4600.0 4600.0 4600.0 4600.0 4600.0 4600.0 4600.0 4600.0 4600.0 4600.0 4600.0 4600.0 4600.0 4600.0 4600.0 4600.0 4600.0 4600.0 4600.0 4600.0 4600.0 4600.0 4600.0 4600.0 4600.0 4600.0 4600.0 4600.0 4600.0 4600.0 4600.0 4600.0 4600.0 4600.0 |
2016-05-12 00:00 2017-08-01 00:00 2017-09-01 00:00 2017-10-01 00:00 2017-11-01 00:00 2017-11-30 23:00 2018-01-01 00:00 2018-02-01 00:00 2018-03-01 00:00 2018-04-01 00:00 2018-05-01 00:00 2018-06-01 00:00 2018-07-01 00:00 2018-08-01 00:00 2018-10-01 00:00 2018-11-01 00:00 2018-12-01 00:00 2019-01-01 00:00 2019-02-01 00:00 2019-03-01 00:00 2019-04-01 00:00 2019-05-01 00:00 2019-06-01 00:00 2020-08-01 00:00 2020-09-01 00:00 2020-10-01 00:00 2020-11-01 00:00 2020-12-01 00:00 2021-02-01 00:00 2021-03-01 00:00 2021-04-01 00:00 2021-05-01 00:00 2021-06-01 00:00 2021-07-01 00:00 2021-08-01 00:00 2021-09-01 00:00 2021-10-01 00:00 2021-11-01 00:00 2021-12-01 00:00 2022-01-01 00:00 2022-02-01 00:00 2022-03-01 00:00 2022-04-01 00:00 2022-05-01 00:00 2022-06-01 00:00 2022-07-01 00:00 2022-08-01 00:00 2022-09-01 00:00 2022-10-01 00:00 2022-11-01 00:00 2022-12-01 00:00 2023-01-01 00:00 2023-02-01 00:00 2023-03-01 00:00 2023-04-01 00:00 2023-05-01 00:00 2023-06-01 00:00 2023-07-01 00:00 2023-08-01 00:00 2023-09-01 00:00 2023-10-01 00:00 2023-11-01 00:00 2023-12-01 00:00 2024-01-01 00:00 2024-02-01 00:00 2024-03-01 00:00 2024-04-01 00:00 2024-05-01 00:00 2024-06-01 00:00 2024-07-01 00:00 2024-08-01 00:00 2024-09-01 00:00 2024-10-01 00:00 2024-11-01 00:00 2024-12-01 00:00 2025-01-01 00:00 2025-02-01 00:00 2025-03-01 00:00 2025-04-01 00:00 2025-05-01 00:00 2025-06-01 00:00 |
2017-08-01 00:00 2017-09-01 00:00 2017-10-01 00:00 2017-11-01 00:00 2017-11-30 23:00 2018-01-01 00:00 2018-02-01 00:00 2018-03-01 00:00 2018-04-01 00:00 2018-05-01 00:00 2018-06-01 00:00 2018-07-01 00:00 2018-08-01 00:00 2018-10-01 00:00 2018-11-01 00:00 2018-12-01 00:00 2019-01-01 00:00 2019-02-01 00:00 2019-03-01 00:00 2019-04-01 00:00 2019-05-01 00:00 2019-06-01 00:00 2020-08-01 00:00 2020-09-01 00:00 2020-10-01 00:00 2020-11-01 00:00 2020-12-01 00:00 2021-02-01 00:00 2021-03-01 00:00 2021-04-01 00:00 2021-05-01 00:00 2021-06-01 00:00 2021-07-01 00:00 2021-08-01 00:00 2021-09-01 00:00 2021-10-01 00:00 2021-11-01 00:00 2021-12-01 00:00 2022-01-01 00:00 2022-02-01 00:00 2022-03-01 00:00 2022-04-01 00:00 2022-05-01 00:00 2022-06-01 00:00 2022-07-01 00:00 2022-08-01 00:00 2022-09-01 00:00 2022-10-01 00:00 2022-11-01 00:00 2022-12-01 00:00 2023-01-01 00:00 2023-02-01 00:00 2023-03-01 00:00 2023-04-01 00:00 2023-05-01 00:00 2023-06-01 00:00 2023-07-01 00:00 2023-08-01 00:00 2023-09-01 00:00 2023-10-01 00:00 2023-11-01 00:00 2023-12-01 00:00 2024-01-01 00:00 2024-02-01 00:00 2024-03-01 00:00 2024-04-01 00:00 2024-05-01 00:00 2024-06-01 00:00 2024-07-01 00:00 2024-08-01 00:00 2024-09-01 00:00 2024-10-01 00:00 2024-11-01 00:00 2024-12-01 00:00 2025-01-01 00:00 2025-02-01 00:00 2025-03-01 00:00 2025-04-01 00:00 2025-05-01 00:00 2025-06-01 00:00 2025-07-01 00:00 |
Active | TRANSMISSION | PLANNED | ONPATH | BPAT | West of Slatt - All Lines in Service (Year Round). | 2016-05-11 12:16 | BPAT54573 | 2024-03-27 11:51 | |||
NOJDAY | 271567 | BPAT | NJD_Path_Rating | NOJDAY(BPAT) NOJDAY(BPAT) |
8400.0 8400.0 |
2016-11-01 00:00 2026-01-01 00:00 |
2023-03-23 01:00 2023-03-23 01:00 |
Active | TRANSMISSION | PLANNED | ONPATH | BPAT | NOJDAY Path Rating | 2016-10-27 13:55 | BPAT58592 | 2017-12-11 11:26 | |||
14 MONTH | 279736 | BPAT | RAVR PAUL | RAVR_PAUL(BPAT) RAVR_PAUL(BPAT) RAVR_PAUL(BPAT) RAVR_PAUL(BPAT) RAVR_PAUL(BPAT) RAVR_PAUL(BPAT) RAVR_PAUL(BPAT) RAVR_PAUL(BPAT) RAVR_PAUL(BPAT) RAVR_PAUL(BPAT) RAVR_PAUL(BPAT) RAVR_PAUL(BPAT) RAVR_PAUL(BPAT) RAVR_PAUL(BPAT) RAVR_PAUL(BPAT) RAVR_PAUL(BPAT) RAVR_PAUL(BPAT) RAVR_PAUL(BPAT) RAVR_PAUL(BPAT) RAVR_PAUL(BPAT) RAVR_PAUL(BPAT) RAVR_PAUL(BPAT) RAVR_PAUL(BPAT) |
1625.0 1640.0 1330.0 1800.0 1600.0 1630.0 1560.0 1560.0 1561.0 1528.0 1561.0 1561.0 1561.0 1561.0 1561.0 1561.0 1561.0 1561.0 1528.0 1528.0 1528.0 1561.0 1561.0 |
2017-04-01 00:00 2017-07-01 00:00 2018-06-01 00:00 2019-06-01 00:00 2019-11-18 10:00 2020-06-01 00:00 2021-06-01 00:00 2022-05-11 00:00 2022-06-01 00:00 2023-06-01 00:00 2023-11-01 00:00 2023-12-01 00:00 2024-01-01 00:00 2024-02-01 00:00 2024-03-01 00:00 2024-04-01 00:00 2024-05-01 00:00 2024-06-01 00:00 2024-06-01 08:00 2024-09-01 00:00 2024-10-01 00:00 2024-11-01 00:00 2025-06-01 00:00 |
2017-07-01 00:00 2018-06-01 00:00 2019-06-01 00:00 2019-11-18 10:00 2020-06-01 00:00 2021-06-01 00:00 2022-05-11 00:00 2022-06-01 00:00 2023-06-01 00:00 2023-11-01 00:00 2023-12-01 00:00 2024-01-01 00:00 2024-02-01 00:00 2024-03-01 00:00 2024-04-01 00:00 2024-05-01 00:00 2024-06-01 00:00 2024-06-01 08:00 2024-09-01 00:00 2024-10-01 00:00 2024-11-01 00:00 2025-06-01 00:00 2025-07-01 00:00 |
Active | TRANSMISSION | PLANNED | ONPATH | BPAT | RAVR_PAUL All Lines in Service. | 2017-03-31 09:29 | BPAT62912 | 2024-03-27 11:46 | |||
NI | 306408 | BPAT | NI | NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) |
400.0 400.0 3150.0 2500.0 2850.0 2500.0 |
2018-10-31 00:00 2018-10-31 00:00 2018-10-31 00:00 2018-10-31 00:00 2018-10-31 00:00 2018-10-31 00:00 |
2028-01-01 00:00 2028-01-01 00:00 2028-01-01 00:00 2028-01-01 00:00 2028-01-01 00:00 2028-01-01 00:00 |
Cancelled | TRANSMISSION | PLANNED | ONPATH | BPAT | NI Path Rating | 2018-10-30 08:20 | BPAT76509 | 2018-10-30 08:37 | |||
NI | 306422 | BPAT | NI | NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) |
400.0 400.0 3150.0 2500.0 2850.0 2500.0 |
2018-10-31 00:00 2018-10-31 00:00 2018-10-31 00:00 2018-10-31 00:00 2018-10-31 00:00 2018-10-31 00:00 |
2028-01-01 00:00 2028-01-01 00:00 2028-01-01 00:00 2028-01-01 00:00 2028-01-01 00:00 2028-01-01 00:00 |
Cancelled | TRANSMISSION | PLANNED | ONPATH | BPAT | NI Path Rating | 2018-10-30 08:41 | BPAT76511 | 2018-10-30 09:57 | |||
NI | 306487 | BPAT | NI | NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_EAST_N>S(BPAT) NI_EAST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) |
400.0 400.0 3150.0 2500.0 2850.0 2500.0 400.0 400.0 3150.0 2500.0 2850.0 2500.0 400.0 400.0 3150.0 2500.0 2850.0 2500.0 |
2018-11-01 00:00 2018-11-01 00:00 2018-11-01 00:00 2018-11-01 00:00 2018-11-01 00:00 2018-11-01 00:00 2019-11-01 00:00 2019-11-01 00:00 2019-11-01 00:00 2019-11-01 00:00 2019-11-01 00:00 2019-11-01 00:00 2028-01-01 00:00 2028-01-01 00:00 2028-01-01 00:00 2028-01-01 00:00 2028-01-01 00:00 2028-01-01 00:00 |
2019-11-01 00:00 2019-11-01 00:00 2019-11-01 00:00 2019-11-01 00:00 2019-11-01 00:00 2019-11-01 00:00 2028-01-01 00:00 2028-01-01 00:00 2028-01-01 00:00 2028-01-01 00:00 2028-01-01 00:00 2028-01-01 00:00 2033-01-01 00:00 2033-01-01 00:00 2033-01-01 00:00 2033-01-01 00:00 2033-01-01 00:00 2033-01-01 00:00 |
Active | TRANSMISSION | PLANNED | ONPATH | BPAT | NI Path Rating | 2018-10-31 08:51 | BPAT76534 | 2023-08-21 10:48 | |||
NI | 84603 | BPAT | NI_Studied_Nomogram | NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) NI_TOTL_N>S(BPAT) NI_TOTL_S>N(BPAT) NI_WEST_N>S(BPAT) NI_WEST_S>N(BPAT) |
1571.0 1409.0 1571.0 1409.0 1571.0 1409.0 1571.0 1409.0 1571.0 1409.0 1571.0 1409.0 |
2019-12-01 00:00 2019-12-01 00:00 2019-12-01 00:00 2019-12-01 00:00 2024-01-01 00:00 2024-01-01 00:00 2024-01-01 00:00 2024-01-01 00:00 2025-01-01 00:00 2025-01-01 00:00 2025-01-01 00:00 2025-01-01 00:00 |
2024-01-01 00:00 2024-01-01 00:00 2024-01-01 00:00 2024-01-01 00:00 2025-01-01 00:00 2025-01-01 00:00 2025-01-01 00:00 2025-01-01 00:00 2026-01-01 00:00 2026-01-01 00:00 2026-01-01 00:00 2026-01-01 00:00 |
Cancelled | TRANSMISSION | PLANNED | ONPATH | BPAT | NI Studied Nomogram | 2009-07-17 15:07 | BPAT10813 | 2018-10-04 11:46 | |||
MI | 323348 | BPAT | MI_Path_TTC | MI_E>W(BPAT) MI_E>W(BPAT) |
1930.0 1930.0 |
2020-02-11 00:00 2029-01-01 00:00 |
2029-01-01 00:00 2033-01-01 00:00 |
Active | TRANSMISSION | PLANNED | ONPATH | BPAT | Townsend-Garrison (NWE path operator) | 2020-02-10 07:57 | BPAT84124 | 2023-08-21 10:52 | |||
COI PDCI | 46533 | BPAT | COI PDCI | AC_S>N(BPAT) DC_S>N(BPAT) AC_S>N(BPAT) DC_S>N(BPAT) |
2450.0 1904.0 2450.0 1904.0 |
2020-04-01 00:00 2020-04-01 00:00 2025-01-01 00:00 2025-01-01 00:00 |
2025-01-01 00:00 2025-01-01 00:00 2026-01-01 00:00 2026-01-01 00:00 |
Cancelled | TRANSMISSION | PLANNED | ONPATH | BPAT | Studied Nomogram COI&PDCI SN | 2008-09-22 10:44 | BPAT6706 | 2019-01-28 09:16 | |||
SATSOP | 333174 | BPAT | SATSOP_Path_Limit | SATSOP_GEN(BPAT) SATSOP_GEN(BPAT) |
650.0 650.0 |
2020-09-16 11:00 2028-01-01 00:00 |
2028-01-01 00:00 2033-01-01 00:00 |
Active | TRANSMISSION | PLANNED | ONPATH | BPAT | Long Term Limit | 2020-09-16 10:49 | BPAT89170 | 2023-08-21 10:51 | |||
14 MONTH | 333180 | BPAT | SATSOP_All_Lines_in_Service | SATSOP_GEN(BPAT) SATSOP_GEN(BPAT) SATSOP_GEN(BPAT) SATSOP_GEN(BPAT) SATSOP_GEN(BPAT) SATSOP_GEN(BPAT) SATSOP_GEN(BPAT) SATSOP_GEN(BPAT) SATSOP_GEN(BPAT) SATSOP_GEN(BPAT) SATSOP_GEN(BPAT) SATSOP_GEN(BPAT) SATSOP_GEN(BPAT) SATSOP_GEN(BPAT) SATSOP_GEN(BPAT) SATSOP_GEN(BPAT) SATSOP_GEN(BPAT) SATSOP_GEN(BPAT) SATSOP_GEN(BPAT) SATSOP_GEN(BPAT) SATSOP_GEN(BPAT) SATSOP_GEN(BPAT) SATSOP_GEN(BPAT) SATSOP_GEN(BPAT) SATSOP_GEN(BPAT) SATSOP_GEN(BPAT) SATSOP_GEN(BPAT) SATSOP_GEN(BPAT) SATSOP_GEN(BPAT) SATSOP_GEN(BPAT) SATSOP_GEN(BPAT) SATSOP_GEN(BPAT) SATSOP_GEN(BPAT) |
650.0 680.0 680.0 680.0 680.0 680.0 680.0 680.0 680.0 680.0 680.0 680.0 680.0 680.0 680.0 680.0 680.0 680.0 680.0 680.0 680.0 680.0 680.0 680.0 680.0 680.0 680.0 680.0 680.0 680.0 680.0 680.0 680.0 |
2020-09-16 12:00 2021-11-09 00:00 2022-04-02 00:00 2022-11-01 00:00 2023-02-01 00:00 2023-03-01 00:00 2023-04-01 00:00 2023-05-01 00:00 2023-06-01 00:00 2023-07-01 00:00 2023-08-01 00:00 2023-09-01 00:00 2023-10-01 00:00 2023-11-01 00:00 2023-12-01 00:00 2024-01-01 00:00 2024-02-01 00:00 2024-03-01 00:00 2024-04-01 00:00 2024-05-01 00:00 2024-06-01 00:00 2024-07-01 00:00 2024-08-01 00:00 2024-09-01 00:00 2024-10-01 00:00 2024-11-01 00:00 2024-12-01 00:00 2025-01-01 00:00 2025-02-01 00:00 2025-03-01 00:00 2025-04-01 00:00 2025-05-01 00:00 2025-06-01 00:00 |
2021-11-09 00:00 2022-04-02 00:00 2022-11-01 00:00 2023-02-01 00:00 2023-03-01 00:00 2023-04-01 00:00 2023-05-01 00:00 2023-06-01 00:00 2023-07-01 00:00 2023-08-01 00:00 2023-09-01 00:00 2023-10-01 00:00 2023-11-01 00:00 2023-12-01 00:00 2024-01-01 00:00 2024-02-01 00:00 2024-03-01 00:00 2024-04-01 00:00 2024-05-01 00:00 2024-06-01 00:00 2024-07-01 00:00 2024-08-01 00:00 2024-09-01 00:00 2024-10-01 00:00 2024-11-01 00:00 2024-12-01 00:00 2025-01-01 00:00 2025-02-01 00:00 2025-03-01 00:00 2025-04-01 00:00 2025-05-01 00:00 2025-06-01 00:00 2025-07-01 00:00 |
Active | TRANSMISSION | PLANNED | ONPATH | BPAT | SATSOP - All Lines in Service (Year Round) | 2020-09-16 11:32 | BPAT89172 | 2024-03-27 11:25 | |||
NI | 364662 | BPAT | NI | NI_EAST_S>N(BPAT) NI_EAST_S>N(BPAT) NI_EAST_S>N(BPAT) |
200.0 200.0 200.0 |
2023-04-07 00:00 2023-06-01 00:00 2024-02-01 00:00 |
2023-06-01 00:00 2024-02-01 00:00 2025-01-01 00:00 |
Active | TRANSMISSION | PLANNED | ONPATH | BPAT | BCH - VARIOUS EQUIPMENT | 2023-04-06 10:41 | BPAT103135 | 2024-01-24 15:14 | |||
GRZN | 366631 | BPAT | GRZN | GRZN_N>S(BPAT) | 4800.0 | 2023-05-17 00:00 | 2099-01-01 00:00 | Active | TRANSMISSION | PLANNED | ONPATH | BPAT | GRZN N>S Long-term Limit | 2023-05-16 13:42 | BPAT104227 | 2023-05-16 13:42 | |||
14 MONTH | 367003 | BPAT | GRZN | GRZN_N>S(BPAT) GRZN_N>S(BPAT) GRZN_N>S(BPAT) GRZN_N>S(BPAT) GRZN_N>S(BPAT) GRZN_N>S(BPAT) GRZN_N>S(BPAT) GRZN_N>S(BPAT) GRZN_N>S(BPAT) GRZN_N>S(BPAT) GRZN_N>S(BPAT) |
4800.0 4800.0 4800.0 4800.0 4800.0 4800.0 4800.0 4800.0 4800.0 4800.0 4800.0 |
2023-06-01 00:00 2024-09-01 00:00 2024-10-01 00:00 2024-11-01 00:00 2024-12-01 00:00 2025-01-01 00:00 2025-02-01 00:00 2025-03-01 00:00 2025-04-01 00:00 2025-05-01 00:00 2025-06-01 00:00 |
2024-09-01 00:00 2024-10-01 00:00 2024-11-01 00:00 2024-12-01 00:00 2025-01-01 00:00 2025-02-01 00:00 2025-03-01 00:00 2025-04-01 00:00 2025-05-01 00:00 2025-06-01 00:00 2025-07-01 00:00 |
Active | TRANSMISSION | PLANNED | ONPATH | BPAT | GRZN All Lines in Service | 2023-05-22 08:09 | BPAT104451 | 2024-03-27 11:52 | |||
SBNDRY | 369914 | BPAT | SBNDRY | SBNDRY_N>S(BPAT) | 1350.0 | 2023-08-22 00:00 | 2033-01-01 00:00 | Active | TRANSMISSION | PLANNED | ONPATH | BPAT | South of Boundary Long Term Limit | 2023-08-21 11:12 | BPAT105687 | 2023-08-21 11:12 | |||
CLMBIA | 369916 | BPAT | CLMBIA | CLMBIA_N>S(BPAT) | 1010.0 | 2023-08-22 00:00 | 2033-01-01 00:00 | Active | TRANSMISSION | PLANNED | ONPATH | BPAT | Columbia Injection Long Term Limit | 2023-08-21 11:14 | BPAT105688 | 2023-08-21 11:14 | |||
WANAPM | 369918 | BPAT | WANAPM | WANAPM_N>S(BPAT) | 750.0 | 2023-08-22 00:00 | 2033-01-01 00:00 | Active | TRANSMISSION | PLANNED | ONPATH | BPAT | Wanapum Injection Long Term Limit | 2023-08-21 11:16 | BPAT105689 | 2023-08-21 11:16 | |||
NOPE | 372090 | BPAT | NOPE S>N | NOPE_S>N(BPAT) NOPE_S>N(BPAT) |
2000.0 1400.0 |
2023-10-18 00:00 2023-12-01 12:00 |
2023-12-01 12:00 2099-01-01 00:00 |
Active | TRANSMISSION | PLANNED | ONPATH | BPAT | NOPE S>N Long-Term Limit | 2023-10-17 13:18 | BPAT106649 | 2023-12-01 11:17 | |||
14 MONTH | 372092 | BPAT | NOPE S>N | NOPE_S>N(BPAT) | 2025.0 | 2023-11-01 00:00 | 2024-06-01 00:00 | Active | TRANSMISSION | PLANNED | ONPATH | BPAT | NOPE S>N Winter/Spring Seasonal Limit | 2023-10-17 13:27 | BPAT106650 | 2023-10-17 13:27 | |||
PDCI | 371774 | BPAT | PDCI | DC_S>N(BPAT) | 975.0 | 2023-11-01 00:00 | 2024-11-01 00:00 | Active | TRANSMISSION | PLANNED | ONPATH | BPAT | LADWP - PDCI SOUTH>NORTH SCHEDULING LIMIT | 2023-10-10 12:59 | BPAT106480 | 2023-10-10 12:59 | |||
14 MONTH | 357159 | BPAT | NOEL | N_ECOL_S>N(BPAT) | 2268.0 | 2023-11-01 00:00 | 2024-06-01 00:00 | Active | TRANSMISSION | PLANNED | ONPATH | BPAT | NOEL - Fall-Spring Seasonal Limits | 2022-08-12 10:33 | BPAT100080 | 2022-10-14 14:09 | |||
14 MONTH | 357161 | BPAT | SCSTER | SCSTER_N>S(BPAT) | 1241.0 | 2023-11-01 00:00 | 2024-06-01 00:00 | Active | TRANSMISSION | PLANNED | ONPATH | BPAT | SCSTER - Fall-Spring Seasonal Limits | 2022-08-12 10:34 | BPAT100081 | 2022-10-14 14:09 | |||
NI | 374748 | BPAT | NI | NI_TOTL_S>N(BPAT) NI_WEST_S>N(BPAT) |
2400.0 2000.0 |
2023-12-15 00:00 2023-12-15 00:00 |
2025-03-31 16:00 2025-03-31 16:00 |
Cancelled | TRANSMISSION | PLANNED | ONPATH | BPAT | BCH - CHAPMAN: 5CX1 | 2023-12-14 07:05 | BPAT108182 | 2023-12-14 07:32 | |||
NI | 374753 | BPAT | NI | NI_TOTL_N>S(BPAT) NI_WEST_N>S(BPAT) |
2400.0 2000.0 |
2023-12-15 00:00 2023-12-15 00:00 |
2025-03-31 16:00 2025-03-31 16:00 |
Active | TRANSMISSION | PLANNED | ONPATH | BPAT | BCH - CHAPMAN: 5CX1 | 2023-12-14 07:35 | BPAT108183 | 2023-12-14 07:35 | |||
14 MONTH | 376653 | BPAT | SOA | SOALSN(BPAT) SOALSN(BPAT) SOALSN(BPAT) |
3500.0 3500.0 3500.0 |
2024-02-14 00:00 2025-05-01 00:00 2025-06-01 00:00 |
2025-05-01 00:00 2025-06-01 00:00 2025-07-01 00:00 |
Active | TRANSMISSION | PLANNED | ONPATH | BPAT | SOA - All lines in service MW limit reflects forecasted NW generation updates | 2024-02-13 11:02 | BPAT109109 | 2024-03-27 11:45 | |||
NWACI | 377571 | BPAT | NWACI | AC_N>S(BPAT) AC_S>N(BPAT) |
4500.0 3600.0 |
2024-04-01 00:00 2024-04-01 00:00 |
2024-06-18 09:00 2024-06-18 09:00 |
Active | TRANSMISSION | PLANNED | ONPATH | BPAT | PG&E - TABLE MOUNTAIN 500kV SCAP-1, PG&E - TABLE MOUNTAIN 500kV SCAP-2 | 2024-03-12 09:07 | BPAT109522 | 2024-03-12 09:07 | |||
14 MONTH | 362045 | BPAT | NWACI PDCI RATS | AC_N>S(BPAT) AC_S>N(BPAT) DC_N>S(BPAT) DC_S>N(BPAT) RATS_N>S(BPAT) RATS_S>N(BPAT) |
4800.0 3000.0 3100.0 2084.0 300.0 200.0 |
2024-04-01 00:00 2024-04-01 00:00 2024-04-01 00:00 2024-04-01 00:00 2024-04-01 00:00 2024-04-01 00:00 |
2024-06-01 00:00 2024-06-01 00:00 2024-06-01 00:00 2024-06-01 00:00 2024-06-01 00:00 2024-06-01 00:00 |
Active | TRANSMISSION | PLANNED | ONPATH | BPAT | NWACI & PDCI & RATS 2024 SPRING SEASONAL LIMITS | 2023-01-11 13:44 | BPAT102011 | 2023-03-27 07:31 | |||
14 MONTH | 362052 | BPAT | WOG E>W | WOGARR_E>W(BPAT) | 2200.0 | 2024-04-01 00:00 | 2024-06-01 00:00 | Active | TRANSMISSION | PLANNED | ONPATH | BPAT | WOG_E>W SPRING 2024 Seasonal limit | 2023-01-11 13:47 | BPAT102012 | 2023-01-11 13:47 | |||
14 MONTH | 362054 | BPAT | WOG W>E | WOGARR_W>E(BPAT) | 1250.0 | 2024-04-01 00:00 | 2024-06-01 00:00 | Active | TRANSMISSION | PLANNED | ONPATH | BPAT | WOG_W>E SPRING 2024 Seasonal limit | 2023-01-11 13:49 | BPAT102013 | 2024-01-19 10:48 | |||
14 MONTH | 362067 | BPAT | WOCN | C-CASC_N(BPAT) | 9595.0 | 2024-04-01 00:00 | 2024-06-01 00:00 | Active | TRANSMISSION | PLANNED | ONPATH | BPAT | WOCN - SPRING 2024 SEASONAL LIMIT | 2023-01-11 13:55 | BPAT102014 | 2024-03-26 08:13 | |||
14 MONTH | 362069 | BPAT | NOHANF | NOHANF(BPAT) NOHANF_S>N(BPAT) |
5100.0 5000.0 |
2024-04-01 00:00 2024-04-01 00:00 |
2024-06-01 00:00 2024-06-01 00:00 |
Active | TRANSMISSION | PLANNED | ONPATH | BPAT | NOHANF - SPRING 2024 SEASONAL LIMIT | 2023-01-11 13:59 | BPAT102015 | 2023-05-04 08:28 | |||
14 MONTH | 364260 | BPAT | WOCS | C-CASC_S(BPAT) | 6059.0 | 2024-04-01 00:00 | 2024-11-01 00:00 | Active | TRANSMISSION | PLANNED | ONPATH | BPAT | WOCS 2024 Spring/Summer Seasonal Limit | 2023-03-27 08:02 | BPAT102937 | 2024-03-15 11:16 | |||
NWACI | 378269 | BPAT | NWACI | AC_N>S(BPAT) AC_S>N(BPAT) |
3975.0 2700.0 |
2024-04-03 06:00 2024-04-03 06:00 |
2024-04-24 10:00 2024-04-24 10:00 |
Active | TRANSMISSION | PLANNED | ONPATH | BPAT | PG&E - Round Mountain-Table Mountain 1 500kV Line, PG&E - Table Mountain 500kV SCAP-1, PG&E - Table Mountain 500kV SCAP-2 | 2024-03-29 07:59 | BPAT109791 | 2024-03-29 07:59 | |||
SOALSN | 378060 | BPAT | SOALSN | SOALSN(BPAT) SOALSN(BPAT) |
1284.0 1284.0 |
2024-04-06 07:00 2024-04-19 14:00 |
2024-04-19 14:00 2024-04-24 16:00 |
Active | TRANSMISSION | PLANNED | ONPATH | BPAT | PGE - KEELER-ST MARYS 1 230kV LINE | 2024-03-26 11:07 | BPAT109713 | 2024-04-01 14:04 | |||
PDCI | 378591 | BPAT | PDCI | DC_N>S(BPAT) DC_S>N(BPAT) |
3100.0 0.0 |
2024-04-09 00:00 2024-04-09 00:00 |
2024-04-20 18:00 2024-04-20 18:00 |
Active | TRANSMISSION | PLANNED | ONPATH | BPAT | LADWP - VICTORVILLE-RINALDI 1 500kV LINE | 2024-04-08 08:49 | BPAT109946 | 2024-04-08 08:49 | |||
NOHANF | 378225 | BPAT | NOHANF | NOHANF(BPAT) NOHANF_S>N(BPAT) |
4753.0 4260.0 |
2024-04-14 22:00 2024-04-14 22:00 |
2024-04-19 17:00 2024-04-19 17:00 |
Active | TRANSMISSION | PLANNED | ONPATH | BPAT | USBR - GRAND COULEE: 500/230kV CSY TIE, USBR - GRAND COULEE: 230kV MAIN BUS SECTIONS 2A & 2B | 2024-03-28 12:38 | BPAT109774 | 2024-03-28 12:39 | |||
WOCN | 378221 | BPAT | WOCN | C-CASC_N(BPAT) | 8867.0 | 2024-04-15 00:00 | 2024-04-22 00:00 | Active | TRANSMISSION | PLANNED | ONPATH | BPAT | BPA - VARIOUS EQUIPMENT OUTAGES | 2024-03-28 10:15 | BPAT109771 | 2024-03-28 10:15 | |||
GRZN | 377912 | BPAT | GRZN | GRZN_N>S(BPAT) | 4800.0 | 2024-04-15 00:00 | 2024-04-22 00:00 | Active | TRANSMISSION | PLANNED | ONPATH | BPAT | BPA - VARIOUS EQUIPMENT OUTAGES | 2024-03-21 13:41 | BPAT109649 | 2024-03-21 13:41 | |||
SCSTER NOEL | 378340 | BPAT | SOC NOEL | N_ECOL_S>N(BPAT) SCSTER_N>S(BPAT) |
2924.0 3195.0 |
2024-04-15 00:00 2024-04-15 00:00 |
2024-04-22 00:00 2024-04-22 00:00 |
Active | TRANSMISSION | PLANNED | ONPATH | BPAT | BPA - Various Equipment outages (Study 0208-ST24-R0) | 2024-04-01 13:55 | BPAT109830 | 2024-04-01 13:55 | |||
NWACI PDCI | 377881 | BPAT | NWACI PDCI | AC_N>S(BPAT) AC_S>N(BPAT) DC_N>S(BPAT) DC_S>N(BPAT) |
4800.0 3000.0 3100.0 2084.0 |
2024-04-15 00:00 2024-04-15 00:00 2024-04-15 00:00 2024-04-15 00:00 |
2024-04-22 00:00 2024-04-22 00:00 2024-04-22 00:00 2024-04-22 00:00 |
Active | TRANSMISSION | PLANNED | ONPATH | BPAT | BPA - VARIOUS OUTAGES (SOL NWACI S>N 3675) | 2024-03-21 07:34 | BPAT109642 | 2024-03-21 07:34 | |||
RT N. OUTAGE | 378943 | BPAT | NI_EAST_N>S(BPAT) NI_TOTL_N>S(BPAT) |
350.0 2350.0 |
2024-04-18 00:00 2024-04-18 00:00 |
2024-04-19 00:00 2024-04-19 00:00 |
Active | TRANSMISSION | FORCED | ONPATH | BPAT | Updated NI limits for 4/18/24 | 2024-04-17 19:37 | BPAT110107 | 2024-04-17 19:37 | ||||
NWACI | 378754 | BPAT | NWACI | AC_N>S(BPAT) AC_S>N(BPAT) |
3800.0 2900.0 |
2024-04-18 07:00 2024-04-18 07:00 |
2024-04-19 17:00 2024-04-19 17:00 |
Cancelled | TRANSMISSION | PLANNED | ONPATH | BPAT | PG&E - Table Mountain 500kV SCAP-1, PG&E - Table Mountain 500kV SCAP-2, PG&E - Round Mountain-Table Mountain #1 500kV Line, PG&E - COTTONWOOD CB 462 | 2024-04-12 07:39 | BPAT110022 | 2024-04-12 10:40 | |||
NWACI PDCI | 378933 | BPAT | NWACI PDCI | AC_N>S(BPAT) AC_S>N(BPAT) DC_N>S(BPAT) DC_S>N(BPAT) |
4800.0 2290.0 3100.0 2084.0 |
2024-04-18 08:00 2024-04-18 08:00 2024-04-18 08:00 2024-04-18 08:00 |
2024-04-18 13:00 2024-04-18 13:00 2024-04-18 13:00 2024-04-18 13:00 |
Scheduled | TRANSMISSION | PLANNED | ONPATH | BPAT | BPA - GRIZZLY PCB 5025, BPA - BAKEOVEN: J.DAY-GRIZZLY 1 & 2 SERIES CAP GROUPS 1 & 2 (SOL NWACI S>N 3675) | 2024-04-17 15:56 | BPAT110105 | 2024-04-17 15:56 | |||
NWACI PDCI | 378928 | BPAT | NWACI PDCI | AC_N>S(BPAT) AC_S>N(BPAT) DC_N>S(BPAT) DC_S>N(BPAT) |
4153.0 1990.0 3100.0 2084.0 |
2024-04-18 13:00 2024-04-18 13:00 2024-04-18 13:00 2024-04-18 13:00 |
2024-04-18 16:00 2024-04-18 16:00 2024-04-18 16:00 2024-04-18 16:00 |
Scheduled | TRANSMISSION | PLANNED | ONPATH | BPAT | BPA - BUCKLEY-GRIZZLY NO 1 500kV LINE, BPA - BAKEOVEN: J.DAY-GRIZZLY 1 & 2 SERIES CAP GROUPS 1 & 2 (SOL NWACI S>N 3675) | 2024-04-17 15:53 | BPAT110104 | 2024-04-17 15:53 | |||
NWACI PDCI | 377901 | BPAT | NWACI PDCI | AC_N>S(BPAT) AC_S>N(BPAT) DC_N>S(BPAT) DC_S>N(BPAT) |
3900.0 1600.0 3100.0 2084.0 |
2024-04-18 13:00 2024-04-18 13:00 2024-04-18 13:00 2024-04-18 13:00 |
2024-04-18 16:00 2024-04-18 16:00 2024-04-18 16:00 2024-04-18 16:00 |
Scheduled | TRANSMISSION | PLANNED | ONPATH | BPAT | BPA - Buckley-Grizzly No 1 500kV LineBPA - Bakeoven: J.Day-Grizzly 1 & 2 Series Cap Groups 1 & 2, BPA- Alvey-Lane #1 230kV Line (SOL NWACI S>N 3675 MW) | 2024-03-21 13:30 | BPAT109646 | 2024-04-17 15:48 | |||
NWACI PDCI | 377906 | BPAT | NWACI PDCI | AC_N>S(BPAT) AC_S>N(BPAT) DC_N>S(BPAT) DC_S>N(BPAT) |
4800.0 2190.0 3100.0 2084.0 |
2024-04-18 13:00 2024-04-18 13:00 2024-04-18 13:00 2024-04-18 13:00 |
2024-05-08 16:00 2024-05-08 16:00 2024-05-08 16:00 2024-05-08 16:00 |
Scheduled | TRANSMISSION | PLANNED | ONPATH | BPAT | BPA - BUCKLEY-GRIZZLY NO 1 500kV LINE (SOL NWACI S>N 3675) | 2024-03-21 13:39 | BPAT109647 | 2024-04-17 15:47 | |||
NI | 378515 | BPAT | NI | NI_TOTL_S>N(BPAT) NI_WEST_S>N(BPAT) |
2000.0 2000.0 |
2024-04-18 13:00 2024-04-18 13:00 |
2024-05-08 16:00 2024-05-08 16:00 |
Scheduled | TRANSMISSION | PLANNED | ONPATH | BPAT | BPA- Buckley-Grizzly 1 500kV Line | 2024-04-05 09:06 | BPAT109912 | 2024-04-17 16:00 | |||
NWACI PDCI | 378521 | BPAT | NWACI PDCI | AC_N>S(BPAT) AC_S>N(BPAT) DC_N>S(BPAT) DC_S>N(BPAT) |
4040.0 1780.0 3100.0 2084.0 |
2024-04-18 13:00 2024-04-18 13:00 2024-04-18 13:00 2024-04-18 13:00 |
2024-04-26 16:00 2024-04-26 16:00 2024-04-26 16:00 2024-04-26 16:00 |
Scheduled | TRANSMISSION | PLANNED | ONPATH | BPAT | BPA - BUCKLEY-GRIZZLY NO 1 500kV LINE, BPA- ALVEY-LANE #1 230kV LINE (SOL NWACI S>N 3675) | 2024-04-05 11:06 | BPAT109916 | 2024-04-17 15:47 | |||
GRZN | 377916 | BPAT | GRZN | GRZN_N>S(BPAT) | 2650.0 | 2024-04-18 13:00 | 2024-04-18 16:00 | Scheduled | TRANSMISSION | PLANNED | ONPATH | BPAT | BPA - BUCKLEY-GRIZZLY NO 1 500kV LINE, BPA - BAKEOVEN: J.DAY-GRIZZLY 1&2 SERIES CAP GROUPS 1&2 | 2024-03-21 13:46 | BPAT109651 | 2024-04-17 15:59 | |||
GRZN | 377918 | BPAT | GRZN | GRZN_N>S(BPAT) | 4533.0 | 2024-04-18 13:00 | 2024-05-08 16:00 | Scheduled | TRANSMISSION | PLANNED | ONPATH | BPAT | BPA - BUCKLEY-GRIZZLY NO 1 500kV LINE | 2024-03-21 13:47 | BPAT109652 | 2024-04-17 15:58 | |||
RAVR_PAUL | 378532 | BPAT | RAVR PAUL | RAVR_PAUL(BPAT) | 1404.0 | 2024-04-20 07:00 | 2024-04-28 16:00 | Scheduled | TRANSMISSION | PLANNED | ONPATH | BPAT | BPA- TPWR Cowlitz-Covington section of Chehalis-Covington 1 230kV Line | 2024-04-05 11:20 | BPAT109918 | 2024-04-05 11:20 | |||
WOCN | 378416 | BPAT | WOCN | C-CASC_N(BPAT) | 9253.0 | 2024-04-22 00:00 | 2024-04-29 00:00 | Scheduled | TRANSMISSION | PLANNED | ONPATH | BPAT | BPA - VARIOUS EQUIPMENT OUTAGES | 2024-04-03 08:47 | BPAT109863 | 2024-04-03 08:47 | |||
SCSTER NOEL | 378510 | BPAT | SCSTER NOEL | N_ECOL_S>N(BPAT) SCSTER_N>S(BPAT) |
2912.0 2754.0 |
2024-04-22 00:00 2024-04-22 00:00 |
2024-04-29 00:00 2024-04-29 00:00 |
Scheduled | TRANSMISSION | PLANNED | ONPATH | BPAT | BPA - VARIOUS EQUIPMENT OUTAGES (STUDY 0231-ST24-R0) | 2024-04-05 08:24 | BPAT109909 | 2024-04-05 08:24 | |||
NWACI | 378687 | BPAT | NWACI | AC_N>S(BPAT) AC_S>N(BPAT) |
4025.0 2725.0 |
2024-04-22 06:00 2024-04-22 06:00 |
2024-04-23 18:00 2024-04-23 18:00 |
Scheduled | TRANSMISSION | PLANNED | ONPATH | BPAT | PG&E - Table Mountain 500kV SCAP-1, PG&E - Table Mountain 500kV SCAP-2, PG&E - Round Mountain-Table Mountain 1 500kV Line, PG&E - Round Mountain: Malin 500Kv SCAP Grp 1 | 2024-04-11 07:40 | BPAT110003 | 2024-04-11 07:40 | |||
NOPE | 378627 | BPAT | NOPE | NOPE_S>N(BPAT) | 2275.0 | 2024-04-22 07:00 | 2024-04-22 17:00 | Scheduled | TRANSMISSION | PLANNED | ONPATH | BPAT | PGE - KEELER-ST MARYS 1 230kV LINE, BPA - LONGVIEW: 230kV SOUTH MAIN BUS | 2024-04-09 08:15 | BPAT109970 | 2024-04-09 08:15 | |||
SOALSN | 378629 | BPAT | SOALSN | SOALSN(BPAT) | 2040.0 | 2024-04-22 07:00 | 2024-04-22 17:00 | Scheduled | TRANSMISSION | PLANNED | ONPATH | BPAT | PGE - KEELER-ST MARYS 1 230kV LINE, BPA - LONGVIEW: 230kV SOUTH MAIN BUS | 2024-04-09 08:35 | BPAT109971 | 2024-04-09 08:35 | |||
WOG | 378659 | BPAT | WOG | WOGARR_E>W(BPAT) | 2000.0 | 2024-04-22 08:00 | 2024-04-22 15:00 | Scheduled | TRANSMISSION | PLANNED | ONPATH | BPAT | BPA - HATWAI: 230kV MAIN BUS | 2024-04-10 10:35 | BPAT109988 | 2024-04-10 10:35 | |||
GRZN | 378530 | BPAT | GRZN | GRZN_N>S(BPAT) | 4100.0 | 2024-04-22 08:00 | 2024-04-25 17:00 | Scheduled | TRANSMISSION | PLANNED | ONPATH | BPAT | BPA- Buckley-Grizzly No 1 500kV Line, BPA- Redmond-Pilot Butte PACW #1 230kV Line | 2024-04-05 11:18 | BPAT109917 | 2024-04-05 11:18 | |||
NOHANF | 378345 | BPAT | NOHANF | NOHANF(BPAT) NOHANF_S>N(BPAT) |
4609.0 2121.0 |
2024-04-22 08:00 2024-04-22 08:00 |
2024-04-26 15:00 2024-04-26 15:00 |
Scheduled | TRANSMISSION | PLANNED | ONPATH | BPAT | BPA - Schultz-Wautoma 1 500kV | 2024-04-01 15:22 | BPAT109831 | 2024-04-01 15:22 | |||
WOCN | 378376 | BPAT | WOCN | C-CASC_N(BPAT) | 8831.0 | 2024-04-22 08:00 | 2024-04-26 15:00 | Scheduled | TRANSMISSION | PLANNED | ONPATH | BPAT | BPA- Schultz-Wautoma 1 500kV Line | 2024-04-02 11:52 | BPAT109846 | 2024-04-02 11:52 | |||
NI | 378388 | BPAT | NI | NI_TOTL_S>N(BPAT) NI_WEST_S>N(BPAT) |
2000.0 2000.0 |
2024-04-22 08:00 2024-04-22 08:00 |
2024-04-26 15:00 2024-04-26 15:00 |
Scheduled | TRANSMISSION | PLANNED | ONPATH | BPAT | BPA- Schultz-Wautoma 1 500kV Line | 2024-04-02 12:48 | BPAT109850 | 2024-04-02 12:48 | |||
PDCI | 378665 | BPAT | PDCI | DC_N>S(BPAT) DC_S>N(BPAT) |
3100.0 0.0 |
2024-04-23 08:00 2024-04-23 08:00 |
2024-04-23 18:00 2024-04-23 18:00 |
Scheduled | TRANSMISSION | PLANNED | ONPATH | BPAT | LADWP - ADELANTO-TOLUCA 1 500kV LINE | 2024-04-10 12:07 | BPAT109993 | 2024-04-10 12:07 | |||
WOCS | 378623 | BPAT | WOCS | C-CASC_S(BPAT) | 4885.0 | 2024-04-23 08:00 | 2024-04-24 17:00 | Scheduled | TRANSMISSION | PLANNED | ONPATH | BPAT | BPA - MCNARY: 230kV MAIN BUS SECTION 3 | 2024-04-09 08:08 | BPAT109968 | 2024-04-09 08:08 | |||
NOPE | 378625 | BPAT | NOPE | NOPE_S>N(BPAT) | 2275.0 | 2024-04-23 08:00 | 2024-04-24 17:00 | Scheduled | TRANSMISSION | PLANNED | ONPATH | BPAT | PGE - KEELER-ST MARYs 1 230kV LINE, BPA - MCNARY: 230kV MAIN BUS SECTION 3 | 2024-04-09 08:12 | BPAT109969 | 2024-04-09 08:12 | |||
SOALSN | 378631 | BPAT | SOALSN | SOALSN(BPAT) | 1860.0 | 2024-04-23 08:00 | 2024-04-24 17:00 | Scheduled | TRANSMISSION | PLANNED | ONPATH | BPAT | PGE - KEELER-ST MARYS 1 230kV LINE, BPA - MCNARY: 230kV MAIN BUS SECTION 3 | 2024-04-09 08:40 | BPAT109972 | 2024-04-09 08:40 | |||
WOCN | 378758 | BPAT | WOCN | C-CASC_N(BPAT) | 8182.0 | 2024-04-23 08:00 | 2024-04-24 16:00 | Scheduled | TRANSMISSION | PLANNED | ONPATH | BPAT | BPA - SCHULTZ-WAUTOMA 1 500kV LINE, PSE - ROCKY REACH-CASCADE & CASCADE-WHITE RIVER 230kV LINE (SOL 8982) | 2024-04-12 09:32 | BPAT110024 | 2024-04-12 09:32 | |||
PDCI | 378668 | BPAT | PDCI | DC_N>S(BPAT) DC_S>N(BPAT) |
3100.0 0.0 |
2024-04-27 05:00 2024-04-27 05:00 |
2024-04-28 21:00 2024-04-28 21:00 |
Scheduled | TRANSMISSION | PLANNED | ONPATH | BPAT | LADWP - TOLUCA RS-E: 500/230kV BANK H | 2024-04-10 12:09 | BPAT109994 | 2024-04-10 12:09 | |||
WOCN | 378655 | BPAT | WOCN | C-CASC_N(BPAT) | 9253.0 | 2024-04-29 00:00 | 2024-05-06 00:00 | Scheduled | TRANSMISSION | PLANNED | ONPATH | BPAT | BPA - VARIOUS EQUIPMENT OUTAGES | 2024-04-10 07:27 | BPAT109985 | 2024-04-10 07:27 | |||
SCSTER NOEL | 378773 | BPAT | SCSTER NOEL | N_ECOL_S>N(BPAT) SCSTER_N>S(BPAT) |
2935.0 2758.0 |
2024-04-29 00:00 2024-04-29 00:00 |
2024-05-06 00:00 2024-05-06 00:00 |
Scheduled | TRANSMISSION | PLANNED | ONPATH | BPAT | BPA - VARIOUS EQUIPMENT OUTAGES (STUDY 0253-ST24-R0) | 2024-04-12 12:38 | BPAT110030 | 2024-04-12 12:38 | |||
NWACI PDCI | 378845 | BPAT | NWACI PDCI | AC_N>S(BPAT) AC_S>N(BPAT) DC_N>S(BPAT) DC_S>N(BPAT) |
4800.0 1600.0 3100.0 2084.0 |
2024-04-29 07:00 2024-04-29 07:00 2024-04-29 07:00 2024-04-29 07:00 |
2024-05-02 16:00 2024-05-02 16:00 2024-05-02 16:00 2024-05-02 16:00 |
Scheduled | TRANSMISSION | PLANNED | ONPATH | BPAT | BPA - BUCKLEY-GRIZZLY NO 1 500kV LINE, BPA - ALVEY: MARION 1 500kV LINE SERIES CAP GROUP 1 (SOL NWACI S>N 3675) | 2024-04-15 08:39 | BPAT110070 | 2024-04-15 08:39 | |||
SCSTER NOEL | 378776 | BPAT | SCSTER NOEL | N_ECOL_S>N(BPAT) SCSTER_N>S(BPAT) |
2586.0 2758.0 |
2024-05-03 07:00 2024-05-03 07:00 |
2024-05-05 20:00 2024-05-05 20:00 |
Scheduled | TRANSMISSION | PLANNED | ONPATH | BPAT | SCL - SNOKING-MAPLE VALLEY 1 & 2 230kV LINES (STUDY 0254-ST24-R0) | 2024-04-12 12:40 | BPAT110031 | 2024-04-12 12:40 | |||
WOCN | 378912 | BPAT | WOCN | C-CASC_N(BPAT) | 8889.0 | 2024-05-06 08:00 | 2024-05-09 17:00 | Scheduled | TRANSMISSION | PLANNED | ONPATH | BPAT | BPA - COVINGTON-BETTAS RD 1 230kV LINE | 2024-04-17 14:52 | BPAT110102 | 2024-04-17 14:52 | |||
WOCN | 378914 | BPAT | WOCN | C-CASC_N(BPAT) | 8852.0 | 2024-05-08 10:00 | 2024-05-08 12:00 | Scheduled | TRANSMISSION | PLANNED | ONPATH | BPAT | BPA - CHIEF JOSEPH-SNOHOMISH 3 OR 4 345kV LINE, BPA - COVINGTON-BETTAS ROAD 1 230kV LINE (SOL 9391) | 2024-04-17 15:07 | BPAT110103 | 2024-04-17 15:07 | |||
WOCN | 378872 | BPAT | WOCN | C-CASC_N(BPAT) | 9061.0 | 2024-05-08 10:00 | 2024-05-08 12:00 | Cancelled | TRANSMISSION | PLANNED | ONPATH | BPAT | BPA - CHIEF JOSEPH SNOHOMISH 3 OR 4 345kV LINE (SOL 9109) | 2024-04-16 12:20 | BPAT110084 | 2024-04-16 12:34 | |||
CLPT Outages: | |||||||||||||||||||
CLPT 54838 | 83791 | CLPT | EAST BUSINESS PARK-SKYLINE 115 KV LINE | 0.0 | 0.0 | 0.0 | 2025-01-01 01:00 | 2025-01-01 02:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | CLPT | Testing:Testing OATI interface - no real outage. Note:Testing OATI interface - no real outage. Path(Impact):ARH-ARH(0). *115kV,Continuous,Include Weekends* | 2021-09-03 13:33 | 54838 | 2021-09-03 13:33 | ||
CLPT 54871 | 83878 | CLPT | EAST BUSINESS PARK-SKYLINE 115 KV LINE | 0.0 | 0.0 | 0.0 | 2025-01-01 03:05 | 2025-01-01 04:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | CLPT | Testing:Testing OATI interface - no real outage. Note:Testing OATI interface - no real outage. Path(Impact):ARH-ARH(0). *115kV,Continuous,Include Weekends* | 2021-09-09 09:55 | 54871 | 2021-09-13 15:37 | ||
CRCM Outages: | |||||||||||||||||||
Winter 2023/24 Limit | 58932 | WACM | TOT-1A | TOT-1A | BOZ>CRG(CRCM) CRG>BOZ(CRCM) CRG>SWR(CRCM) SWR>CRG(CRCM) SWR>VNL(CRCM) VNL>FGE(CRCM) VNL>SWR(CRCM) |
395.0 | 395.0 | 194.3 194.3 104.7 104.7 104.7 179.4 104.7 |
2023-11-01 00:00 2023-11-01 00:00 2023-11-01 00:00 2023-11-01 00:00 2023-11-01 00:00 2023-11-01 00:00 2023-11-01 00:00 |
2024-06-01 00:00 2024-06-01 00:00 2024-06-01 00:00 2024-06-01 00:00 2024-06-01 00:00 2024-06-01 00:00 2024-06-01 00:00 |
Active | Transmission | Planned | OnPath | CRCM,WACM | TOT-1A Winter Ratings- Maximum Seasonal TTC of 500 MW -sr. | 2023-09-27 13:02 | WACM17891 | 2023-09-27 13:02 |
Winter 2023/24 Limit | 58935 | WACM | TOT-5 | TOT-5 | AU>CRG(CRCM) BLUE>CRG(CRCM) CCW>MIDW(CRCM) CRG>AU(CRCM) MIDW>CCW(CRCM) |
750.0 | 750.0 | 456.8 21.8 246.5 456.8 246.5 |
2023-11-01 00:00 2023-11-01 00:00 2023-11-01 00:00 2023-11-01 00:00 2023-11-01 00:00 |
2024-06-01 00:00 2024-06-01 00:00 2024-06-01 00:00 2024-06-01 00:00 2024-06-01 00:00 |
Active | Transmission | Planned | OnPath | CRCM,WACM | TOT-5 Winter 2023/24 Rating for system intact is 1680 MW. CRCM Share is 725 MW. JK | 2023-09-27 13:19 | WACM17894 | 2023-09-27 13:19 |
Winter 2023/24- Limit | 58931 | WACM | TOT-2A | TOT-2A | CCI>SHR2(CRCM) HSP>SJ345(CRCM) SHR2>CCI(CRCM) SJ345>HSP(CRCM) |
420.0 | 420.0 | 248.8 169.2 248.8 169.2 |
2023-11-01 00:00 2023-11-01 00:00 2023-11-01 00:00 2023-11-01 00:00 |
2024-06-01 00:00 2024-06-01 00:00 2024-06-01 00:00 2024-06-01 00:00 |
Active | Transmission | Planned | OnPath | CRCM,WACM | TOT-2A Winter 2023/24 ratings based on 200 MW of SWC Average Load. CRCM Share will be 418 MW. PSCO share is 40 MW and TSGT will be 40 MW. JK | 2023-09-27 12:48 | WACM17890 | 2023-09-27 12:48 |
GLENCANYON2-PNPKWALC230 | 60503 | CRCM | GLENCANYON2-PNPKWALC230 | FLG>GLENCANYON2(CRCM) FLG>PNPKWALC230(CRCM) GLENCANYON2>FLG(CRCM) PNPKWALC230>FLG(CRCM) |
1494.0 1494.0 1494.0 1494.0 |
1494.0 1494.0 1494.0 1494.0 |
1250.0 1250.0 1250.0 1250.0 |
2024-02-27 19:00 2024-02-27 19:00 2024-02-27 19:00 2024-02-27 19:00 |
2024-05-30 16:00 2024-05-30 16:00 2024-05-30 16:00 2024-05-30 16:00 |
Active | TRANSMISSION | PLANNED | ONPATH | CRCM,WACM | INFO-23-2702. WALC outage C-23-1385 | 2024-02-27 18:33 | CRCM18246 | 2024-02-27 18:33 | |
GLENCANYON2-PNPKWALC230 | 60509 | CRCM | GLENCANYON2-PNPKWALC230 | FLG>GLENCANYON2(CRCM) FLG>PNPKWALC230(CRCM) GLENCANYON2>FLG(CRCM) PNPKWALC230>FLG(CRCM) |
1494.0 1494.0 1494.0 1494.0 |
1494.0 1494.0 1494.0 1494.0 |
1200.0 1200.0 1200.0 1200.0 |
2024-03-25 07:00 2024-03-25 07:00 2024-03-25 07:00 2024-03-25 07:00 |
2024-04-04 14:39 2024-04-04 14:39 2024-04-04 14:39 2024-04-04 14:39 |
Completed | TRANSMISSION | PLANNED | ONPATH | CRCM,WACM | INFO-24-0708. WALC C-24-0302. | 2024-02-27 19:20 | CRCM18248 | 2024-04-04 14:40 | |
CRG-BLUE | 60633 | CRCM | TOT-5 (CRCM), CRG-BLUE | BLUE>CRG(CRCM) CRG>BLUE(CRCM) |
50.0 50.0 |
50.0 50.0 |
0.0 0.0 |
2024-04-08 07:00 2024-04-08 07:00 |
2024-04-09 15:34 2024-04-09 15:34 |
Completed | TRANSMISSION | PLANNED | ONPATH | CRCM | ICC-24-0013 | 2024-03-08 21:59 | CRCM18277 | 2024-04-09 15:33 | |
CRG-HDN | 60636 | CRCM | CRG-HDN | CRG>HDN(CRCM) HDN>CRG(CRCM) |
442.0 442.0 |
442.0 442.0 |
0.0 0.0 |
2024-04-08 07:00 2024-04-08 07:00 |
2024-04-09 15:35 2024-04-09 15:35 |
Completed | TRANSMISSION | PLANNED | ONPATH | CRCM | ICC-24-0013 | 2024-03-08 22:01 | CRCM18278 | 2024-04-09 15:34 | |
System Conditions | 60632 | WACM | TOT-5 | TOT-5 | AU>CRG(CRCM) BLUE>CRG(CRCM) CCW>MIDW(CRCM) CRG>AU(CRCM) MIDW>CCW(CRCM) |
750.0 | 750.0 | 296.1 14.1 159.8 296.1 159.8 |
2024-04-08 07:00 2024-04-08 07:00 2024-04-08 07:00 2024-04-08 07:00 2024-04-08 07:00 |
2024-04-09 16:00 2024-04-09 16:00 2024-04-09 16:00 2024-04-09 16:00 2024-04-09 16:00 |
Completed | Transmission | Planned | OffPath | CRCM,LAPT,WACM | ICC-24-0013;Series 20 (TOT5 Limit 1400MW) | 2024-03-08 21:54 | WACM18276 | 2024-04-09 15:30 |
System Conditions | 60639 | WACM | TOT-5 | TOT-5 | AU>CRG(CRCM) BLUE>CRG(CRCM) CCW>MIDW(CRCM) CRG>AU(CRCM) MIDW>CCW(CRCM) |
750.0 | 750.0 | 472.5 22.5 255.0 472.5 255.0 |
2024-04-09 15:00 2024-04-09 15:00 2024-04-09 15:00 2024-04-09 15:00 2024-04-09 15:00 |
2024-04-11 14:00 2024-04-11 14:00 2024-04-11 14:00 2024-04-11 14:00 2024-04-11 14:00 |
Completed | Transmission | Planned | OffPath | CRCM,LAPT,WACM | ICC-24-0014;Series 22 (TOT5 Limit 1400MW) | 2024-03-08 22:24 | WACM18279 | 2024-04-11 13:24 |
CRG-RFL 230 | 60941 | CRCM | CRAIG>RIFLE 230KV | CCI>CRG(CRCM) CRG>CCI(CRCM) CRG>HSP(CRCM) HSP>CRG(CRCM) |
442.0 442.0 170.0 170.0 |
442.0 442.0 170.0 170.0 |
129.0 129.0 46.0 46.0 |
2024-04-12 07:00 2024-04-12 07:00 2024-04-12 07:00 2024-04-12 07:00 |
2024-04-13 10:00 2024-04-13 10:00 2024-04-13 10:00 2024-04-13 10:00 |
Completed | TRANSMISSION | PLANNED | ONPATH | CRCM,WACM | CRCM TTC will be limited across CRG-CCI and CRG-HSP during this outage. Limit is dependent upon system operating conditions. | 2024-04-09 10:20 | CRCM18443 | 2024-04-13 09:09 | |
System Conditions | 60640 | WACM | TOT-5 | TOT-5 | AU>CRG(CRCM) BLUE>CRG(CRCM) CCW>MIDW(CRCM) CRG>AU(CRCM) MIDW>CCW(CRCM) |
750.0 | 750.0 | 245.7 11.7 132.6 245.7 132.6 |
2024-04-12 07:00 2024-04-12 07:00 2024-04-12 07:00 2024-04-12 07:00 2024-04-12 07:00 |
2024-04-13 10:00 2024-04-13 10:00 2024-04-13 10:00 2024-04-13 10:00 2024-04-13 10:00 |
Completed | Transmission | Planned | OffPath | CRCM,LAPT,WACM | ICC-24-0015;TOT-5 to series 30. | 2024-03-08 22:30 | WACM18280 | 2024-04-13 09:08 |
System Conditions | 60641 | WACM | TOT-2A | TOT-2A | CCI>SHR2(CRCM) HSP>SJ345(CRCM) SHR2>CCI(CRCM) SJ345>HSP(CRCM) |
420.0 | 420.0 | 175.0 119.0 175.0 119.0 |
2024-04-12 07:00 2024-04-12 07:00 2024-04-12 07:00 2024-04-12 07:00 |
2024-04-13 10:00 2024-04-13 10:00 2024-04-13 10:00 2024-04-13 10:00 |
Completed | Transmission | Planned | OffPath | CRCM,WACM | ICC-24-0015; TOT2A Series 16 | 2024-03-08 22:43 | WACM18281 | 2024-04-13 09:09 |
CRG-RFL 230 | 60642 | CRCM | CRAIG>RIFLE 230KV | CCI>CRG(CRCM) CRG>CCI(CRCM) CRG>HSP(CRCM) HSP>CRG(CRCM) |
442.0 442.0 170.0 170.0 |
442.0 442.0 170.0 170.0 |
129.0 129.0 46.0 46.0 |
2024-04-15 07:00 2024-04-15 07:00 2024-04-15 07:00 2024-04-15 07:00 |
2024-04-18 15:00 2024-04-18 15:00 2024-04-18 15:00 2024-04-18 15:00 |
Cancelled | TRANSMISSION | PLANNED | ONPATH | CRCM | ICC-24-0015; CRCM TTC will be limited across CRG-CCI and CRG-HSP during this outage. Limit is dependent upon system operating conditions. | 2024-03-08 22:47 | CRCM18282 | 2024-04-09 10:19 | |
CRG-SWR | 60992 | CRCM | TOT-1A (CRCM), CRG-SWR | CRG>SWR(CRCM) SWR>CRG(CRCM) |
140.0 140.0 |
140.0 140.0 |
0.0 0.0 |
2024-04-18 08:00 2024-04-18 08:00 |
2024-04-18 11:00 2024-04-18 11:00 |
Cancelled | TRANSMISSION | FORCED | ONPATH | CRCM,WACM | C-24- 1099; Series 10 | 2024-04-17 15:27 | CRCM18459 | 2024-04-17 15:36 | |
CRG-SWR | 61003 | CRCM | TOT-1A (CRCM), CRG-SWR | CRG>SWR(CRCM) SWR>CRG(CRCM) |
140.0 140.0 |
140.0 140.0 |
0.0 0.0 |
2024-04-18 08:00 2024-04-18 08:00 |
2024-04-18 11:00 2024-04-18 11:00 |
Scheduled | TRANSMISSION | FORCED | ONPATH | CRCM,WACM | C-24- 1099; Series 10 | 2024-04-17 15:37 | CRCM18462 | 2024-04-17 15:37 | |
SWR-VNL | 60995 | CRCM | TOT-1A (CRCM), SWR-VNL | SWR>VNL(CRCM) VNL>SWR(CRCM) |
140.0 140.0 |
140.0 140.0 |
0.0 0.0 |
2024-04-18 08:00 2024-04-18 08:00 |
2024-04-18 11:00 2024-04-18 11:00 |
Cancelled | TRANSMISSION | FORCED | ONPATH | CRCM,WACM | C-24- 1099; Series 10 | 2024-04-17 15:29 | CRCM18460 | 2024-04-17 15:36 | |
SWR-VNL | 61006 | CRCM | TOT-1A (CRCM), SWR-VNL | SWR>VNL(CRCM) VNL>SWR(CRCM) |
140.0 140.0 |
140.0 140.0 |
0.0 0.0 |
2024-04-18 08:00 2024-04-18 08:00 |
2024-04-18 11:00 2024-04-18 11:00 |
Scheduled | TRANSMISSION | FORCED | ONPATH | CRCM,WACM | C-24- 1099; Series 10 | 2024-04-17 15:39 | CRCM18463 | 2024-04-17 15:39 | |
System Conditions | 60991 | WACM | TOT-1A | TOT-1A | 395.0 | 395.0 | 0.0 | 2024-04-18 08:00 | 2024-04-17 16:00 | Terminated | Transmission | Forced | OnPath | CRCM,WACM | C-24- 1099; Series 10 | 2024-04-17 15:26 | WACM18458 | 2024-04-17 15:33 | |
System Conditions | 60998 | WACM | TOT-1A | TOT-1A | BOZ>CRG(CRCM) CRG>BOZ(CRCM) CRG>SWR(CRCM) SWR>CRG(CRCM) SWR>VNL(CRCM) VNL>FGE(CRCM) VNL>SWR(CRCM) |
395.0 | 395.0 | 253.5 253.5 136.5 136.5 136.5 234.0 136.5 |
2024-04-18 08:00 2024-04-18 08:00 2024-04-18 08:00 2024-04-18 08:00 2024-04-18 08:00 2024-04-18 08:00 2024-04-18 08:00 |
2024-04-18 11:00 2024-04-18 11:00 2024-04-18 11:00 2024-04-18 11:00 2024-04-18 11:00 2024-04-18 11:00 2024-04-18 11:00 |
Scheduled | Transmission | Forced | OnPath | CRCM,WACM | C-24- 1099; Series 10 | 2024-04-17 15:35 | WACM18461 | 2024-04-17 15:35 |
System Conditions | 60692 | WACM | TOT-3 | TOT-3 | ARH>AU(LAPT) AU>ARH(LAPT) AU>SCSW(LAPT) SCSW>AU(LAPT) |
509.0 | 509.0 | 189.6 189.6 111.4 111.4 |
2024-04-22 07:00 2024-04-22 07:00 2024-04-22 07:00 2024-04-22 07:00 |
2024-05-23 16:00 2024-05-23 16:00 2024-05-23 16:00 2024-05-23 16:00 |
Scheduled | Transmission | Planned | OffPath | CRCM,WACM | ICC-24-0020 & ICC-24-0023. TOT-3 to series 32 (due to dual outage) [C-24-0702 04/24/2024 through 04/25/2024] | 2024-03-14 23:53 | WACM18302 | 2024-03-15 18:29 |
CRG-BLUE | 60100 | CRCM | TOT-5 (CRCM), CRG-BLUE | BLUE>CRG(CRCM) CRG>BLUE(CRCM) |
50.0 50.0 |
50.0 50.0 |
0.0 0.0 |
2024-04-29 06:00 2024-04-29 06:00 |
2024-05-17 16:00 2024-05-17 16:00 |
Scheduled | TRANSMISSION | PLANNED | ONPATH | CRCM,LAPT,WACM | INFO-24-0306; Series 4; TOT-5 limit 1360 MW | 2024-01-18 21:19 | CRCM18172 | 2024-01-18 21:19 | |
HDN-BLUE | 60103 | CRCM | BLUE-HDN | BLUE>HDN(CRCM) HDN>BLUE(CRCM) |
50.0 50.0 |
50.0 50.0 |
0.0 0.0 |
2024-04-29 06:00 2024-04-29 06:00 |
2024-05-17 16:00 2024-05-17 16:00 |
Scheduled | TRANSMISSION | PLANNED | ONPATH | CRCM,LAPT,WACM | INFO-24-0306; Series 4; TOT-5 limit 1360 MW | 2024-01-18 21:20 | CRCM18173 | 2024-01-18 21:20 | |
HDN-BLUE | 60106 | LAPT | BLUE-HDN | BLUE>HDN(LAPT) HDN>BLUE(LAPT) |
133.0 25.0 |
133.0 25.0 |
0.0 0.0 |
2024-04-29 06:00 2024-04-29 06:00 |
2024-05-17 16:00 2024-05-17 16:00 |
Scheduled | TRANSMISSION | FORCED | ONPATH | CRCM,LAPT,WACM | INFO-24-0306; Series 4; TOT-5 limit 1360 MW | 2024-01-18 21:22 | LAPT18174 | 2024-01-18 21:22 | |
System Conditions | 60099 | WACM | TOT-5 | TOT-5 | AU>CRG(CRCM) BLUE>CRG(CRCM) CCW>MIDW(CRCM) CRG>AU(CRCM) MIDW>CCW(CRCM) |
750.0 | 750.0 | 428.4 20.4 231.2 428.4 231.2 |
2024-04-29 06:00 2024-04-29 06:00 2024-04-29 06:00 2024-04-29 06:00 2024-04-29 06:00 |
2024-05-17 16:00 2024-05-17 16:00 2024-05-17 16:00 2024-05-17 16:00 2024-05-17 16:00 |
Scheduled | Transmission | Planned | OnPath | CRCM,LAPT,WACM | INFO-24-0306; Series 4; TOT-5 limit 1360 MW | 2024-01-18 21:17 | WACM18171 | 2024-01-18 21:17 |
System Conditions | 60647 | WACM | TOT-2A | TOT-2A | CCI>SHR2(CRCM) HSP>SJ345(CRCM) SHR2>CCI(CRCM) SJ345>HSP(CRCM) |
420.0 | 420.0 | 170.3 115.7 170.3 115.7 |
2024-04-30 06:00 2024-04-30 06:00 2024-04-30 06:00 2024-04-30 06:00 |
2024-05-01 16:00 2024-05-01 16:00 2024-05-01 16:00 2024-05-01 16:00 |
Scheduled | Transmission | Planned | OnPath | CRCM,WACM | C-24-0728; TOT2A Series 8 | 2024-03-08 23:08 | WACM18283 | 2024-03-08 23:08 |
CCI-SHR2 | 60648 | CRCM | TOT-2A (CRCM), CCI-SHR2 | CCI>SHR2(CRCM) SHR2>CCI(CRCM) |
250.0 250.0 |
250.0 250.0 |
0.0 0.0 |
2024-04-30 06:30 2024-04-30 06:30 |
2024-05-01 16:00 2024-05-01 16:00 |
Scheduled | TRANSMISSION | PLANNED | ONPATH | CRCM,WACM | C-24-0728 | 2024-03-08 23:11 | CRCM18284 | 2024-03-08 23:11 | |
HSP-SJ345 | 60973 | CRCM | TOT-2A (CRCM), HSP-SJ345 | HSP>SJ345(CRCM) SJ345>HSP(CRCM) |
170.0 170.0 |
170.0 170.0 |
0.0 0.0 |
2024-05-06 07:00 2024-05-06 07:00 |
2024-05-07 16:00 2024-05-07 16:00 |
Scheduled | TRANSMISSION | PLANNED | ONPATH | CRCM,WACM | ICC-24-1080 | 2024-04-16 18:51 | CRCM18453 | 2024-04-16 18:51 | |
System Conditions | 60972 | WACM | TOT-2A | TOT-2A (NORTH-SOUTH) | CCI>SHR2(CRCM) HSP>SJ345(CRCM) |
420.0 | 420.0 | 198.8 135.2 |
2024-05-06 07:00 2024-05-06 07:00 |
2024-05-07 16:00 2024-05-07 16:00 |
Scheduled | Transmission | Planned | OnPath | CRCM,WACM | ICC-24-1080. TOT2 to series 4 | 2024-04-16 18:49 | WACM18452 | 2024-04-16 18:49 |
System Conditions | 60576 | WACM | TOT-5 | TOT-5 | AU>CRG(CRCM) BLUE>CRG(CRCM) CCW>MIDW(CRCM) CRG>AU(CRCM) MIDW>CCW(CRCM) |
750.0 | 750.0 | 472.5 22.5 255.0 472.5 255.0 |
2024-05-23 07:00 2024-05-23 07:00 2024-05-23 07:00 2024-05-23 07:00 2024-05-23 07:00 |
2024-05-24 15:00 2024-05-24 15:00 2024-05-24 15:00 2024-05-24 15:00 2024-05-24 15:00 |
Scheduled | Transmission | Forced | OnPath | CRCM,WACM | INFO-24-0752; Series 10; TOT-5 limit 1455 MW | 2024-03-05 19:21 | WACM18260 | 2024-03-05 19:21 |
System Conditions | 60575 | WACM | TOT-5 | TOT-5 | AU>CRG(CRCM) BLUE>CRG(CRCM) CCW>MIDW(CRCM) CRG>AU(CRCM) MIDW>CCW(CRCM) |
750.0 | 750.0 | 472.5 22.5 255.0 472.5 255.0 |
2024-05-28 07:00 2024-05-28 07:00 2024-05-28 07:00 2024-05-28 07:00 2024-05-28 07:00 |
2024-06-02 15:00 2024-06-02 15:00 2024-06-02 15:00 2024-06-02 15:00 2024-06-02 15:00 |
Scheduled | Transmission | Planned | OnPath | CRCM,WACM | INFO-24-0753; Series 12; TOT-5 limit 1450 MW | 2024-03-05 19:19 | WACM18259 | 2024-03-05 19:19 |
CRG-BOZ | 58815 | CRCM | TOT-1A (CRCM), BOZ-CRG | BOZ>CRG(CRCM) CRG>BOZ(CRCM) |
218.0 285.0 |
218.0 285.0 |
0.0 0.0 |
2024-05-28 12:00 2024-05-28 12:00 |
2024-06-20 11:00 2024-06-20 11:00 |
Scheduled | TRANSMISSION | PLANNED | ONPATH | CRCM,WACM | C-24-0010 | 2023-09-06 20:58 | CRCM17854 | 2023-09-06 20:58 | |
System Conditions | 58814 | WACM | TOT-1A | TOT-1A | BOZ>CRG(CRCM) CRG>BOZ(CRCM) CRG>SWR(CRCM) SWR>CRG(CRCM) SWR>VNL(CRCM) VNL>FGE(CRCM) VNL>SWR(CRCM) |
395.0 | 395.0 | 37.7 37.7 20.3 20.3 20.3 34.8 20.3 |
2024-05-28 12:00 2024-05-28 12:00 2024-05-28 12:00 2024-05-28 12:00 2024-05-28 12:00 2024-05-28 12:00 2024-05-28 12:00 |
2024-06-20 11:00 2024-06-20 11:00 2024-06-20 11:00 2024-06-20 11:00 2024-06-20 11:00 2024-06-20 11:00 2024-06-20 11:00 |
Scheduled | Transmission | Planned | OnPath | CRCM,WACM | C-24-0010. TOT-1A to series 2 | 2023-09-06 20:51 | WACM17853 | 2023-09-06 20:51 |
CSU Outages: | |||||||||||||||||||
DGT Outages: | |||||||||||||||||||
EPE Outages: | |||||||||||||||||||
EDDY DC CONVERTER | 364399 | EPE | EDDY HVDC terminal | EDDY230-EDDY345(EPE) EDDY345-EDDY230(EPE) EDDY230-EDDY345(EPE) EDDY345-EDDY230(EPE) EDDY230-EDDY345(EPE) EDDY345-EDDY230(EPE) |
133.0 133.0 133.0 133.0 133.0 133.0 |
133.0 133.0 133.0 133.0 133.0 133.0 |
86.0 86.0 86.0 86.0 86.0 86.0 |
2022-08-01 00:00 2022-08-01 00:00 2022-12-31 23:59 2022-12-31 23:59 2023-12-31 23:59 2023-12-31 23:59 |
2022-12-31 23:59 2022-12-31 23:59 2023-12-31 23:59 2023-12-31 23:59 2025-01-01 00:00 2025-01-01 00:00 |
Active | TRANSMISSION | PLANNED | ONPATH | EPE | Reliability Constraints | 2022-06-01 14:23 | EPE144221 | 2023-08-17 06:51 | |
PALO VERDE EAST DERATE | 442486 | EPE | BROWNING-PINAL CENTRAL 500kV LINE | C1-C2(EPE) C1-JOJOBA500(EPE) C1-PV1(EPE) C2-C1(EPE) C2-KYRENE500(EPE) C2-WESTWING500(EPE) JOJOBA500-C1(EPE) KYRENE500-C2(EPE) PALOVERDE500-PV1(EPE) PV1-C1(EPE) PV1-PALOVERDE500(EPE) WESTWING500-C2(EPE) |
1149.0 1149.0 1149.0 1149.0 1149.0 1149.0 1149.0 1149.0 1149.0 1149.0 1149.0 1149.0 |
1149.0 1149.0 1149.0 1149.0 1149.0 1149.0 1149.0 1149.0 1149.0 1149.0 1149.0 1149.0 |
1085.0 1085.0 1085.0 1085.0 1085.0 1085.0 1085.0 1085.0 1085.0 1085.0 1085.0 1085.0 |
2023-10-20 07:00 2023-10-20 07:00 2023-10-20 07:00 2023-10-20 07:00 2023-10-20 07:00 2023-10-20 07:00 2023-10-20 07:00 2023-10-20 07:00 2023-10-20 07:00 2023-10-20 07:00 2023-10-20 07:00 2023-10-20 07:00 |
2024-04-22 17:00 2024-04-22 17:00 2024-04-22 17:00 2024-04-22 17:00 2024-04-22 17:00 2024-04-22 17:00 2024-04-22 17:00 2024-04-22 17:00 2024-04-22 17:00 2024-04-22 17:00 2024-04-22 17:00 2024-04-22 17:00 |
Cancelled | TRANSMISSION | PLANNED | ONPATH | EPE | OASIS Event Id SRP 169342Move PCL to new breakers BRG932_935, new bus diff relays, new breakers BRG928_935, bus work for new T2 transformers. | 2023-10-13 14:27 | EPE169344 | 2023-10-18 08:46 | |
IID Outages: | |||||||||||||||||||
IPCO Outages: | |||||||||||||||||||
JBSNWEST | 112547 | IPCO | Populus 345 kV Series Capacitor #1 (C2) | JBSN-POP(IPCO) JBSN-POP(IPCO) JBSN-POP(IPCO) JBSN-POP(IPCO) JBSN-POP(IPCO) JBSN-POP(IPCO) JBSN-POP(IPCO) JBSN-POP(IPCO) JBSN-POP(IPCO) JBSN-POP(IPCO) JBSN-POP(IPCO) JBSN-POP(IPCO) JBSN-POP(IPCO) |
800.0 800.0 800.0 800.0 800.0 800.0 800.0 800.0 800.0 800.0 800.0 800.0 800.0 |
800.0 800.0 800.0 800.0 800.0 800.0 800.0 800.0 800.0 800.0 800.0 800.0 800.0 |
717.0 750.0 750.0 750.0 750.0 717.0 717.0 717.0 717.0 717.0 717.0 717.0 717.0 |
2023-10-31 06:00 2023-10-31 08:54 2023-11-02 17:00 2023-11-10 17:00 2023-12-06 17:00 2023-12-14 14:24 2024-01-10 17:00 2024-01-24 17:00 2024-02-02 17:00 2024-02-12 17:00 2024-02-26 17:00 2024-03-11 17:00 2024-03-25 17:00 |
2023-10-31 08:54 2023-11-02 17:00 2023-11-10 17:00 2023-12-06 17:00 2023-12-14 14:24 2024-01-10 17:00 2024-01-24 17:00 2024-02-02 17:00 2024-02-12 17:00 2024-02-26 17:00 2024-03-11 17:00 2024-03-25 17:00 2024-04-15 12:36 |
Terminated | TRANSMISSION | PLANNED | ONPATH | IPCO | Per Path 19 Operator (PAC) Request-Po345 kV Series Capacitor #1 (C2) | 2023-10-31 05:54 | IPCO47884 | 2024-04-15 12:36 | |
JBSNWEST | 113966 | IPCO | TMKL Cap seg #2 | JBSN-POP(IPCO) JBSN-POP(IPCO) JBSN-POP(IPCO) JBSN-POP(IPCO) JBSN-POP(IPCO) JBSN-POP(IPCO) JBSN-POP(IPCO) JBSN-POP(IPCO) |
800.0 800.0 800.0 800.0 800.0 800.0 800.0 800.0 |
800.0 800.0 800.0 800.0 800.0 800.0 800.0 800.0 |
717.0 717.0 717.0 717.0 717.0 717.0 717.0 717.0 |
2023-12-06 15:27 2023-12-15 15:00 2024-01-10 16:00 2024-01-24 16:00 2024-02-07 16:00 2024-02-29 16:00 2024-03-18 16:00 2024-04-01 16:00 |
2023-12-15 15:00 2024-01-10 16:00 2024-01-24 16:00 2024-02-07 16:00 2024-02-29 16:00 2024-03-18 16:00 2024-04-01 16:00 2024-05-01 16:00 |
Active | TRANSMISSION | FORCED | ONPATH | IPCO | Per Path 19 Operator (PAC) Request | 2023-12-06 15:29 | IPCO48537 | 2024-04-01 08:23 | |
BORAHWEST | 114472 | IPCO | Burns Series Cap Bypass | BorahWest(IPCO) BorahWest(IPCO) BorahWest(IPCO) BorahWest(IPCO) BorahWest(IPCO) BorahWest(IPCO) BorahWest(IPCO) BorahWest(IPCO) BorahWest(IPCO) BorahWest(IPCO) BorahWest(IPCO) |
2557.0 2557.0 2557.0 2557.0 2557.0 2557.0 2557.0 2557.0 2557.0 2557.0 2557.0 |
2557.0 2557.0 2557.0 2557.0 2557.0 2557.0 2557.0 2557.0 2557.0 2557.0 2557.0 |
2250.0 2250.0 2250.0 2250.0 2250.0 2250.0 2250.0 2250.0 2510.0 2510.0 2510.0 |
2023-12-19 21:25 2023-12-20 17:00 2023-12-21 17:00 2023-12-26 23:59 2023-12-27 23:59 2024-01-05 23:59 2024-01-19 16:00 2024-02-02 16:00 2024-02-09 10:20 2024-03-01 16:00 2024-03-29 16:00 |
2023-12-20 17:00 2023-12-21 17:00 2023-12-26 23:59 2023-12-27 23:59 2024-01-05 23:59 2024-01-19 16:00 2024-02-02 16:00 2024-02-09 10:20 2024-03-01 16:00 2024-03-29 16:00 2024-04-30 16:00 |
Active | TRANSMISSION | FORCED | ONPATH | IPCO | BURNS SERIES CAPS FULL BYPASS | 2023-12-19 21:28 | IPCO48734 | 2024-03-28 10:40 | |
BURNS SC FULL BYPASS | 117113 | IPCO | Burns Series Caps Full Bypass | IDNW-NORTHWEST(IPCO) NORTHWEST-IDNW(IPCO) SMLK-TOT75(IPCO) IDNW-NORTHWEST(IPCO) NORTHWEST-IDNW(IPCO) SMLK-TOT75(IPCO) IDNW-NORTHWEST(IPCO) NORTHWEST-IDNW(IPCO) SMLK-TOT75(IPCO) IDNW-NORTHWEST(IPCO) NORTHWEST-IDNW(IPCO) |
2230.0 1340.0 450.0 2230.0 1340.0 450.0 2230.0 1340.0 450.0 2190.0 1200.0 |
2230.0 1340.0 450.0 2230.0 1340.0 450.0 2190.0 1200.0 450.0 2190.0 1200.0 |
2230.0 1145.0 535.0 2230.0 1145.0 438.0 2230.0 1145.0 438.0 2145.0 1145.0 |
2024-02-09 10:05 2024-02-09 10:05 2024-02-09 10:05 2024-02-27 11:59 2024-02-27 11:59 2024-02-27 11:59 2024-03-29 16:00 2024-03-29 16:00 2024-03-29 16:00 2024-04-14 12:10 2024-04-14 12:10 |
2024-02-27 11:59 2024-02-27 11:59 2024-02-27 11:59 2024-03-29 16:00 2024-03-29 16:00 2024-03-29 16:00 2024-04-14 12:10 2024-04-14 12:10 2024-04-30 16:00 2024-04-30 16:00 2024-04-30 16:00 |
Active | TRANSMISSION | FORCED | ONPATH | IPCO | BURNS SERIES CAPS FULL BYPASS | 2024-02-09 10:10 | IPCO49502 | 2024-04-14 12:11 | |
JBSNWEST | 113885 | IPCO | 345 kV Series Capacitor #2 (C1), 345 kV Series Cap | JBSN-POP(IPCO) JBSN-POP(IPCO) |
800.0 800.0 |
800.0 800.0 |
717.0 717.0 |
2024-04-01 07:00 2024-04-06 16:00 |
2024-04-06 16:00 2024-04-15 12:35 |
Completed | TRANSMISSION | PLANNED | ONPATH | IPCO | Per Path 19 Operator (PAC) Request-345 kV Series Capacitor 1(C1), 345 kV Series Capacitor #2 (C2) at Populus | 2023-12-04 12:22 | IPCO48489 | 2024-04-15 12:34 | |
JBSNWEST | 120017 | IPCO | JB Unit #1 conversion to NG | JBSN-POP(IPCO) | 800.0 | 800.0 | 700.0 | 2024-04-02 10:00 | 2024-04-30 22:59 | Active | TRANSMISSION | FORCED | ONPATH | IPCO | Per Path 19 Operator (PAC) Request | 2024-04-02 09:32 | IPCO50246 | 2024-04-02 09:32 | |
JBSNWEST | 120163 | IPCO | FYI-PAC #24-00086-345 kV Series Capacitor #2 (C1), | JBSN-POP(IPCO) | 800.0 | 800.0 | 717.0 | 2024-04-08 07:00 | 2024-04-13 16:00 | Completed | TRANSMISSION | PLANNED | ONPATH | IPCO | Per Path 19 Operator (PAC) Request CT Word and Trigger Circuit Maintenance. | 2024-04-04 13:54 | IPCO50297 | 2024-04-04 13:54 | |
JBSNWEST | 113883 | IPCO | 345 kV Series Capacitor #2 (C1), 345 kV Series Cap | JBSN-POP(IPCO) | 800.0 | 800.0 | 717.0 | 2024-04-08 07:00 | 2024-04-13 16:00 | Cancelled | TRANSMISSION | PLANNED | ONPATH | IPCO | Per Path 19 Operator (PAC) Request-345 kV Series Capacitor #2 (C1), 345 kV Series Capacitor #2 (C2) at Populus | 2023-12-04 12:17 | IPCO48488 | 2024-04-04 13:28 | |
M345-RGSUB | 120501 | IPCO | M345 Out of Service | IPCEIM-M345(IPCO) M345-IPCEIM(IPCO) M345-RGSUB(IPCO) RGSUB-M345(IPCO) |
9999.0 9999.0 360.0 500.0 |
9999.0 9999.0 360.0 500.0 |
0.0 0.0 0.0 0.0 |
2024-04-12 02:49 2024-04-12 02:49 2024-04-12 02:49 2024-04-12 02:49 |
2024-04-12 04:37 2024-04-12 04:37 2024-04-12 04:37 2024-04-12 04:37 |
Terminated | TRANSMISSION | FORCED | ONPATH | IPCO | M345 Out of Service | 2024-04-12 02:52 | IPCO50420 | 2024-04-12 04:37 | |
CURTAILMENT | 120552 | IPCO | OTECTAP-LAGRANDE(IPCO) | 413.0 | 413.0 | 413.0 | 2024-04-12 10:00 | 2024-04-12 11:00 | Completed | TRANSMISSION | FORCED | ONPATH | IPCO | LaGrande Path Limit | 2024-04-12 09:35 | IPCO50431 | 2024-04-12 09:35 | ||
CURTAILMENT | 120554 | IPCO | IDNW-NORTHWEST(IPCO) | 2190.0 | 2190.0 | 2190.0 | 2024-04-12 10:00 | 2024-04-12 11:00 | Completed | TRANSMISSION | FORCED | ONPATH | IPCO | Path 14 Limit | 2024-04-12 09:41 | IPCO50432 | 2024-04-12 09:43 | ||
CURTAILMENT | 120557 | IPCO | OTECTAP-LAGRANDE(IPCO) | 413.0 | 413.0 | 413.0 | 2024-04-12 11:00 | 2024-04-12 12:00 | Completed | TRANSMISSION | FORCED | ONPATH | IPCO | LaGrande Path Limit | 2024-04-12 10:44 | IPCO50433 | 2024-04-12 10:44 | ||
CURTAILMENT | 120559 | IPCO | OTECTAP-LAGRANDE(IPCO) | 413.0 | 413.0 | 413.0 | 2024-04-12 13:00 | 2024-04-12 14:00 | Completed | TRANSMISSION | FORCED | ONPATH | IPCO | LaGrande Path Limit | 2024-04-12 12:38 | IPCO50434 | 2024-04-12 12:38 | ||
CURTAILMENT | 120561 | IPCO | OTECTAP-LAGRANDE(IPCO) | 413.0 | 413.0 | 413.0 | 2024-04-12 14:00 | 2024-04-12 15:00 | Completed | TRANSMISSION | FORCED | ONPATH | IPCO | LaGrande Path Limit | 2024-04-12 13:38 | IPCO50435 | 2024-04-12 13:38 | ||
JBSNWEST | 120609 | IPCO | JBSN-POP(IPCO) JBSN-POP(IPCO) JBSN-POP(IPCO) |
800.0 800.0 800.0 |
800.0 800.0 800.0 |
467.0 467.0 467.0 |
2024-04-12 22:40 2024-04-13 01:00 2024-04-13 06:00 |
2024-04-13 01:00 2024-04-13 06:00 2024-04-13 06:45 |
Completed | TRANSMISSION | FORCED | ONPATH | IPCO | Per Path 19 Operator (PAC) Request | 2024-04-12 22:42 | IPCO50447 | 2024-04-13 06:44 | ||
CURTAILMENT | 120653 | IPCO | TOTOR-HURR(IPCO) | 400.0 | 400.0 | 400.0 | 2024-04-13 11:00 | 2024-04-13 12:00 | Completed | TRANSMISSION | FORCED | ONPATH | IPCO | HURR Path Limit | 2024-04-13 10:48 | IPCO50464 | 2024-04-13 10:48 | ||
CURTAILMENT | 120657 | IPCO | OTECTAP-LAGRANDE(IPCO) | 413.0 | 413.0 | 413.0 | 2024-04-13 13:00 | 2024-04-13 14:00 | Completed | TRANSMISSION | FORCED | ONPATH | IPCO | LaGrande Path Limit | 2024-04-13 12:41 | IPCO50466 | 2024-04-13 12:41 | ||
JBSNWEST | 120674 | IPCO | 345kV Series Capacitor #2 (C1), 345kV Series Cap | JBSN-POP(IPCO) JBSN-POP(IPCO) |
800.0 800.0 |
800.0 800.0 |
717.0 2230.0 |
2024-04-14 04:00 2024-04-14 09:53 |
2024-04-14 09:53 2024-04-15 12:33 |
Completed | TRANSMISSION | FORCED | ONPATH | IPCO | Per Path 19 Operator (PAC) Request-345 kV Series Capacitor #2 (C1), 345 kV Series Capacitor #2 (C2) at Populus | 2024-04-14 03:53 | IPCO50475 | 2024-04-15 12:32 | |
CURTAILMENT | 120687 | IPCO | OTECTAP-LAGRANDE(IPCO) | 413.0 | 413.0 | 413.0 | 2024-04-14 09:00 | 2024-04-14 10:00 | Completed | TRANSMISSION | FORCED | ONPATH | IPCO | LaGrande Path Limit | 2024-04-14 08:44 | IPCO50483 | 2024-04-14 08:44 | ||
CURTAILMENT | 120691 | IPCO | IDNW-NORTHWEST(IPCO) | 2190.0 | 2190.0 | 2190.0 | 2024-04-14 10:00 | 2024-04-14 11:00 | Completed | TRANSMISSION | FORCED | ONPATH | IPCO | Path 14 Limit | 2024-04-14 09:48 | IPCO50486 | 2024-04-14 09:48 | ||
CURTAILMENT | 120700 | IPCO | OTECTAP-LAGRANDE(IPCO) | 413.0 | 413.0 | 413.0 | 2024-04-14 11:00 | 2024-04-14 12:00 | Completed | TRANSMISSION | FORCED | ONPATH | IPCO | LaGrande Path Limit | 2024-04-14 10:38 | IPCO50491 | 2024-04-14 10:38 | ||
CURTAILMENT | 120704 | IPCO | IDNW-NORTHWEST(IPCO) | 2190.0 | 2190.0 | 2230.0 | 2024-04-14 11:00 | 2024-04-14 12:00 | Completed | TRANSMISSION | FORCED | ONPATH | IPCO | Path 14 Limit | 2024-04-14 10:44 | IPCO50493 | 2024-04-14 10:44 | ||
CURTAILMENT | 120710 | IPCO | OTECTAP-LAGRANDE(IPCO) | 413.0 | 413.0 | 413.0 | 2024-04-14 12:00 | 2024-04-14 13:00 | Completed | TRANSMISSION | FORCED | ONPATH | IPCO | LaGrande Path Limit | 2024-04-14 11:40 | IPCO50496 | 2024-04-14 11:40 | ||
CURTAILMENT | 120713 | IPCO | IDNW-NORTHWEST(IPCO) | 2190.0 | 2190.0 | 2145.0 | 2024-04-14 12:00 | 2024-04-14 13:00 | Completed | TRANSMISSION | FORCED | ONPATH | IPCO | Path 14 Limit | 2024-04-14 11:54 | IPCO50497 | 2024-04-14 11:54 | ||
CURTAILMENT | 120725 | IPCO | OTECTAP-LAGRANDE(IPCO) | 413.0 | 413.0 | 413.0 | 2024-04-14 13:00 | 2024-04-14 14:00 | Completed | TRANSMISSION | FORCED | ONPATH | IPCO | LaGrande Path Limit | 2024-04-14 12:40 | IPCO50499 | 2024-04-14 12:40 | ||
CURTAILMENT | 120727 | IPCO | TOTOR-HURR(IPCO) | 400.0 | 400.0 | 400.0 | 2024-04-14 13:00 | 2024-04-14 14:00 | Completed | TRANSMISSION | FORCED | ONPATH | IPCO | HURR Path Limit | 2024-04-14 12:41 | IPCO50500 | 2024-04-14 12:41 | ||
CURTAILMENT | 120729 | IPCO | IDNW-NORTHWEST(IPCO) | 2190.0 | 2190.0 | 2145.0 | 2024-04-14 13:00 | 2024-04-14 14:00 | Completed | TRANSMISSION | FORCED | ONPATH | IPCO | Path 14 Limit | 2024-04-14 12:46 | IPCO50501 | 2024-04-14 12:46 | ||
CURTAILMENT | 120731 | IPCO | TOTOR-HURR(IPCO) | 400.0 | 400.0 | 400.0 | 2024-04-14 14:00 | 2024-04-14 15:00 | Completed | TRANSMISSION | FORCED | ONPATH | IPCO | HURR Path Limit | 2024-04-14 13:35 | IPCO50502 | 2024-04-14 13:35 | ||
JBSNWEST | 120780 | IPCO | Populus: 345kV Series Capacitor #1 (C2) | JBSN-POP(IPCO) | 800.0 | 800.0 | 717.0 | 2024-04-15 12:11 | 2024-12-31 17:00 | Active | TRANSMISSION | FORCED | ONPATH | IPCO | Populus: 345kV Series Capacitor #1 (C2) | 2024-04-15 12:17 | IPCO50526 | 2024-04-15 12:17 | |
JBSNWEST | 120782 | IPCO | Populus: 345kV Series Capacitor #2 (C2) | JBSN-POP(IPCO) | 800.0 | 800.0 | 717.0 | 2024-04-15 12:20 | 2024-12-31 17:00 | Active | TRANSMISSION | FORCED | ONPATH | IPCO | Populus: 345kV Series Capacitor #2 (C2) | 2024-04-15 12:22 | IPCO50527 | 2024-04-15 12:22 | |
CURTAILMENT | 120846 | IPCO | TOTOR-HURR(IPCO) | 400.0 | 400.0 | 400.0 | 2024-04-17 08:00 | 2024-04-17 09:00 | Completed | TRANSMISSION | FORCED | ONPATH | IPCO | HURR Path Limit | 2024-04-17 07:40 | IPCO50559 | 2024-04-17 07:40 | ||
CURTAILMENT | 120848 | IPCO | TOTOR-HURR(IPCO) | 400.0 | 400.0 | 400.0 | 2024-04-17 09:00 | 2024-04-17 10:00 | Completed | TRANSMISSION | FORCED | ONPATH | IPCO | HURR Path Limit | 2024-04-17 08:40 | IPCO50560 | 2024-04-17 08:40 | ||
CURTAILMENT | 120850 | IPCO | OTECTAP-LAGRANDE(IPCO) | 413.0 | 413.0 | 413.0 | 2024-04-17 09:00 | 2024-04-17 10:00 | Completed | TRANSMISSION | FORCED | ONPATH | IPCO | LaGrande Path Limit | 2024-04-17 08:40 | IPCO50561 | 2024-04-17 08:40 | ||
CURTAILMENT | 120852 | IPCO | OTECTAP-LAGRANDE(IPCO) | 413.0 | 413.0 | 413.0 | 2024-04-17 11:00 | 2024-04-17 12:00 | Completed | TRANSMISSION | FORCED | ONPATH | IPCO | LaGrande Path Limit | 2024-04-17 10:40 | IPCO50562 | 2024-04-17 10:40 | ||
BORAHWEST | 120593 | IPCO | Combo Burns C506/HSTU-MPSN | BorahWest(IPCO) | 2557.0 | 2557.0 | 2415.0 | 2024-04-18 07:00 | 2024-04-19 13:30 | Scheduled | TRANSMISSION | FORCED | ONPATH | IPCO | 2024-04-12 14:57 | IPCO50440 | 2024-04-12 14:57 | ||
IDAHO-NORTHWEST | 120464 | IPCO | Combo MPSN C506/BURNS C506 | IDNW-NORTHWEST(IPCO) NORTHWEST-IDNW(IPCO) |
2190.0 1200.0 |
2190.0 1200.0 |
2070.0 1100.0 |
2024-04-22 06:30 2024-04-22 06:30 |
2024-04-26 16:00 2024-04-26 16:00 |
Scheduled | TRANSMISSION | PLANNED | ONPATH | IPCO | Path 14 Limit | 2024-04-11 10:23 | IPCO50400 | 2024-04-11 10:23 | |
BORAHWEST | 120467 | IPCO | Combo MPSN C506/BURNS C506 | BorahWest(IPCO) | 2557.0 | 2557.0 | 2250.0 | 2024-04-22 06:30 | 2024-04-26 16:00 | Scheduled | TRANSMISSION | PLANNED | ONPATH | IPCO | 2024-04-11 10:26 | IPCO50401 | 2024-04-11 10:26 | ||
AVISTA SOP 33 | 120775 | IPCO | HATWAI 230KV MAIN BUS | NORTHWEST-IDNW(IPCO) | 1200.0 | 1200.0 | 850.0 | 2024-04-22 08:00 | 2024-04-22 15:00 | Scheduled | GENERATION | PLANNED | ONPATH | IPCO | Path 14 restrictions for Avista outages: Hatwai 230kV Main Bus | 2024-04-15 10:38 | IPCO50524 | 2024-04-15 10:38 | |
BORAHWEST | 120476 | IPCO | COMBO KPRT-MPSN, MPSN C506, BURNS C506 | BorahWest(IPCO) | 2557.0 | 2557.0 | 1710.0 | 2024-04-23 06:00 | 2024-04-26 16:00 | Scheduled | TRANSMISSION | PLANNED | ONPATH | IPCO | COMBO KPRT-MPSN, MPSN C506, BURNS C506 | 2024-04-11 15:26 | IPCO50407 | 2024-04-11 15:26 | |
BORAHWEST | 120478 | IPCO | COMBO KPRT-MPSN, BURNS C506 | BorahWest(IPCO) | 2557.0 | 2557.0 | 1770.0 | 2024-04-23 06:00 | 2024-04-30 16:00 | Scheduled | TRANSMISSION | PLANNED | ONPATH | IPCO | COMBO KPRT-MPSN, BURNS C506 | 2024-04-11 15:30 | IPCO50408 | 2024-04-11 15:30 | |
BORAHWEST | 119717 | IPCO | KINPORT-MIDPOINT 345KV | BorahWest(IPCO) | 2557.0 | 2557.0 | 1870.0 | 2024-04-23 06:00 | 2024-05-31 16:00 | Scheduled | TRANSMISSION | PLANNED | ONPATH | IPCO | KINPORT-MIDPOINT 345KV LINE | 2024-03-25 09:25 | IPCO50143 | 2024-04-01 10:20 | |
HMWY-SMLK | 114846 | IPCO | Hemingway - Summerlake 500kV | H500-TOT75(IPCO) IDNW-NORTHWEST(IPCO) IPCEIM-M500(IPCO) M500-TOT75(IPCO) NORTHWEST-IDNW(IPCO) SMLK-IPCEIM(IPCO) SMLK-TOT75(IPCO) TOT75-H500(IPCO) TOT75-M500(IPCO) TOTOR-NORTHWEST(IPCO) |
1050.0 2190.0 9999.0 700.0 1200.0 9999.0 450.0 760.0 410.0 450.0 |
1050.0 2190.0 9999.0 700.0 1200.0 9999.0 450.0 760.0 410.0 450.0 |
0.0 905.0 0.0 0.0 385.0 0.0 0.0 0.0 0.0 400.0 |
2024-05-11 08:00 2024-05-11 08:00 2024-05-11 08:00 2024-05-11 08:00 2024-05-11 08:00 2024-05-11 08:00 2024-05-11 08:00 2024-05-11 08:00 2024-05-11 08:00 2024-05-11 08:00 |
2024-05-24 17:00 2024-05-24 17:00 2024-05-24 17:00 2024-05-24 17:00 2024-05-24 17:00 2024-05-24 17:00 2024-05-24 17:00 2024-05-24 17:00 2024-05-24 17:00 2024-05-24 17:00 |
Scheduled | TRANSMISSION | PLANNED | ONPATH | IPCO | HMWY-SMLK 500KV LINE | 2024-01-03 10:16 | IPCO48868 | 2024-01-03 10:16 | |
BORAHWEST | 114857 | IPCO | HEMINGWAY-SUMMER LAKE 500KV | BorahWest(IPCO) | 2557.0 | 2557.0 | 2250.0 | 2024-05-11 08:00 | 2024-05-24 17:00 | Scheduled | TRANSMISSION | PLANNED | ONPATH | IPCO | HEMINGWAY-SUMMER LAKE 500KV | 2024-01-03 10:24 | IPCO48869 | 2024-01-03 10:24 | |
JEFF - BGSY | 117502 | IPCO | Antelope-Goshen 161KV | ANTE-GSHN(IPCO) GSHN-ANTE(IPCO) |
0.0 0.0 |
0.0 0.0 |
0.0 0.0 |
2024-05-27 10:00 2024-05-27 10:00 |
2024-05-31 14:00 2024-05-31 14:00 |
Scheduled | TRANSMISSION | PLANNED | ONPATH | IPCO | Line Out of Service | 2024-02-27 08:48 | IPCO49680 | 2024-02-27 08:48 | |
JBSNWEST | 120789 | IPCO | Populus: 345kV Series Capacitor #2 (C1 C2) | JBSN-POP(IPCO) | 800.0 | 800.0 | 717.0 | 2024-09-16 07:30 | 2024-09-20 16:00 | Scheduled | TRANSMISSION | PLANNED | ONPATH | IPCO | Populus: 345kV Series Capacitor #2 (C2), Populus: 345kV Series Capacitor #2 (C1) | 2024-04-15 12:51 | IPCO50529 | 2024-04-15 12:52 | |
JBSNWEST | 120791 | IPCO | Populus: 345kV Series Capacitor #1 (C1 C2) | JBSN-POP(IPCO) | 800.0 | 800.0 | 717.0 | 2024-09-23 07:30 | 2024-09-27 16:00 | Scheduled | TRANSMISSION | PLANNED | ONPATH | IPCO | Populus: 345kV Series Capacitor #1 (C1), Populus: 345kV Series Capacitor #1 (C2) | 2024-04-15 13:03 | IPCO50530 | 2024-04-15 13:03 | |
LAPT Outages: | |||||||||||||||||||
Winter 2023/24 Limit | 58934 | WACM | TOT-3 (LAPT) | TOT-3 | ARH>AU(LAPT) AU>ARH(LAPT) AU>SCSW(LAPT) SCSW>AU(LAPT) |
509.0 | 509.0 | 333.9 333.9 196.1 196.1 |
2023-11-01 00:00 2023-11-01 00:00 2023-11-01 00:00 2023-11-01 00:00 |
2024-06-01 00:00 2024-06-01 00:00 2024-06-01 00:00 2024-06-01 00:00 |
Active | Transmission | Planned | OnPath | LAPT,WACM | TOT-3 Winter 2023 Ratings of 1843 MW for system intact (Cell A1). Using Cell A2 with zero DC tie schedule the Limit will be 1577 MW and LAPTs share of transfer is 530 MW. JK | 2023-09-27 13:18 | WACM17893 | 2023-09-27 13:18 |
System Conditions | 60283 | WACM | TOT-3 | TOT-3 | ARH>AU(LAPT) AU>ARH(LAPT) AU>SCSW(LAPT) SCSW>AU(LAPT) |
509.0 | 509.0 | 139.2 139.2 81.8 81.8 |
2024-03-23 07:00 2024-03-23 07:00 2024-03-23 07:00 2024-03-23 07:00 |
2024-05-10 14:00 2024-05-10 14:00 2024-05-10 14:00 2024-05-10 14:00 |
Active | Transmission | Planned | OffPath | BEPW,LAPT,WACM | C-24-0522; TOT-3 to series 10 | 2024-02-07 00:06 | WACM18218 | 2024-03-22 17:20 |
System Conditions | 60767 | WACM | TOT-3 BASIN (BEPW) | TOT 3 BASIN (BEPW) | AU>LRS(BEPW) KEOT>LRS(BEPW) LRS>AU(BEPW) LRS>KEOT(BEPW) |
722.0 | 722.0 | 171.4 100.6 171.4 100.6 |
2024-03-23 07:00 2024-03-23 07:00 2024-03-23 07:00 2024-03-23 07:00 |
2024-05-10 14:00 2024-05-10 14:00 2024-05-10 14:00 2024-05-10 14:00 |
Active | Transmission | Planned | OffPath | BEPW,LAPT,WACM | C-24-0522; TOT-3 to series 10 | 2024-03-22 15:49 | WACM18351 | 2024-03-22 17:19 |
System Conditions | 59954 | WACM | TOT-3 | TOT-3 | ARH>AU(LAPT) AU>ARH(LAPT) AU>SCSW(LAPT) SCSW>AU(LAPT) |
509.0 | 509.0 | 256.4 256.4 150.6 150.6 |
2024-03-25 07:00 2024-03-25 07:00 2024-03-25 07:00 2024-03-25 07:00 |
2024-04-04 22:00 2024-04-04 22:00 2024-04-04 22:00 2024-04-04 22:00 |
Completed | Transmission | Planned | OffPath | LAPT,WACM | INFO-24-0261. TOT- 3 series 16. | 2024-01-11 05:13 | WACM18150 | 2024-04-04 21:39 |
AU-LRS | 60831 | BEPW | TOT-3 (BASIN), LRS>AU 345 kV | AU>LRS(BEPW) LRS>AU(BEPW) AU>LRS(BEPW) LRS>AU(BEPW) |
0.0 0.0 0.0 0.0 |
0.0 0.0 0.0 0.0 |
0.0 0.0 0.0 0.0 |
2024-04-02 07:00 2024-04-02 07:00 2024-04-04 18:00 2024-04-04 18:00 |
2024-04-04 18:00 2024-04-04 18:00 2024-04-04 21:29 2024-04-04 21:29 |
Completed | TRANSMISSION | PLANNED | ONPATH | BEPW,LAPT,WACM | C-24-0916/0919; Series 2; Concurrent with C-24-0522 and INFO-24-0261.. | 2024-03-28 18:05 | BEPW18381 | 2024-04-04 21:29 | |
System Conditions | 60829 | WACM | TOT-3 | TOT-3 | ARH>AU(LAPT) AU>ARH(LAPT) AU>SCSW(LAPT) SCSW>AU(LAPT) |
509.0 | 509.0 | 115.9 115.9 68.1 68.1 |
2024-04-02 07:00 2024-04-02 07:00 2024-04-02 07:00 2024-04-02 07:00 |
2024-04-04 22:00 2024-04-04 22:00 2024-04-04 22:00 2024-04-04 22:00 |
Completed | Transmission | Planned | OnPath | BEPW,LAPT,WACM | C-24-0916/0919; Series 2; Concurrent with C-24-0522 and INFO-24-0261 | 2024-03-28 18:02 | WACM18379 | 2024-04-04 21:30 |
System Conditions | 60830 | WACM | TOT-3 BASIN (BEPW) | TOT 3 BASIN (BEPW) | AU>LRS(BEPW) KEOT>LRS(BEPW) LRS>AU(BEPW) LRS>KEOT(BEPW) |
722.0 | 722.0 | 148.7 87.3 148.7 87.3 |
2024-04-02 07:00 2024-04-02 07:00 2024-04-02 07:00 2024-04-02 07:00 |
2024-04-04 22:00 2024-04-04 22:00 2024-04-04 22:00 2024-04-04 22:00 |
Completed | Transmission | Planned | OnPath | BEPW,LAPT,WACM | C-24-0916/0919; Series 2; Concurrent with C-24-0522 and INFO-24-0261 | 2024-03-28 18:04 | WACM18380 | 2024-04-04 21:30 |
System Conditions | 60632 | WACM | TOT-5 | TOT-5 | AU>CRG(CRCM) BLUE>CRG(CRCM) CCW>MIDW(CRCM) CRG>AU(CRCM) MIDW>CCW(CRCM) |
750.0 | 750.0 | 296.1 14.1 159.8 296.1 159.8 |
2024-04-08 07:00 2024-04-08 07:00 2024-04-08 07:00 2024-04-08 07:00 2024-04-08 07:00 |
2024-04-09 16:00 2024-04-09 16:00 2024-04-09 16:00 2024-04-09 16:00 2024-04-09 16:00 |
Completed | Transmission | Planned | OffPath | CRCM,LAPT,WACM | ICC-24-0013;Series 20 (TOT5 Limit 1400MW) | 2024-03-08 21:54 | WACM18276 | 2024-04-09 15:30 |
BC-BSAN | 59971 | LAPT | BC-BSAN | BC>BSAN(LAPT) BSAN>BC(LAPT) |
109.0 109.0 |
109.0 109.0 |
0.0 0.0 |
2024-04-08 08:00 2024-04-08 08:00 |
2024-04-12 15:00 2024-04-12 15:00 |
Cancelled | TRANSMISSION | PLANNED | ONPATH | LAPT,WACM | C-24-0100 | 2024-01-12 02:24 | LAPT18155 | 2024-04-08 04:04 | |
System Conditions | 60934 | WACM | TOT-4B | TOT-4B | DJ>YTW(LAPT) | 230.0 | 230.0 | 238.0 | 2024-04-09 07:00 | 2024-04-10 14:00 | Completed | Transmission | Planned | OnPath | LAPT,WACM | PPW-24-04315. TOT4B to curve 101. | 2024-04-09 07:42 | WACM18442 | 2024-04-09 07:42 |
System Conditions | 60639 | WACM | TOT-5 | TOT-5 | AU>CRG(CRCM) BLUE>CRG(CRCM) CCW>MIDW(CRCM) CRG>AU(CRCM) MIDW>CCW(CRCM) |
750.0 | 750.0 | 472.5 22.5 255.0 472.5 255.0 |
2024-04-09 15:00 2024-04-09 15:00 2024-04-09 15:00 2024-04-09 15:00 2024-04-09 15:00 |
2024-04-11 14:00 2024-04-11 14:00 2024-04-11 14:00 2024-04-11 14:00 2024-04-11 14:00 |
Completed | Transmission | Planned | OffPath | CRCM,LAPT,WACM | ICC-24-0014;Series 22 (TOT5 Limit 1400MW) | 2024-03-08 22:24 | WACM18279 | 2024-04-11 13:24 |
System Conditions | 60640 | WACM | TOT-5 | TOT-5 | AU>CRG(CRCM) BLUE>CRG(CRCM) CCW>MIDW(CRCM) CRG>AU(CRCM) MIDW>CCW(CRCM) |
750.0 | 750.0 | 245.7 11.7 132.6 245.7 132.6 |
2024-04-12 07:00 2024-04-12 07:00 2024-04-12 07:00 2024-04-12 07:00 2024-04-12 07:00 |
2024-04-13 10:00 2024-04-13 10:00 2024-04-13 10:00 2024-04-13 10:00 2024-04-13 10:00 |
Completed | Transmission | Planned | OffPath | CRCM,LAPT,WACM | ICC-24-0015;TOT-5 to series 30. | 2024-03-08 22:30 | WACM18280 | 2024-04-13 09:08 |
System Conditions | 60869 | WACM | TOT-4B | TOT-4B | DJ>YTW(LAPT) | 230.0 | 230.0 | 198.0 | 2024-04-15 08:00 | 2024-04-26 13:00 | Active | Transmission | Planned | OnPath | LAPT,WACM | INFO-24-0954. TOT-4B to curve118. | 2024-04-03 01:05 | WACM18409 | 2024-04-03 01:05 |
CRG-BLUE | 60100 | CRCM | TOT-5 (CRCM), CRG-BLUE | BLUE>CRG(CRCM) CRG>BLUE(CRCM) |
50.0 50.0 |
50.0 50.0 |
0.0 0.0 |
2024-04-29 06:00 2024-04-29 06:00 |
2024-05-17 16:00 2024-05-17 16:00 |
Scheduled | TRANSMISSION | PLANNED | ONPATH | CRCM,LAPT,WACM | INFO-24-0306; Series 4; TOT-5 limit 1360 MW | 2024-01-18 21:19 | CRCM18172 | 2024-01-18 21:19 | |
HDN-BLUE | 60103 | CRCM | BLUE-HDN | BLUE>HDN(CRCM) HDN>BLUE(CRCM) |
50.0 50.0 |
50.0 50.0 |
0.0 0.0 |
2024-04-29 06:00 2024-04-29 06:00 |
2024-05-17 16:00 2024-05-17 16:00 |
Scheduled | TRANSMISSION | PLANNED | ONPATH | CRCM,LAPT,WACM | INFO-24-0306; Series 4; TOT-5 limit 1360 MW | 2024-01-18 21:20 | CRCM18173 | 2024-01-18 21:20 | |
HDN-BLUE | 60106 | LAPT | BLUE-HDN | BLUE>HDN(LAPT) HDN>BLUE(LAPT) |
133.0 25.0 |
133.0 25.0 |
0.0 0.0 |
2024-04-29 06:00 2024-04-29 06:00 |
2024-05-17 16:00 2024-05-17 16:00 |
Scheduled | TRANSMISSION | FORCED | ONPATH | CRCM,LAPT,WACM | INFO-24-0306; Series 4; TOT-5 limit 1360 MW | 2024-01-18 21:22 | LAPT18174 | 2024-01-18 21:22 | |
System Conditions | 60099 | WACM | TOT-5 | TOT-5 | AU>CRG(CRCM) BLUE>CRG(CRCM) CCW>MIDW(CRCM) CRG>AU(CRCM) MIDW>CCW(CRCM) |
750.0 | 750.0 | 428.4 20.4 231.2 428.4 231.2 |
2024-04-29 06:00 2024-04-29 06:00 2024-04-29 06:00 2024-04-29 06:00 2024-04-29 06:00 |
2024-05-17 16:00 2024-05-17 16:00 2024-05-17 16:00 2024-05-17 16:00 2024-05-17 16:00 |
Scheduled | Transmission | Planned | OnPath | CRCM,LAPT,WACM | INFO-24-0306; Series 4; TOT-5 limit 1360 MW | 2024-01-18 21:17 | WACM18171 | 2024-01-18 21:17 |
BC-BSAN | 60273 | LAPT | BC>BSAN(LAPT) BSAN>BC(LAPT) |
109.0 109.0 |
109.0 109.0 |
0.0 0.0 |
2024-05-06 08:00 2024-05-06 08:00 |
2024-05-10 09:00 2024-05-10 09:00 |
Scheduled | TRANSMISSION | PLANNED | ONPATH | LAPT | System conditions. | 2024-02-06 21:43 | LAPT18214 | 2024-02-06 21:43 | ||
BC-BSAN | 60270 | LAPT | BC>BSAN(LAPT) BSAN>BC(LAPT) |
109.0 109.0 |
109.0 109.0 |
0.0 0.0 |
2024-05-10 09:00 2024-05-10 09:00 |
2024-05-16 15:00 2024-05-16 15:00 |
Scheduled | TRANSMISSION | PLANNED | ONPATH | LAPT | system conditions | 2024-02-06 21:38 | LAPT18213 | 2024-02-06 21:38 | ||
SCSE-SCSW | 60209 | LAPT | SCSE-SCSW | SCSE>SCSW(LAPT) SCSW>SCSE(LAPT) |
200.0 200.0 |
200.0 200.0 |
0.0 0.0 |
2024-06-03 07:00 2024-06-03 07:00 |
2024-06-14 17:00 2024-06-14 17:00 |
Scheduled | TRANSMISSION | PLANNED | ONPATH | LAPT,WACM | INFO-24-0092. SPP#: 1-00451814. | 2024-02-04 18:21 | LAPT18197 | 2024-02-04 18:21 | |
LDWP Outages: | |||||||||||||||||||
NWOR | 134980 | LDWP | NWOR (E-W)(LDWP) NWOR (W-E)(LDWP) NWOR (E-W)(LDWP) NWOR (W-E)(LDWP) NWOR (E-W)(LDWP) NWOR (W-E)(LDWP) NWOR (E-W)(LDWP) NWOR (W-E)(LDWP) NWOR (E-W)(LDWP) NWOR (W-E)(LDWP) NWOR (E-W)(LDWP) NWOR (W-E)(LDWP) |
0.0 0.0 2592.0 2662.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 |
0.0 0.0 2592.0 2662.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 |
2565.0 2635.0 2565.0 2635.0 2565.0 2635.0 2565.0 2635.0 2565.0 2635.0 2565.0 2635.0 |
2023-04-30 16:00 2023-04-30 16:00 2023-06-09 18:00 2023-06-09 18:00 2023-06-11 00:00 2023-06-11 00:00 2023-07-05 11:25 2023-07-05 11:25 2024-01-03 17:00 2024-01-03 17:00 2024-07-01 15:00 2024-07-01 15:00 |
2023-06-09 18:00 2023-06-09 18:00 2023-06-11 00:00 2023-06-11 00:00 2023-07-05 11:25 2023-07-05 11:25 2024-01-03 17:00 2024-01-03 17:00 2024-07-01 15:00 2024-07-01 15:00 2024-12-02 17:00 2024-12-02 17:00 |
Active | TRANSMISSION | PLANNED | ONPATH | LDWP | NWOR MCC-VIC 1 CAP OUT PER BID 16491 MCC-VIC 2 BYPASSED PER RT JOTS ENTRY. VALUES REPORTED VIA ATTACHMENTS TO BID 27342. FS. | 2023-04-20 11:50 | LDWP51063 | 2024-02-06 14:47 | ||
NWOR | 135334 | LDWP | NWOR (E-W)(LDWP) NWOR (W-E)(LDWP) NWOR (E-W)(LDWP) NWOR (W-E)(LDWP) |
0.0 0.0 0.0 0.0 |
0.0 0.0 0.0 0.0 |
2578.0 2648.0 2578.0 2648.0 |
2023-06-10 00:00 2023-06-10 00:00 2024-07-01 15:00 2024-07-01 15:00 |
2024-07-01 15:00 2024-07-01 15:00 2025-02-07 15:00 2025-02-07 15:00 |
Active | TRANSMISSION | PLANNED | ONPATH | LDWP | MCC-VIC 2 Series Compensation Bypassed | 2023-06-09 10:02 | LDWP51137 | 2024-02-06 13:23 | ||
VIC-LA | 136376 | LDWP | LA-VIC(LDWP) VIC-LA(LDWP) LA-VIC(LDWP) VIC-LA(LDWP) |
4500.0 4500.0 4500.0 4500.0 |
4300.0 4300.0 4500.0 4500.0 |
3050.0 3050.0 3050.0 3050.0 |
2024-01-14 04:00 2024-01-14 04:00 2024-04-07 18:00 2024-04-07 18:00 |
2024-04-07 18:00 2024-04-07 18:00 2024-04-20 18:00 2024-04-20 18:00 |
Active | TRANSMISSION | PLANNED | ONPATH | LDWP | VIC-LA 2023/11/16 10:19 BID 26925 TRANS PATROL: VICTORVILLE-RINALDI 1 500KV LINE (-OUT/CLEARED/CBS & DISC OPEN]; {RELOCATE TRANSMISSION TOWERS TO ADJUST ALIGNMENT] {VIC-LA & PDCI DE-RATES} (AWAITING LIMITS) AE | 2023-11-16 10:38 | LDWP51436 | 2024-04-06 06:59 | ||
PDCI (PATH 65) | 136379 | LDWP | PNDC (S-N)(LDWP) PNDC (S-N)(LDWP) |
975.0 975.0 |
975.0 975.0 |
0.0 0.0 |
2024-01-14 04:00 2024-04-07 18:00 |
2024-04-07 18:00 2024-04-20 18:00 |
Active | TRANSMISSION | PLANNED | ONPATH | LDWP | PNDC 2023/11/16 10:19 BID 26925 TRANS PATROL: VICTORVILLE-RINALDI 1 500KV LINE (-OUT/CLEARED/CBS & DISC OPEN]; {RELOCATE TRANSMISSION TOWERS TO ADJUST ALIGNMENT] {VIC-LA & PDCI DE-RATES} (AWAITING LIMITS) AE | 2023-11-16 10:40 | LDWP51437 | 2024-04-06 07:06 | ||
MISC | 136476 | LDWP | LA-SYL(LDWP) SYL-LA(LDWP) |
2050.0 2200.0 |
2050.0 2200.0 |
1100.0 1400.0 |
2024-01-27 13:00 2024-01-27 13:00 |
2024-11-27 16:00 2024-11-27 16:00 |
Cancelled | TRANSMISSION | FORCED | ONPATH | LDWP | LA-SYL 2023/11/24 10:23 BID 73542 SYLMAR-SS: SYLMAR-RINALDI 230-KV LINE 3 (-OUT-), [INCLUDING CB'S E-32 & E-33 AT RIN-RS DUE TO BLEED-THROUGH ISSUES];[INCLUDES CB E-32 AT SYL-SS]; (SYLMAR-SS STATION WASH DE-ENERGIZED); [IN CONJUNCTION WITH HASKELL CANYON-SYLMAR 230-KV LINE 1]. FS. | 2023-11-27 08:39 | LDWP51469 | 2023-11-27 08:40 | ||
INT-DC (PATH 27) | 137352 | LDWP | INT DC (NE-SW)(LDWP) INT DC (SW-NE)(LDWP) |
2400.0 1400.0 |
2400.0 1400.0 |
1200.0 1200.0 |
2024-04-10 22:00 2024-04-10 22:00 |
2024-04-22 22:00 2024-04-22 22:00 |
Active | TRANSMISSION | PLANNED | ONPATH | LDWP | INT DC 2024/03/25 11:59 OUTAGE 75944 INTERMOUNTAIN-ADELANTO POLE 2 REMAINS (-OUT-), ADL-CS/INT-CS: POLE 2 CONVERTERS (OUT/CLEARED-) FOR 2024 ANNUAL SIR; {INTERMOUNTAIN- ADELANTO POLE 1 RETURNS TO SERVICE - ON-LINE}; {INTERMOUNTAIN-ADELANTO POLE 2 IN METALLIC RETURN ONLY} [PATH 27: STS / INT-DC: NOW AVAILABLE FOR 1200-MW]. FS. | 2024-03-25 13:35 | LDWP51757 | 2024-03-25 13:38 | ||
IPP NET IMPORTS | 137294 | LDWP | IPP NET IMPORTS(LDWP) IPP NET IMPORTS(LDWP) IPP NET IMPORTS(LDWP) |
551.0 558.0 558.0 |
551.0 558.0 558.0 |
462.0 462.0 462.0 |
2024-04-15 08:00 2024-04-17 15:00 2024-04-17 19:00 |
2024-04-17 15:00 2024-04-17 19:00 2024-04-29 15:00 |
Active | TRANSMISSION | FORCED | ONPATH | LDWP | IPP NET IMPORTS 2024/03/13 08:46 BID 74716 PACE: HUNTINGTON-PINTO 1 345KV LINE (-OUT/CLEARED-) [REPLACE JUMPER INSULATORS] {PACE # 24-00416} (IPP NET IMPORTS LIMIT). FS. | 2024-03-13 08:52 | LDWP51747 | 2024-04-17 17:41 | ||
IPP NET IMPORTS | 137346 | LDWP | IPP NET IMPORTS(LDWP) | 558.0 | 558.0 | 462.0 | 2024-04-17 15:00 | 2024-04-29 15:00 | Cancelled | TRANSMISSION | FORCED | ONPATH | LDWP | IPP NET IMPORTS 2024/03/25 10:27 OUTAGE 76568 PACE: HUNTINGTON-PINTO 1 345KV LINE (-OUT / CLEARED-) [CAMP WILLIAMS - 4 CORNERS 345KV LINE, HUNTINGTON TO PINTO SEGMENT] REPLACE (8) STRUCTURES - "DEADEND PROJECT" STR# 844, 930, 963, 995, 1039, 1086, 1115, 1149. FS. | 2024-03-25 10:36 | LDWP51756 | 2024-04-15 13:33 | ||
VIC-LA | 137419 | LDWP | LA-VIC(LDWP) VIC-LA(LDWP) |
4500.0 4500.0 |
4500.0 4500.0 |
3050.0 3050.0 |
2024-04-20 18:00 2024-04-20 18:00 |
2024-04-22 15:00 2024-04-22 15:00 |
Scheduled | TRANSMISSION | FORCED | ONPATH | LDWP | VIC-LA 2024/04/09 10:44 OUTAGE 76858 RINALDI-RS: VICTORVILLE-RINALDI 500-KV LINE 1 / BANK G (LINE OPENED ENDED AT RIN-RS; REMAINS OUT/ENERGIZED ONLY); {AFFECTS PDCI/VIC-LA PATHS)[AT RIN-RS: INSTALL, DECLARE NEW BANK G-2 C-PHASE, THEN ENERGIZE VIA VIC-SS, TEST, & SOAK FOR 24-HRS AT RIN-RS]; {AFFECTS PDCI/VIC-LA PATHS). FS. | 2024-04-09 14:05 | LDWP51767 | 2024-04-09 14:05 | ||
PDCI (PATH 65) | 137422 | LDWP | PNDC (S-N)(LDWP) | 975.0 | 975.0 | 0.0 | 2024-04-20 18:00 | 2024-04-22 15:00 | Scheduled | TRANSMISSION | PLANNED | ONPATH | LDWP | PNDC 2024/04/09 10:44 OUTAGE 76858 RINALDI-RS: VICTORVILLE-RINALDI 500-KV LINE 1 / BANK G (LINE OPENED ENDED AT RIN-RS; REMAINS OUT/ENERGIZED ONLY); {AFFECTS PDCI/VIC-LA PATHS)[AT RIN-RS: INSTALL, DECLARE NEW BANK G-2 C-PHASE, THEN ENERGIZE VIA VIC-SS, TEST, & SOAK FOR 24-HRS AT RIN-RS]; {AFFECTS PDCI/VIC-LA PATHS). FS. | 2024-04-09 14:08 | LDWP51768 | 2024-04-09 14:08 | ||
MISC | 137453 | LDWP | LA-TOL(LDWP) TOL-LA(LDWP) |
1400.0 1400.0 |
1400.0 1400.0 |
1350.0 1350.0 |
2024-04-21 07:00 2024-04-21 07:00 |
2024-04-21 15:00 2024-04-21 15:00 |
Scheduled | TRANSMISSION | FORCED | ONPATH | LDWP | LA-TOL 2024/04/10 15:50 BID 76708 RS-E / SYSTEM PROTECTION: VALLEY-TOLUCA 2 230KV LINE (-OUT / INCLUDING CBS-) [REPLACE DVC21 RELAY / TEST RELAY AND TRIP CBS] AE | 2024-04-11 07:22 | LDWP51780 | 2024-04-11 07:22 | ||
NEOR (PATH 49) | 137286 | LDWP | MED5-WW(LDWP) WW-MED5(LDWP) |
365.0 365.0 |
365.0 365.0 |
232.0 232.0 |
2024-04-21 07:00 2024-04-21 07:00 |
2024-04-26 17:00 2024-04-26 17:00 |
Scheduled | TRANSMISSION | FORCED | ONPATH | LDWP | WW-MD5 2024/03/12 14:27 OUTAGE 75538 SRP / PERKINS: PERKINS-MEAD 500KV SERIES CAPACITOR (-OUT / CLEARED-) [ANNUAL MAINTENANCE AND REPAIR] {SRP # 00380-24} (PATH 49 DE-RATE). FS. | 2024-03-12 14:38 | LDWP51745 | 2024-03-12 14:38 | ||
NEOR (PATH 49) | 137456 | LDWP | MED5-WW(LDWP) WW-MED5(LDWP) |
365.0 365.0 |
365.0 365.0 |
232.0 232.0 |
2024-04-22 06:00 2024-04-22 06:00 |
2024-04-25 16:00 2024-04-25 16:00 |
Cancelled | TRANSMISSION | PLANNED | ONPATH | LDWP | WW-MD5 2024/04/10 19:11 BID 76865 SCE / ELDORADO: ELDORADO-MOENKOPI 500KV LINE SERIES CAPACITORS (-OUT / CLEARED-) [REMOVING SERIES CAPS AT ELDORADO] {APS # 24-08954} (PATH 49 DERATE) AE | 2024-04-11 10:27 | LDWP51781 | 2024-04-11 10:28 | ||
NEOR (PATH 49) | 137461 | LDWP | CRY-NAV (LDWP)(LDWP) NAV-CRY (LDWP)(LDWP) NAV-CRY (NVE)(LDWP) NAV-CRY (WALC)(LDWP) |
967.0 967.0 533.0 500.0 |
967.0 967.0 533.0 500.0 |
704.0 704.0 393.0 366.0 |
2024-04-22 06:00 2024-04-22 06:00 2024-04-22 06:00 2024-04-22 06:00 |
2024-04-25 16:00 2024-04-25 16:00 2024-04-25 16:00 2024-04-25 16:00 |
Scheduled | TRANSMISSION | PLANNED | ONPATH | LDWP | NEOR 2024/04/10 19:11 BID 76865 SCE / ELDORADO: ELDORADO-MOENKOPI 500KV LINE SERIES CAPACITORS (-OUT / CLEARED-) [REMOVING SERIES CAPS AT ELDORADO] {APS # 24-08954} (PATH 49 DERATE) AE | 2024-04-11 10:32 | LDWP51782 | 2024-04-11 10:32 | ||
INT-DC (PATH 27) | 137357 | LDWP | INT DC (NE-SW)(LDWP) INT DC (SW-NE)(LDWP) |
2400.0 1400.0 |
2400.0 1400.0 |
1250.0 1250.0 |
2024-04-22 22:00 2024-04-22 22:00 |
2024-07-01 00:00 2024-07-01 00:00 |
Scheduled | TRANSMISSION | PLANNED | ONPATH | LDWP | INT DC 2024/03/25 11:59 OUTAGE 75944 -RETURN- INTERMOUNTAIN-ADELANTO POLE 2 REMAINS (-OUT-), ADL-CS/INT-CS: POLE 2 CONVERTERS (OUT/CLEARED-) FOR 2024 ANNUAL SIR; {INTERMOUNTAIN- ADELANTO POLE 1 RETURNS TO SERVICE - ON-LINE}; {INTERMOUNTAIN-ADELANTO POLE 2 IN METALLIC RETURN ONLY} [PATH 27: STS / INT-DC: NOW AVAILABLE FOR 1200-MW]. FS. | 2024-03-25 13:46 | LDWP51758 | 2024-03-25 13:46 | ||
VIC-LA | 137445 | LDWP | LA-VIC(LDWP) VIC-LA(LDWP) |
4500.0 4500.0 |
4500.0 4500.0 |
2850.0 2850.0 |
2024-04-23 08:00 2024-04-23 08:00 |
2024-04-23 18:00 2024-04-23 18:00 |
Scheduled | TRANSMISSION | PLANNED | ONPATH | LDWP | VIC-LA 2024/10/04 10:51 BID 76975 ADELANTO-TOLUCA 500-KV LINE 1 / BANK G / BANK H (-OUT/OPEN ENDED); [230-KV CB'S ONLY OPENED @ RS-E]; (REMAINS ENERGIZED {TO INVESTIGATE & REPAIR BANK G LTC TAP CHANGER B-PHASE NOT OPERATIONAL] AE | 2024-04-10 11:02 | LDWP51777 | 2024-04-10 11:02 | ||
PDCI (PATH 65) | 137448 | LDWP | PNDC (S-N)(LDWP) | 975.0 | 975.0 | 0.0 | 2024-04-23 08:00 | 2024-04-23 18:00 | Scheduled | TRANSMISSION | PLANNED | ONPATH | LDWP | PNDC 2024/10/04 10:51 BID 76975 ADELANTO-TOLUCA 500-KV LINE 1 / BANK G / BANK H (-OUT/OPEN ENDED); [230-KV CB'S ONLY OPENED @ RS-E]; (REMAINS ENERGIZED {TO INVESTIGATE & REPAIR BANK G LTC TAP CHANGER B-PHASE NOT OPERATIONAL] AE | 2024-04-10 11:06 | LDWP51778 | 2024-04-10 11:06 | ||
MISC | 137450 | LDWP | LA-TOL(LDWP) TOL-LA(LDWP) |
1400.0 1400.0 |
1400.0 1400.0 |
1300.0 1300.0 |
2024-04-23 08:00 2024-04-23 08:00 |
2024-04-23 18:00 2024-04-23 18:00 |
Scheduled | TRANSMISSION | PLANNED | ONPATH | LDWP | LA-TOL 2024/10/04 10:51 BID 76975 ADELANTO-TOLUCA 500-KV LINE 1 / BANK G / BANK H (-OUT/OPEN ENDED); [230-KV CB'S ONLY OPENED @ RS-E]; (REMAINS ENERGIZED {TO INVESTIGATE & REPAIR BANK G LTC TAP CHANGER B-PHASE NOT OPERATIONAL] AE | 2024-04-10 11:09 | LDWP51779 | 2024-04-10 11:09 | ||
NWOR | 137494 | LDWP | NWOR (E-W)(LDWP) NWOR (W-E)(LDWP) |
2592.0 2662.0 |
2592.0 2662.0 |
1992.0 2062.0 |
2024-04-24 05:00 2024-04-24 05:00 |
2024-04-30 00:00 2024-04-30 00:00 |
Scheduled | TRANSMISSION | PLANNED | ONPATH | LDWP | NWOR 2024/17/04 08:36 BID 76026 SCE / LUGO: ELDORADO-LUGO 500KV LINE (-OUT / CLEARED-) [SUPPORT THE LUGO SERIES CAPACITOR TESTING] {SCE # 24-015417} (PATH 46 DE-RATE) AE | 2024-04-17 10:26 | LDWP51786 | 2024-04-17 10:26 | ||
NWOR | 137497 | LDWP | NWOR (E-W)(LDWP) NWOR (W-E)(LDWP) |
0.0 0.0 |
0.0 0.0 |
1923.0 1993.0 |
2024-04-26 08:00 2024-04-26 08:00 |
2024-04-26 15:00 2024-04-26 15:00 |
Scheduled | TRANSMISSION | PLANNED | ONPATH | LDWP | NWOR 2024/17/04 08:37 BID 76785 SCE / JULIAN HINDS: JULIAN HINDS-MIRAGE 220KV LINE (-OUT / CLEARED-) [REPAIR LINE GROUND DISCONNECTS] {SCE # 24-020001} (PATH 46 DE-RATE) AE | 2024-04-17 10:43 | LDWP51787 | 2024-04-17 10:43 | ||
PDCI (PATH 65) | 137440 | LDWP | PNDC (S-N)(LDWP) | 975.0 | 975.0 | 0.0 | 2024-04-27 05:00 | 2024-04-28 21:00 | Scheduled | TRANSMISSION | PLANNED | ONPATH | LDWP | PNDC 2024/10/04 10:40 BID 75917 RS-E: BANK H 500/230-KV (-OUT/CLEARED-); [CB'S & DISC'S OPENED HIGH/LOW SIDES]; (AFFECTS VIC-LA/PDCI) {TO INVESTIGATE & REPAIR BANK H -13.8KV TERTIARY WINDING GROUND} [CONTINUOUS OUTAGE}. AE | 2024-04-10 10:53 | LDWP51775 | 2024-04-10 10:53 | ||
VIC-LA | 137442 | LDWP | LA-VIC(LDWP) VIC-LA(LDWP) |
4500.0 4500.0 |
4500.0 4500.0 |
2850.0 2850.0 |
2024-04-27 05:00 2024-04-27 05:00 |
2024-04-28 21:00 2024-04-28 21:00 |
Scheduled | TRANSMISSION | PLANNED | ONPATH | LDWP | VIC-LA 2024/10/04 10:40 BID 75917 RS-E: BANK H 500/230-KV (-OUT/CLEARED-); [CB'S & DISC'S OPENED HIGH/LOW SIDES]; (AFFECTS VIC-LA/PDCI) {TO INVESTIGATE & REPAIR BANK H -13.8KV TERTIARY WINDING GROUND} [CONTINUOUS OUTAGE}. AE | 2024-04-10 10:54 | LDWP51776 | 2024-04-10 10:54 | ||
NWOR | 137471 | LDWP | NWOR (E-W)(LDWP) NWOR (W-E)(LDWP) |
0.0 0.0 |
0.0 0.0 |
2062.0 2132.0 |
2024-05-06 05:00 2024-05-06 05:00 |
2024-05-08 17:00 2024-05-08 17:00 |
Scheduled | TRANSMISSION | PLANNED | ONPATH | LDWP | NWOR 2024/04/12 11:09 OUTAGE 76465 VICTORVILLE SS / SYSTEM PROTECTION / ESC: MCCULLOUGH-VICTORVILLE 1 500KV LINE (-OUT / CLEARED / INCLUDING CBS-) [RELAY TESTING / ISOLATE LINE SERIES CAPACITOR FOR REMOVAL / REPLACEMENT] {PATH 46 DE-RATE}. FS. | 2024-04-12 11:25 | LDWP51784 | 2024-04-12 11:25 | ||
MATL Outages: | |||||||||||||||||||
NEVP Outages: | |||||||||||||||||||
GONDER PAVANT CAP BANK | 436694 | NEVP | PATH 32 | NVEN-NIE(NEVP) NVEN-NIE(NEVP) NVEN-NIE(NEVP) NVEN-NIE(NEVP) NVEN-NIE(NEVP) |
1000.0 1000.0 1000.0 1000.0 1000.0 |
1000.0 1000.0 1000.0 1000.0 1000.0 |
910.0 910.0 910.0 910.0 910.0 |
2023-09-21 09:00 2023-09-21 15:00 2023-12-29 15:00 2024-01-31 15:00 2024-02-29 15:00 |
2023-09-21 15:00 2023-12-29 15:00 2024-01-31 15:00 2024-02-29 15:00 2024-06-01 01:00 |
Active | TRANSMISSION | PLANNED | ONPATH | NEVP | iTOA #23-05464 - Gonder Pavant Cap Bank OOS for PACE WORK. PPW outage #23-16030. | 2023-09-11 11:30 | NEVP167536 | 2024-02-29 13:30 | |
SPAULDING/SUMMIT 60KV | 466598 | NEVP | PATH 24 | SUMMIT120-WEST.NVEN(NEVP) WEST.NVEN-SUMMIT120(NEVP) SUMMIT120-WEST.NVEN(NEVP) WEST.NVEN-SUMMIT120(NEVP) |
100.0 18.0 100.0 18.0 |
100.0 18.0 100.0 18.0 |
100.0 18.0 100.0 18.0 |
2024-04-11 12:30 2024-04-11 12:30 2024-04-11 18:00 2024-04-11 18:00 |
2024-04-11 18:00 2024-04-11 18:00 2024-04-12 18:00 2024-04-12 18:00 |
Completed | TRANSMISSION | FORCED | ONPATH | NEVP | LINE OPEN ON PG&E SIDE, PICKING UP APPROX 5MW OF STRANDED LOAD. | 2024-04-11 12:36 | NEVP177701 | 2024-04-12 18:05 | |
PATH 16 | 466734 | NEVP | PATH 16 | M345-NVEN(NEVP) NIE-NORTHSYS(NEVP) NIE-NVEN(NEVP) NORTHSYS-NIE(NEVP) NVEN-M345(NEVP) NVEN-NIE(NEVP) |
500.0 1275.0 775.0 1330.0 360.0 1000.0 |
500.0 1275.0 775.0 1330.0 360.0 1000.0 |
0.0 975.0 700.0 765.0 0.0 700.0 |
2024-04-12 02:40 2024-04-12 02:40 2024-04-12 02:40 2024-04-12 02:40 2024-04-12 02:40 2024-04-12 02:40 |
2024-04-12 04:35 2024-04-12 04:35 2024-04-12 04:35 2024-04-12 04:35 2024-04-12 04:35 2024-04-12 04:35 |
Completed | TRANSMISSION | FORCED | ONPATH | NEVP | LINE OOS | 2024-04-12 02:47 | NEVP177736 | 2024-04-12 04:37 | |
SPAULDING/SUMMIT 60KV | 467050 | NEVP | Path24 | SUMMIT120-WEST.NVEN(NEVP) WEST.NVEN-SUMMIT120(NEVP) SUMMIT120-WEST.NVEN(NEVP) WEST.NVEN-SUMMIT120(NEVP) |
100.0 18.0 100.0 18.0 |
100.0 18.0 100.0 18.0 |
100.0 18.0 100.0 18.0 |
2024-04-13 20:00 2024-04-13 20:00 2024-04-15 18:00 2024-04-15 18:00 |
2024-04-15 18:00 2024-04-15 18:00 2024-04-22 18:00 2024-04-22 18:00 |
Active | TRANSMISSION | PLANNED | ONPATH | NEVP | LINE OPEN ON PG&E SIDE, PICKING UP APPROX 5MW OF STRANDED LOAD. | 2024-04-13 20:09 | NEVP177846 | 2024-04-15 17:44 | |
MD-MKT 500 | 460271 | NEVP | MD-MKT 500 Line OOS | SIE-NVES1(NEVP) | 3168.0 | 3168.0 | 2657.0 | 2024-04-15 09:10 | 2024-04-15 12:00 | Completed | TRANSMISSION | PLANNED | ONPATH | NEVP | WALC is taking out their Mead-Marketplace 500 kV line, which affect our southern exports. | 2024-02-06 10:33 | NEVP175325 | 2024-04-15 12:06 | |
HA-RE 345 (Path 35) | 462994 | NEVP | HA-RE 345 (Path 35) OOS | REDB-SIE(NEVP) SIE-REDB(NEVP) |
600.0 580.0 |
600.0 580.0 |
0.0 0.0 |
2024-04-16 08:00 2024-04-16 08:00 |
2024-04-16 13:00 2024-04-16 13:00 |
Cancelled | TRANSMISSION | PLANNED | ONPATH | NEVP | HA-RE 345 (Path 35) OOS; Maintenance | 2024-03-11 10:46 | NEVP176361 | 2024-04-15 13:20 | |
ED-MOE Series Cap | 466343 | NEVP | ED-MOE Series Cap OOS | CRY500-NA500(NEVP) NA500-CRY500(NEVP) |
533.0 533.0 |
533.0 533.0 |
310.0 310.0 |
2024-04-22 06:00 2024-04-22 06:00 |
2024-04-25 16:00 2024-04-25 16:00 |
Scheduled | TRANSMISSION | PLANNED | ONPATH | NEVP | Eldorado-Moenkopi 500 kV Series Cap OOS | 2024-04-09 08:42 | NEVP177617 | 2024-04-09 08:42 | |
HA-RBS 500 kV | 464820 | NEVP | HA-RBS 500 kV OOS | HA500-NIE(NEVP) NIE-HA500(NEVP) |
600.0 900.0 |
600.0 900.0 |
0.0 0.0 |
2024-04-25 08:00 2024-04-25 08:00 |
2024-04-28 15:00 2024-04-28 15:00 |
Scheduled | TRANSMISSION | PLANNED | ONPATH | NEVP | HA-RBS 500 kV OOS for line repair | 2024-03-28 07:01 | NEVP177073 | 2024-04-04 12:39 | |
FALCON-ROBINSON SUMMT3428 | 439213 | NEVP | Falcon-Robinson Summit 3428 | HA500-NIE(NEVP) NIE-HA500(NEVP) |
600.0 900.0 |
600.0 900.0 |
600.0 900.0 |
2024-05-06 08:00 2024-05-06 08:00 |
2024-05-17 15:00 2024-05-17 15:00 |
Scheduled | TRANSMISSION | FORCED | ONPATH | NEVP | iTOA #23-00034 LiDAR work | 2023-10-02 12:22 | NEVP168563 | 2023-10-02 12:22 | |
MARBLE 60 | 467364 | NEVP | PATH 24 | MARBLE60-WEST.NVEN(NEVP) WEST.NVEN-MARBLE60(NEVP) |
18.0 18.0 |
18.0 18.0 |
0.0 0.0 |
2024-05-06 22:00 2024-05-06 22:00 |
2024-05-10 22:00 2024-05-10 22:00 |
Scheduled | TRANSMISSION | PLANNED | ONPATH | NEVP | ITOA #24-02616 - LINE 619, picking up Plumas Sierra stranded load. | 2024-04-17 14:20 | NEVP177961 | 2024-04-17 14:20 | |
HILLTOP CAP BANK | 460108 | NEVP | PATH 76 | HILLTOP345-NVEN(NEVP) | 300.0 | 300.0 | 210.0 | 2024-05-07 08:00 | 2024-05-08 15:00 | Scheduled | TRANSMISSION | PLANNED | ONPATH | NEVP | iTOA #24-00639 - HILLTOP CAP BANK OOS | 2024-02-02 09:48 | NEVP175247 | 2024-02-02 09:48 | |
MARBLE 60 | 467361 | NEVP | PATH 24 | MARBLE60-WEST.NVEN(NEVP) WEST.NVEN-MARBLE60(NEVP) |
18.0 18.0 |
18.0 18.0 |
0.0 0.0 |
2024-05-21 22:00 2024-05-21 22:00 |
2024-05-24 22:00 2024-05-24 22:00 |
Scheduled | TRANSMISSION | PLANNED | ONPATH | NEVP | ITOA #24-02615 - LINE 619, picking up Plumas Sierra stranded load. | 2024-04-17 13:57 | NEVP177960 | 2024-04-17 13:57 | |
DRUM-SUMMIT #1 | 466475 | NEVP | PATH 24 | NIE-NORTHSYS(NEVP) SUMMIT120-WEST.NVEN(NEVP) |
1275.0 100.0 |
1275.0 100.0 |
1255.0 83.0 |
2024-07-08 06:00 2024-07-08 06:00 |
2024-07-20 18:00 2024-07-20 18:00 |
Scheduled | TRANSMISSION | PLANNED | ONPATH | NEVP | ITOA #24-02423 - LINE 133 OOS, Derate path 24 | 2024-04-10 13:21 | NEVP177657 | 2024-04-10 13:21 | |
HILLTOP/FT.SAGE 3450 | 462686 | NEVP | PATH 76 | HILLTOP345-NVEN(NEVP) NVEN-HILLTOP345(NEVP) NVEN-M345(NEVP) NVEN-NIE(NEVP) |
300.0 200.0 360.0 1000.0 |
300.0 200.0 360.0 1000.0 |
0.0 0.0 300.0 908.0 |
2024-10-07 08:00 2024-10-07 08:00 2024-10-07 08:00 2024-10-07 08:00 |
2024-10-11 17:00 2024-10-11 17:00 2024-10-11 17:00 2024-10-11 17:00 |
Scheduled | TRANSMISSION | PLANNED | ONPATH | NEVP | ITOA #24-01586 - LINE 3450 OOS, Derate path 76 | 2024-03-08 08:35 | NEVP176254 | 2024-03-08 08:35 | |
NWMT Outages: | |||||||||||||||||||
230KV CROSSOVER-YTP | 11956 | NWMT | Crossover PAR Outage | CROSSOVER-MTSE(NWMT) MTSE-CROSSOVER(NWMT) MTSE-NWMT.SYSTEM(NWMT) NWMT.SYSTEM-MTSE(NWMT) |
478.0 450.0 600.0 600.0 |
478.0 450.0 600.0 600.0 |
178.0 150.0 178.0 550.0 |
2023-11-17 16:00 2023-11-17 16:00 2023-11-17 16:00 2023-11-17 16:00 |
2024-12-31 22:00 2024-12-31 22:00 2024-12-31 22:00 2024-12-31 22:00 |
Active | TRANSMISSION | FORCED | ONPATH | NWMT | 2023-11-17 15:19 | NWMT2750 | 2023-11-17 15:19 | ||
24-0371-TR | 12365 | NWMT | 161kV Alkali Creek-Rimrock | MTSE-YTP(NWMT) YTP-MTSE(NWMT) |
400.0 400.0 |
400.0 400.0 |
300.0 300.0 |
2024-04-30 07:00 2024-04-30 07:00 |
2024-04-30 16:00 2024-04-30 16:00 |
Scheduled | TRANSMISSION | PLANNED | OFFPATH | NWMT | NWMT request for work | 2024-04-17 14:52 | NWMT2823 | 2024-04-17 14:52 | |
PGE Outages: | |||||||||||||||||||
ROUNDBUTTE-REDMOND | 198378 | PGE | Redmond BPA-Round Butte 230kV | ROUNDBUTTE-REDMOND(PGE) | 357.0 | 357.0 | 0.0 | 2024-05-13 08:00 | 2024-05-17 16:00 | Scheduled | TRANSMISSION | PLANNED | ONPATH | PGE | Limit on RoundButte to Redmond Path declared by PGE | 2023-11-29 11:41 | PGE67334 | 2023-11-29 11:41 | |
PNM Outages: | |||||||||||||||||||
EDDY230-AMRAD345 | 372915 | PNM | EDDY230-AMRAD345 | AMRAD345-EDDY230(PNM) EDDY230-AMRAD345(PNM) AMRAD345-EDDY230(PNM) EDDY230-AMRAD345(PNM) AMRAD345-EDDY230(PNM) EDDY230-AMRAD345(PNM) |
67.0 67.0 67.0 67.0 67.0 67.0 |
67.0 67.0 67.0 67.0 67.0 67.0 |
44.0 44.0 44.0 44.0 44.0 44.0 |
2022-08-01 14:00 2022-08-01 14:00 2022-12-31 23:59 2022-12-31 23:59 2023-12-31 23:59 2023-12-31 23:59 |
2022-12-31 23:59 2022-12-31 23:59 2023-12-31 23:59 2023-12-31 23:59 2025-01-01 00:00 2025-01-01 00:00 |
Active | TRANSMISSION | FORCED | ONPATH | PNM | Eddy230-Amrd345 line reduction due to Reliability Constraints | 2022-08-01 13:57 | PNM147096 | 2023-08-09 10:34 | |
BW230 IMP/EXP RESTRICTION | 453356 | PNM | BW345-BW230 | BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) |
200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 |
200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 |
150.0 150.0 150.0 150.0 150.0 150.0 150.0 150.0 150.0 150.0 150.0 150.0 150.0 150.0 150.0 150.0 150.0 150.0 150.0 150.0 150.0 150.0 150.0 150.0 150.0 150.0 150.0 150.0 150.0 150.0 150.0 150.0 150.0 150.0 150.0 150.0 150.0 150.0 150.0 150.0 50.0 150.0 50.0 150.0 50.0 150.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 0.0 100.0 0.0 100.0 0.0 100.0 0.0 100.0 0.0 100.0 0.0 100.0 0.0 100.0 0.0 100.0 0.0 100.0 0.0 100.0 200.0 100.0 200.0 100.0 200.0 100.0 200.0 100.0 200.0 100.0 200.0 100.0 200.0 100.0 200.0 100.0 200.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 |
2023-12-11 18:00 2023-12-11 18:00 2023-12-11 19:00 2023-12-11 19:00 2023-12-11 20:00 2023-12-11 20:00 2023-12-11 21:00 2023-12-11 21:00 2023-12-11 22:00 2023-12-11 22:00 2023-12-11 23:00 2023-12-11 23:00 2023-12-12 01:00 2023-12-12 01:00 2023-12-12 02:00 2023-12-12 02:00 2023-12-12 03:00 2023-12-12 03:00 2023-12-12 04:00 2023-12-12 04:00 2023-12-12 05:00 2023-12-12 05:00 2023-12-12 06:00 2023-12-12 06:00 2023-12-12 07:00 2023-12-12 07:00 2023-12-12 08:00 2023-12-12 08:00 2023-12-12 09:00 2023-12-12 09:00 2023-12-12 10:00 2023-12-12 10:00 2023-12-12 11:00 2023-12-12 11:00 2023-12-12 12:00 2023-12-12 12:00 2023-12-12 13:00 2023-12-12 13:00 2023-12-12 14:00 2023-12-12 14:00 2024-01-05 02:00 2024-01-05 02:00 2024-01-05 03:00 2024-01-05 03:00 2024-01-05 04:00 2024-01-05 04:00 2024-01-05 04:48 2024-01-05 04:48 2024-01-05 05:00 2024-01-05 05:00 2024-01-05 06:00 2024-01-05 06:00 2024-01-05 07:00 2024-01-05 07:00 2024-01-05 08:00 2024-01-05 08:00 2024-01-05 09:00 2024-01-05 09:00 2024-01-05 10:00 2024-01-05 10:00 2024-01-05 11:00 2024-01-05 11:00 2024-01-05 12:00 2024-01-05 12:00 2024-01-05 13:00 2024-01-05 13:00 2024-01-05 14:00 2024-01-05 14:00 2024-01-05 14:59 2024-01-05 14:59 2024-01-05 15:00 2024-01-05 15:00 2024-01-05 16:00 2024-01-05 16:00 2024-01-05 17:00 2024-01-05 17:00 2024-01-05 18:00 2024-01-05 18:00 2024-01-05 19:00 2024-01-05 19:00 2024-01-05 20:00 2024-01-05 20:00 2024-01-05 21:00 2024-01-05 21:00 2024-01-05 22:00 2024-01-05 22:00 2024-01-05 23:00 2024-01-05 23:00 2024-01-06 01:00 2024-01-06 01:00 2024-01-06 02:00 2024-01-06 02:00 2024-01-06 03:00 2024-01-06 03:00 2024-01-06 04:00 2024-01-06 04:00 2024-01-06 05:00 2024-01-06 05:00 2024-01-06 06:00 2024-01-06 06:00 2024-01-06 07:00 2024-01-06 07:00 2024-01-06 08:00 2024-01-06 08:00 2024-01-06 09:00 2024-01-06 09:00 2024-01-06 10:00 2024-01-06 10:00 2024-01-06 11:00 2024-01-06 11:00 2024-01-06 12:00 2024-01-06 12:00 2024-01-06 13:00 2024-01-06 13:00 2024-01-06 14:00 2024-01-06 14:00 2024-01-12 10:52 2024-01-12 10:52 2024-01-12 11:00 2024-01-12 11:00 2024-01-12 12:00 2024-01-12 12:00 2024-01-12 13:00 2024-01-12 13:00 2024-01-12 14:00 2024-01-12 14:00 2024-01-12 15:00 2024-01-12 15:00 2024-01-12 16:00 2024-01-12 16:00 2024-01-12 17:00 2024-01-12 17:00 2024-01-12 18:00 2024-01-12 18:00 2024-01-12 19:00 2024-01-12 19:00 2024-01-12 19:50 2024-01-12 19:50 2024-01-12 20:00 2024-01-12 20:00 2024-01-12 21:00 2024-01-12 21:00 2024-01-12 22:00 2024-01-12 22:00 2024-01-12 23:00 2024-01-12 23:00 2024-01-13 01:00 2024-01-13 01:00 2024-01-13 02:00 2024-01-13 02:00 2024-01-13 03:00 2024-01-13 03:00 2024-01-13 04:00 2024-01-13 04:00 2024-01-13 04:45 2024-01-13 04:45 2024-01-13 05:00 2024-01-13 05:00 2024-01-13 06:00 2024-01-13 06:00 2024-01-13 07:00 2024-01-13 07:00 2024-01-13 08:00 2024-01-13 08:00 2024-01-13 09:00 2024-01-13 09:00 2024-01-13 10:00 2024-01-13 10:00 2024-01-13 11:00 2024-01-13 11:00 2024-01-13 12:00 2024-01-13 12:00 2024-01-13 13:00 2024-01-13 13:00 2024-01-13 14:00 2024-01-13 14:00 2024-01-13 15:00 2024-01-13 15:00 2024-01-13 16:00 2024-01-13 16:00 2024-01-13 17:00 2024-01-13 17:00 2024-01-13 18:00 2024-01-13 18:00 2024-01-13 19:00 2024-01-13 19:00 2024-01-13 20:00 2024-01-13 20:00 2024-01-13 21:00 2024-01-13 21:00 2024-01-13 22:00 2024-01-13 22:00 2024-01-13 23:00 2024-01-13 23:00 2024-01-14 01:00 2024-01-14 01:00 2024-01-14 02:00 2024-01-14 02:00 2024-01-14 03:00 2024-01-14 03:00 2024-01-14 04:00 2024-01-14 04:00 2024-01-14 05:00 2024-01-14 05:00 2024-01-14 06:00 2024-01-14 06:00 2024-01-14 06:49 2024-01-14 06:49 2024-01-14 07:00 2024-01-14 07:00 2024-01-14 08:00 2024-01-14 08:00 2024-01-14 09:00 2024-01-14 09:00 2024-01-14 10:00 2024-01-14 10:00 2024-01-14 11:00 2024-01-14 11:00 2024-01-14 12:00 2024-01-14 12:00 2024-01-14 13:00 2024-01-14 13:00 2024-01-14 14:00 2024-01-14 14:00 2024-01-14 15:00 2024-01-14 15:00 2024-01-14 16:00 2024-01-14 16:00 2024-01-14 17:00 2024-01-14 17:00 2024-01-14 18:00 2024-01-14 18:00 2024-01-14 19:00 2024-01-14 19:00 2024-01-14 20:00 2024-01-14 20:00 2024-01-14 21:00 2024-01-14 21:00 2024-01-14 22:00 2024-01-14 22:00 2024-01-14 23:00 2024-01-14 23:00 2024-01-15 01:00 2024-01-15 01:00 2024-01-15 02:00 2024-01-15 02:00 2024-01-15 03:00 2024-01-15 03:00 2024-01-15 04:00 2024-01-15 04:00 2024-01-15 05:00 2024-01-15 05:00 2024-01-15 06:00 2024-01-15 06:00 2024-01-15 07:00 2024-01-15 07:00 2024-01-15 08:00 2024-01-15 08:00 2024-01-15 09:00 2024-01-15 09:00 2024-01-15 10:00 2024-01-15 10:00 2024-01-15 11:00 2024-01-15 11:00 2024-01-15 12:00 2024-01-15 12:00 2024-01-15 13:00 2024-01-15 13:00 2024-01-15 14:00 2024-01-15 14:00 2024-01-31 19:00 2024-01-31 19:00 2024-01-31 20:00 2024-01-31 20:00 2024-01-31 21:00 2024-01-31 21:00 2024-01-31 22:00 2024-01-31 22:00 2024-01-31 23:00 2024-01-31 23:00 2024-02-01 01:00 2024-02-01 01:00 2024-02-01 02:00 2024-02-01 02:00 2024-02-01 03:00 2024-02-01 03:00 2024-02-01 04:00 2024-02-01 04:00 2024-02-01 05:00 2024-02-01 05:00 2024-02-01 06:00 2024-02-01 06:00 2024-02-01 07:00 2024-02-01 07:00 2024-02-01 08:00 2024-02-01 08:00 2024-02-01 09:00 2024-02-01 09:00 2024-02-01 10:00 2024-02-01 10:00 2024-02-01 11:00 2024-02-01 11:00 2024-02-01 12:00 2024-02-01 12:00 2024-02-01 13:00 2024-02-01 13:00 2024-02-01 14:00 2024-02-01 14:00 |
2023-12-11 19:00 2023-12-11 19:00 2023-12-11 20:00 2023-12-11 20:00 2023-12-11 21:00 2023-12-11 21:00 2023-12-11 22:00 2023-12-11 22:00 2023-12-11 23:00 2023-12-11 23:00 2023-12-12 01:00 2023-12-12 01:00 2023-12-12 02:00 2023-12-12 02:00 2023-12-12 03:00 2023-12-12 03:00 2023-12-12 04:00 2023-12-12 04:00 2023-12-12 05:00 2023-12-12 05:00 2023-12-12 06:00 2023-12-12 06:00 2023-12-12 07:00 2023-12-12 07:00 2023-12-12 08:00 2023-12-12 08:00 2023-12-12 09:00 2023-12-12 09:00 2023-12-12 10:00 2023-12-12 10:00 2023-12-12 11:00 2023-12-12 11:00 2023-12-12 12:00 2023-12-12 12:00 2023-12-12 13:00 2023-12-12 13:00 2023-12-12 14:00 2023-12-12 14:00 2024-01-05 02:00 2024-01-05 02:00 2024-01-05 03:00 2024-01-05 03:00 2024-01-05 04:00 2024-01-05 04:00 2024-01-05 04:48 2024-01-05 04:48 2024-01-05 05:00 2024-01-05 05:00 2024-01-05 06:00 2024-01-05 06:00 2024-01-05 07:00 2024-01-05 07:00 2024-01-05 08:00 2024-01-05 08:00 2024-01-05 09:00 2024-01-05 09:00 2024-01-05 10:00 2024-01-05 10:00 2024-01-05 11:00 2024-01-05 11:00 2024-01-05 12:00 2024-01-05 12:00 2024-01-05 13:00 2024-01-05 13:00 2024-01-05 14:00 2024-01-05 14:00 2024-01-05 14:59 2024-01-05 14:59 2024-01-05 15:00 2024-01-05 15:00 2024-01-05 16:00 2024-01-05 16:00 2024-01-05 17:00 2024-01-05 17:00 2024-01-05 18:00 2024-01-05 18:00 2024-01-05 19:00 2024-01-05 19:00 2024-01-05 20:00 2024-01-05 20:00 2024-01-05 21:00 2024-01-05 21:00 2024-01-05 22:00 2024-01-05 22:00 2024-01-05 23:00 2024-01-05 23:00 2024-01-06 01:00 2024-01-06 01:00 2024-01-06 02:00 2024-01-06 02:00 2024-01-06 03:00 2024-01-06 03:00 2024-01-06 04:00 2024-01-06 04:00 2024-01-06 05:00 2024-01-06 05:00 2024-01-06 06:00 2024-01-06 06:00 2024-01-06 07:00 2024-01-06 07:00 2024-01-06 08:00 2024-01-06 08:00 2024-01-06 09:00 2024-01-06 09:00 2024-01-06 10:00 2024-01-06 10:00 2024-01-06 11:00 2024-01-06 11:00 2024-01-06 12:00 2024-01-06 12:00 2024-01-06 13:00 2024-01-06 13:00 2024-01-06 14:00 2024-01-06 14:00 2024-01-12 10:52 2024-01-12 10:52 2024-01-12 11:00 2024-01-12 11:00 2024-01-12 12:00 2024-01-12 12:00 2024-01-12 13:00 2024-01-12 13:00 2024-01-12 14:00 2024-01-12 14:00 2024-01-12 15:00 2024-01-12 15:00 2024-01-12 16:00 2024-01-12 16:00 2024-01-12 17:00 2024-01-12 17:00 2024-01-12 18:00 2024-01-12 18:00 2024-01-12 19:00 2024-01-12 19:00 2024-01-12 19:50 2024-01-12 19:50 2024-01-12 20:00 2024-01-12 20:00 2024-01-12 21:00 2024-01-12 21:00 2024-01-12 22:00 2024-01-12 22:00 2024-01-12 23:00 2024-01-12 23:00 2024-01-13 01:00 2024-01-13 01:00 2024-01-13 02:00 2024-01-13 02:00 2024-01-13 03:00 2024-01-13 03:00 2024-01-13 04:00 2024-01-13 04:00 2024-01-13 04:45 2024-01-13 04:45 2024-01-13 05:00 2024-01-13 05:00 2024-01-13 06:00 2024-01-13 06:00 2024-01-13 07:00 2024-01-13 07:00 2024-01-13 08:00 2024-01-13 08:00 2024-01-13 09:00 2024-01-13 09:00 2024-01-13 10:00 2024-01-13 10:00 2024-01-13 11:00 2024-01-13 11:00 2024-01-13 12:00 2024-01-13 12:00 2024-01-13 13:00 2024-01-13 13:00 2024-01-13 14:00 2024-01-13 14:00 2024-01-13 15:00 2024-01-13 15:00 2024-01-13 16:00 2024-01-13 16:00 2024-01-13 17:00 2024-01-13 17:00 2024-01-13 18:00 2024-01-13 18:00 2024-01-13 19:00 2024-01-13 19:00 2024-01-13 20:00 2024-01-13 20:00 2024-01-13 21:00 2024-01-13 21:00 2024-01-13 22:00 2024-01-13 22:00 2024-01-13 23:00 2024-01-13 23:00 2024-01-14 01:00 2024-01-14 01:00 2024-01-14 02:00 2024-01-14 02:00 2024-01-14 03:00 2024-01-14 03:00 2024-01-14 04:00 2024-01-14 04:00 2024-01-14 05:00 2024-01-14 05:00 2024-01-14 06:00 2024-01-14 06:00 2024-01-14 06:49 2024-01-14 06:49 2024-01-14 07:00 2024-01-14 07:00 2024-01-14 08:00 2024-01-14 08:00 2024-01-14 09:00 2024-01-14 09:00 2024-01-14 10:00 2024-01-14 10:00 2024-01-14 11:00 2024-01-14 11:00 2024-01-14 12:00 2024-01-14 12:00 2024-01-14 13:00 2024-01-14 13:00 2024-01-14 14:00 2024-01-14 14:00 2024-01-14 15:00 2024-01-14 15:00 2024-01-14 16:00 2024-01-14 16:00 2024-01-14 17:00 2024-01-14 17:00 2024-01-14 18:00 2024-01-14 18:00 2024-01-14 19:00 2024-01-14 19:00 2024-01-14 20:00 2024-01-14 20:00 2024-01-14 21:00 2024-01-14 21:00 2024-01-14 22:00 2024-01-14 22:00 2024-01-14 23:00 2024-01-14 23:00 2024-01-15 01:00 2024-01-15 01:00 2024-01-15 02:00 2024-01-15 02:00 2024-01-15 03:00 2024-01-15 03:00 2024-01-15 04:00 2024-01-15 04:00 2024-01-15 05:00 2024-01-15 05:00 2024-01-15 06:00 2024-01-15 06:00 2024-01-15 07:00 2024-01-15 07:00 2024-01-15 08:00 2024-01-15 08:00 2024-01-15 09:00 2024-01-15 09:00 2024-01-15 10:00 2024-01-15 10:00 2024-01-15 11:00 2024-01-15 11:00 2024-01-15 12:00 2024-01-15 12:00 2024-01-15 13:00 2024-01-15 13:00 2024-01-15 14:00 2024-01-15 14:00 2024-01-31 19:00 2024-01-31 19:00 2024-01-31 20:00 2024-01-31 20:00 2024-01-31 21:00 2024-01-31 21:00 2024-01-31 22:00 2024-01-31 22:00 2024-01-31 23:00 2024-01-31 23:00 2024-02-01 01:00 2024-02-01 01:00 2024-02-01 02:00 2024-02-01 02:00 2024-02-01 03:00 2024-02-01 03:00 2024-02-01 04:00 2024-02-01 04:00 2024-02-01 05:00 2024-02-01 05:00 2024-02-01 06:00 2024-02-01 06:00 2024-02-01 07:00 2024-02-01 07:00 2024-02-01 08:00 2024-02-01 08:00 2024-02-01 09:00 2024-02-01 09:00 2024-02-01 10:00 2024-02-01 10:00 2024-02-01 11:00 2024-02-01 11:00 2024-02-01 12:00 2024-02-01 12:00 2024-02-01 13:00 2024-02-01 13:00 2024-02-01 14:00 2024-02-01 14:00 2024-03-21 10:08 2024-03-21 10:08 |
Completed | TRANSMISSION | FORCED | ONPATH | PNM | BW230 IMPORT RESTRICTION DUE TO reliability | 2023-12-11 17:50 | PNM172768 | 2024-03-21 10:07 | |
PV EAST TRANSMISSION | 459875 | PNM | Orme - Rudd 230kV Line 1 | PALOVERDE500-WESTWING500(PNM) | 577.0 | 577.0 | 520.0 | 2024-01-30 16:00 | 2024-03-27 09:27 | Completed | TRANSMISSION | PLANNED | ONPATH | PNM | SRP# 175153: Palo Verde East transmission system reduction due to: Reconductor of line 1. | 2024-01-30 14:55 | PNM175157 | 2024-03-27 09:26 | |
BW230 CONVERTER OUTAGE | 461253 | PNM | Blackwater Converter | BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) |
200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 |
200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 |
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 |
2024-02-19 17:32 2024-02-19 17:32 2024-02-19 23:00 2024-02-19 23:00 2024-02-20 23:00 2024-02-20 23:00 2024-02-21 12:00 2024-02-21 12:00 2024-02-21 13:00 2024-02-21 13:00 2024-02-21 14:00 2024-02-21 14:00 2024-02-21 15:00 2024-02-21 15:00 2024-02-21 16:00 2024-02-21 16:00 2024-02-21 17:00 2024-02-21 17:00 2024-02-21 18:00 2024-02-21 18:00 2024-02-21 19:00 2024-02-21 19:00 2024-02-21 20:00 2024-02-21 20:00 2024-02-21 21:00 2024-02-21 21:00 2024-02-21 22:00 2024-02-21 22:00 2024-02-21 23:00 2024-02-21 23:00 2024-02-22 12:00 2024-02-22 12:00 2024-02-22 13:00 2024-02-22 13:00 2024-02-22 14:00 2024-02-22 14:00 2024-02-22 15:00 2024-02-22 15:00 2024-02-22 16:00 2024-02-22 16:00 2024-02-22 17:00 2024-02-22 17:00 2024-02-22 18:00 2024-02-22 18:00 2024-02-22 19:00 2024-02-22 19:00 2024-02-22 20:00 2024-02-22 20:00 2024-02-22 21:00 2024-02-22 21:00 2024-02-22 22:00 2024-02-22 22:00 2024-02-22 23:00 2024-02-22 23:00 2024-02-23 12:00 2024-02-23 12:00 2024-02-23 13:00 2024-02-23 13:00 2024-02-23 14:00 2024-02-23 14:00 2024-02-23 15:00 2024-02-23 15:00 2024-02-23 16:00 2024-02-23 16:00 2024-02-23 17:00 2024-02-23 17:00 2024-02-23 18:00 2024-02-23 18:00 2024-02-23 19:00 2024-02-23 19:00 2024-02-23 20:00 2024-02-23 20:00 2024-02-23 21:00 2024-02-23 21:00 2024-02-23 22:00 2024-02-23 22:00 2024-02-23 23:00 2024-02-23 23:00 2024-02-24 12:00 2024-02-24 12:00 2024-02-24 13:00 2024-02-24 13:00 2024-02-24 14:00 2024-02-24 14:00 2024-02-24 15:00 2024-02-24 15:00 2024-02-24 16:00 2024-02-24 16:00 2024-02-24 17:00 2024-02-24 17:00 2024-02-24 18:00 2024-02-24 18:00 2024-02-24 19:00 2024-02-24 19:00 2024-02-24 20:00 2024-02-24 20:00 2024-02-24 21:00 2024-02-24 21:00 2024-02-24 22:00 2024-02-24 22:00 2024-02-24 23:00 2024-02-24 23:00 2024-02-25 12:00 2024-02-25 12:00 2024-02-25 13:00 2024-02-25 13:00 2024-02-25 14:00 2024-02-25 14:00 2024-02-25 15:00 2024-02-25 15:00 2024-02-25 16:00 2024-02-25 16:00 2024-02-25 17:00 2024-02-25 17:00 2024-02-25 18:00 2024-02-25 18:00 2024-02-25 19:00 2024-02-25 19:00 2024-02-25 20:00 2024-02-25 20:00 2024-02-25 21:00 2024-02-25 21:00 2024-02-25 22:00 2024-02-25 22:00 2024-02-25 23:00 2024-02-25 23:00 2024-02-26 12:00 2024-02-26 12:00 2024-02-26 13:00 2024-02-26 13:00 2024-02-26 14:00 2024-02-26 14:00 2024-02-26 15:00 2024-02-26 15:00 2024-02-26 16:00 2024-02-26 16:00 2024-02-26 17:00 2024-02-26 17:00 2024-02-26 18:00 2024-02-26 18:00 2024-02-26 19:00 2024-02-26 19:00 2024-02-26 20:00 2024-02-26 20:00 2024-02-26 21:00 2024-02-26 21:00 2024-02-26 22:00 2024-02-26 22:00 2024-02-26 23:00 2024-02-26 23:00 2024-02-27 12:00 2024-02-27 12:00 2024-02-27 13:00 2024-02-27 13:00 2024-02-27 14:00 2024-02-27 14:00 2024-02-27 15:00 2024-02-27 15:00 2024-02-27 16:00 2024-02-27 16:00 2024-02-27 17:00 2024-02-27 17:00 2024-02-27 18:00 2024-02-27 18:00 2024-02-27 19:00 2024-02-27 19:00 2024-02-27 20:00 2024-02-27 20:00 2024-02-27 21:00 2024-02-27 21:00 2024-02-27 22:00 2024-02-27 22:00 2024-02-27 23:00 2024-02-27 23:00 2024-02-28 12:00 2024-02-28 12:00 2024-02-28 13:00 2024-02-28 13:00 2024-02-28 14:00 2024-02-28 14:00 2024-02-28 15:00 2024-02-28 15:00 2024-02-28 16:00 2024-02-28 16:00 2024-02-28 17:00 2024-02-28 17:00 2024-02-28 18:00 2024-02-28 18:00 2024-02-28 19:00 2024-02-28 19:00 2024-02-28 20:00 2024-02-28 20:00 2024-02-28 21:00 2024-02-28 21:00 2024-02-28 22:00 2024-02-28 22:00 2024-02-28 23:00 2024-02-28 23:00 2024-02-29 12:00 2024-02-29 12:00 2024-02-29 13:00 2024-02-29 13:00 2024-02-29 14:00 2024-02-29 14:00 2024-02-29 15:00 2024-02-29 15:00 2024-02-29 16:00 2024-02-29 16:00 2024-02-29 17:00 2024-02-29 17:00 2024-02-29 18:00 2024-02-29 18:00 2024-02-29 19:00 2024-02-29 19:00 2024-02-29 20:00 2024-02-29 20:00 2024-02-29 21:00 2024-02-29 21:00 2024-02-29 22:00 2024-02-29 22:00 2024-02-29 23:00 2024-02-29 23:00 2024-03-01 12:00 2024-03-01 12:00 |
2024-02-19 23:00 2024-02-19 23:00 2024-02-20 23:00 2024-02-20 23:00 2024-02-21 12:00 2024-02-21 12:00 2024-02-21 13:00 2024-02-21 13:00 2024-02-21 14:00 2024-02-21 14:00 2024-02-21 15:00 2024-02-21 15:00 2024-02-21 16:00 2024-02-21 16:00 2024-02-21 17:00 2024-02-21 17:00 2024-02-21 18:00 2024-02-21 18:00 2024-02-21 19:00 2024-02-21 19:00 2024-02-21 20:00 2024-02-21 20:00 2024-02-21 21:00 2024-02-21 21:00 2024-02-21 22:00 2024-02-21 22:00 2024-02-21 23:00 2024-02-21 23:00 2024-02-22 12:00 2024-02-22 12:00 2024-02-22 13:00 2024-02-22 13:00 2024-02-22 14:00 2024-02-22 14:00 2024-02-22 15:00 2024-02-22 15:00 2024-02-22 16:00 2024-02-22 16:00 2024-02-22 17:00 2024-02-22 17:00 2024-02-22 18:00 2024-02-22 18:00 2024-02-22 19:00 2024-02-22 19:00 2024-02-22 20:00 2024-02-22 20:00 2024-02-22 21:00 2024-02-22 21:00 2024-02-22 22:00 2024-02-22 22:00 2024-02-22 23:00 2024-02-22 23:00 2024-02-23 12:00 2024-02-23 12:00 2024-02-23 13:00 2024-02-23 13:00 2024-02-23 14:00 2024-02-23 14:00 2024-02-23 15:00 2024-02-23 15:00 2024-02-23 16:00 2024-02-23 16:00 2024-02-23 17:00 2024-02-23 17:00 2024-02-23 18:00 2024-02-23 18:00 2024-02-23 19:00 2024-02-23 19:00 2024-02-23 20:00 2024-02-23 20:00 2024-02-23 21:00 2024-02-23 21:00 2024-02-23 22:00 2024-02-23 22:00 2024-02-23 23:00 2024-02-23 23:00 2024-02-24 12:00 2024-02-24 12:00 2024-02-24 13:00 2024-02-24 13:00 2024-02-24 14:00 2024-02-24 14:00 2024-02-24 15:00 2024-02-24 15:00 2024-02-24 16:00 2024-02-24 16:00 2024-02-24 17:00 2024-02-24 17:00 2024-02-24 18:00 2024-02-24 18:00 2024-02-24 19:00 2024-02-24 19:00 2024-02-24 20:00 2024-02-24 20:00 2024-02-24 21:00 2024-02-24 21:00 2024-02-24 22:00 2024-02-24 22:00 2024-02-24 23:00 2024-02-24 23:00 2024-02-25 12:00 2024-02-25 12:00 2024-02-25 13:00 2024-02-25 13:00 2024-02-25 14:00 2024-02-25 14:00 2024-02-25 15:00 2024-02-25 15:00 2024-02-25 16:00 2024-02-25 16:00 2024-02-25 17:00 2024-02-25 17:00 2024-02-25 18:00 2024-02-25 18:00 2024-02-25 19:00 2024-02-25 19:00 2024-02-25 20:00 2024-02-25 20:00 2024-02-25 21:00 2024-02-25 21:00 2024-02-25 22:00 2024-02-25 22:00 2024-02-25 23:00 2024-02-25 23:00 2024-02-26 12:00 2024-02-26 12:00 2024-02-26 13:00 2024-02-26 13:00 2024-02-26 14:00 2024-02-26 14:00 2024-02-26 15:00 2024-02-26 15:00 2024-02-26 16:00 2024-02-26 16:00 2024-02-26 17:00 2024-02-26 17:00 2024-02-26 18:00 2024-02-26 18:00 2024-02-26 19:00 2024-02-26 19:00 2024-02-26 20:00 2024-02-26 20:00 2024-02-26 21:00 2024-02-26 21:00 2024-02-26 22:00 2024-02-26 22:00 2024-02-26 23:00 2024-02-26 23:00 2024-02-27 12:00 2024-02-27 12:00 2024-02-27 13:00 2024-02-27 13:00 2024-02-27 14:00 2024-02-27 14:00 2024-02-27 15:00 2024-02-27 15:00 2024-02-27 16:00 2024-02-27 16:00 2024-02-27 17:00 2024-02-27 17:00 2024-02-27 18:00 2024-02-27 18:00 2024-02-27 19:00 2024-02-27 19:00 2024-02-27 20:00 2024-02-27 20:00 2024-02-27 21:00 2024-02-27 21:00 2024-02-27 22:00 2024-02-27 22:00 2024-02-27 23:00 2024-02-27 23:00 2024-02-28 12:00 2024-02-28 12:00 2024-02-28 13:00 2024-02-28 13:00 2024-02-28 14:00 2024-02-28 14:00 2024-02-28 15:00 2024-02-28 15:00 2024-02-28 16:00 2024-02-28 16:00 2024-02-28 17:00 2024-02-28 17:00 2024-02-28 18:00 2024-02-28 18:00 2024-02-28 19:00 2024-02-28 19:00 2024-02-28 20:00 2024-02-28 20:00 2024-02-28 21:00 2024-02-28 21:00 2024-02-28 22:00 2024-02-28 22:00 2024-02-28 23:00 2024-02-28 23:00 2024-02-29 12:00 2024-02-29 12:00 2024-02-29 13:00 2024-02-29 13:00 2024-02-29 14:00 2024-02-29 14:00 2024-02-29 15:00 2024-02-29 15:00 2024-02-29 16:00 2024-02-29 16:00 2024-02-29 17:00 2024-02-29 17:00 2024-02-29 18:00 2024-02-29 18:00 2024-02-29 19:00 2024-02-29 19:00 2024-02-29 20:00 2024-02-29 20:00 2024-02-29 21:00 2024-02-29 21:00 2024-02-29 22:00 2024-02-29 22:00 2024-02-29 23:00 2024-02-29 23:00 2024-03-01 12:00 2024-03-01 12:00 2024-03-21 09:01 2024-03-21 09:01 |
Completed | DC CONVERTER | FORCED | ONPATH | PNM | Blackwater Converter Outage due to DC smoothing reactor on fire. | 2024-02-19 17:32 | PNM175754 | 2024-03-21 09:01 | |
NOMO PATH48 REDUCTION | 451931 | PNM | ARR-West Mesa 345kV line outage | FOURCORNER345-WM345(PNM) | 2018.0 | 2018.0 | 2018.0 | 2024-03-04 08:00 | 2024-03-19 15:04 | Completed | TRANSMISSION | PLANNED | ONPATH | PNM | NOMO Path48 NNMI Line Reduction due to (fill Facility Name)outage. Due to planned for relay upgrades and various other maintenance activities. | 2023-11-28 09:17 | PNM172118 | 2024-03-19 15:03 | |
BW230 IMP/EXP RESTRICTION | 464022 | PNM | BW345-BW230 | BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) |
200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 |
200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 |
50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 |
2024-03-21 08:50 2024-03-21 08:50 2024-03-21 09:00 2024-03-21 09:00 2024-03-21 10:00 2024-03-21 10:00 2024-03-21 11:00 2024-03-21 11:00 2024-03-21 12:00 2024-03-21 12:00 2024-03-21 13:00 2024-03-21 13:00 2024-03-21 14:00 2024-03-21 14:00 2024-03-21 15:00 2024-03-21 15:00 2024-03-21 16:00 2024-03-21 16:00 2024-03-21 17:00 2024-03-21 17:00 2024-03-21 18:00 2024-03-21 18:00 2024-03-21 19:00 2024-03-21 19:00 2024-03-21 20:00 2024-03-21 20:00 2024-03-21 21:00 2024-03-21 21:00 2024-03-21 22:00 2024-03-21 22:00 2024-03-21 23:00 2024-03-21 23:00 2024-03-22 01:00 2024-03-22 01:00 2024-03-22 02:00 2024-03-22 02:00 2024-03-22 03:00 2024-03-22 03:00 2024-03-22 04:00 2024-03-22 04:00 2024-03-22 05:00 2024-03-22 05:00 2024-03-22 06:00 2024-03-22 06:00 2024-03-22 07:00 2024-03-22 07:00 2024-03-22 08:00 2024-03-22 08:00 2024-03-22 09:00 2024-03-22 09:00 2024-03-22 10:00 2024-03-22 10:00 2024-03-22 11:00 2024-03-22 11:00 2024-03-22 12:00 2024-03-22 12:00 2024-03-22 13:00 2024-03-22 13:00 2024-03-22 14:00 2024-03-22 14:00 |
2024-03-21 09:00 2024-03-21 09:00 2024-03-21 10:00 2024-03-21 10:00 2024-03-21 11:00 2024-03-21 11:00 2024-03-21 12:00 2024-03-21 12:00 2024-03-21 13:00 2024-03-21 13:00 2024-03-21 14:00 2024-03-21 14:00 2024-03-21 15:00 2024-03-21 15:00 2024-03-21 16:00 2024-03-21 16:00 2024-03-21 17:00 2024-03-21 17:00 2024-03-21 18:00 2024-03-21 18:00 2024-03-21 19:00 2024-03-21 19:00 2024-03-21 20:00 2024-03-21 20:00 2024-03-21 21:00 2024-03-21 21:00 2024-03-21 22:00 2024-03-21 22:00 2024-03-21 23:00 2024-03-21 23:00 2024-03-22 01:00 2024-03-22 01:00 2024-03-22 02:00 2024-03-22 02:00 2024-03-22 03:00 2024-03-22 03:00 2024-03-22 04:00 2024-03-22 04:00 2024-03-22 05:00 2024-03-22 05:00 2024-03-22 06:00 2024-03-22 06:00 2024-03-22 07:00 2024-03-22 07:00 2024-03-22 08:00 2024-03-22 08:00 2024-03-22 09:00 2024-03-22 09:00 2024-03-22 10:00 2024-03-22 10:00 2024-03-22 11:00 2024-03-22 11:00 2024-03-22 12:00 2024-03-22 12:00 2024-03-22 13:00 2024-03-22 13:00 2024-03-22 14:00 2024-03-22 14:00 2024-10-31 23:59 2024-10-31 23:59 |
Active | TRANSMISSION | FORCED | ONPATH | PNM | BW230 IMPORT RESTRICTION DUE TO limited reactor capacity. Replacement parts on order | 2024-03-21 08:35 | PNM176763 | 2024-03-21 08:35 | |
EDDY230-AMRAD345 | 464044 | PNM | EDDY230-AMRAD345 | AMRAD345-EDDY230(PNM) EDDY230-AMRAD345(PNM) AMRAD345-EDDY230(PNM) EDDY230-AMRAD345(PNM) |
67.0 67.0 67.0 67.0 |
67.0 67.0 67.0 67.0 |
0.0 0.0 0.0 0.0 |
2024-03-21 10:10 2024-03-21 10:10 2024-03-26 16:00 2024-03-26 16:00 |
2024-03-26 16:00 2024-03-26 16:00 2024-04-01 13:00 2024-04-01 13:00 |
Completed | TRANSMISSION | FORCED | ONPATH | PNM | Eddy230-Amrd345 line reduction due to notification from EPE | 2024-03-21 10:04 | PNM176771 | 2024-04-01 12:59 | |
GUADALUPE345-CLINECRNR345 | 465304 | PNM | GUADALUPE345-CLINECRNR345 | BW345-TAIBAN(PNM) CLINECRNR345-GUADALUPE345(PNM) GUADALUPE345-CLINECRNR345(PNM) GUADALUPE345-TAIBAN(PNM) TAIBAN-BW345(PNM) TAIBAN-GUADALUPE345(PNM) BW345-TAIBAN(PNM) CLINECRNR345-GUADALUPE345(PNM) GUADALUPE345-CLINECRNR345(PNM) GUADALUPE345-TAIBAN(PNM) TAIBAN-BW345(PNM) TAIBAN-GUADALUPE345(PNM) |
572.0 210.0 932.0 204.0 202.0 772.0 572.0 210.0 932.0 204.0 202.0 772.0 |
572.0 210.0 932.0 204.0 202.0 772.0 572.0 210.0 932.0 204.0 202.0 772.0 |
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 |
2024-04-01 01:20 2024-04-01 01:20 2024-04-01 01:20 2024-04-01 01:20 2024-04-01 01:20 2024-04-01 01:20 2024-04-01 11:00 2024-04-01 11:00 2024-04-01 11:00 2024-04-01 11:00 2024-04-01 11:00 2024-04-01 11:00 |
2024-04-01 11:00 2024-04-01 11:00 2024-04-01 11:00 2024-04-01 11:00 2024-04-01 11:00 2024-04-01 11:00 2024-04-01 11:44 2024-04-01 11:44 2024-04-01 11:44 2024-04-01 11:44 2024-04-01 11:44 2024-04-01 11:44 |
Completed | TRANSMISSION | FORCED | ONPATH | PNM | GUADALUPE345-CLINECRNR345 OOS DUE TO line trip | 2024-04-01 01:19 | PNM177261 | 2024-04-01 11:45 | |
PV EAST TRANSMISSION | 464693 | PNM | Paloverde East Transmission System Reduction | PALOVERDE500-WESTWING500(PNM) | 577.0 | 577.0 | 496.0 | 2024-04-01 06:00 | 2024-04-04 12:30 | Completed | TRANSMISSION | PLANNED | ONPATH | PNM | SRP 177020 Palo Verde East transmission system reduction due to preventative maintenance | 2024-03-27 12:59 | PNM177025 | 2024-04-04 12:29 | |
CORONADO500-SPRINGER345 | 461879 | PNM | CORONADO500-SPRINGER345 | CORONADO500-SPRINGER345(PNM) SPRINGER345-CORONADO500(PNM) |
100.0 100.0 |
100.0 100.0 |
0.0 0.0 |
2024-04-01 08:00 2024-04-01 08:00 |
2024-04-01 12:00 2024-04-01 12:00 |
Completed | TRANSMISSION | PLANNED | ONPATH | PNM | CORONADO345-SPRINGER345 LINE REDUCTION DUE TO Coronado 9B Transformer | 2024-02-28 11:13 | PNM175985 | 2024-02-28 11:13 | |
GUADALUPE345-CLINECRNR345 | 465297 | PNM | GUADALUPE345-CLINECRNR345 | BW345-TAIBAN(PNM) CLINECRNR345-GUADALUPE345(PNM) GUADALUPE345-CLINECRNR345(PNM) GUADALUPE345-TAIBAN(PNM) TAIBAN-BW345(PNM) TAIBAN-GUADALUPE345(PNM) |
572.0 210.0 932.0 204.0 202.0 772.0 |
572.0 210.0 932.0 204.0 202.0 772.0 |
0.0 0.0 0.0 0.0 0.0 0.0 |
2024-04-01 11:00 2024-04-01 11:00 2024-04-01 11:00 2024-04-01 11:00 2024-04-01 11:00 2024-04-01 11:00 |
2024-04-01 12:00 2024-04-01 12:00 2024-04-01 12:00 2024-04-01 12:00 2024-04-01 12:00 2024-04-01 12:00 |
Cancelled | TRANSMISSION | FORCED | ONPATH | PNM | GUADALUPE345-CLINECRNR345 OOS DUE TO CP line trip | 2024-04-01 01:13 | PNM177260 | 2024-04-01 01:20 | |
BW230 IMP/EXP RESTRICTION | 465725 | PNM | BW345-BW230 | BW230-BW345(PNM) BW345-BW230(PNM) |
200.0 200.0 |
200.0 200.0 |
0.0 0.0 |
2024-04-03 12:25 2024-04-03 12:25 |
2024-04-03 15:00 2024-04-03 15:00 |
Completed | TRANSMISSION | FORCED | ONPATH | PNM | BW230 IMPORT RESTRICTION DUE TO: Reason Unknown at this time. | 2024-04-03 12:21 | PNM177402 | 2024-04-03 12:23 | |
CORONADO500-SPRINGER345 | 461882 | PNM | CORONADO500-SPRINGER345 | CORONADO500-SPRINGER345(PNM) SPRINGER345-CORONADO500(PNM) |
100.0 100.0 |
100.0 100.0 |
0.0 0.0 |
2024-04-04 13:00 2024-04-04 13:00 |
2024-04-04 17:00 2024-04-04 17:00 |
Cancelled | TRANSMISSION | PLANNED | ONPATH | PNM | CORONADO345-SPRINGER345 LINE REDUCTION DUE TO Coronado 9B Transformer | 2024-02-28 11:17 | PNM175986 | 2024-03-08 10:40 | |
NOMO PATH48 REDUCTION | 461887 | PNM | West Mesa-Ambrosia (WA) 230 kV line OOS | FOURCORNER345-WM345(PNM) | 2018.0 | 2018.0 | 1958.0 | 2024-04-08 06:00 | 2024-05-07 18:00 | Active | TRANSMISSION | FORCED | ONPATH | PNM | NOMO Path48 NNMI Line Reduction due to West Mesa-Ambrosia (WA) 230 kV line OOS - relay replacement. | 2024-02-28 13:25 | PNM175988 | 2024-02-28 13:34 | |
PV EAST TRANSMISSION | 466211 | PNM | Paloverde East Transmission System Reduction | PALOVERDE500-WESTWING500(PNM) | 577.0 | 577.0 | 531.0 | 2024-04-08 07:30 | 2024-04-12 10:40 | Completed | TRANSMISSION | FORCED | ONPATH | PNM | SRP 177460 Kyrene500-Kyrene230 line reduction due to Kyrene 500/230kV Trans #7 | 2024-04-08 07:17 | PNM177574 | 2024-04-12 10:39 | |
PV EAST TRANSMISSION | 466216 | PNM | Paloverde East Transmission System Reduction | JOJOBA500-KYRENE500(PNM) PALOVERDE500-WESTWING500(PNM) |
577.0 577.0 |
577.0 577.0 |
531.0 531.0 |
2024-04-08 07:30 2024-04-08 07:30 |
2024-04-12 10:40 2024-04-12 10:40 |
Completed | TRANSMISSION | PLANNED | ONPATH | PNM | SRP 177460 Kyrene 500/230kV Transformer #7 | 2024-04-08 07:33 | PNM177577 | 2024-04-12 10:39 | |
KYRENE500 -KYRENE230KV | 466209 | PNM | Kyrene500-Kyrene230 | KYRENE500-KYRENE230(PNM) KYRENE500-KYRENE230(PNM) |
184.0 184.0 |
184.0 184.0 |
92.0 92.0 |
2024-04-08 08:00 2024-04-08 09:00 |
2024-04-08 09:00 2024-04-12 17:00 |
Completed | TRANSMISSION | FORCED | ONPATH | PNM | SRP 177460 Kyrene500-Kyrene230 line reduction due to Kyrene 500/230kV Trans #7 | 2024-04-08 07:15 | PNM177573 | 2024-04-08 07:18 | |
BW230 IMP/EXP RESTRICTION | 467131 | PNM | BW345-BW230 | BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) BW230-BW345(PNM) BW345-BW230(PNM) |
200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 |
200.0 200.0 200.0 200.0 200.0 200.0 200.0 200.0 |
0.0 50.0 0.0 50.0 0.0 50.0 0.0 50.0 |
2024-04-14 16:40 2024-04-14 16:40 2024-04-14 23:59 2024-04-14 23:59 2024-04-15 06:00 2024-04-15 06:00 2024-04-15 19:00 2024-04-15 19:00 |
2024-04-14 23:59 2024-04-14 23:59 2024-04-15 06:00 2024-04-15 06:00 2024-04-15 19:00 2024-04-15 19:00 2024-04-15 23:24 2024-04-15 23:24 |
Terminated | TRANSMISSION | FORCED | ONPATH | PNM | BW230 IMPORT RESTRICTION DUE TO Reliability | 2024-04-14 16:37 | PNM177882 | 2024-04-15 23:24 | |
BW230 IMP/EXP RESTRICTION | 467236 | PNM | BW345-BW230 | BW230-BW345(PNM) BW230-BW345(PNM) |
200.0 200.0 |
200.0 200.0 |
0.0 0.0 |
2024-04-16 01:35 2024-04-16 17:00 |
2024-04-16 17:00 2024-04-17 07:00 |
Completed | TRANSMISSION | FORCED | ONPATH | PNM | BW230 IMPORT RESTRICTION DUE TO Reliability | 2024-04-16 01:32 | PNM177921 | 2024-04-16 16:28 | |
PV EAST TRANSMISSION | 467305 | PNM | Rudd 500/230kV Transformer 1A/1B | PALOVERDE500-WESTWING500(PNM) | 577.0 | 577.0 | 441.0 | 2024-04-17 06:00 | 2024-04-17 17:00 | Completed | TRANSMISSION | PLANNED | ONPATH | PNM | SRP 177393: Palo Verde East transmission system reduction due to: Repair hot spot on 916 disconnect. | 2024-04-16 14:03 | PNM177936 | 2024-04-16 14:03 | |
BW230 IMP/EXP RESTRICTION | 467374 | PNM | BW345-BW230 | BW230-BW345(PNM) | 200.0 | 200.0 | 0.0 | 2024-04-17 17:00 | 2024-04-18 07:00 | Active | TRANSMISSION | FORCED | ONPATH | PNM | BW230 IMPORT RESTRICTION DUE TO Reliability | 2024-04-17 16:58 | PNM177967 | 2024-04-17 16:59 | |
NOMO PATH48 REDUCTION | 461885 | PNM | West Mesa 200 MVA 230/115kV T2 | FOURCORNER345-WM345(PNM) | 2018.0 | 2018.0 | 2018.0 | 2024-05-08 08:00 | 2024-05-21 16:00 | Scheduled | TRANSMISSION | FORCED | ONPATH | PNM | NOMO Path48 NNMI Line Reduction due to: West Mesa 200 MVA 230/115kV T2 Transformer Relay Upgrade. | 2024-02-28 13:15 | PNM175987 | 2024-02-28 13:15 | |
NOMO PATH48 REDUCTION | 461962 | PNM | BI Line (Bisti - Ambrosia) | FOURCORNER345-WM345(PNM) | 2018.0 | 2018.0 | 2018.0 | 2024-05-08 08:00 | 2024-05-24 16:00 | Cancelled | TRANSMISSION | PLANNED | ONPATH | PNM | NNM Import Restrictions due to the BI 230kV line OOS - Relay Upgrade (Bisti and Ambrosia). NNMI reduced by 10 percent | 2024-02-29 09:55 | PNM176016 | 2024-02-29 10:41 | |
NOMO PATH48 REDUCTION | 461964 | PNM | BI Line (Bisti - Ambrosia) | FOURCORNER345-WM345(PNM) | 2018.0 | 2018.0 | 2018.0 | 2024-05-08 08:00 | 2024-05-24 16:00 | Scheduled | TRANSMISSION | PLANNED | ONPATH | PNM | NNM Import Restrictions due to the BI 230kV line OOS - Relay Upgrade (Bisti and Ambrosia). NNMI reduced by 10 percent | 2024-02-29 10:37 | PNM176017 | 2024-02-29 10:37 | |
PPW Outages: | |||||||||||||||||||
PPW 171983 | 10361 | PPW | Riverton: 230 kV Cap Bank S/C 472 | 0.0 | 0.0 | 0.0 | 2021-02-18 09:03 | 2024-06-03 17:00 | ACTIVE | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Riverton: 230 kV Cap Bank S/C 472: | 2022-11-14 00:32 | 75797 | 2024-01-02 07:37 | ||
PPW 175805 | 9275 | PPW | Hemingway-Summer Lake 500 kV line (Path 75 Schedule Limitation) | H500-SMLK(PPW) H500-SMLK(PPW) H500-SMLK(PPW) |
1500.0 1500.0 1500.0 |
1500.0 1500.0 1500.0 |
1386.0 1386.0 1386.0 |
2021-06-02 12:00 2022-10-04 04:21 2023-12-01 23:59 |
2022-10-04 04:21 2023-12-01 23:59 2024-12-04 12:00 |
ACTIVE | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Hemingway-Summer Lake 500 kV line (Path 75 Schedule Limitation):Path Restriction Notes: Path 75 Westbound = 1386.: | 2021-12-21 14:06 | 80760 | 2023-11-27 09:28 | |
PPW 23-17390 | 13038 | PPW | Sigurd: 345/230 kV Bank #6 | OTHERGEN-PACE(PPW) OTHERGEN-PACE(PPW) |
9999.0 9999.0 |
9999.0 9999.0 |
9999.0 0.0 |
2023-09-21 15:33 2023-09-21 16:52 |
2023-09-21 16:52 2024-07-01 19:33 |
ACTIVE | TRANSMISSION | URGENT | ONPATH | PPW | continuous: Commissioning required transformer is being replaced Updated 11/02/2023 Take #6 XFMR out of service and replace. Based on oil sample :Possible real-time restrictions to Sigurd Solar.: | 2023-09-21 15:06 | 131763 | 2023-12-07 14:01 | |
PPW 23-19875 | 13744 | PPW | Scheduling Limitation: Path 19 (Bridger West) Scheduling Limitation | JBSN-JB345(PPW) JBSN-JB345(PPW) |
1600.0 1600.0 |
1600.0 1600.0 |
1600.0 1433.0 |
2023-10-27 05:23 2023-10-27 12:13 |
2023-10-27 12:13 2024-06-19 17:00 |
ACTIVE | TRANSMISSION | FORCED | ONPATH | PPW | continuous:Return series caps to normal.:Bridger West 2150 PAC 1433 IPCO 717: | 2023-10-27 12:22 | 134271 | 2024-02-15 19:32 | |
PPW 23-19877 | 14565 | PPW | Populus: 345 kV Series Capacitor #1 (C2) | JBSN-JB345(PPW) JBSN-JB345(PPW) JBSN-JB345(PPW) |
1600.0 1600.0 1600.0 |
1600.0 1600.0 1600.0 |
1600.0 1433.0 1433.0 |
2023-10-27 05:26 2023-10-27 05:26 2024-03-25 17:00 |
2023-10-27 05:26 2024-03-25 17:00 2024-12-31 17:00 |
ACTIVE | TRANSMISSION | FORCED | ONPATH | PPW | continuous:Segment two controller not working properly:JBSN-JB345 = 2150. PacifiCorp = 1433. IPCo = 717.: | 2023-12-04 13:10 | 134273 | 2024-03-24 16:52 | |
PPW 23-19878 | 15670 | PPW | Populus: 345 kV Series Capacitor #2 (C2) | JBSN-JB345(PPW) JBSN-JB345(PPW) JBSN-JB345(PPW) |
1600.0 1600.0 1600.0 |
1600.0 1600.0 1600.0 |
1600.0 1427.0 1427.0 |
2023-10-27 05:29 2023-10-27 05:29 2024-03-25 17:00 |
2023-10-27 05:29 2024-03-25 17:00 2024-12-31 17:00 |
ACTIVE | TRANSMISSION | FORCED | ONPATH | PPW | continuous:Segment two controller not working properly:JBSN-JB345 = 2150. PacifiCorp = 1433. IPCo = 717.: | 2024-02-12 09:57 | 134274 | 2024-03-24 16:52 | |
PPW 23-21675 | 14822 | PPW | Threemile Knoll: THREEMLE 360A 345KV CAP DIS,Threemile Knoll: Series Cap C1,Threemile Knoll: Series | JBSN-JB345(PPW) NUT-PATHC(PPW) PATHC-NUT(PPW) NUT-PATHC(PPW) |
1600.0 1172.0 1600.0 1060.0 |
1600.0 1172.0 1600.0 1060.0 |
1433.0 730.0 1480.0 618.0 |
2023-11-24 02:21 2023-11-24 02:21 2023-11-24 02:21 2024-04-01 00:00 |
2024-05-01 16:00 2024-04-01 00:00 2024-05-01 16:00 2024-05-01 16:00 |
ACTIVE | TRANSMISSION | FORCED | ONPATH | PPW | continuous:repair switch 360A:JBSN-JB345 = 2150. PacifiCorp = 1433. IPCo = 717 NUT-PATHC = 730 Summer/730 Winter. PATHC-NUT = 1480 Summer/1560 Winter.: | 2023-12-14 12:21 | 136090 | 2024-04-02 12:33 | |
PPW 23-20576 | 13993 | PPW | Dave Johnston: TIE CB 1H216,Dave Johnston: LINE CB 1H218 | WYOEAST-AEOW(PPW) | 1800.0 | 1800.0 | 1800.0 | 2023-12-13 08:35 | 2024-07-18 14:00 | ACTIVE | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Rebuild the Amasa Bay to a higher amperage:No de-rate to AW/4B with Amasa-Windstar 230 kV termporary line in service.: | 2023-11-06 14:38 | 134976 | 2024-03-13 13:09 | |
PPW 24-00097 | 14597 | PPW | Jim Bridger: 345/20 kV Unit #1 Main Bank (T3485) | JBSN-JB345(PPW) JBSN-JB345(PPW) |
1600.0 1600.0 |
1600.0 1600.0 |
1600.0 1400.0 |
2023-12-31 06:13 2023-12-31 06:45 |
2023-12-31 06:45 2024-04-30 00:00 |
ACTIVE | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Natural Gas Conversion:JBSN-JB345 = 2100. PacifiCorp = 1400. IPCo = 700.: | 2023-12-06 13:32 | 136892 | 2023-12-31 14:46 | |
PPW 24-00488 | 15058 | PPW | Burns: Series Cap Segment #1 & 2 | BORA-M500(PPW) SMLK-H500(PPW) BORA-M500(PPW) SMLK-H500(PPW) BORA-M500(PPW) SMLK-H500(PPW) |
1090.0 100.0 1090.0 100.0 1090.0 100.0 |
1090.0 100.0 1090.0 100.0 1090.0 100.0 |
1090.0 100.0 959.0 96.0 959.0 96.0 |
2024-01-09 03:48 2024-01-09 03:48 2024-01-09 03:48 2024-01-09 03:48 2024-03-29 16:00 2024-03-29 16:00 |
2024-01-09 03:48 2024-01-09 03:48 2024-03-29 16:00 2024-03-29 16:00 2024-04-30 16:00 2024-04-30 16:00 |
ACTIVE | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Investigating a possible failure of relay voltage sensing component.:Path 75 limited to 507 (Midpoint Series Caps bypassed for maint). SMLK-H500 = 96; BORA-M500 = 959;: | 2024-01-03 10:34 | 138306 | 2024-03-28 10:09 | |
PPW 24-00351 | 15028 | PPW | Iron Gate: T-3135 | OTHERGEN-PACW(PPW) OTHERGEN-PACW(PPW) |
9999.0 9999.0 |
9999.0 9999.0 |
9999.0 0.0 |
2024-01-09 08:00 2024-01-09 08:54 |
2024-01-09 08:54 2024-12-31 15:30 |
ACTIVE | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Plant decommissioning: | 2023-12-29 12:31 | 138153 | 2024-01-09 08:54 | |
PPW 24-00908 | 15202 | PPW | Sigurd: 345/230 kV Bank #6 | OTHERGEN-PACE(PPW) OTHERGEN-PACE(PPW) |
9999.0 9999.0 |
9999.0 9999.0 |
9999.0 0.0 |
2024-01-09 09:15 2024-01-09 12:30 |
2024-01-09 12:30 2024-07-01 19:33 |
ACTIVE | TRANSMISSION | URGENT | ONPATH | PPW | continuous: Commissioning required transformer is being replaced Updated 11/02/2023 Take #6 XFMR out of service and replace. Based on oil sample :Possible real-time restrictions to Sigurd Solar.: | 2024-01-09 09:18 | 138727 | 2024-01-09 12:34 | |
PPW 24-00950 | 15630 | PPW | COPCO #2-Iron Gate 69 kV line | OTHERGEN-PACW(PPW) OTHERGEN-PACW(PPW) OTHERGEN-PACW(PPW) |
9999.0 9999.0 9999.0 |
9999.0 9999.0 9999.0 |
9999.0 0.0 0.0 |
2024-01-15 01:43 2024-01-15 01:43 2024-01-15 17:00 |
2024-01-15 01:43 2024-01-15 17:00 2024-12-31 17:00 |
ACTIVE | TRANSMISSION | URGENT | ONPATH | PPW | continuous:Wreck out Line-62 | 2024-02-09 12:14 | 138769 | 2024-02-09 12:14 | |
PPW 24-00123 | 15065 | PPW | Lake Park: XFMR 2,Lake Park-Terminal 138kV line | PACE-WESTVALLEY(PPW) WESTVALLEY-PACE(PPW) PACE-WESTVALLEY(PPW) WESTVALLEY-PACE(PPW) |
210.0 210.0 210.0 210.0 |
210.0 210.0 210.0 210.0 |
210.0 210.0 210.0 210.0 |
2024-01-31 14:00 2024-01-31 14:00 2024-02-23 01:48 2024-02-23 01:48 |
2024-02-23 01:48 2024-02-23 01:48 2024-04-16 11:20 2024-04-16 11:20 |
COMPLETED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:**Commissioning required** | 2024-01-04 09:56 | 137341 | 2024-04-16 11:22 | |
PPW 24-05215 | 16611 | PPW | PG&E Cascade: CB 122 | CRAG-CRAGVIEW(PPW) CRAGVIEW-CRAG(PPW) PACW-CRAGVIEW(PPW) CRAG-CRAGVIEW(PPW) CRAGVIEW-CRAG(PPW) PACW-CRAGVIEW(PPW) PACW-CRAGVIEW(PPW) |
45.0 80.0 150.0 45.0 80.0 150.0 115.0 |
45.0 80.0 150.0 45.0 80.0 150.0 115.0 |
45.0 80.0 150.0 0.0 0.0 0.0 0.0 |
2024-03-24 09:00 2024-03-24 09:00 2024-03-24 09:00 2024-03-24 09:32 2024-03-24 09:32 2024-03-24 09:32 2024-04-01 00:00 |
2024-03-24 09:32 2024-03-24 09:32 2024-03-24 09:32 2024-04-30 15:00 2024-04-30 15:00 2024-04-01 00:00 2024-04-30 15:00 |
ACTIVE | TRANSMISSION | URGENT | ONPATH | PPW | continuous:Path 25 open ended for voltage stability for a PG&E Cottonwood Bank outage. Scheduling Limitation to 0MW bi-directionally. | 2024-03-31 18:03 | 143040 | 2024-04-04 15:12 | |
PPW 24-04204 | 16150 | PPW | Castella-Nutglade Tap section of the Castella-Crag View-Mount Shasta 69 kV line | CRAGVIEW-DOGCREEK(PPW) HYDROGEN-PACW(PPW) PACW-NTLOAD(PPW) CRAGVIEW-DOGCREEK(PPW) HYDROGEN-PACW(PPW) PACW-NTLOAD(PPW) CRAGVIEW-DOGCREEK(PPW) HYDROGEN-PACW(PPW) PACW-NTLOAD(PPW) |
18.0 9999.0 9999.0 18.0 9999.0 9999.0 18.0 9999.0 9999.0 |
18.0 9999.0 9999.0 18.0 9999.0 9999.0 18.0 9999.0 9999.0 |
18.0 9999.0 9999.0 0.0 0.0 0.0 0.0 0.0 0.0 |
2024-04-01 00:09 2024-04-01 00:09 2024-04-01 00:09 2024-04-01 00:09 2024-04-01 00:09 2024-04-01 00:09 2024-04-15 18:00 2024-04-15 18:00 2024-04-15 18:00 |
2024-04-01 00:09 2024-04-01 00:09 2024-04-01 00:09 2024-04-15 18:00 2024-04-15 18:00 2024-04-15 18:00 2024-04-26 18:00 2024-04-26 18:00 2024-04-26 18:00 |
ACTIVE | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Replace Transmision under build poles for continued fire mitigation work. this will be between Nutglade sub, and castella sub.:CRAGVIEW-DOGCREEK = 0 | 2024-03-07 08:48 | 142028 | 2024-04-02 11:27 | |
PPW 24-06062 | 16750 | PPW | Path 25 Schedule Limitation (Cascade 115 kV Tie) | CRAGVIEW-PACW(PPW) CRAGVIEW-PACW(PPW) |
108.0 108.0 |
108.0 108.0 |
108.0 0.0 |
2024-04-09 00:00 2024-04-09 02:35 |
2024-04-09 02:35 2025-04-09 00:00 |
ACTIVE | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:CRAGVIEW-PACW TTC = 0 PER PLANNING.:CRAGVIEW-PACW = 0 INDEFINITELY: | 2024-04-09 09:34 | 143888 | 2024-04-09 09:35 | |
PPW 24-02583 | 15606 | PPW | Path 25 Schedule Limitation (Cascade 115 kV Tie) | CRAG-CRAGVIEW(PPW) CRAG-CRAGVIEW(PPW) CRAGVIEW-CRAG(PPW) |
45.0 45.0 80.0 |
45.0 45.0 80.0 |
45.0 0.0 80.0 |
2024-04-11 06:00 2024-04-12 06:00 2024-04-12 06:00 |
2024-04-12 06:00 2024-05-08 18:00 2024-05-08 18:00 |
Active | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Keswick-Trinity 60kV Line (HFRA) (French Gulch-Trinity SECT) Cleared | 2024-02-08 10:05 | 140404 | 2024-03-28 09:59 | |
PPW 24-04320 | 16184 | PPW | Grant Street: CB 4M266 | 0.0 | 0.0 | 0.0 | 2024-04-14 07:30 | 2024-04-14 16:00 | Completed | DISTRIBUTION | PLANNED | ONPATH | PPW | 1234567 Daily:Brett Lulay will be replacing X-Arms on Pole#346403 2550 NW Monroe, Corvallis: | 2024-03-07 12:34 | 142144 | 2024-03-07 12:35 | ||
PPW 24-03013 | 15751 | PPW | Path 25 Schedule Limitation (Cascade 115 kV Tie) | CRAG-CRAGVIEW(PPW) CRAGVIEW-CRAG(PPW) |
45.0 80.0 |
45.0 80.0 |
45.0 80.0 |
2024-04-15 06:00 2024-04-15 06:00 |
2024-04-18 18:00 2024-04-18 18:00 |
CANCELLED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Volta-Deschutes 60kV Line (HFRA) (Deschutes SECT) AND Kilarc-Volta 60kV Tie Line Cleared | 2024-02-15 09:46 | 140835 | 2024-03-21 14:19 | |
PPW 24-05085 | 16428 | PPW | Path 25 Schedule Limitation (Cascade 115 kV Tie) | CRAG-CRAGVIEW(PPW) CRAGVIEW-CRAG(PPW) |
45.0 80.0 |
45.0 80.0 |
45.0 80.0 |
2024-04-15 06:00 2024-04-15 06:00 |
2024-04-19 18:00 2024-04-19 18:00 |
CANCELLED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:T-Line to replace poles 016/354, 016/355, 017/382, 018/393, 018/404, 018/409, 019/421, 019/429, 019/432, | 2024-03-21 14:12 | 142910 | 2024-03-21 14:15 | |
PPW 24-06088 | 16759 | PPW | Nutglade: CB 8G95 | 0.0 | 0.0 | 0.0 | 2024-04-15 07:00 | 2024-04-15 17:00 | CANCELLED | DISTRIBUTION | PLANNED | ONPATH | PPW | 1234567 Daily:EDGAR RICO/ WILSON 630-688-5238 Hendricks Spacer Cable installation at various locations | 2024-04-09 13:05 | 143914 | 2024-04-15 13:40 | ||
PPW 24-06061 | 16751 | PPW | Umatilla: RC_5W682_171403_5W658 | 0.0 | 0.0 | 0.0 | 2024-04-15 07:30 | 2024-04-15 17:30 | CANCELLED | DISTRIBUTION | URGENT | ONPATH | PPW | 1234567 Daily:WIRE PULLING JOB. UEC TO MCNARY ROCKPILE JOB.: | 2024-04-09 09:54 | 143887 | 2024-04-15 06:36 | ||
PPW 24-05960 | 16722 | PPW | Campbell: FR-5814 on a portion of 5R312 on pole 056360 | 0.0 | 0.0 | 0.0 | 2024-04-15 07:30 | 2024-04-17 15:00 | CANCELLED | DISTRIBUTION | URGENT | ONPATH | PPW | weekly:HOLD FOR MARCUS WYATT 541 591 0799: | 2024-04-08 06:17 | 143786 | 2024-04-08 06:17 | ||
PPW 24-05965 | 16727 | PPW | Campbell: FR-5814 on a portion of 5R312 on pole 056360 | 0.0 | 0.0 | 0.0 | 2024-04-15 07:30 | 2024-04-15 15:00 | CANCELLED | DISTRIBUTION | URGENT | ONPATH | PPW | 1234567 Daily:HOLD FOR MARCUS WYATT 541 591 0799: | 2024-04-08 06:18 | 143791 | 2024-04-15 08:47 | ||
PPW 24-04321 | 16185 | PPW | Grant Street: CB 4M266 | 0.0 | 0.0 | 0.0 | 2024-04-15 07:30 | 2024-04-15 16:00 | CANCELLED | DISTRIBUTION | PLANNED | ONPATH | PPW | 1234567 Daily:Brett Lulay will be replacing X-Arms on Pole#346403 2550 NW Monroe, Corvallis: | 2024-03-07 12:34 | 142145 | 2024-04-15 16:05 | ||
PPW 24-03421 | 15894 | PPW | Path 25 Schedule Limitation (Cascade 115 kV Tie) | CRAG-CRAGVIEW(PPW) CRAGVIEW-CRAG(PPW) |
45.0 80.0 |
45.0 80.0 |
5.0 80.0 |
2024-04-15 08:00 2024-04-15 08:00 |
2024-04-19 15:00 2024-04-19 15:00 |
Active | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:T-Line to replace poles 016/354, 016/355, 017/382, 018/393, 018/404, 018/409, 019/421, 019/429, 019/432, | 2024-02-22 13:26 | 141243 | 2024-03-21 14:17 | |
PPW 24-05076 | 16455 | PPW | Clearwater 2: GSU T-3026, 7, 8 | HYDROGEN-PACW(PPW) HYDROGEN-PACW(PPW) |
9999.0 9999.0 |
9999.0 9999.0 |
9999.0 9999.0 |
2024-04-15 08:00 2024-05-07 08:00 |
2024-04-19 15:30 2024-05-10 15:30 |
CANCELLED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Clearwater 2 GSU Transformer Maintenance:Clearwater Unit 2 unavailable.: | 2024-03-22 12:38 | 142901 | 2024-04-01 11:06 | |
PPW 24-05624 | 16637 | PPW | Voelker: CB 5Y631 | 0.0 | 0.0 | 0.0 | 2024-04-15 08:05 | 2024-04-15 17:27 | COMPLETED | DISTRIBUTION | URGENT | ONPATH | PPW | 1234567 Daily:Interset Poles and move wire : | 2024-04-02 15:23 | 143449 | 2024-04-15 17:30 | ||
PPW 24-04916 | 16370 | PPW | Big Muddy-Platte Line Jct section of Dave Johnston-Platte line Jct 69kV line | 0.0 | 0.0 | 0.0 | 2024-04-15 08:06 | 2024-04-15 14:45 | COMPLETED | TRANSMISSION | PLANNED | ONPATH | PPW | 1234567 Daily:retro fitting existing poles to meet avian specifications. : | 2024-03-19 12:59 | 142741 | 2024-04-15 14:50 | ||
PPW 24-02119 | 15494 | PPW | BPA Jones Canyon: Cap Group 1/Section 1 | WINDGEN-PACW(PPW) WINDGEN-PACW(PPW) WINDGEN-PACW(PPW) |
9999.0 9999.0 9999.0 |
9999.0 9999.0 9999.0 |
9999.0 0.0 0.0 |
2024-04-15 07:00 2024-04-15 08:07 2024-04-17 16:00 |
2024-04-15 08:07 2024-04-17 16:00 2024-04-18 16:00 |
ACTIVE | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Maintenance:Possible restriction to Leaning Juniper Wind.: | 2024-02-01 08:23 | 139938 | 2024-04-17 17:52 | |
PPW 24-05605 | 16626 | PPW | Casper-Riverton 230 kV line | TOT4B-WYONORTH(PPW) WAPAEAST-WAPANORTH(PPW) WYOEAST-AEOW(PPW) TOT4B-WYONORTH(PPW) WAPAEAST-WAPANORTH(PPW) WYOEAST-AEOW(PPW) |
631.0 249.0 1800.0 631.0 249.0 1800.0 |
631.0 249.0 1800.0 631.0 249.0 1800.0 |
540.0 198.0 1675.0 540.0 198.0 1675.0 |
2024-04-15 08:08 2024-04-15 08:08 2024-04-15 08:08 2024-04-15 08:31 2024-04-15 08:31 2024-04-15 08:31 |
2024-04-15 08:31 2024-04-15 08:31 2024-04-15 08:31 2024-04-26 12:31 2024-04-26 12:31 2024-04-26 12:31 |
ACTIVE | TRANSMISSION | URGENT | ONPATH | PPW | continuous:Replace 4 strs and 6 arms with other "A" conditions:AW/4B Curve 118. WAPAEAST-WAPANORTH = 198. WYOEAST-AEOW (Aeolus West) = 1675. TOT4B-WYONORTH = 540. TOT 4B = 738. | 2024-04-01 11:39 | 143430 | 2024-04-15 08:11 | |
PPW 24-05613 | 16624 | PPW | Raven-Rock Springs 230 kV line | TRONA-WYOCENTRAL(PPW) WYOCENTRAL-TRONA(PPW) |
640.0 640.0 |
640.0 640.0 |
404.0 404.0 |
2024-04-15 09:16 2024-04-15 09:16 |
2024-04-17 14:07 2024-04-17 14:07 |
COMPLETED | TRANSMISSION | URGENT | ONPATH | PPW | continuous:Replace str and arms on 230 on Rock Springs to Raven:TRONA-WYOCENTRAL & WYOCENTRAL-TRONA = 404 Summer/560 Winter.: | 2024-04-01 11:26 | 143438 | 2024-04-17 14:10 | |
PPW 24-00416 | 15050 | PPW | Huntington-Pinto 345 kV line | PACE-PINTO(PPW) PINTO-PACE(PPW) PACE-PINTO(PPW) PINTO-PACE(PPW) PACE-PINTO(PPW) PINTO-PACE(PPW) PACE-PINTO(PPW) PINTO-PACE(PPW) PACE-PINTO(PPW) PINTO-PACE(PPW) PACE-PINTO(PPW) PINTO-PACE(PPW) PACE-PINTO(PPW) PINTO-PACE(PPW) PACE-PINTO(PPW) PINTO-PACE(PPW) PACE-PINTO(PPW) PINTO-PACE(PPW) FOURCORNE345-PINTO(PPW) PACE-PINTO(PPW) PINTO-PACE(PPW) |
740.0 700.0 740.0 700.0 740.0 700.0 740.0 700.0 740.0 700.0 740.0 700.0 740.0 700.0 740.0 700.0 740.0 700.0 660.0 740.0 700.0 |
740.0 700.0 740.0 700.0 740.0 700.0 740.0 700.0 740.0 700.0 740.0 700.0 740.0 700.0 740.0 700.0 740.0 700.0 660.0 740.0 700.0 |
740.0 700.0 740.0 700.0 740.0 700.0 740.0 700.0 740.0 700.0 740.0 700.0 740.0 700.0 740.0 700.0 740.0 700.0 660.0 0.0 0.0 |
2024-01-16 08:00 2024-01-16 08:00 2024-01-17 08:00 2024-01-17 08:00 2024-02-13 08:00 2024-02-13 08:00 2024-02-19 08:00 2024-02-19 08:00 2024-03-01 08:00 2024-03-01 08:00 2024-03-13 08:00 2024-03-13 08:00 2024-04-15 08:00 2024-04-15 08:00 2024-04-15 09:00 2024-04-15 09:00 2024-04-15 09:37 2024-04-15 09:37 2024-04-15 10:00 2024-04-15 10:00 2024-04-15 10:00 |
2024-01-17 08:00 2024-01-17 08:00 2024-01-20 15:00 2024-01-20 15:00 2024-02-15 15:00 2024-02-15 15:00 2024-02-21 15:00 2024-02-21 15:00 2024-03-03 15:00 2024-03-03 15:00 2024-03-15 15:00 2024-03-15 15:00 2024-04-15 09:00 2024-04-15 09:00 2024-04-15 09:37 2024-04-15 09:37 2024-04-15 10:00 2024-04-15 10:00 2024-04-29 15:00 2024-04-29 15:00 2024-04-29 15:00 |
ACTIVE | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:PINTO - Huntington 345KV LINE REPLACE "JUMPER" INSULATORS | 2024-01-02 12:02 | 138234 | 2024-04-17 17:37 | |
PPW 24-05332 | 16670 | PPW | Carbon-Helper 138kV line | OTHERGEN-PACE(PPW) OTHERGEN-PACE(PPW) |
9999.0 9999.0 |
9999.0 9999.0 |
0.0 0.0 |
2024-04-15 12:50 2024-04-16 14:00 |
2024-04-16 14:00 2024-04-17 16:41 |
COMPLETED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Reframing structure 14 on Helper - Moab 138 kV Line:Graphite Solar restricted to < 20MW: | 2024-04-04 11:30 | 143157 | 2024-04-17 16:46 | |
PPW 24-06096 | 16760 | PPW | Nutglade: CB 8G95 | 0.0 | 0.0 | 0.0 | 2024-04-16 07:00 | 2024-04-16 17:00 | CANCELLED | DISTRIBUTION | PLANNED | ONPATH | PPW | 1234567 Daily:EDGAR RICO/ WILSON 630-688-5238 Hendricks Spacer Cable installation at various locations | 2024-04-09 13:05 | 143922 | 2024-04-15 11:48 | ||
PPW 24-04917 | 16371 | PPW | Big Muddy-Platte Line Jct section of Dave Johnston-Platte line Jct 69kV line | 0.0 | 0.0 | 0.0 | 2024-04-16 07:11 | 2024-04-16 09:01 | COMPLETED | TRANSMISSION | PLANNED | ONPATH | PPW | 1234567 Daily:retro fitting existing poles to meet avian specifications. : | 2024-03-19 12:59 | 142742 | 2024-04-16 09:02 | ||
PPW 24-05966 | 16728 | PPW | Campbell: FR-5814 on a portion of 5R312 on pole 056360 | 0.0 | 0.0 | 0.0 | 2024-04-16 07:30 | 2024-04-16 15:00 | CANCELLED | DISTRIBUTION | URGENT | ONPATH | PPW | 1234567 Daily:HOLD FOR MARCUS WYATT 541 591 0799: | 2024-04-08 06:18 | 143792 | 2024-04-15 08:47 | ||
PPW 24-06066 | 16752 | PPW | Umatilla: RC_5W682_171403_5W658 | 0.0 | 0.0 | 0.0 | 2024-04-16 07:30 | 2024-04-16 17:30 | CANCELLED | DISTRIBUTION | URGENT | ONPATH | PPW | 1234567 Daily:WIRE PULLING JOB. UEC TO MCNARY ROCKPILE JOB.: | 2024-04-09 09:54 | 143892 | 2024-04-15 12:50 | ||
PPW 24-06362 | 16778 | PPW | Donkey Creek-Wyodak #2 230 kV line | ANTELOPE-WYOEAST(PPW) WYOEAST-ANTELOPE(PPW) ANTELOPE-WYOEAST(PPW) WYOEAST-ANTELOPE(PPW) |
376.0 376.0 376.0 376.0 |
376.0 376.0 376.0 376.0 |
376.0 376.0 376.0 376.0 |
2024-04-16 07:00 2024-04-16 07:00 2024-04-16 07:55 2024-04-16 07:55 |
2024-04-16 07:55 2024-04-16 07:55 2024-04-16 16:22 2024-04-16 16:22 |
COMPLETED | TRANSMISSION | URGENT | ONPATH | PPW | continuous:Oil cleanup at Wyodak Baghouse. Need to clean SW 1H7144, breaker 1H1000, and 230kV metering CT/PTs that are between the two.:No impact to ANTE-WYOE or ANTE--WYOE as long as Donkey Creek-WyoDak #1 230 kV line is in service.: | 2024-04-15 08:57 | 144191 | 2024-04-16 16:23 | |
PPW 24-05354 | 16534 | PPW | Hazelwood: CB 4M335 | 0.0 | 0.0 | 0.0 | 2024-04-16 08:00 | 2024-04-16 15:00 | CANCELLED | DISTRIBUTION | PLANNED | ONPATH | PPW | 1234567 Daily:Andy Johnson Will be working on pole #122169 1880 16th Ave. SW: | 2024-03-26 20:46 | 143179 | 2024-04-16 18:08 | ||
PPW 24-00025 | 11808 | PPW | BPA Jones Canyon-BPA Santiam 230 kV line | WINDGEN-PACW(PPW) | 9999.0 | 9999.0 | 9999.0 | 2024-04-16 08:00 | 2024-04-16 16:00 | CANCELLED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:BPA work on Tumble Creek-Santiam section.:COI and PDCI restrictions to be determined by BPA. | 2023-07-28 09:59 | 126718 | 2024-04-04 09:02 | |
PPW 24-04658 | 16293 | PPW | DG&T Bonanza-Upalco 138 kV line | 0.0 | 0.0 | 0.0 | 2024-04-16 08:03 | 2024-04-16 15:38 | COMPLETED | TRANSMISSION | PLANNED | ONPATH | PPW | 1234567 Daily:Changing insulators: | 2024-03-14 09:53 | 142483 | 2024-04-16 15:42 | ||
PPW 24-05145 | 16512 | PPW | IPCO Borah-Populus #1 345 kV line | EIMPACE-EIMIPCO(PPW) JBSN-JB345(PPW) NUT-PATHC(PPW) EIMPACE-EIMIPCO(PPW) NUT-PATHC(PPW) |
2350.0 1600.0 1060.0 2350.0 1060.0 |
2350.0 1600.0 1060.0 2350.0 1060.0 |
2125.0 1600.0 360.0 2350.0 1060.0 |
2024-04-16 08:30 2024-04-16 08:30 2024-04-16 08:30 2024-04-16 12:36 2024-04-16 12:36 |
2024-04-16 12:36 2024-04-16 12:36 2024-04-16 12:36 2024-04-16 16:00 2024-04-16 16:00 |
COMPLETED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Re-attach static on structure # 3/195:NUT-PATHC = 360 Summer/700 Winter. | 2024-03-25 14:21 | 142970 | 2024-04-16 12:37 | |
PPW 24-05697 | 16638 | PPW | Voelker: CB 5Y631 | 0.0 | 0.0 | 0.0 | 2024-04-16 09:54 | 2024-04-16 17:50 | COMPLETED | DISTRIBUTION | URGENT | ONPATH | PPW | 1234567 Daily:Interset Poles and move wire : | 2024-04-02 15:23 | 143522 | 2024-04-16 17:53 | ||
PPW 24-06001 | 16747 | PPW | Wapato: CB 5Y682 | 0.0 | 0.0 | 0.0 | 2024-04-16 10:06 | 2024-04-16 17:33 | COMPLETED | DISTRIBUTION | PLANNED | ONPATH | PPW | 1234567 Daily:R/R Poles, 420 S Naches, Wapato, WA : | 2024-04-08 18:43 | 143827 | 2024-04-16 17:38 | ||
PPW 24-04918 | 16372 | PPW | Big Muddy-Platte Line Jct section of Dave Johnston-Platte line Jct 69kV line | 0.0 | 0.0 | 0.0 | 2024-04-17 06:30 | 2024-04-17 16:00 | Completed | TRANSMISSION | PLANNED | ONPATH | PPW | 1234567 Daily:retro fitting existing poles to meet avian specifications. : | 2024-03-19 12:59 | 142743 | 2024-03-19 12:59 | ||
PPW 24-06097 | 16761 | PPW | Nutglade: CB 8G95 | 0.0 | 0.0 | 0.0 | 2024-04-17 07:00 | 2024-04-17 17:00 | CANCELLED | DISTRIBUTION | PLANNED | ONPATH | PPW | 1234567 Daily:EDGAR RICO/ WILSON 630-688-5238 Hendricks Spacer Cable installation at various locations | 2024-04-09 13:06 | 143923 | 2024-04-15 11:48 | ||
PPW 24-04660 | 16294 | PPW | DG&T Bonanza-Upalco 138 kV line | 0.0 | 0.0 | 0.0 | 2024-04-17 07:00 | 2024-04-17 16:00 | Completed | TRANSMISSION | PLANNED | ONPATH | PPW | 1234567 Daily:Changing insulators: | 2024-03-14 09:53 | 142485 | 2024-03-14 09:53 | ||
PPW 24-06067 | 16753 | PPW | Umatilla: RC_5W682_171403_5W658 | 0.0 | 0.0 | 0.0 | 2024-04-17 07:26 | 2024-04-17 16:51 | COMPLETED | DISTRIBUTION | URGENT | ONPATH | PPW | 1234567 Daily:WIRE PULLING JOB. UEC TO MCNARY ROCKPILE JOB.: | 2024-04-09 09:54 | 143893 | 2024-04-17 16:56 | ||
PPW 24-05967 | 16729 | PPW | Campbell: FR-5814 on a portion of 5R312 on pole 056360 | 0.0 | 0.0 | 0.0 | 2024-04-17 07:30 | 2024-04-17 15:00 | CANCELLED | DISTRIBUTION | URGENT | ONPATH | PPW | 1234567 Daily:HOLD FOR MARCUS WYATT 541 591 0799: | 2024-04-08 06:18 | 143793 | 2024-04-15 08:47 | ||
PPW 24-05369 | 16535 | PPW | Hazelwood: CB 4M335 | 0.0 | 0.0 | 0.0 | 2024-04-17 08:00 | 2024-04-17 15:00 | Completed | DISTRIBUTION | PLANNED | ONPATH | PPW | 1234567 Daily:Andy Johnson Will be working on pole #122169 1880 16th Ave. SW: | 2024-03-26 20:46 | 143194 | 2024-03-26 20:46 | ||
PPW 24-06044 | 16748 | PPW | Wapato: CB 5Y682 | 0.0 | 0.0 | 0.0 | 2024-04-17 08:29 | 2024-04-17 16:42 | COMPLETED | DISTRIBUTION | PLANNED | ONPATH | PPW | 1234567 Daily:R/R Poles, 420 S Naches, Wapato, WA : | 2024-04-08 18:43 | 143870 | 2024-04-17 16:46 | ||
PPW 24-05698 | 16639 | PPW | Voelker: CB 5Y631 | 0.0 | 0.0 | 0.0 | 2024-04-17 09:12 | 2024-04-17 19:06 | COMPLETED | DISTRIBUTION | URGENT | ONPATH | PPW | 1234567 Daily:Interset Poles and move wire : | 2024-04-02 15:23 | 143523 | 2024-04-17 19:07 | ||
PPW 24-06565 | 16785 | PPW | Emery: 345/6.9 kV Unit 2 Xfmrs 2-1 & 2-2 | THERMALGEN-PACE(PPW) THERMALGEN-PACE(PPW) |
9999.0 9999.0 |
9999.0 9999.0 |
9999.0 0.0 |
2024-04-17 09:00 2024-04-17 09:23 |
2024-04-17 09:23 2024-04-20 09:00 |
ACTIVE | TRANSMISSION | URGENT | ONPATH | PPW | continuous:Tube leak repairs.:Hunter (Emery) Unit #2 unavailable.: | 2024-04-16 14:24 | 144394 | 2024-04-17 09:23 | |
PPW 24-05257 | 16513 | PPW | Huntington-Pinto 345 kV line | FOURCORNE345-PINTO(PPW) PACE-PINTO(PPW) PINTO-PACE(PPW) PACE-PINTO(PPW) PINTO-PACE(PPW) |
660.0 740.0 700.0 740.0 700.0 |
660.0 740.0 700.0 740.0 700.0 |
660.0 740.0 700.0 740.0 700.0 |
2024-04-17 15:00 2024-04-17 15:00 2024-04-17 15:00 2024-04-29 15:00 2024-04-29 15:00 |
2024-04-29 15:00 2024-04-29 15:00 2024-04-29 15:00 2024-05-02 15:00 2024-05-02 15:00 |
CANCELLED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Replace structures.:PACE-PINTO & PINTO-PACE = 0. FOURCORNE345-PINTO (TOT 2B1 S>N) = Pinto load: | 2024-03-25 14:23 | 143082 | 2024-04-15 12:40 | |
PPW 24-04919 | 16373 | PPW | Big Muddy-Platte Line Jct section of Dave Johnston-Platte line Jct 69kV line | 0.0 | 0.0 | 0.0 | 2024-04-18 06:30 | 2024-04-18 16:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | 1234567 Daily:retro fitting existing poles to meet avian specifications. : | 2024-03-19 12:59 | 142744 | 2024-03-19 12:59 | ||
PPW 24-06098 | 16762 | PPW | Nutglade: CB 8G95 | 0.0 | 0.0 | 0.0 | 2024-04-18 07:00 | 2024-04-18 17:00 | SCHEDULED | DISTRIBUTION | PLANNED | ONPATH | PPW | 1234567 Daily:EDGAR RICO/ WILSON 630-688-5238 Hendricks Spacer Cable installation at various locations | 2024-04-09 13:06 | 143924 | 2024-04-09 13:06 | ||
PPW 24-06068 | 16754 | PPW | Umatilla: RC_5W682_171403_5W658 | 0.0 | 0.0 | 0.0 | 2024-04-18 07:30 | 2024-04-18 17:30 | SCHEDULED | DISTRIBUTION | URGENT | ONPATH | PPW | 1234567 Daily:WIRE PULLING JOB. UEC TO MCNARY ROCKPILE JOB.: | 2024-04-09 09:54 | 143894 | 2024-04-09 09:54 | ||
PPW 24-04942 | 16575 | PPW | Hale-Spanish Fork 138kV line | THERMALGEN-PACE(PPW) | 9999.0 | 9999.0 | 0.0 | 2024-04-18 08:00 | 2024-04-19 14:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:FHCA a-condition x-arm replacement str 81 | 2024-03-28 12:49 | 142767 | 2024-03-28 12:49 | |
PPW 24-06464 | 16782 | PPW | Path 17 Schedule Limitation (IPCo Borah West) | BORA-M500(PPW) | 1090.0 | 1090.0 | 1029.0 | 2024-04-18 08:00 | 2024-04-19 14:30 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Six-year circuit breaker maintenance.:BORA-M500 =1029: | 2024-04-16 09:42 | 144293 | 2024-04-16 09:46 | |
PPW 24-06045 | 16749 | PPW | Wapato: CB 5Y682 | 0.0 | 0.0 | 0.0 | 2024-04-18 08:53 | 2024-04-18 16:00 | SCHEDULED | DISTRIBUTION | PLANNED | ONPATH | PPW | 1234567 Daily:R/R Poles, 420 S Naches, Wapato, WA : | 2024-04-08 18:43 | 143871 | 2024-04-08 18:43 | ||
PPW 24-05699 | 16640 | PPW | Voelker: CB 5Y631 | 0.0 | 0.0 | 0.0 | 2024-04-18 09:00 | 2024-04-18 16:00 | SCHEDULED | DISTRIBUTION | URGENT | ONPATH | PPW | 1234567 Daily:Interset Poles and move wire : | 2024-04-02 15:23 | 143524 | 2024-04-02 15:23 | ||
PPW 24-02596 | 15620 | PPW | Copco #2 115 kV Yard-Copco #2 Plant 115 kV line | HYDROGEN-PACW(PPW) HYDROGEN-PACW(PPW) |
9999.0 9999.0 |
9999.0 9999.0 |
9999.0 0.0 |
2024-03-18 10:00 2024-04-18 10:00 |
2024-03-20 15:41 2024-04-23 15:00 |
SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Relay work. Each circuit breaker to be isolated prior to cycling.:GEN: Copco 2 generation must be off and remain off line for the duration of this outage.: | 2024-02-09 09:01 | 140417 | 2024-03-12 10:03 | |
PPW 24-05468 | 16719 | PPW | Swift #1: Unit #12 Main Transformer - T2100 | HYDROGEN-PACW(PPW) | 9999.0 | 9999.0 | 9999.0 | 2024-04-18 10:39 | 2024-04-22 14:39 | CANCELLED | TRANSMISSION | URGENT | ONPATH | PPW | continuous:TBD:Swift Unit #12 offline.: | 2024-04-05 15:23 | 143293 | 2024-04-15 15:10 | |
PPW 24-05719 | 16674 | PPW | Vilas: T-3877 | OTHERGEN-PACW(PPW) | 9999.0 | 9999.0 | 0.0 | 2024-04-18 21:00 | 2024-04-19 04:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Add oil to LTC :Eagle Point Solar off-line for duration of outage: | 2024-04-04 14:12 | 143544 | 2024-04-04 14:12 | |
PPW 24-04920 | 16374 | PPW | Big Muddy-Platte Line Jct section of Dave Johnston-Platte line Jct 69kV line | 0.0 | 0.0 | 0.0 | 2024-04-19 06:30 | 2024-04-19 16:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | 1234567 Daily:retro fitting existing poles to meet avian specifications. : | 2024-03-19 12:59 | 142745 | 2024-03-19 12:59 | ||
PPW 24-06099 | 16763 | PPW | Nutglade: CB 8G95 | 0.0 | 0.0 | 0.0 | 2024-04-19 07:00 | 2024-04-19 17:00 | SCHEDULED | DISTRIBUTION | PLANNED | ONPATH | PPW | 1234567 Daily:EDGAR RICO/ WILSON 630-688-5238 Hendricks Spacer Cable installation at various locations | 2024-04-09 13:06 | 143925 | 2024-04-09 13:06 | ||
PPW 24-06069 | 16755 | PPW | Umatilla: RC_5W682_171403_5W658 | 0.0 | 0.0 | 0.0 | 2024-04-19 07:30 | 2024-04-19 17:30 | SCHEDULED | DISTRIBUTION | URGENT | ONPATH | PPW | 1234567 Daily:WIRE PULLING JOB. UEC TO MCNARY ROCKPILE JOB.: | 2024-04-09 09:54 | 143895 | 2024-04-09 09:54 | ||
PPW 24-05614 | 16625 | PPW | Westvaco-Blacks Fork section of the Blacks Fork-Raven 230 kV line | TRONA-WYOCENTRAL(PPW) WYOCENTRAL-TRONA(PPW) |
640.0 640.0 |
640.0 640.0 |
404.0 404.0 |
2024-04-19 09:34 2024-04-19 09:34 |
2024-04-26 13:34 2024-04-26 13:34 |
SCHEDULED | TRANSMISSION | URGENT | ONPATH | PPW | continuous:Replace arms and complete overdue "A" conditions on the Westvaco to Blacksfork 230 section.:TRONA-WYOCENTRAL & WYOCENTRAL-TRONA = 404 Summer/560 Winter.: | 2024-04-01 11:34 | 143439 | 2024-04-01 11:34 | |
PPW 24-04921 | 16375 | PPW | Big Muddy-Platte Line Jct section of Dave Johnston-Platte line Jct 69kV line | 0.0 | 0.0 | 0.0 | 2024-04-20 06:30 | 2024-04-20 16:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | 1234567 Daily:retro fitting existing poles to meet avian specifications. : | 2024-03-19 12:59 | 142746 | 2024-03-19 12:59 | ||
PPW 24-06100 | 16764 | PPW | Nutglade: CB 8G95 | 0.0 | 0.0 | 0.0 | 2024-04-20 07:00 | 2024-04-20 17:00 | SCHEDULED | DISTRIBUTION | PLANNED | ONPATH | PPW | 1234567 Daily:EDGAR RICO/ WILSON 630-688-5238 Hendricks Spacer Cable installation at various locations | 2024-04-09 13:06 | 143926 | 2024-04-09 13:06 | ||
PPW 24-05473 | 16574 | PPW | Swift #1: Unit #13 Main Transformer - T30 | HYDROGEN-PACW(PPW) | 9999.0 | 9999.0 | 0.0 | 2024-04-21 07:00 | 2024-04-26 16:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:TBD:Swift unit #13 offline.: | 2024-03-28 12:33 | 143298 | 2024-03-28 12:33 | |
PPW 24-04922 | 16376 | PPW | Big Muddy-Platte Line Jct section of Dave Johnston-Platte line Jct 69kV line | 0.0 | 0.0 | 0.0 | 2024-04-22 06:30 | 2024-04-22 16:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | 1234567 Daily:retro fitting existing poles to meet avian specifications. : | 2024-03-19 12:59 | 142747 | 2024-03-19 12:59 | ||
PPW 24-06240 | 16776 | PPW | IPCo Midpoint: 500 kV Series Cap C506 | BORA-M500(PPW) | 1090.0 | 1090.0 | 1090.0 | 2024-04-22 06:30 | 2024-04-26 16:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Place gravel in capacitor bank yard.:BORA-M500 = 1090;: | 2024-04-12 10:23 | 144069 | 2024-04-12 10:27 | |
PPW 24-03787 | 16003 | PPW | Path 25 Schedule Limitation (Cascade 115 kV Tie) | CRAG-CRAGVIEW(PPW) CRAGVIEW-CRAG(PPW) |
45.0 80.0 |
45.0 80.0 |
5.0 80.0 |
2024-04-22 07:00 2024-04-22 07:00 |
2024-04-26 09:00 2024-04-26 09:00 |
SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Remove temp poles, install new jack bus and make main bus connections.:CRAG-CRAGVIEW = 5; CRAGVIEW-CRAG = 80: | 2024-02-28 12:15 | 141611 | 2024-03-21 14:21 | |
PPW 24-06562 | 16786 | PPW | Parowan-Sigurd-West Cedar 230 kV line | OTHERGEN-PACE(PPW) | 9999.0 | 9999.0 | 0.0 | 2024-04-22 07:30 | 2024-04-22 16:00 | SCHEDULED | TRANSMISSION | URGENT | ONPATH | PPW | continuous:Remove Debris over center phase Insulators/ Parowan Valley:Granite Mountain Solar West (50MW) restricted to 0 MW.: | 2024-04-16 15:11 | 144391 | 2024-04-16 15:11 | |
PPW 24-04934 | 16576 | PPW | Hale-Tanner 138 kV line | THERMALGEN-PACE(PPW) | 9999.0 | 9999.0 | 0.0 | 2024-04-22 08:00 | 2024-04-24 14:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:FHCA a-condition str replacement str #4:Possible real-time restriction to Lakeside 1 (Dynamo) generation.: | 2024-03-28 13:21 | 142759 | 2024-03-28 13:21 | |
PPW 24-02144 | 15521 | PPW | Clearwater Switching Station: CB 2U157 | HYDROGEN-PACW(PPW) | 9999.0 | 9999.0 | 0.0 | 2024-04-22 10:00 | 2024-04-26 16:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Breaker minor maint.:Clearwater 1 Hydro unavailable.: | 2024-02-02 13:07 | 139963 | 2024-02-02 13:07 | |
PPW 24-06522 | 16783 | PPW | Naughton: Unit #1 Main Bank | THERMALGEN-PACE(PPW) | 9999.0 | 9999.0 | 0.0 | 2024-04-22 21:00 | 2024-04-23 12:00 | SCHEDULED | TRANSMISSION | URGENT | ONPATH | PPW | continuous:Circulation water line repair.:Naughton Unit #1 unavailable.: | 2024-04-16 09:54 | 144351 | 2024-04-16 09:54 | |
PPW 24-05263 | 16505 | PPW | Path 17 Schedule Limitation (IPCo Borah West) | BORA-M500(PPW) EIMPACE-EIMIPCO(PPW) BORA-M500(PPW) EIMPACE-EIMIPCO(PPW) |
1090.0 2350.0 1090.0 2350.0 |
1090.0 2350.0 1090.0 2350.0 |
797.0 2125.0 1090.0 2350.0 |
2024-04-23 06:00 2024-04-23 06:00 2024-05-31 16:00 2024-05-31 16:00 |
2024-05-31 16:00 2024-05-31 16:00 2024-07-26 16:00 2024-07-26 16:00 |
SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Build out 345kV bay:BORA-M500 = No Bridger West Impact. | 2024-03-25 10:35 | 143088 | 2024-04-05 09:19 | |
PPW 24-04923 | 16377 | PPW | Big Muddy-Platte Line Jct section of Dave Johnston-Platte line Jct 69kV line | 0.0 | 0.0 | 0.0 | 2024-04-23 06:30 | 2024-04-23 16:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | 1234567 Daily:retro fitting existing poles to meet avian specifications. : | 2024-03-19 12:59 | 142748 | 2024-03-19 12:59 | ||
PPW 24-02031 | 15479 | PPW | BPA McNary: 230 kV Main Bus Section #3,BPA McNary: 230/115 kV Bank #9 | MCNARY-WALLULA(PPW) WALLULA-MCNARY(PPW) MCNARY-WALLULA(PPW) WALLULA-MCNARY(PPW) MCNARY-WALLULA(PPW) WALLULA-MCNARY(PPW) |
480.0 480.0 480.0 480.0 480.0 480.0 |
480.0 480.0 480.0 480.0 480.0 480.0 |
402.0 402.0 402.0 402.0 402.0 402.0 |
2024-04-23 08:00 2024-04-23 08:00 2024-04-24 07:00 2024-04-24 07:00 2024-04-24 16:00 2024-04-24 16:00 |
2024-04-24 07:00 2024-04-24 07:00 2024-04-24 16:00 2024-04-24 16:00 2024-04-24 17:00 2024-04-24 17:00 |
SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Attach the main bus to the A-437 disconnect.: | 2024-01-31 10:56 | 139850 | 2024-03-26 13:04 | |
PPW 24-04924 | 16378 | PPW | Big Muddy-Platte Line Jct section of Dave Johnston-Platte line Jct 69kV line | 0.0 | 0.0 | 0.0 | 2024-04-24 06:30 | 2024-04-24 16:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | 1234567 Daily:retro fitting existing poles to meet avian specifications. : | 2024-03-19 12:59 | 142749 | 2024-03-19 12:59 | ||
PPW 24-05736 | 16675 | PPW | Crowfoot-Weirich section of the Fry-Weirich 115 kV line | PACW-NTLOAD(PPW) | 9999.0 | 9999.0 | 0.0 | 2024-04-24 07:00 | 2024-04-24 15:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Inter set distribution pole. 38089 Weirich Dr., Lebanon:Sweet Home & Weirich will be radial from BPA Albany. Network Load Service Arrangements may be required.: | 2024-04-04 14:23 | 143561 | 2024-04-04 14:25 | |
PPW 24-05733 | 16784 | PPW | Communications Sites: Scipio Pass (UT) Communications Site | OTHERGEN-PACE(PPW) | 9999.0 | 9999.0 | 0.0 | 2024-04-24 09:30 | 2024-04-24 16:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Replace microwave communications equipment.:BLUNDELL AND SULPURDALE GEOTHERMAL REQUIRED OFFLINE.: | 2024-04-16 13:47 | 143558 | 2024-04-16 14:02 | |
PPW 24-04925 | 16379 | PPW | Big Muddy-Platte Line Jct section of Dave Johnston-Platte line Jct 69kV line | 0.0 | 0.0 | 0.0 | 2024-04-25 06:30 | 2024-04-25 16:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | 1234567 Daily:retro fitting existing poles to meet avian specifications. : | 2024-03-19 12:59 | 142750 | 2024-03-19 12:59 | ||
PPW 24-06318 | 16775 | PPW | Mile Hi: CB 5L104,Mile Hi: CB 5L105 | OTHERGEN-PACW(PPW) | 9999.0 | 9999.0 | 0.0 | 2024-04-25 10:00 | 2024-04-25 17:30 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | 1234567 Daily:Feeder Tie with 5L104 and 5L105 to energize new 1000mcm copper Get-A-Way on 5L104. move load from 5L104 to 5L105 . :Metzker (Lakeview) Solar unavailable.: | 2024-04-12 09:16 | 144147 | 2024-04-15 10:46 | |
PPW 24-04926 | 16380 | PPW | Big Muddy-Platte Line Jct section of Dave Johnston-Platte line Jct 69kV line | 0.0 | 0.0 | 0.0 | 2024-04-26 06:30 | 2024-04-26 16:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | 1234567 Daily:retro fitting existing poles to meet avian specifications. : | 2024-03-19 12:59 | 142751 | 2024-03-19 12:59 | ||
PPW 24-04565 | 16281 | PPW | Populus-Terminal 345 kV line | NUT-PACE(PPW) NUT-PATHC(PPW) PACE-NUT(PPW) PATHC-NUT(PPW) |
2563.0 1060.0 2563.0 1600.0 |
2563.0 1060.0 2563.0 1600.0 |
1398.0 788.0 1398.0 1600.0 |
2024-04-29 07:00 2024-04-29 07:00 2024-04-29 07:00 2024-04-29 07:00 |
2024-05-09 14:00 2024-05-09 14:00 2024-05-09 14:00 2024-05-09 14:00 |
SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Bridgerland: Commission CBs 10C4, 10C7, 10D20, SWs 10C1, 10C2(GRD), 10C3, 10C5, 10C6, 10C11, 10D18, 10D19, 10D21, 10D22, 10C23 (GRD), 10F25, PTs 6, 7,8. Leave SW 10F25 open and tagged.:NUT-PACE & PACE-NUT = 1398. | 2024-03-13 15:08 | 142390 | 2024-03-15 10:22 | |
PPW 24-04119 | 16149 | PPW | Diamond Hill-EWEB McKenzie section of the BPA Alvey-Diamond Hill 230 kV line | PACW-NTLOAD(PPW) PACW-NTLOAD(PPW) PACW-NTLOAD(PPW) |
9999.0 9999.0 9999.0 |
9999.0 9999.0 9999.0 |
9999.0 9999.0 0.0 |
2024-03-26 08:00 2024-04-03 08:00 2024-04-29 08:00 |
2024-04-03 08:00 2024-04-10 13:00 2024-05-08 13:00 |
SCHEDULED | TRANSMISSION | URGENT | ONPATH | PPW | continuous:Install Coyote Splice Box on pole 5/35 pulling fiber to 2/36.:Network Load Service must be arranged for EWEB McKenzie. | 2024-03-07 08:40 | 141943 | 2024-03-13 14:31 | |
PPW 24-02594 | 15629 | PPW | BPA Malin-Summer Lake 500 kV line | PACW-SMLK(PPW) SMLK-PACW(PPW) |
550.0 1187.0 |
550.0 1187.0 |
0.0 0.0 |
2024-04-29 08:00 2024-04-29 08:00 |
2024-05-24 15:00 2024-05-24 15:00 |
SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Major/Control Relay Maintenance on the BPA Summer Lake - Malin Line Relays at BPA Summer Lake. Line can remain in-service. Relays will be removed one-at-a-time with redundant relaying.:PACW-SMLK & SMLK-PACW = 0. | 2024-02-09 11:53 | 140415 | 2024-02-09 11:53 | |
PPW 24-05026 | 16427 | PPW | Dixonville: 115 kV Main Bus,Dixonville-Glide Tap section of the Dixonville-Toketee Switch Station 11 | HYDROGEN-PACW(PPW) HYDROGEN-PACW(PPW) |
9999.0 9999.0 |
9999.0 9999.0 |
9999.0 0.0 |
2024-04-15 08:00 2024-04-29 08:00 |
2024-04-29 08:00 2024-05-16 17:00 |
SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:This work will replace SW 2U2A, SW 2U23 and 2U21. Reconductor from SW 2U2A to SW 2U23 and 2U22 to SW 2U21.:Umpqua River Hydro Project Restriction = 174 Summer/199 Winter.: | 2024-03-21 10:37 | 142851 | 2024-04-09 08:22 | |
PPW 24-02145 | 15520 | PPW | Clearwater Switching Station: CB 2U155 | HYDROGEN-PACW(PPW) | 9999.0 | 9999.0 | 0.0 | 2024-04-29 10:00 | 2024-05-03 16:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Breaker minor maint.:Lemolo 2 and Clearwater 2 Hydro unavailable.: | 2024-02-02 13:00 | 139964 | 2024-02-02 13:00 | |
PPW 24-01180 | 15261 | PPW | COPCO No. 2-Ager section of COPCO No. 2-Yreka 115 kV line | CRAGVIEW-CRAG(PPW) CRAGVIEW-CRAG(PPW) CRAGVIEW-CRAG(PPW) CRAGVIEW-CRAG(PPW) |
80.0 80.0 80.0 80.0 |
80.0 80.0 80.0 80.0 |
80.0 80.0 80.0 60.0 |
2024-01-31 15:00 2024-03-20 15:00 2024-04-08 15:00 2024-04-29 15:00 |
2024-01-31 18:00 2024-03-20 18:00 2024-04-08 18:00 2024-04-29 18:00 |
SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | 1234567 Daily:REPLACE JUMPER CONNECTOR ON SWITCH 2G75:CRAGVIEW-CRAG = 60 summer/ 80 winter.: | 2024-01-16 09:49 | 138999 | 2024-04-05 11:00 | |
PPW 24-06189 | 16770 | PPW | Sigurd-Sigurd Solar 230 kV,Sigurd Solar: SW 89-H | OTHERGEN-PACE(PPW) | 9999.0 | 9999.0 | 0.0 | 2024-04-29 19:00 | 2024-04-30 04:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Annual maintenance on Sigurd Solar switch 89-H1.:Sigurd Solar generation unavailable.: | 2024-04-10 15:05 | 144018 | 2024-04-10 15:13 | |
PPW 24-04376 | 16194 | PPW | Red Butte-Harry Allen 345 kV line | REDB-REDBL(PPW) REDBL-REDB(PPW) REDB-REDBL(PPW) REDBL-REDB(PPW) |
515.0 515.0 515.0 515.0 |
515.0 515.0 515.0 515.0 |
515.0 515.0 0.0 0.0 |
2024-04-16 08:00 2024-04-16 08:00 2024-04-30 08:00 2024-04-30 08:00 |
2024-04-16 13:00 2024-04-16 13:00 2024-04-30 13:00 2024-04-30 13:00 |
SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Clear Bird nest at STR 1:REDBL-REDB & REDB-REDBL (TOT 2C) = 0.: | 2024-03-08 12:33 | 142200 | 2024-04-16 14:47 | |
PPW 24-06131 | 16766 | PPW | Blacks Fork-Monument 230 kV line | TRONA-WYOCENTRAL(PPW) WYOCENTRAL-TRONA(PPW) |
640.0 640.0 |
640.0 640.0 |
404.0 404.0 |
2024-04-30 08:18 2024-04-30 08:18 |
2024-05-04 12:18 2024-05-04 12:18 |
SCHEDULED | TRANSMISSION | URGENT | ONPATH | PPW | continuous:Change out rotten arms on Blacks fork to Monument 230 line.:TRONA-WYOCENTRAL & WYOCENTRAL-TRONA = 404 Summer/560 Winter.: | 2024-04-10 10:06 | 143957 | 2024-04-11 10:11 | |
PPW 24-01895 | 15984 | PPW | Roberts Creek: CB 3U66 | THERMALGEN-PACW(PPW) THERMALGEN-PACW(PPW) |
9999.0 9999.0 |
9999.0 9999.0 |
9999.0 0.0 |
2024-04-10 10:00 2024-04-30 10:00 |
2024-04-12 16:30 2024-05-03 16:30 |
SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:BMMO, Breaker minor maint.:Roseburg Forest Products Plant Net generation or load curtailed to 20 MW or less: | 2024-02-26 13:44 | 139714 | 2024-03-22 12:15 | |
PPW 24-02363 | 15563 | PPW | Path 25 Schedule Limitation (Cascade 115 kV Tie) | CRAG-CRAGVIEW(PPW) CRAG-CRAGVIEW(PPW) CRAGVIEW-CRAG(PPW) |
45.0 45.0 80.0 |
45.0 45.0 80.0 |
45.0 0.0 80.0 |
2024-04-01 05:00 2024-05-01 05:00 2024-05-01 05:00 |
2024-04-01 05:05 2024-05-01 05:05 2024-05-01 05:05 |
SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Benton 60kV CB 42 Breaker Maintenance:CRAG-CRAGVIEW = 0; CRAGVIEW-CRAG = 80: | 2024-02-05 10:46 | 140182 | 2024-03-28 13:05 | |
PPW 24-04647 | 16282 | PPW | Path 25 Schedule Limitation (Cascade 115 kV Tie) | CRAG-CRAGVIEW(PPW) CRAGVIEW-CRAG(PPW) |
45.0 80.0 |
45.0 80.0 |
5.0 80.0 |
2024-05-01 06:00 2024-05-01 06:00 |
2024-05-01 18:00 2024-05-01 18:00 |
SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:PAINT STRUCTURE 016/353 DESCHUTES SW 59 (HWY 44).:CRAG-CRAGVIEW = 5; CRAGVIEW-CRAG = 80: | 2024-03-14 09:28 | 142472 | 2024-03-21 14:29 | |
PPW 24-02138 | 15495 | PPW | BPA McNary: CB B997 | WINDGEN-PACW(PPW) | 9999.0 | 9999.0 | 9999.0 | 2024-02-05 07:00 | 2024-02-06 16:00 | CANCELLED | TRANSMISSION | URGENT | ONPATH | PPW | continuous:Diagnostic Service.: | 2024-02-01 10:13 | 139957 | 2024-02-02 10:47 | |
PPW 24-02188 | 15519 | PPW | Upalco-Emma Park 138 kV line | PACE-NTLOAD(PPW) PACE-VNL(PPW) VNL-PACE(PPW) PACE-NTLOAD(PPW) PACE-VNL(PPW) VNL-PACE(PPW) |
9999.0 140.0 138.0 9999.0 140.0 138.0 |
9999.0 140.0 138.0 9999.0 140.0 138.0 |
9999.0 140.0 138.0 0.0 0.0 0.0 |
2024-02-26 08:00 2024-02-26 08:00 2024-02-26 08:00 2024-05-01 08:00 2024-05-01 08:00 2024-05-01 08:00 |
2024-02-28 17:00 2024-02-28 17:00 2024-02-28 17:00 2024-05-03 17:00 2024-05-03 17:00 2024-05-03 17:00 |
SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Replace structures 349, 375:PACE-VNL = 0. VNL-PACE = Ashley load. Network Load Service Arrangements may be required for Ashley. Impact to TOT-1A & CRSP Schedules. Bonanza West (Path 33) = 645.: | 2024-02-02 12:40 | 140007 | 2024-02-21 09:28 | |
PPW 24-03806 | 16012 | PPW | BPA McNary: CB A400 | WINDGEN-PACW(PPW) | 9999.0 | 9999.0 | 0.0 | 2024-05-02 06:30 | 2024-05-02 11:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:BPA CB maintenance. CB bypassed.:Orchard Wind Farm restricted to 0 MW. Limit Orchard Wind Farm to 0 MW.: | 2024-02-28 14:49 | 141630 | 2024-02-28 14:49 | |
PPW 24-06018 | 16769 | PPW | BPA Salem-Dallas section of the BPA Salem-Monpac 115 kV line | PACW-NTLOAD(PPW) | 9999.0 | 9999.0 | 0.0 | 2024-05-02 10:10 | 2024-07-03 14:10 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Road widening for round about Hwy 99 and Clow Corner. | 2024-04-10 14:40 | 143844 | 2024-04-10 14:48 | |
PPW 24-05086 | 16429 | PPW | Path 25 Schedule Limitation (Cascade 115 kV Tie) | CRAG-CRAGVIEW(PPW) CRAGVIEW-CRAG(PPW) |
45.0 80.0 |
45.0 80.0 |
5.0 80.0 |
2024-05-03 06:00 2024-05-03 06:00 |
2024-05-03 18:00 2024-05-03 18:00 |
SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:T-Line to replace poles 000/004, 006/129 & replace/repair hardware 005/104:CRAG-CRAGVIEW = 5; CRAGVIEW-CRAG = 80: | 2024-03-21 14:47 | 142911 | 2024-03-21 14:47 | |
PPW 24-06132 | 16767 | PPW | Firehole-Little Mtn section of the Firehole-WAPA Flaming Gorge 230 kV line | FGE-WYOCENTRAL(PPW) PACW-NTLOAD(PPW) WYOCENTRAL-FGE(PPW) FGE-WYOCENTRAL(PPW) PACW-NTLOAD(PPW) WYOCENTRAL-FGE(PPW) |
200.0 9999.0 200.0 200.0 9999.0 200.0 |
200.0 9999.0 200.0 200.0 9999.0 200.0 |
20.0 0.0 0.0 200.0 9999.0 200.0 |
2024-05-03 08:40 2024-05-03 08:40 2024-05-03 08:40 2024-05-07 12:40 2024-05-07 12:40 2024-05-07 12:40 |
2024-05-07 12:40 2024-05-07 12:40 2024-05-07 12:40 2024-06-07 12:40 2024-06-07 12:40 2024-06-07 12:40 |
SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Change out rotten arms on multiple strs on the Firehole to Little mtn section 230kv line.:WYOCENTRAL-FGE = 0. FGE-WYOCENTRAL = Little Mtn Load. Network Load Service Arrangements may be required. WYOCENTRAL-FGE = 0. FGE-WYOCENTRAL = Little Mtn Load. Network Load Service Arrangements may be required.: | 2024-04-10 10:27 | 143958 | 2024-04-17 10:24 | |
PPW 24-03530 | 15944 | PPW | Klamath Co-Gen: GSU 301 | THERMALGEN-PACW(PPW) | 9999.0 | 9999.0 | 0.0 | 2024-05-03 10:00 | 2024-05-24 14:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:High Side grounding on GSU 301:Klamath Co-Gen GSU301 unavailable.: | 2024-02-23 16:17 | 141352 | 2024-02-23 16:17 | |
PPW 24-03528 | 15942 | PPW | Klamath Co-Gen: GSU 101 | THERMALGEN-PACW(PPW) | 9999.0 | 9999.0 | 0.0 | 2024-05-03 15:56 | 2024-05-10 19:56 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:GSU101 Testing:Klamath Co-Gen GSU101 unavailable.: | 2024-02-23 15:59 | 141350 | 2024-02-23 15:59 | |
PPW 24-06324 | 16779 | PPW | Emery-Spanish Fork 345 kV line | THERMALGEN-PACE(PPW) | 9999.0 | 9999.0 | 0.0 | 2024-05-06 07:00 | 2024-05-12 14:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Gateway South OL360A, 360b line crossing -Emery - Spanish Fork and Huntington to Spanish Fork 345kV:Hunter Unit #2 unavailable.: | 2024-04-15 10:06 | 144153 | 2024-04-15 10:06 | |
PPW 24-01664 | 15352 | PPW | Captain Jack-Olinda 500 kV line | MALIN500-RDM500(PPW) RDM500-MALIN500(PPW) |
800.0 612.0 |
800.0 612.0 |
475.0 416.0 |
2024-05-06 08:00 2024-05-06 08:00 |
2024-05-10 15:00 2024-05-10 15:00 |
SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:WAPA to replace river crossing spacers:MALIN500-RDM500 = 475. RDM500-MALIN500 = 416.: | 2024-01-24 09:56 | 139483 | 2024-01-24 09:56 | |
PPW 24-00664 | 15092 | PPW | Fry: 230/115 kV Bank #1 T2254 | PACW-NTLOAD(PPW) | 9999.0 | 9999.0 | 0.0 | 2024-05-06 08:01 | 2024-05-17 14:01 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:LTC Maint.:Murder Creek and Oremet substations fed from BPA Albany-BPA Salem 115 kV line. Network load service may be needed.: | 2024-01-05 12:52 | 138482 | 2024-01-05 12:52 | |
PPW 24-05827 | 16671 | PPW | IPCO Borah: C341 Series Cap (Populus #1) | JBSN-JB345(PPW) NUT-PATHC(PPW) |
1600.0 1060.0 |
1600.0 1060.0 |
1600.0 800.0 |
2024-05-06 09:00 2024-05-06 09:00 |
2024-05-10 15:00 2024-05-10 15:00 |
SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Yearly inspection:NUT-PATHC = 800 Summer/900 Winter.: | 2024-04-04 12:05 | 143653 | 2024-04-04 12:05 | |
PPW 24-06198 | 16773 | PPW | Hale-Midway 138 kV line | DEER_CREEK-PACE(PPW) HYDROGEN-PACE(PPW) |
5.0 9999.0 |
5.0 9999.0 |
0.0 0.0 |
2024-05-07 07:00 2024-05-07 07:00 |
2024-05-16 16:00 2024-05-16 16:00 |
SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Install new relaying :DRCRK-PACE = 0. Deer Creek Hydro unavailable.: | 2024-04-11 10:32 | 144027 | 2024-04-11 10:32 | |
PPW 24-06070 | 16756 | PPW | BPA Foster Tap-BPA Lebanon Section of the Foster-BPA Lebanon 115 kV Line | HYDROGEN-PACW(PPW) | 9999.0 | 9999.0 | 0.0 | 2024-05-08 08:00 | 2024-05-08 15:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Trip checks to Foster CB 2M38 and USACOE CBs XP1, XP2, and XP02.:Foster Hydro USCE Unit #1 and #2 unavailable.: | 2024-04-09 10:02 | 143896 | 2024-04-09 10:02 | |
PPW 24-02531 | 15595 | PPW | BPA McNary: 115/69 kV Bank #10 | WINDGEN-PACW(PPW) | 9999.0 | 9999.0 | 0.0 | 2024-05-09 07:00 | 2024-05-09 16:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Differential relay test trip checks.:Orchard Wind required offline.: | 2024-02-07 14:32 | 140352 | 2024-02-07 14:32 | |
PPW 24-05527 | 16631 | PPW | Bridgerland: 345/138 kV XFMR | NUT-PACE(PPW) NUT-PATHC(PPW) PACE-NUT(PPW) PATHC-NUT(PPW) |
2563.0 1060.0 2563.0 1600.0 |
2563.0 1060.0 2563.0 1600.0 |
1398.0 688.0 1398.0 1410.0 |
2024-05-10 07:00 2024-05-10 07:00 2024-05-10 07:00 2024-05-10 07:00 |
2024-05-10 14:00 2024-05-10 14:00 2024-05-10 14:00 2024-05-10 14:00 |
SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:**Commissioning REQ** Bridgerland Commission CBs 7H43, 7H46 | 2024-04-02 14:54 | 143352 | 2024-04-02 14:54 | |
PPW 24-03529 | 15943 | PPW | Klamath Co-Gen: GSU 201 | THERMALGEN-PACW(PPW) | 9999.0 | 9999.0 | 0.0 | 2024-05-10 14:00 | 2024-05-24 14:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:GSU 201 Testing:Klamath Co-Gen GSU201 unavailable.: | 2024-02-23 16:11 | 141351 | 2024-02-23 16:11 | |
PPW 24-03753 | 16001 | PPW | Klamath Co-Gen: 11L20 ABC SW | THERMALGEN-PACW(PPW) THERMALGEN-PACW(PPW) THERMALGEN-PACW(PPW) |
9999.0 9999.0 9999.0 |
9999.0 9999.0 9999.0 |
9999.0 0.0 9999.0 |
2024-05-10 14:00 2024-05-10 14:30 2024-05-24 13:30 |
2024-05-10 14:30 2024-05-24 13:30 2024-05-24 14:00 |
SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Replace SW blades and operators on 11L20:Klamath Co-Generation #201 unavailable.: | 2024-02-28 10:10 | 141577 | 2024-02-29 13:40 | |
PPW 24-03435 | 15930 | PPW | BPA Summer Lake: CB 4957,BPA Summer Lake: CB 4958,Hemingway-Summer Lake 500 kV line | BORA-M500(PPW) H500-SMLK(PPW) PACW-NTLOAD(PPW) SMLK-H500(PPW) |
1090.0 1500.0 9999.0 100.0 |
1090.0 1500.0 9999.0 100.0 |
1090.0 1500.0 9999.0 100.0 |
2024-05-11 08:00 2024-05-11 08:00 2024-05-11 08:00 2024-05-11 08:00 |
2024-05-24 17:00 2024-05-24 17:00 2024-05-24 17:00 2024-05-24 17:00 |
CANCELLED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:BPA Summer Lake CB 4957 Maintenance, CB 4958 Repairs:H500-SMLK & SMLK-H500 = 0; BORA-M500 = 959; | 2024-02-23 14:40 | 141257 | 2024-04-08 10:38 | |
PPW 24-02591 | 15631 | PPW | BPA Summer Lake: CB 4957,BPA Summer Lake: CB 4958,Hemingway-Summer Lake 500 kV line | H500-SMLK(PPW) PACW-NTLOAD(PPW) SMLK-H500(PPW) |
1500.0 9999.0 100.0 |
1500.0 9999.0 100.0 |
0.0 0.0 0.0 |
2024-05-11 08:00 2024-05-11 08:00 2024-05-11 08:00 |
2024-05-24 17:00 2024-05-24 17:00 2024-05-24 17:00 |
SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Major/Control Relay Maintenance:H500-SMLK & SMLK-H500 = 0; BORA-M500 = 959; | 2024-02-09 12:21 | 140412 | 2024-02-09 12:21 | |
PPW 24-00011 | 10513 | PPW | Hemingway-Summer Lake 500 kV line | H500-SMLK(PPW) JBSN-JB345(PPW) PACW-NTLOAD(PPW) SMLK-H500(PPW) |
1500.0 1600.0 9999.0 100.0 |
1500.0 1600.0 9999.0 100.0 |
0.0 1600.0 0.0 0.0 |
2024-05-11 08:00 2024-05-11 08:00 2024-05-11 08:00 2024-05-11 08:00 |
2024-05-24 17:00 2024-05-24 17:00 2024-05-24 17:00 2024-05-24 17:00 |
SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Spacer replacement :H500-SMLK & SMLK-H500 = 0; Network Load Service Arrangements may be required for Southern Oregon Load.: | 2023-02-10 12:28 | 114287 | 2023-02-14 13:50 | |
PPW 24-04733 | 16312 | PPW | Latigo-Three Buttes 230 kV line | WINDGEN-PACE(PPW) | 9999.0 | 9999.0 | 0.0 | 2024-05-13 06:00 | 2024-05-16 18:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Annual outage.:Three Buttes Wind unavailable.: | 2024-03-15 10:03 | 142558 | 2024-03-15 10:03 | |
PPW 24-06268 | 16781 | PPW | CCPD River Road Plant: PCB 1 | THERMALGEN-PACW(PPW) | 9999.0 | 9999.0 | 0.0 | 2024-05-13 07:30 | 2024-05-31 16:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Overhaul River Road PCB-1 and Install new disconnects.:CCPD River Road unavailable.: | 2024-04-16 08:56 | 144097 | 2024-04-16 08:56 | |
PPW 24-06077 | 16757 | PPW | Moonshine: 230/34.5 kV Bank T-1 | WINDGEN-PACE(PPW) | 9999.0 | 9999.0 | 0.0 | 2024-05-14 06:00 | 2024-05-14 18:00 | SCHEDULED | TRANSMISSION | URGENT | ONPATH | PPW | continuous:1-Year substation offline maintenance.:Power County Wind Units #1 and #2 unavailable.: | 2024-04-09 10:44 | 143903 | 2024-04-09 10:44 | |
PPW 24-04626 | 16346 | PPW | Carbon-Spanish Fork #1 138 kV line,Carbon-Spanish Fork #2 138 kV line | OTHERGEN-PACE(PPW) PACE-VNL(PPW) VNL-PACE(PPW) |
9999.0 140.0 138.0 |
9999.0 140.0 138.0 |
0.0 75.0 75.0 |
2024-05-15 07:00 2024-05-15 07:00 2024-05-15 07:00 |
2024-05-23 14:00 2024-05-23 14:00 2024-05-23 14:00 |
SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:GWS Line Crossing:No de-rate. Use normal scheduling limits: PACE-VNL = 140 & VNL-PACE = 138 PACE-VNL & VNL-PACE = 75 Summer, 112 Winter. | 2024-03-18 10:16 | 142451 | 2024-03-18 10:16 | |
PPW 24-04827 | 16345 | PPW | Top of the World (Duke Energy): 230/34 kV T1,Top of the World (Duke Energy): 230/34 kV T2 | WINDGEN-PACW(PPW) | 9999.0 | 9999.0 | 0.0 | 2024-05-20 06:00 | 2024-05-23 18:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Annual outage maintenance.:Top of the world wind farm unavailable.: | 2024-03-18 09:10 | 142652 | 2024-03-18 09:10 | |
PPW 24-06426 | 16787 | PPW | BPA McNary-Cold Springs section of the BPA McNary-Wallula 230 kV line | 0.0 | 0.0 | 0.0 | 2024-05-20 08:00 | 2024-05-20 17:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Replacing wood cross arm with steel truss: | 2024-04-17 09:58 | 144255 | 2024-04-17 09:58 | ||
PPW 24-05657 | 16632 | PPW | Sunbeam-Treasureton 230 kV line | NUT-PATHC(PPW) NUT-SUNBEAM(PPW) SUNBEAM-NUT(PPW) |
1060.0 1.0 45.0 |
1060.0 1.0 45.0 |
500.0 0.0 0.0 |
2024-05-20 09:00 2024-05-20 09:00 2024-05-20 09:00 |
2024-05-31 16:00 2024-05-31 16:00 2024-05-31 16:00 |
SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Replace 2 A-Condition structures:NUT-PATHC = 500 Summer/900 Winter. NUT-SUNBEAM & SUNBEAM-NUT = 0. Network Resource Transmission Service arrangements must be made for Moonbeam generation (Power County Wind at Sunbeam) through Idaho Power.: | 2024-04-02 15:12 | 143482 | 2024-04-02 15:12 | |
PPW 24-05857 | 16768 | PPW | Merwin: CB 2P50,Merwin: CB 2P51 | 0.0 | 0.0 | 0.0 | 2024-05-21 08:00 | 2024-05-22 16:30 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | 1234567 Daily:Relay maintenance. I will be disabling the trip from the breaker failure relay. Relay maintenance requires that we roll the breaker failure lockout. I would like to take one breaker at a time out of service to preform testing. | 2024-04-10 14:38 | 143683 | 2024-04-10 14:38 | ||
PPW 24-02769 | 15981 | PPW | Antelope: CB 167 | ANTE-GSHN(PPW) GSHN-ANTE(PPW) |
170.0 90.0 |
170.0 90.0 |
10.0 0.0 |
2024-05-27 10:00 2024-05-27 10:00 |
2024-05-31 14:00 2024-05-31 14:00 |
SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:BMMO on CB167:ANTE-GSHN & GSHN-ANTE = 0.: | 2024-02-26 12:35 | 140590 | 2024-02-26 12:35 | |
PPW 24-03295 | 15846 | PPW | Swift #2-Woodland Tap 230 kV line,BPA Ross-BPA Woodland Tap-BPA Lexington 230kV Line | HYDROGEN-PACW(PPW) PACW-WOODLANDTAP(PPW) WOODLANDTAP-PACW(PPW) |
9999.0 370.0 370.0 |
9999.0 370.0 370.0 |
0.0 0.0 0.0 |
2024-05-28 08:00 2024-05-28 08:00 2024-05-28 08:00 |
2024-05-31 16:00 2024-05-31 16:00 2024-05-31 16:00 |
SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Replace line drops at Woodland Tap.:Swift #1 & #2 Generation unavailable (333 mw). | 2024-02-21 09:55 | 141117 | 2024-02-21 09:55 | |
PPW 24-00186 | 14928 | PPW | Malin: 500 kV CAP Group #1,Malin-PG&E Round Mountain #1 500 kV line | MALIN500-RDM500(PPW) RDM500-MALIN500(PPW) |
800.0 612.0 |
800.0 612.0 |
625.0 416.0 |
2024-05-28 08:00 2024-05-28 08:00 |
2024-05-30 15:00 2024-05-30 15:00 |
SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous: PCB Routine Services on 4188 and 4189:MALIN500-RDM500 = 625. RDM500-MALIN500 = 416.: | 2023-12-20 11:26 | 137782 | 2023-12-20 11:26 | |
PPW 24-05727 | 16656 | PPW | Hermiston: CB 3W90,Hermiston: Line Side Disc CB 3W90 | WINDGEN-PACW(PPW) | 9999.0 | 9999.0 | 0.0 | 2024-05-28 10:00 | 2024-05-31 15:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Hermiston CB 3W90 BMMO & Line Side Disc Repairs:Orchard Wind required offline.: | 2024-04-03 14:13 | 143552 | 2024-04-03 14:13 | |
PPW 24-06081 | 16758 | PPW | BPA Ponderosa: 230 kV Non-GIS Interconnect Bus | PONDEROSA115-PONDEROSAPAC(PPW) | 182.0 | 182.0 | 182.0 | 2024-06-03 08:00 | 2024-06-06 15:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Relay maintenance. Non-redundant PJC differential relay.:PONDEROSA115-PONDEROSAPAC =182 Summer/270 Winter.: | 2024-04-09 11:07 | 143907 | 2024-04-09 11:07 | |
PPW 24-05350 | 16573 | PPW | Leaning Juniper Wind: 230/34 kV Bank #1,Leaning Juniper Wind: 34.5 kV Main Bus | WINDGEN-PACW(PPW) | 9999.0 | 9999.0 | 0.0 | 2024-06-12 10:00 | 2024-06-13 14:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Perform control circuitry checks and protective device testing:Leaning Juniper Wind restricted to 0 MW.: | 2024-03-28 12:18 | 143175 | 2024-03-28 12:18 | |
PPW 24-04189 | 16311 | PPW | Cove (OR): 230/69 kV Bank #2 (T3398) | COVEPACW-ROUNDBUTTE(PPW) ROUNDBUTTE-COVEPACW(PPW) |
123.0 123.0 |
123.0 123.0 |
60.0 60.0 |
2024-07-01 12:00 2024-07-01 12:00 |
2024-07-21 12:00 2024-07-21 12:00 |
SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:T-3398 LTC Maintenance and Bushing Replacement:COVEPACW-ROUNDBUTTE & ROUNDBUTTE-COVEPACW = 60.: | 2024-03-15 09:39 | 142013 | 2024-03-15 09:39 | |
PPW 24-04663 | 16295 | PPW | Bonanza-Mona 345 kV line | 0.0 | 0.0 | 0.0 | 2024-07-09 06:00 | 2024-07-09 16:30 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | 1234567 Daily:Replacing dead end insulators.: | 2024-03-14 09:58 | 142488 | 2024-03-14 09:58 | ||
PPW 24-03078 | 16263 | PPW | Newell-Tulelake Tap section of Hornet-Newell 69 kV line 5 | PACW-NTLOAD(PPW) | 9999.0 | 9999.0 | 0.0 | 2024-07-09 06:30 | 2024-07-10 18:30 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Replace 2 Poles. 4/33 and 14/33. Hwy 139:BPA Canby to provide Network Service for Perez, Clear Lake, and SVEC Austin load Approx 5 Me. Network load service agreements may be needed.: | 2024-03-12 13:33 | 140900 | 2024-03-12 13:33 | |
PPW 24-04665 | 16296 | PPW | Bonanza-Mona 345 kV line | 0.0 | 0.0 | 0.0 | 2024-07-10 06:00 | 2024-07-10 16:30 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | 1234567 Daily:Replacing dead end insulators.: | 2024-03-14 09:58 | 142490 | 2024-03-14 09:58 | ||
PPW 24-04666 | 16297 | PPW | Bonanza-Mona 345 kV line | 0.0 | 0.0 | 0.0 | 2024-07-11 06:00 | 2024-07-11 16:30 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | 1234567 Daily:Replacing dead end insulators.: | 2024-03-14 09:58 | 142491 | 2024-03-14 09:58 | ||
PPW 24-02598 | 15607 | PPW | Dog Creek-PG&E Cascade 60 kV line | CRAG-DOGCREEK(PPW) | 10.0 | 10.0 | 0.0 | 2024-07-15 07:00 | 2024-07-16 18:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Delta-Mountain Gate JCT 60kV Line (PACW) (HFRA) (Delta-Antler SECT) Cleared | 2024-02-08 12:33 | 140419 | 2024-02-08 12:46 | |
PPW 24-02600 | 15608 | PPW | Dog Creek-PG&E Cascade 60 kV line | CRAG-DOGCREEK(PPW) | 10.0 | 10.0 | 0.0 | 2024-07-17 07:00 | 2024-07-19 18:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Delta-Mountain Gate JCT 60kV Line (EPSS) (HFRA) (Antler-Mountain Gate SECT) Cleared | 2024-02-08 12:44 | 140421 | 2024-02-08 12:46 | |
PPW 24-02950 | 15722 | PPW | Path 25 Schedule Limitation (Cascade 115 kV Tie) | CRAG-CRAGVIEW(PPW) CRAG-CRAGVIEW(PPW) CRAGVIEW-CRAG(PPW) |
45.0 45.0 80.0 |
45.0 45.0 80.0 |
45.0 0.0 80.0 |
2024-04-11 05:15 2024-07-21 05:15 2024-07-21 05:15 |
2024-04-11 05:20 2024-07-21 05:20 2024-07-21 05:20 |
SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Cascade 60kV CB 72 Breaker Exercise | 2024-02-14 12:54 | 140771 | 2024-04-02 08:32 | |
PPW 24-03478 | 15929 | PPW | Cove (OR): 230/69 kV Bank #1 (T3886) | COVEPACW-ROUNDBUTTE(PPW) ROUNDBUTTE-COVEPACW(PPW) |
123.0 123.0 |
123.0 123.0 |
60.0 60.0 |
2024-07-22 10:00 2024-07-22 10:00 |
2024-07-26 15:00 2024-07-26 15:00 |
SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Transformer Relay Maintenance and Trip Checking:COVEPACW-ROUNDBUTTE & ROUNDBUTTE-COVEPACW = 60.: | 2024-02-23 14:27 | 141300 | 2024-02-23 14:27 | |
PPW 24-01403 | 15269 | PPW | Dave Johnston-TSGT Laramie River Station 230 kV line | DJ-WYOEAST(PPW) WYOEAST-DJ(PPW) |
790.0 790.0 |
790.0 790.0 |
478.0 478.0 |
2024-09-03 08:00 2024-09-03 08:00 |
2024-09-13 16:00 2024-09-13 16:00 |
SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:TSGT 2024 structure replacements.:DJ-WYOEAST & WYOEAST-DJ = 442 (Dave Johnston-WAPA Stegall 230 kV line rating): | 2024-01-18 10:59 | 139222 | 2024-01-18 11:14 | |
PPW 24-03091 | 16240 | PPW | Bullard-Davis Creek section of the Alturas-Bullard 115 kV line | OTHERGEN-PACW(PPW) | 9999.0 | 9999.0 | 0.0 | 2024-09-10 07:00 | 2024-09-10 18:30 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | 1234567 Daily:LINE WORK:Airport Solar and Garrett Solar restricted to 0 MW during switching.: | 2024-03-11 09:47 | 140913 | 2024-03-11 09:47 | |
PPW 24-00012 | 10515 | PPW | Hemingway-Summer Lake 500 kV line | H500-SMLK(PPW) JBSN-JB345(PPW) PACW-NTLOAD(PPW) SMLK-H500(PPW) |
1500.0 1600.0 9999.0 100.0 |
1500.0 1600.0 9999.0 100.0 |
0.0 1467.0 0.0 0.0 |
2024-09-14 08:00 2024-09-14 08:00 2024-09-14 08:00 2024-09-14 08:00 |
2024-09-27 17:00 2024-09-27 17:00 2024-09-27 17:00 2024-09-27 17:00 |
SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Spacer replacement :H500-SMLK & SMLK-H500 = 0; | 2023-02-10 12:39 | 114288 | 2023-02-10 12:39 | |
PPW 24-00086 | 15593 | PPW | Populus: 345 kV Series Capacitor #2 (C2),Populus: 345 kV Series Capacitor #2 (C1) | JBSN-JB345(PPW) | 1600.0 | 1600.0 | 1433.0 | 2024-09-16 07:30 | 2024-09-20 16:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:CT Work and Trigger Circuit. Maintenance:JBSN-JB345 = 2150. PacifiCorp = 1433. IPCo = 717.: | 2024-02-06 14:24 | 136707 | 2024-02-06 14:24 | |
PPW 24-00085 | 15594 | PPW | Populus: 345 kV Series Capacitor #1 (C2),Populus: 345 kV Series Capacitor #1 (C1) | JBSN-JB345(PPW) | 1600.0 | 1600.0 | 1433.0 | 2024-09-23 07:30 | 2024-09-27 16:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:CT work and Control circuits. Cap Bank Maintenance and addition of new relays. :JBSN-JB345 = 2150. PacifiCorp = 1433. IPCo = 717.: | 2024-02-06 14:26 | 136706 | 2024-02-06 14:26 | |
PPW 24-02033 | 15467 | PPW | BPA Ponderosa: 500/230 kV Bank #1,BPA Ponderosa: CB 4618 | BPAT.PACW-PONDEROSA230(PPW) | 267.0 | 267.0 | 267.0 | 2024-09-23 08:00 | 2024-10-03 15:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Transformer diagnostic service.:BPAT.PACW-PONDEROSA230 = 617 Summer/ 700 Winter: | 2024-01-30 15:53 | 139852 | 2024-01-30 15:53 | |
PPW 24-00049 | 13659 | PPW | Echo-Hinkle 69kV line | WINDGEN-PACW(PPW) | 9999.0 | 9999.0 | 0.0 | 2024-10-07 08:00 | 2024-10-10 16:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Annual substation maintenance (oil sampling), Echo Hinkle 69kV Transmission Line maintenance:Echo and blacksmith generation limited to 0 MW. Both sites disconnected from the transmission system.: | 2023-10-19 14:21 | 133780 | 2023-10-19 14:21 | |
PPW 25-00004 | 16651 | PPW | BPA Jones Canyon-BPA Santiam 230 kV line | WINDGEN-PACW(PPW) | 9999.0 | 9999.0 | 0.0 | 2025-01-09 08:00 | 2025-01-09 16:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | PPW | continuous:Line maintenance:COI and PDCI restrictions to be determined by BPA. | 2024-04-03 11:19 | 143568 | 2024-04-03 11:19 | |
PRPA Outages: | |||||||||||||||||||
TOT 1A OUTAGE (FORCED) | 115711 | PRPA | Bonanza Generation | BOZ-CRG(PRPA) CRG-BOZ(PRPA) BOZ-CRG(PRPA) CRG-BOZ(PRPA) BOZ-CRG(PRPA) CRG-BOZ(PRPA) BOZ-CRG(PRPA) CRG-BOZ(PRPA) BOZ-CRG(PRPA) CRG-BOZ(PRPA) |
27.0 27.0 27.0 27.0 27.0 27.0 27.0 27.0 27.0 27.0 |
27.0 27.0 27.0 27.0 27.0 27.0 27.0 27.0 27.0 27.0 |
29.0 25.0 29.0 25.0 29.0 25.0 29.0 25.0 29.0 27.0 |
2024-01-17 23:30 2024-01-17 23:30 2024-01-18 02:00 2024-01-18 02:00 2024-01-18 18:00 2024-01-18 18:00 2024-01-19 18:00 2024-01-19 18:00 2024-01-20 15:21 2024-01-20 15:21 |
2024-01-18 02:00 2024-01-18 02:00 2024-01-18 18:00 2024-01-18 18:00 2024-01-19 18:00 2024-01-19 18:00 2024-01-20 15:21 2024-01-20 15:21 2024-01-22 18:30 2024-01-22 18:30 |
Completed | TRANSMISSION | FORCED | TOT 1A | PRPA | Bonanza Generation | 2024-01-17 23:31 | PRPA49157 | 2024-01-20 15:22 | |
RAWHIDE-AULT (PLANNED) | 115915 | PRPA | Rawhide-Ault Ault Carey 230kV lines | RAW-AU(PRPA) RAW-AU(PRPA) RAW-AU(PRPA) |
350.0 350.0 350.0 |
350.0 350.0 350.0 |
76.0 76.0 76.0 |
2024-01-29 08:00 2024-02-02 16:00 2024-02-02 17:00 |
2024-02-02 16:00 2024-02-02 17:00 2024-02-02 17:15 |
Completed | TRANSMISSION | PLANNED | RAW-AU | PRPA | Rawhide-Ault & Ault Carey 230kV lines | 2024-01-23 15:36 | PRPA49285 | 2024-02-02 17:13 | |
TOT-7 OUTAGE (PLANNED) | 115912 | PRPA | Ault-Carey Ault Rawhide 230kV lines | AU-STVRN(PRPA) STVRN-AU(PRPA) AU-STVRN(PRPA) STVRN-AU(PRPA) AU-STVRN(PRPA) STVRN-AU(PRPA) |
214.0 214.0 214.0 214.0 214.0 214.0 |
214.0 214.0 214.0 214.0 214.0 214.0 |
76.0 0.0 76.0 0.0 76.0 0.0 |
2024-01-29 08:00 2024-01-29 08:00 2024-02-02 16:00 2024-02-02 16:00 2024-02-02 17:00 2024-02-02 17:00 |
2024-02-02 16:00 2024-02-02 16:00 2024-02-02 17:00 2024-02-02 17:00 2024-02-02 17:15 2024-02-02 17:15 |
Completed | TRANSMISSION | PLANNED | TOT 7 | PRPA | Ault-Carey & Ault Rawhide 230kV lines OOS | 2024-01-23 15:31 | PRPA49284 | 2024-02-02 17:14 | |
RAWHIDE-AULT (FORCED) | 120287 | PRPA | Ault West Bus Ault-Carey 230kV line | RAW-AU(PRPA) | 350.0 | 350.0 | 214.0 | 2024-04-08 13:00 | 2024-04-09 16:30 | Terminated | TRANSMISSION | FORCED | RAW-AU | PRPA | Ault West Bus & Ault-Carey 230kV line | 2024-04-08 12:43 | PRPA50346 | 2024-04-09 16:32 | |
TOT-5 OUTAGE (PLANNED) | 120293 | PRPA | Craig-Hayden #2 230KV Line | AU-CRG(PRPA) CRG-AU(PRPA) |
153.0 190.0 |
153.0 190.0 |
134.0 134.0 |
2024-04-09 16:00 2024-04-09 16:00 |
2024-04-11 14:24 2024-04-11 14:24 |
Completed | TRANSMISSION | PLANNED | TOT 5 | PRPA | Craig-Hayden #2 230KV Line OOS per WAPA. Originally Scheduled 4/11/24-4/14/24. | 2024-04-08 19:38 | PRPA50349 | 2024-04-11 14:23 | |
TOT-5 OUTAGE (PLANNED) | 118168 | PRPA | Craig-Hayden #2 230KV Line | AU-CRG(PRPA) CRG-AU(PRPA) |
153.0 190.0 |
153.0 190.0 |
134.0 134.0 |
2024-04-11 12:01 2024-04-11 12:01 |
2024-04-14 16:00 2024-04-14 16:00 |
Cancelled | TRANSMISSION | PLANNED | TOT 5 | PRPA | Hayden Terminal of the Craig-Hayden #2 230KV Line OOS | 2024-03-08 08:26 | PRPA49935 | 2024-04-08 19:35 | |
RAWHIDE-AULT (PLANNED) | 120830 | PRPA | AULT-RAWHIDE AULT-CAREY DUAL CIRCUIT LINE OUTAGE | RAW-AU(PRPA) | 350.0 | 350.0 | 86.0 | 2024-04-22 12:00 | 2024-04-28 00:00 | Scheduled | TRANSMISSION | PLANNED | RAW-AU | PRPA | AULT-RAWHIDE & AULT-CAREY DUAL CIRCUIT LINE OUTAGES | 2024-04-16 14:42 | PRPA50551 | 2024-04-16 14:42 | |
TOT-7 OUTAGE (PLANNED) | 120828 | PRPA | AULT-RAWHIDE AULT-CAREY DUAL CIRCUIT LINE OUTAGE | AU-STVRN(PRPA) | 214.0 | 214.0 | 86.0 | 2024-04-22 12:00 | 2024-04-28 00:00 | Scheduled | TRANSMISSION | PLANNED | TOT 7 | PRPA | AULT-RAWHIDE & AULT-CAREY DUAL CIRCUIT LINE OUTAGES | 2024-04-16 14:39 | PRPA50550 | 2024-04-16 14:39 | |
TOT-1A OUTAGE (PLANNED) | 120864 | PRPA | Firehole-Little Mountain Tap | BOZ-CRG(PRPA) CRG-BOZ(PRPA) |
27.0 27.0 |
27.0 27.0 |
24.0 24.0 |
2024-05-03 09:40 2024-05-03 09:40 |
2024-05-07 13:40 2024-05-07 13:40 |
Scheduled | TRANSMISSION | PLANNED | TOT 1A | PRPA | Firehole-Little Mountain Tap Section of the Firehole-Flaming Gorge 230KV Line OOS, per WAPA | 2024-04-17 15:55 | PRPA50566 | 2024-04-17 15:55 | |
TOT-1A OUTAGE (PLANNED) | 110535 | PRPA | Bonanza-Craig 345KV Line TER FACILITY NAME | BOZ-CRG(PRPA) CRG-BOZ(PRPA) |
28.0 28.0 |
28.0 28.0 |
0.0 0.0 |
2024-05-28 13:00 2024-05-28 13:00 |
2024-06-20 11:00 2024-06-20 11:00 |
Cancelled | TRANSMISSION | PLANNED | TOT 1A | PRPA | Bonanza-Craig 345KV Line out of service per WAPA. | 2023-09-06 15:37 | PRPA47278 | 2023-12-12 10:43 | |
TOT-1A OUTAGE (PLANNED) | 114112 | PRPA | Bonanza-Craig 345KV Line | BOZ-CRG(PRPA) CRG-BOZ(PRPA) |
27.0 27.0 |
27.0 27.0 |
0.0 0.0 |
2024-05-28 13:00 2024-05-28 13:00 |
2024-06-20 11:00 2024-06-20 11:00 |
Cancelled | TRANSMISSION | PLANNED | TOT 1A | PRPA | Bonanza-Craig 345KV Line OOS per WAPA. | 2023-12-12 10:46 | PRPA48622 | 2023-12-14 09:22 | |
TOT-1A OUTAGE (PLANNED) | 114170 | PRPA | Bonanza-Craig 345KV Line | BOZ-CRG(PRPA) CRG-BOZ(PRPA) |
27.0 27.0 |
27.0 27.0 |
0.0 0.0 |
2024-09-16 10:00 2024-09-16 10:00 |
2024-09-26 16:00 2024-09-26 16:00 |
Scheduled | TRANSMISSION | PLANNED | TOT 1A | PRPA | Bonanza-Craig 345KV Line OOS per WAPA | 2023-12-14 09:26 | PRPA48656 | 2023-12-14 09:26 | |
PSCO Outages: | |||||||||||||||||||
NOMOGRAM | 116019 | PSCO | Nomogram | MSST-PSCO(PSCO) PSCO.SOUTH-PSCO(PSCO) MSST-PSCO(PSCO) PSCO.SOUTH-PSCO(PSCO) |
4986.0 2529.0 4986.0 2529.0 |
4986.0 2529.0 4986.0 2529.0 |
2800.0 2000.0 2800.0 2000.0 |
2024-01-31 13:00 2024-01-31 13:00 2025-01-31 14:00 2025-01-31 14:00 |
2025-01-31 14:00 2025-01-31 14:00 2030-01-31 14:00 2030-01-31 14:00 |
Active | TRANSMISSION | PLANNED | ONPATH | PSCO | TTC updates based on Nomogram studies. | 2024-01-31 12:40 | PSCO49317 | 2024-04-10 14:58 | |
TOT 2A RESTRICTION | 116044 | PSCO | TOT2AN-TOT2AS(PSCO) TOT2AN-TOT2AS(PSCO) TOT2AN-TOT2AS(PSCO) TOT2AN-TOT2AS(PSCO) TOT2AN-TOT2AS(PSCO) TOT2AN-TOT2AS(PSCO) TOT2AN-TOT2AS(PSCO) TOT2AN-TOT2AS(PSCO) TOT2AN-TOT2AS(PSCO) TOT2AN-TOT2AS(PSCO) TOT2AN-TOT2AS(PSCO) TOT2AN-TOT2AS(PSCO) TOT2AN-TOT2AS(PSCO) TOT2AN-TOT2AS(PSCO) TOT2AN-TOT2AS(PSCO) TOT2AN-TOT2AS(PSCO) TOT2AN-TOT2AS(PSCO) |
60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 |
60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 |
25.0 20.0 25.0 19.0 19.0 19.0 19.0 19.0 19.0 0.0 19.0 19.0 0.0 15.0 30.0 40.0 30.0 |
2024-02-04 02:25 2024-02-04 06:48 2024-02-04 15:48 2024-02-04 18:07 2024-02-04 22:11 2024-02-12 04:00 2024-02-19 14:00 2024-02-26 14:00 2024-03-05 14:00 2024-03-06 13:00 2024-03-06 17:00 2024-03-19 15:00 2024-04-08 21:00 2024-04-08 23:14 2024-04-10 03:56 2024-04-11 01:57 2024-04-12 17:00 |
2024-02-04 06:48 2024-02-04 15:48 2024-02-04 18:07 2024-02-04 22:11 2024-02-12 04:00 2024-02-19 14:00 2024-02-26 14:00 2024-03-05 14:00 2024-03-06 13:00 2024-03-06 17:00 2024-03-19 15:00 2024-04-08 21:00 2024-04-08 23:14 2024-04-10 03:56 2024-04-11 01:57 2024-04-12 17:00 2024-04-16 17:00 |
Completed | TRANSMISSION | FORCED | ONPATH | PSCO | Real Time Constraint. | 2024-02-04 02:18 | PSCO49326 | 2024-04-12 19:17 | ||
COMANCHE TO MIDWAY | 119334 | PSCO | Comanche to Midway 230kV | COMA-MIDW(PSCO) MIDW-COMA(PSCO) |
1147.0 1147.0 |
1147.0 1147.0 |
654.0 654.0 |
2024-03-18 10:30 2024-03-18 10:30 |
2024-03-19 19:00 2024-03-19 19:00 |
Completed | TRANSMISSION | FORCED | ONPATH | PSCO | Comanche to Midway 230kV | 2024-03-18 10:30 | PSCO50053 | 2024-03-18 10:30 | |
COMANCHE TO PSCO | 119331 | PSCO | Comanche to Midway 230kV | COMA-PSCO(PSCO) PSCO-COMA(PSCO) |
1592.0 1592.0 |
1592.0 1592.0 |
1472.0 1472.0 |
2024-03-18 10:30 2024-03-18 10:30 |
2024-03-19 19:00 2024-03-19 19:00 |
Completed | TRANSMISSION | FORCED | ONPATH | PSCO | Comanche to Midway 230kV outage | 2024-03-18 10:22 | PSCO50052 | 2024-03-18 10:22 | |
COMANCHE TO MIDWAY | 119370 | PSCO | Comanche to Midway 230kV | COMA-MIDW(PSCO) MIDW-COMA(PSCO) |
1147.0 1147.0 |
1147.0 1147.0 |
654.0 654.0 |
2024-03-20 10:00 2024-03-20 10:00 |
2024-03-22 19:00 2024-03-22 19:00 |
Completed | TRANSMISSION | FORCED | ONPATH | PSCO | Comanche to Midway 230kV | 2024-03-20 09:56 | PSCO50072 | 2024-03-20 09:56 | |
TOT 2A RESTRICTION | 119353 | PSCO | TOT2AS-TOT2AN(PSCO) | 200.0 | 200.0 | 188.0 | 2024-03-20 10:00 | 2024-03-20 14:00 | Completed | TRANSMISSION | FORCED | ONPATH | PSCO | 2024-03-20 07:52 | PSCO50067 | 2024-03-20 07:52 | |||
TOT 2A RESTRICTION | 119510 | PSCO | TOT2AS-TOT2AN(PSCO) | 200.0 | 200.0 | 188.0 | 2024-03-20 14:00 | 2024-03-20 16:00 | Completed | TRANSMISSION | FORCED | ONPATH | PSCO | 2024-03-20 11:05 | PSCO50080 | 2024-03-20 11:05 | |||
COMANCHE TO MIDWAY | 119702 | PSCO | Comanche to Midway 230kV | COMA-MIDW(PSCO) MIDW-COMA(PSCO) |
1147.0 1147.0 |
1147.0 1147.0 |
654.0 654.0 |
2024-03-22 23:45 2024-03-22 23:45 |
2024-03-29 13:57 2024-03-29 13:57 |
Terminated | TRANSMISSION | FORCED | ONPATH | PSCO | Comanche to Midway 230kV | 2024-03-22 23:38 | PSCO50138 | 2024-03-29 13:57 | |
SPRING CANYON WIND FARM | 117349 | PSCO | Spring Canyon #1 | GENERATOR-PSCO(PSCO) | 9999.0 | 9999.0 | 99999.0 | 2024-03-25 08:00 | 2024-04-05 16:00 | Completed | TRANSMISSION | FORCED | ONPATH | PSCO | PSCo Spring Canyon #1 unavailable. Contract path North Yuma to Story Out of service | 2024-02-17 17:13 | PSCO49600 | 2024-02-17 17:13 | |
COMANCHE TO MIDWAY | 117189 | PSCO | Comanche to Mirasol 230kV Line | COMA-MIDW(PSCO) MIDW-COMA(PSCO) |
1147.0 1147.0 |
1147.0 1147.0 |
654.0 654.0 |
2024-03-26 07:00 2024-03-26 07:00 |
2024-03-28 17:00 2024-03-28 17:00 |
Completed | TRANSMISSION | PLANNED | ONPATH | PSCO | Transmission limit due to Comanche to Mirasol 230kV Line planned outage. | 2024-02-14 20:58 | PSCO49535 | 2024-02-16 17:56 | |
TOT 2A RESTRICTION | 119734 | PSCO | TOT2AS-TOT2AN(PSCO) | 200.0 | 200.0 | 180.0 | 2024-03-26 10:00 | 2024-03-26 11:00 | Completed | TRANSMISSION | FORCED | ONPATH | PSCO | 2024-03-26 08:43 | PSCO50152 | 2024-03-26 08:43 | |||
TOT 2A RESTRICTION | 119736 | PSCO | TOT2AS-TOT2AN(PSCO) | 200.0 | 200.0 | 180.0 | 2024-03-26 11:00 | 2024-03-26 12:00 | Completed | TRANSMISSION | FORCED | ONPATH | PSCO | 2024-03-26 08:44 | PSCO50153 | 2024-03-26 08:44 | |||
TOT 2A RESTRICTION | 119738 | PSCO | TOT2AS-TOT2AN(PSCO) | 200.0 | 200.0 | 180.0 | 2024-03-26 12:00 | 2024-03-26 19:00 | Completed | TRANSMISSION | FORCED | ONPATH | PSCO | 2024-03-26 09:46 | PSCO50154 | 2024-03-26 09:46 | |||
ATER UNITS | 114147 | PSCO | Poncha to Sargent 115kV line | GENERATOR-PSCO(PSCO) | 9999.0 | 9999.0 | 9999.0 | 2024-04-01 08:00 | 2024-05-03 17:00 | Cancelled | TRANSMISSION | PLANNED | ONPATH | PSCO | Alamosa CTs must run, 1unit minimum 5MW with 2nd unit available as needed for voltage support. | 2023-12-13 20:31 | PSCO48644 | 2024-02-15 23:01 | |
LAMAR DC TIE | 117310 | PSCO | Lamar to Finney 345KV line | LAMR230-LAMR345(PSCO) LAMR345-LAMR230(PSCO) |
210.0 210.0 |
210.0 210.0 |
0.0 0.0 |
2024-04-03 08:00 2024-04-03 08:00 |
2024-04-04 12:00 2024-04-04 12:00 |
Completed | TRANSMISSION | FORCED | ONPATH | PSCO | Lamar HVDC tie will be unavailable for the duration due to structure replacement. | 2024-02-16 18:04 | PSCO49583 | 2024-04-04 11:59 | |
MSST GEN TIE | 117313 | PSCO | Statcom Voltage Controller | GENERATOR-PSCO(PSCO) | 9999.0 | 9999.0 | 9999.0 | 2024-04-08 07:00 | 2024-04-12 10:29 | Completed | TRANSMISSION | FORCED | ONPATH | PSCO | GenTie generation is limited to 1300MW. | 2024-02-16 18:22 | PSCO49584 | 2024-04-12 10:28 | |
MALTA TO PSCO | 119655 | PSCO | Buena Vista to Otero Tap 115kV line | MALTA-PSCO(PSCO) | 921.0 | 921.0 | 895.0 | 2024-04-08 08:00 | 2024-04-12 16:00 | Completed | TRANSMISSION | PLANNED | ONPATH | PSCO | 2024-03-21 11:45 | PSCO50102 | 2024-03-21 11:45 | ||
TOT 2A RESTRICTION | 120631 | PSCO | TOT2AN-TOT2AS(PSCO) | 60.0 | 60.0 | 30.0 | 2024-04-13 02:00 | 2024-04-13 03:00 | Completed | TRANSMISSION | FORCED | ONPATH | PSCO | 2024-04-13 01:06 | PSCO50453 | 2024-04-13 01:06 | |||
TOT 2A RESTRICTION | 120655 | PSCO | S-N | TOT2AS-TOT2AN(PSCO) | 200.0 | 200.0 | 185.0 | 2024-04-13 14:00 | 2024-04-13 18:00 | Completed | TRANSMISSION | FORCED | ONPATH | PSCO | Real time Constraint S-N | 2024-04-13 13:24 | PSCO50465 | 2024-04-13 13:24 | |
TRANSMISSION CONSTRAINT | 120680 | PSCO | TOT 2A S-N | TOT2AS-TOT2AN(PSCO) | 200.0 | 200.0 | 185.0 | 2024-04-14 09:00 | 2024-04-14 14:00 | Completed | TRANSMISSION | FORCED | ONPATH | PSCO | TOT 2A S-N Real Time Constraint | 2024-04-14 08:23 | PSCO50479 | 2024-04-14 08:23 | |
TOT 2A RESTRICTION | 120802 | PSCO | TOT2AN-TOT2AS(PSCO) | 60.0 | 60.0 | 30.0 | 2024-04-15 17:00 | 2024-04-15 18:00 | Completed | TRANSMISSION | FORCED | ONPATH | PSCO | 2024-04-15 16:49 | PSCO50535 | 2024-04-15 16:49 | |||
TOT 2A RESTRICTION | 120819 | PSCO | TOT2AN-TOT2AS(PSCO) | 60.0 | 60.0 | 35.0 | 2024-04-16 17:00 | 2024-04-20 23:00 | Active | TRANSMISSION | FORCED | ONPATH | PSCO | 2024-04-16 04:59 | PSCO50544 | 2024-04-16 04:59 | |||
GOLDEN WEST WIND | 120043 | PSCO | Line to Golden West | GENERATOR-PSCO(PSCO) GENERATOR-PSCO(PSCO) |
9999.0 9999.0 |
9999.0 9999.0 |
9999.0 9999.0 |
2024-04-22 08:00 2024-04-22 17:00 |
2024-04-22 17:00 2024-04-22 23:00 |
Scheduled | TRANSMISSION | FORCED | ONPATH | PSCO | Golden West and Grazing Yak unavailable | 2024-04-02 18:50 | PSCO50259 | 2024-04-16 17:40 | |
TRANSMISSION CONSTRAINT | 120040 | PSCO | Comanche to Midway 230kV | COMA-MIDW(PSCO) MIDW-COMA(PSCO) |
1147.0 1147.0 |
1147.0 1147.0 |
654.0 654.0 |
2024-04-22 08:00 2024-04-22 08:00 |
2024-04-26 16:00 2024-04-26 16:00 |
Scheduled | TRANSMISSION | PLANNED | ONPATH | PSCO | 2024-04-02 18:47 | PSCO50258 | 2024-04-02 18:47 | ||
VALMONT GEN | 119640 | PSCO | 9030 VALM-VALM NUG line outage | GENERATOR-PSCO(PSCO) | 9999.0 | 9999.0 | 99999.0 | 2024-04-24 07:00 | 2024-05-13 15:00 | Scheduled | TRANSMISSION | FORCED | ONPATH | PSCO | VALM 7 & 8 Unavailable | 2024-03-20 17:11 | PSCO50089 | 2024-03-20 17:11 | |
PSEI Outages: | |||||||||||||||||||
TPWR-PSEI limitation | 83901 | PSEI | Breaker 825 CT rating limitation | PSEI.SYSTEM-TPWR.STAR(PSEI) TPWR.STAR-PSEI.SYSTEM(PSEI) |
240.0 240.0 |
240.0 240.0 |
228.0 228.0 |
2010-11-01 15:00 2010-11-01 15:00 |
2030-11-01 00:00 2030-11-01 00:00 |
Active | TRANSMISSION | FORCED | ONPATH | PSEI | Breaker 825 has CT rating limiting transfers both directions to 228 MWs | 2010-11-01 14:52 | PSEI38337 | 2010-11-01 14:52 | |
NewRevised CENT-PSEI | 84264 | PSEI | Centralia-Tono path | CENTRALIA-PSEI.SYSTEM(PSEI) | 400.0 | 400.0 | 398.0 | 2010-11-08 16:00 | 2030-01-01 00:00 | Active | TRANSMISSION | FORCED | ONPATH | PSEI | CT's in the Tono transformer have a rating factor of 1.0 so should be limited to 398 MVA on the Tono banks (2000:5 CT ratio) with the current metering. | 2010-11-08 15:44 | PSEI38514 | 2010-11-08 15:44 | |
JD-COB Uprate 2011 | 98437 | PSEI | Pacific AC Intertie | JOHNDAY-COB(PSEI) | 400.0 | 0.0 | 350.0 | 2011-08-01 00:00 | 2040-01-01 00:00 | Active | TRANSMISSION | PLANNED | ONPATH | PSEI | BPAT is path operator - determines OTC and PSEIs share - uprate project complete, posting 350 MW year round for forward sales | 2011-07-27 17:06 | PSEI44671 | 2011-07-27 17:06 | |
JD-COB Upgrade | 100195 | PSEI | Pacific AC Intertie | JOHNDAY-COB(PSEI) | 400.0 | 0.0 | 400.0 | 2011-10-01 00:00 | 2041-10-01 00:00 | Active | TRANSMISSION | PLANNED | ONPATH | PSEI | BPAT completed upgrade project - PSEI management determined PSEIs share 400 year around | 2011-08-30 14:22 | PSEI45364 | 2011-08-30 14:22 | |
New PSEI-SUMAS TTC | 106292 | PSEI | City of Sumas | PSEI.SYSTEM-SUMAS(PSEI) | 7.0 | 0.0 | 10.0 | 2012-01-01 00:00 | 2028-10-01 00:00 | Active | TRANSMISSION | PLANNED | ONPATH | PSEI | Studies associated with Network Service to this load show increased capacity to serve load | 2011-11-18 14:04 | PSEI47219 | 2011-11-18 14:04 | |
CENTRALIA-PSEI.SYSTEM | 170800 | PSEI | Tono | CENTRALIA-PSEI.SYSTEM(PSEI) | 400.0 | 0.0 | 400.0 | 2014-11-26 12:00 | 2040-11-26 00:00 | Active | TRANSMISSION | PLANNED | ONPATH | PSEI | contract limit | 2014-11-26 10:47 | PSEI70549 | 2014-11-26 10:47 | |
JD - COB | 467349 | PSEI | JOHNDAY-COB(PSEI) JOHNDAY-COB(PSEI) JOHNDAY-COB(PSEI) |
400.0 400.0 400.0 |
400.0 400.0 400.0 |
331.0 325.0 331.0 |
2024-04-18 00:00 2024-04-18 08:00 2024-04-18 16:00 |
2024-04-18 08:00 2024-04-18 16:00 2024-04-19 00:00 |
Active | TRANSMISSION | FORCED | ONPATH | PSEI | Reduction of TTC on COI by path operator, BPAT as Path Operator establishes the path rating. **TTC = 325MWs, ETR @ ____** | 2024-04-17 12:51 | PSEI177955 | 2024-04-17 12:51 | ||
COB - JD | 467351 | PSEI | COB-JOHNDAY(PSEI) COB-JOHNDAY(PSEI) COB-JOHNDAY(PSEI) |
306.0 306.0 306.0 |
306.0 306.0 306.0 |
225.0 133.0 148.0 |
2024-04-18 00:00 2024-04-18 08:00 2024-04-18 16:00 |
2024-04-18 08:00 2024-04-18 16:00 2024-04-19 00:00 |
Active | TRANSMISSION | FORCED | ONPATH | PSEI | Reduction of TTC on COI by path operator, BPAT as Path Operator establishes the path rating. **TTC = 133MWs, ETR @ ____** | 2024-04-17 12:54 | PSEI177956 | 2024-04-17 12:54 | ||
JD - COB | 467370 | PSEI | JOHNDAY-COB(PSEI) | 400.0 | 400.0 | 331.0 | 2024-04-18 00:00 | 2024-04-18 13:00 | Active | TRANSMISSION | FORCED | ONPATH | PSEI | Reduction of TTC on COI by path operator, BPAT as Path Operator establishes the path rating. **TTC = 331MWs, ETR @ ____** | 2024-04-17 16:08 | PSEI177965 | 2024-04-17 16:08 | ||
JD - COB | 466798 | PSEI | JOHNDAY-COB(PSEI) | 400.0 | 400.0 | 317.0 | 2024-04-18 07:00 | 2024-04-19 17:00 | Scheduled | TRANSMISSION | FORCED | ONPATH | PSEI | Reduction of TTC on COI by path operator, BPAT as Path Operator establishes the path rating. **TTC = 317 MWs | 2024-04-12 07:47 | PSEI177753 | 2024-04-12 07:47 | ||
JD - COB | 466845 | PSEI | JOHNDAY-COB(PSEI) | 400.0 | 400.0 | 331.0 | 2024-04-18 07:00 | 2024-04-18 08:00 | Scheduled | TRANSMISSION | FORCED | ONPATH | PSEI | Reduction of TTC on COI by path operator, BPAT as Path Operator establishes the path rating. **TTC = 331 MWs** | 2024-04-12 11:31 | PSEI177761 | 2024-04-12 11:31 | ||
COB - JD | 466792 | PSEI | COB-JOHNDAY(PSEI) | 306.0 | 306.0 | 225.0 | 2024-04-18 07:00 | 2024-04-18 08:00 | Scheduled | TRANSMISSION | FORCED | ONPATH | PSEI | Reduction of TTC on COI by path operator, BPAT as Path Operator establishes the path rating. **TTC = 225 MWs | 2024-04-12 07:43 | PSEI177750 | 2024-04-12 07:43 | ||
COB - JD | 466794 | PSEI | COB-JOHNDAY(PSEI) | 306.0 | 306.0 | 133.0 | 2024-04-18 08:00 | 2024-04-18 16:00 | Scheduled | TRANSMISSION | FORCED | ONPATH | PSEI | Reduction of TTC on COI by path operator, BPAT as Path Operator establishes the path rating. TTC = 133 MWs | 2024-04-12 07:44 | PSEI177751 | 2024-04-12 07:44 | ||
JD - COB | 466847 | PSEI | JOHNDAY-COB(PSEI) | 400.0 | 400.0 | 325.0 | 2024-04-18 08:00 | 2024-04-18 16:00 | Scheduled | TRANSMISSION | FORCED | ONPATH | PSEI | Reduction of TTC on COI by path operator, BPAT as Path Operator establishes the path rating. **TTC = 325 MWs | 2024-04-12 11:32 | PSEI177762 | 2024-04-12 11:32 | ||
COB - JD | 467372 | PSEI | COB-JOHNDAY(PSEI) | 306.0 | 306.0 | 191.0 | 2024-04-18 08:00 | 2024-04-18 13:00 | Scheduled | TRANSMISSION | FORCED | ONPATH | PSEI | Reduction of TTC on COI by path operator, BPAT as Path Operator establishes the path rating. **TTC = 191MWs, ETR @ ____** | 2024-04-17 16:11 | PSEI177966 | 2024-04-17 16:11 | ||
JD - COB | 466849 | PSEI | JOHNDAY-COB(PSEI) | 400.0 | 400.0 | 331.0 | 2024-04-18 16:00 | 2024-04-18 17:00 | Scheduled | TRANSMISSION | FORCED | ONPATH | PSEI | Reduction of TTC on COI by path operator, BPAT as Path Operator establishes the path rating. **TTC = 331 MWs | 2024-04-12 11:33 | PSEI177763 | 2024-04-12 11:33 | ||
COB - JD | 466796 | PSEI | COB-JOHNDAY(PSEI) | 306.0 | 306.0 | 148.0 | 2024-04-18 16:00 | 2024-04-19 17:00 | Scheduled | TRANSMISSION | FORCED | ONPATH | PSEI | Reduction of TTC on COI by path operator, BPAT as Path Operator establishes the path rating. **TTC = 148 MWs | 2024-04-12 07:46 | PSEI177752 | 2024-04-12 07:46 | ||
SMD1 Outages: | |||||||||||||||||||
COI DERATE (N-S AND S-N) | 151709 | BANC | COTP N-S(BANC) COTP S-N(BANC) |
4800.0 3675.0 |
4800.0 3675.0 |
4500.0 3600.0 |
2024-04-01 00:00 2024-04-01 00:00 |
2024-06-18 09:00 2024-06-18 09:00 |
Active | TRANSMISSION | PLANNED | ONPATH | SMD1,TANC | DERATE: COI N>S 4500MW, S>N 3600MW for TABLE MOUNTAIN 500KV SCAP 1 AND SCAP 2 | 2024-03-12 19:43 | BANC54212 | 2024-03-12 19:43 | ||
COI DERATE (N-S ONLY) | 151866 | BANC | COTP N-S(BANC) | 4800.0 | 4800.0 | 4505.0 | 2024-04-01 00:00 | 2024-06-01 00:00 | Active | TRANSMISSION | PLANNED | ONPATH | SMD1,TANC | DERATE Per WECC Operating Studies Subcommittee (OSS) COI N-S Max TTC for April and May 2024 is 4505 MW | 2024-03-29 09:28 | BANC54244 | 2024-03-29 09:28 | ||
COI DERATE (S-N ONLY) | 151716 | BANC | Spring Seasonal | COTP S-N(BANC) | 3675.0 | 3675.0 | 3000.0 | 2024-04-01 00:01 | 2024-05-31 23:59 | Active | TRANSMISSION | PLANNED | ONPATH | SMD1,TANC | Spring Seasonal N>S 4800 MW, S>N 3000 MW | 2024-03-16 19:24 | BANC54214 | 2024-03-16 19:24 | |
COI DERATE (N-S AND S-N) | 151931 | BANC | COI N>S 3975 S>N 2700 | COTP N-S(BANC) COTP S-N(BANC) COTP N-S(BANC) COTP S-N(BANC) COTP N-S(BANC) COTP S-N(BANC) COTP S-N(BANC) COTP S-N(BANC) |
4800.0 3675.0 4800.0 3675.0 4800.0 3675.0 3675.0 3675.0 |
4800.0 3675.0 4800.0 3675.0 4800.0 3675.0 3675.0 3675.0 |
3975.0 2700.0 3900.0 2675.0 3975.0 2675.0 2700.0 2675.0 |
2024-04-11 18:00 2024-04-11 18:00 2024-04-11 19:43 2024-04-11 19:43 2024-04-12 21:31 2024-04-12 21:31 2024-04-13 20:27 2024-04-18 08:00 |
2024-04-11 19:43 2024-04-11 19:43 2024-04-12 21:31 2024-04-12 21:31 2024-04-24 10:00 2024-04-13 20:27 2024-04-18 08:00 2024-04-24 10:00 |
Active | TRANSMISSION | PLANNED | ONPATH | SMD1,TANC | DERATE: Updated TTC: COI N>S 3975 S>N 2700:Table Mountain 500kV SCAP-1, PG&E - Table Mountain 500kV SCAP-2, PG&E - Round Mountain: Malin 500kV SCAPs Group 2, PG&E - Round Mountain-Table Mountain 1 500kV Line. | 2024-04-05 19:53 | BANC54254 | 2024-04-13 20:33 | |
COI DERATE (S-N ONLY) | 151765 | BANC | COI DERATE | COTP S-N(BANC) | 3675.0 | 3675.0 | 3000.0 | 2024-04-15 00:00 | 2024-04-22 00:00 | Active | TRANSMISSION | PLANNED | ONPATH | SMD1,TANC | DERATE: BPA VARIOUS OUTAGES COI S>N 3000 MW | 2024-03-21 20:25 | BANC54224 | 2024-03-21 20:25 | |
COI DERATE (N-S AND S-N) | 152001 | BANC | RDM-TBM #1, CTW CB 462, TBM Scaps | COTP N-S(BANC) COTP S-N(BANC) |
4800.0 3675.0 |
4800.0 3675.0 |
3800.0 2900.0 |
2024-04-18 07:00 2024-04-18 07:00 |
2024-04-19 17:00 2024-04-19 17:00 |
Cancelled | TRANSMISSION | PLANNED | ONPATH | SMD1,TANC | DERATE: N>S 3800, S>N 2900. PGAE Various eqpt outages. | 2024-04-13 04:26 | BANC54263 | 2024-04-13 18:04 | |
COI DERATE (S-N ONLY) | 152028 | BANC | COI DERATE | COTP S-N(BANC) | 3675.0 | 3675.0 | 2290.0 | 2024-04-18 08:00 | 2024-04-18 13:00 | Scheduled | TRANSMISSION | PLANNED | ONPATH | SMD1,TANC | DERATE: Grizzley PCB 5025, J.Day-Grizzley1 & 2 Series CAP S>N 2290 MW | 2024-04-17 18:25 | BANC54267 | 2024-04-17 18:36 | |
COI DERATE (N-S AND S-N) | 151782 | BANC | COI DERATE | COTP N-S(BANC) COTP S-N(BANC) |
4800.0 3675.0 |
4800.0 3675.0 |
4153.0 1990.0 |
2024-04-18 08:00 2024-04-18 08:00 |
2024-04-18 16:00 2024-04-18 16:00 |
Cancelled | TRANSMISSION | PLANNED | ONPATH | SMD1,TANC | DERATE: BPA LINE AND BUS WORKCOI N>S 4153 MW S>N 1990 MW | 2024-03-22 22:21 | BANC54229 | 2024-04-05 21:15 | |
COI DERATE (S-N ONLY) | 151780 | BANC | COI DERATE | COTP S-N(BANC) | 3675.0 | 3675.0 | 2190.0 | 2024-04-18 13:00 | 2024-05-08 16:00 | Scheduled | TRANSMISSION | PLANNED | ONPATH | SMD1,TANC | DERATE: BPA LINE & SUBSTATION WORK COI S>N 2190 MW | 2024-03-22 22:14 | BANC54228 | 2024-04-17 18:29 | |
COI DERATE (N-S AND S-N) | 151940 | BANC | COI N>S 3900 S>N 1600 | COTP N-S(BANC) COTP S-N(BANC) |
4800.0 3675.0 |
4800.0 3675.0 |
3900.0 1600.0 |
2024-04-18 13:00 2024-04-18 13:00 |
2024-04-18 16:00 2024-04-18 16:00 |
Scheduled | TRANSMISSION | PLANNED | ONPATH | SMD1,TANC | Derate: Buckley-Grizzly No 1 500kV Line. J. Day-Grizzly 1 & 2 Series Cap Groups 1 & 2, Alvey-Lane #1 230kV Line | 2024-04-05 21:08 | BANC54255 | 2024-04-17 18:19 | |
COI DERATE (N-S AND S-N) | 151945 | BANC | COI Derate N>S 4040 S>N 1780 | COTP N-S(BANC) COTP S-N(BANC) |
4800.0 3675.0 |
4800.0 3675.0 |
4040.0 1780.0 |
2024-04-18 13:00 2024-04-18 13:00 |
2024-04-26 16:00 2024-04-26 16:00 |
Scheduled | TRANSMISSION | PLANNED | ONPATH | SMD1,TANC | COI N>S 4040MW, S>N 1780MW.BUCKLEY-GRIZZLY NO 1 500kV LINE, BPA- ALVEY-LANE #1 230kV LINE | 2024-04-05 21:39 | BANC54256 | 2024-04-17 18:13 | |
COI DERATE (N-S AND S-N) | 151973 | BANC | COTP N-S(BANC) COTP S-N(BANC) |
4800.0 3675.0 |
4800.0 3675.0 |
4025.0 2725.0 |
2024-04-22 06:00 2024-04-22 06:00 |
2024-04-23 18:00 2024-04-23 18:00 |
Scheduled | TRANSMISSION | PLANNED | ONPATH | SMD1,TANC | DERATE: Round Mountain 500kV Series Cap 1, SC1, COI N>S 4025 MW; S>N 2725 MW | 2024-04-10 18:25 | BANC54259 | 2024-04-10 18:25 | ||
COI DERATE (N-S AND S-N) | 151996 | BANC | RDM-TBM #1, TBM SCaps, RDM Scaps, | COTP N-S(BANC) COTP S-N(BANC) |
4800.0 3675.0 |
4800.0 3675.0 |
4025.0 2725.0 |
2024-04-22 06:00 2024-04-22 06:00 |
2024-04-23 18:00 2024-04-23 18:00 |
Cancelled | TRANSMISSION | PLANNED | ONPATH | SMD1,TANC | DERATE: 4025 N>S, 2725 S>N. PGAE Various work. | 2024-04-13 04:18 | BANC54262 | 2024-04-13 04:20 | |
COI DERATE (N-S AND S-N) | 152032 | BANC | COI DERATE | COTP N-S(BANC) COTP S-N(BANC) |
4800.0 3675.0 |
4800.0 3675.0 |
4000.0 2700.0 |
2024-04-24 07:00 2024-04-24 07:00 |
2024-04-24 10:00 2024-04-24 10:00 |
Scheduled | TRANSMISSION | PLANNED | ONPATH | SMD1,TANC | DERATE: N>S 4000MW, S>N 2700 Round Mountain-Table Mountain #1 500KV Line, WASN -TRACY KT1A 500/230KV Bank, TABLE Mountain SCAP-1 & SCAP2 | 2024-04-17 20:15 | BANC54268 | 2024-04-17 20:15 | |
COI DERATE (N-S AND S-N) | 152035 | BANC | COI DERATE N>S 3300 MW | COTP N-S(BANC) COTP S-N(BANC) |
4800.0 3675.0 |
4800.0 3675.0 |
3300.0 3600.0 |
2024-04-24 10:00 2024-04-24 10:00 |
2024-04-24 16:00 2024-04-24 16:00 |
Scheduled | TRANSMISSION | PLANNED | ONPATH | SMD1,TANC | DERATE: N>S 3300 MW, S>N 3600 MW, WASN -TRACY KT1A 500/230KV Bank, TABLE Mountain SCAP-1 & SCAP2 | 2024-04-17 20:19 | BANC54269 | 2024-04-17 20:19 | |
COI DERATE (S-N ONLY) | 152015 | BANC | COI Derate | COTP S-N(BANC) | 3675.0 | 3675.0 | 1600.0 | 2024-04-29 07:00 | 2024-05-02 16:00 | Scheduled | TRANSMISSION | PLANNED | ONPATH | SMD1,TANC | DERATE: BPA – Buckley-Grizzly No 1 500kV Line, Alvey: Marion 1 500kV Line Series Cap Group 1, COI S->N 1600 MW. | 2024-04-15 18:05 | BANC54265 | 2024-04-15 18:05 | |
COI DERATE (N-S ONLY) | 151712 | BANC | COTP N-S(BANC) | 4800.0 | 4800.0 | 4325.0 | 2024-06-18 09:00 | 2024-07-08 09:00 | Scheduled | TRANSMISSION | PLANNED | ONPATH | SMD1,TANC | DERATE: COI N>S 4325MW, S>N NO CHANGE. TABLE MOUNTAIN 500KV SCAP-2 | 2024-03-12 19:48 | BANC54213 | 2024-03-12 19:48 | ||
SPPC Outages: | |||||||||||||||||||
SRP Outages: | |||||||||||||||||||
Orme - Rudd 230kV Line 1 | 459848 | SRP | Orme - Rudd 230kV Line #1 | C1-PALOVERDE500(SRP) JOJOBA2-PINALWEST500(SRP) PALOVERDE500-C1(SRP) PALOVERDE500-RUDD500(SRP) PINALWEST500-JOJOBA2(SRP) PV EAST TOTAL(SRP) RUDD500-PALOVERDE500(SRP) |
2542.0 741.0 2542.0 1111.0 741.0 11797.0 1111.0 |
2542.0 741.0 2542.0 1111.0 741.0 11797.0 1111.0 |
2293.0 669.0 2293.0 1003.0 669.0 10644.0 1003.0 |
2024-01-30 16:00 2024-01-30 16:00 2024-01-30 16:00 2024-01-30 16:00 2024-01-30 16:00 2024-01-30 16:00 2024-01-30 16:00 |
2024-03-27 09:14 2024-03-27 09:14 2024-03-27 09:14 2024-03-27 09:14 2024-03-27 09:14 2024-03-27 09:14 2024-03-27 09:14 |
Completed | TRANSMISSION | PLANNED | ONPATH | SRP | Reconductor of line 1 | 2024-01-30 14:23 | SRP175153 | 2024-03-27 09:14 | |
Browning-SilverKing 500kV | 463368 | SRP | Browning-Silverking 500kV Line | BROWNING500-SILVERKING500(SRP) CORONADO500-SILVERKIN500(SRP) SILVERKIN500-BROWNING500(SRP) SILVERKIN500-CORONADO500(SRP) |
1364.0 1494.0 1494.0 1364.0 |
1364.0 1494.0 1494.0 1364.0 |
0.0 729.0 0.0 729.0 |
2024-03-18 06:00 2024-03-18 06:00 2024-03-18 06:00 2024-03-18 06:00 |
2024-03-27 08:53 2024-03-27 08:53 2024-03-27 08:53 2024-03-27 08:53 |
Completed | TRANSMISSION | PLANNED | ONPATH | SRP | Browning-Silverking 500kV Line | 2024-03-13 14:48 | SRP176468 | 2024-03-27 08:54 | |
Cdr Mtn-Yvpi 500kV Line | 461971 | SRP | Cedar Mountain - Yavapai 500kV Line | MEAD500-PERKINS500(SRP) PERKINS500-MEAD500(SRP) |
349.0 349.0 |
349.0 349.0 |
333.0 333.0 |
2024-03-26 09:00 2024-03-26 09:00 |
2024-03-26 16:00 2024-03-26 16:00 |
Completed | TRANSMISSION | PLANNED | ONPATH | SRP | RELAY FUNCTIONAL TESTING PERFORMED AT BOTH ENDS OF THIS LINE | 2024-02-29 11:35 | SRP176018 | 2024-02-29 11:35 | |
Imperial Vly SRS Cap | 461427 | SRP | Imperial Valley Series Cap | MEAD500-PERKINS500(SRP) PERKINS500-MEAD500(SRP) |
349.0 349.0 |
349.0 349.0 |
326.0 326.0 |
2024-03-27 07:00 2024-03-27 07:00 |
2024-03-30 16:00 2024-03-30 16:00 |
Completed | TRANSMISSION | PLANNED | ONPATH | SRP | Scheduled Maintenance | 2024-02-21 10:22 | SRP175797 | 2024-02-21 10:22 | |
WW-Yavapai 500kV Line | 461978 | SRP | West Wing - Yavapi 500kV Line | MEAD500-PERKINS500(SRP) PERKINS500-MEAD500(SRP) |
349.0 349.0 |
349.0 349.0 |
309.0 309.0 |
2024-03-27 09:00 2024-03-27 09:00 |
2024-03-27 16:00 2024-03-27 16:00 |
Completed | TRANSMISSION | PLANNED | ONPATH | SRP | RELAY FUNCTIONAL TESTING PERFORMED AT BOTH ENDS OF THIS LINE | 2024-02-29 13:49 | SRP176021 | 2024-02-29 13:49 | |
Rudd 500/230kV Xfmr 3A | 464675 | SRP | Rudd 500/230kV Transformer 3A | C1-PALOVERDE500(SRP) JOJOBA2-PINALWEST500(SRP) PALOVERDE500-C1(SRP) PALOVERDE500-RUDD500(SRP) PINALWEST500-JOJOBA2(SRP) PV EAST TOTAL(SRP) RUDD500-PALOVERDE500(SRP) |
2542.0 741.0 2542.0 1111.0 741.0 11797.0 1111.0 |
2542.0 741.0 2542.0 1111.0 741.0 11797.0 1111.0 |
2188.0 638.0 2188.0 957.0 638.0 10155.0 957.0 |
2024-04-01 06:00 2024-04-01 06:00 2024-04-01 06:00 2024-04-01 06:00 2024-04-01 06:00 2024-04-01 06:00 2024-04-01 06:00 |
2024-04-04 12:24 2024-04-04 12:24 2024-04-04 12:24 2024-04-04 12:24 2024-04-04 12:24 2024-04-04 12:24 2024-04-04 12:24 |
Completed | TRANSMISSION | PLANNED | ONPATH | SRP | Preventive Maintenance | 2024-03-27 12:23 | SRP177020 | 2024-04-04 12:23 | |
CO-SI 500kV Ln Srs Cap | 465707 | SRP | Coronado - Silverking500kV Line Series Cap | CORONADO500-SILVERKIN500(SRP) SILVERKIN500-CORONADO500(SRP) |
1494.0 1364.0 |
1494.0 1364.0 |
1047.0 1047.0 |
2024-04-06 07:00 2024-04-06 07:00 |
2024-04-12 10:17 2024-04-12 10:17 |
Completed | TRANSMISSION | PLANNED | ONPATH | SRP | 2024-04-03 09:19 | SRP177393 | 2024-04-12 10:17 | ||
Kyrene 500kV West Bus | 465880 | SRP | Kyrene 500kV West Bus | C1-PALOVERDE500(SRP) JOJOBA2-PINALWEST500(SRP) PALOVERDE500-C1(SRP) PALOVERDE500-RUDD500(SRP) PINALWEST500-JOJOBA2(SRP) PV EAST TOTAL(SRP) RUDD500-PALOVERDE500(SRP) |
2542.0 741.0 2542.0 1111.0 741.0 11797.0 1111.0 |
2542.0 741.0 2542.0 1111.0 741.0 11797.0 1111.0 |
2338.0 681.0 2338.0 1022.0 681.0 10853.0 1022.0 |
2024-04-08 06:00 2024-04-08 06:00 2024-04-08 06:00 2024-04-08 06:00 2024-04-08 06:00 2024-04-08 06:00 2024-04-08 06:00 |
2024-04-12 10:18 2024-04-12 10:18 2024-04-12 10:18 2024-04-12 10:18 2024-04-12 10:18 2024-04-12 10:18 2024-04-12 10:18 |
Completed | TRANSMISSION | PLANNED | ONPATH | SRP | Includes Kyrene 500/230kV Transformer #7 | 2024-04-05 16:01 | SRP177460 | 2024-04-12 10:17 | |
Silverking500/230kV Xfmr4 | 465823 | SRP | Silverking 500/230kV Transformer #4 | CORONADO500-SILVERKIN500(SRP) SILVERKIN500-CORONADO500(SRP) |
1494.0 1364.0 |
1494.0 1364.0 |
973.0 973.0 |
2024-04-08 06:00 2024-04-08 06:00 |
2024-04-30 17:00 2024-04-30 17:00 |
Active | TRANSMISSION | PLANNED | ONPATH | SRP | Replace 500kV disconnects SI926 and SI927 | 2024-04-04 14:45 | SRP177440 | 2024-04-05 09:11 | |
Mead-Mrktplce 500kV Line | 461458 | SRP | Mead-Marketplace 500kV Line | MARKETPLACE-MEAD500(SRP) MEAD500-MARKETPLACE(SRP) |
556.0 556.0 |
556.0 556.0 |
0.0 0.0 |
2024-04-15 10:00 2024-04-15 10:00 |
2024-04-15 12:03 2024-04-15 12:03 |
Completed | TRANSMISSION | PLANNED | ONPATH | SRP | Scheduled Maintenance | 2024-02-22 09:19 | SRP175814 | 2024-04-15 12:02 | |
Rudd500/230 Xfmr 1A/1B | 467274 | SRP | Rudd 500/230kV Transformer 1A/1B | C1-PALOVERDE500(SRP) JOJOBA2-PINALWEST500(SRP) PALOVERDE500-C1(SRP) PALOVERDE500-RUDD500(SRP) PINALWEST500-JOJOBA2(SRP) PV EAST TOTAL(SRP) RUDD500-PALOVERDE500(SRP) C1-PALOVERDE500(SRP) JOJOBA2-PINALWEST500(SRP) PALOVERDE500-C1(SRP) PALOVERDE500-RUDD500(SRP) PINALWEST500-JOJOBA2(SRP) PV EAST TOTAL(SRP) RUDD500-PALOVERDE500(SRP) |
2542.0 741.0 2542.0 1111.0 741.0 11797.0 1111.0 2542.0 741.0 2542.0 1111.0 741.0 11797.0 1111.0 |
2542.0 741.0 2542.0 1111.0 741.0 11797.0 1111.0 2542.0 741.0 2542.0 1111.0 741.0 11797.0 1111.0 |
1942.0 566.0 1942.0 849.0 566.0 9013.0 849.0 1942.0 566.0 1942.0 849.0 566.0 9013.0 849.0 |
2024-04-17 06:00 2024-04-17 06:00 2024-04-17 06:00 2024-04-17 06:00 2024-04-17 06:00 2024-04-17 06:00 2024-04-17 06:00 2024-04-17 15:00 2024-04-17 15:00 2024-04-17 15:00 2024-04-17 15:00 2024-04-17 15:00 2024-04-17 15:00 2024-04-17 15:00 |
2024-04-17 15:00 2024-04-17 15:00 2024-04-17 15:00 2024-04-17 15:00 2024-04-17 15:00 2024-04-17 15:00 2024-04-17 15:00 2024-04-17 17:00 2024-04-17 17:00 2024-04-17 17:00 2024-04-17 17:00 2024-04-17 17:00 2024-04-17 17:00 2024-04-17 17:00 |
Completed | TRANSMISSION | FORCED | ONPATH | SRP | Repair hot spot on 916 disconnect | 2024-04-16 13:27 | SRP177933 | 2024-04-16 13:28 | |
Perkins-Mead Line Srs Cap | 461461 | SRP | Perkins- Mead Line Series Cap | MEAD500-PERKINS500(SRP) PERKINS500-MEAD500(SRP) |
349.0 349.0 |
349.0 349.0 |
223.0 223.0 |
2024-04-21 07:00 2024-04-21 07:00 |
2024-04-26 17:00 2024-04-26 17:00 |
Scheduled | TRANSMISSION | PLANNED | ONPATH | SRP | Request is for Relay Maintenance and GE to perform yearly maintenance on the Series Capacitors.Perkins 500kV Mead Line Series Capacitor | 2024-02-22 09:25 | SRP175815 | 2024-02-22 09:25 | |
SWTC Outages: | |||||||||||||||||||
BICKNELL VAIL 345 | 466233 | SWTC | Vail-Bicknell | BICKNELL230-VAIL345(SWTC) VAIL345-BICKNELL230(SWTC) BICKNELL230-VAIL345(SWTC) VAIL345-BICKNELL230(SWTC) |
420.0 420.0 420.0 420.0 |
420.0 420.0 420.0 420.0 |
0.0 0.0 0.0 0.0 |
2024-04-15 08:00 2024-04-15 08:00 2024-04-15 15:00 2024-04-15 15:00 |
2024-04-15 15:00 2024-04-15 15:00 2024-04-18 16:00 2024-04-18 16:00 |
Cancelled | TRANSMISSION | PLANNED | ONPATH | SWTC | 2024-04-08 13:00 | SWTC177588 | 2024-04-10 07:37 | ||
APACHE / HAYDEN 115 | 466549 | SWTC | Apache-Hayden 115 kV Line | APACHE115-HAYDEN115(SWTC) HAYDEN115-APACHE115(SWTC) |
126.0 126.0 |
126.0 126.0 |
0.0 0.0 |
2024-04-15 08:00 2024-04-15 08:00 |
2024-04-18 16:00 2024-04-18 16:00 |
Active | TRANSMISSION | PLANNED | ONPATH | SWTC | CROW 1-00461924SRP OMS ID 15569528 | 2024-04-11 07:29 | SWTC177685 | 2024-04-11 07:29 | |
APACHE / HAYDEN 115 | 467315 | SWTC | Apache-Hayden 115 | APACHE115-HAYDEN115(SWTC) HAYDEN115-APACHE115(SWTC) |
126.0 126.0 |
126.0 126.0 |
0.0 0.0 |
2024-04-22 08:00 2024-04-22 08:00 |
2024-04-25 16:00 2024-04-25 16:00 |
Cancelled | TRANSMISSION | PLANNED | ONPATH | SWTC | 2024-04-16 16:00 | SWTC177941 | 2024-04-17 09:08 | ||
TANC Outages: | |||||||||||||||||||
COI DERATE (N-S AND S-N) | 151709 | BANC | COTP N-S(BANC) COTP S-N(BANC) |
4800.0 3675.0 |
4800.0 3675.0 |
4500.0 3600.0 |
2024-04-01 00:00 2024-04-01 00:00 |
2024-06-18 09:00 2024-06-18 09:00 |
Active | TRANSMISSION | PLANNED | ONPATH | SMD1,TANC | DERATE: COI N>S 4500MW, S>N 3600MW for TABLE MOUNTAIN 500KV SCAP 1 AND SCAP 2 | 2024-03-12 19:43 | BANC54212 | 2024-03-12 19:43 | ||
COI DERATE (N-S ONLY) | 151866 | BANC | COTP N-S(BANC) | 4800.0 | 4800.0 | 4505.0 | 2024-04-01 00:00 | 2024-06-01 00:00 | Active | TRANSMISSION | PLANNED | ONPATH | SMD1,TANC | DERATE Per WECC Operating Studies Subcommittee (OSS) COI N-S Max TTC for April and May 2024 is 4505 MW | 2024-03-29 09:28 | BANC54244 | 2024-03-29 09:28 | ||
COI DERATE (S-N ONLY) | 151716 | BANC | Spring Seasonal | COTP S-N(BANC) | 3675.0 | 3675.0 | 3000.0 | 2024-04-01 00:01 | 2024-05-31 23:59 | Active | TRANSMISSION | PLANNED | ONPATH | SMD1,TANC | Spring Seasonal N>S 4800 MW, S>N 3000 MW | 2024-03-16 19:24 | BANC54214 | 2024-03-16 19:24 | |
COI DERATE (N-S AND S-N) | 151931 | BANC | COI N>S 3975 S>N 2700 | COTP N-S(BANC) COTP S-N(BANC) COTP N-S(BANC) COTP S-N(BANC) COTP N-S(BANC) COTP S-N(BANC) COTP S-N(BANC) COTP S-N(BANC) |
4800.0 3675.0 4800.0 3675.0 4800.0 3675.0 3675.0 3675.0 |
4800.0 3675.0 4800.0 3675.0 4800.0 3675.0 3675.0 3675.0 |
3975.0 2700.0 3900.0 2675.0 3975.0 2675.0 2700.0 2675.0 |
2024-04-11 18:00 2024-04-11 18:00 2024-04-11 19:43 2024-04-11 19:43 2024-04-12 21:31 2024-04-12 21:31 2024-04-13 20:27 2024-04-18 08:00 |
2024-04-11 19:43 2024-04-11 19:43 2024-04-12 21:31 2024-04-12 21:31 2024-04-24 10:00 2024-04-13 20:27 2024-04-18 08:00 2024-04-24 10:00 |
Active | TRANSMISSION | PLANNED | ONPATH | SMD1,TANC | DERATE: Updated TTC: COI N>S 3975 S>N 2700:Table Mountain 500kV SCAP-1, PG&E - Table Mountain 500kV SCAP-2, PG&E - Round Mountain: Malin 500kV SCAPs Group 2, PG&E - Round Mountain-Table Mountain 1 500kV Line. | 2024-04-05 19:53 | BANC54254 | 2024-04-13 20:33 | |
COI DERATE (S-N ONLY) | 151765 | BANC | COI DERATE | COTP S-N(BANC) | 3675.0 | 3675.0 | 3000.0 | 2024-04-15 00:00 | 2024-04-22 00:00 | Active | TRANSMISSION | PLANNED | ONPATH | SMD1,TANC | DERATE: BPA VARIOUS OUTAGES COI S>N 3000 MW | 2024-03-21 20:25 | BANC54224 | 2024-03-21 20:25 | |
COI DERATE (N-S AND S-N) | 152001 | BANC | RDM-TBM #1, CTW CB 462, TBM Scaps | COTP N-S(BANC) COTP S-N(BANC) |
4800.0 3675.0 |
4800.0 3675.0 |
3800.0 2900.0 |
2024-04-18 07:00 2024-04-18 07:00 |
2024-04-19 17:00 2024-04-19 17:00 |
Cancelled | TRANSMISSION | PLANNED | ONPATH | SMD1,TANC | DERATE: N>S 3800, S>N 2900. PGAE Various eqpt outages. | 2024-04-13 04:26 | BANC54263 | 2024-04-13 18:04 | |
COI DERATE (S-N ONLY) | 152028 | BANC | COI DERATE | COTP S-N(BANC) | 3675.0 | 3675.0 | 2290.0 | 2024-04-18 08:00 | 2024-04-18 13:00 | Scheduled | TRANSMISSION | PLANNED | ONPATH | SMD1,TANC | DERATE: Grizzley PCB 5025, J.Day-Grizzley1 & 2 Series CAP S>N 2290 MW | 2024-04-17 18:25 | BANC54267 | 2024-04-17 18:36 | |
COI DERATE (N-S AND S-N) | 151782 | BANC | COI DERATE | COTP N-S(BANC) COTP S-N(BANC) |
4800.0 3675.0 |
4800.0 3675.0 |
4153.0 1990.0 |
2024-04-18 08:00 2024-04-18 08:00 |
2024-04-18 16:00 2024-04-18 16:00 |
Cancelled | TRANSMISSION | PLANNED | ONPATH | SMD1,TANC | DERATE: BPA LINE AND BUS WORKCOI N>S 4153 MW S>N 1990 MW | 2024-03-22 22:21 | BANC54229 | 2024-04-05 21:15 | |
COI DERATE (S-N ONLY) | 151780 | BANC | COI DERATE | COTP S-N(BANC) | 3675.0 | 3675.0 | 2190.0 | 2024-04-18 13:00 | 2024-05-08 16:00 | Scheduled | TRANSMISSION | PLANNED | ONPATH | SMD1,TANC | DERATE: BPA LINE & SUBSTATION WORK COI S>N 2190 MW | 2024-03-22 22:14 | BANC54228 | 2024-04-17 18:29 | |
COI DERATE (N-S AND S-N) | 151940 | BANC | COI N>S 3900 S>N 1600 | COTP N-S(BANC) COTP S-N(BANC) |
4800.0 3675.0 |
4800.0 3675.0 |
3900.0 1600.0 |
2024-04-18 13:00 2024-04-18 13:00 |
2024-04-18 16:00 2024-04-18 16:00 |
Scheduled | TRANSMISSION | PLANNED | ONPATH | SMD1,TANC | Derate: Buckley-Grizzly No 1 500kV Line. J. Day-Grizzly 1 & 2 Series Cap Groups 1 & 2, Alvey-Lane #1 230kV Line | 2024-04-05 21:08 | BANC54255 | 2024-04-17 18:19 | |
COI DERATE (N-S AND S-N) | 151945 | BANC | COI Derate N>S 4040 S>N 1780 | COTP N-S(BANC) COTP S-N(BANC) |
4800.0 3675.0 |
4800.0 3675.0 |
4040.0 1780.0 |
2024-04-18 13:00 2024-04-18 13:00 |
2024-04-26 16:00 2024-04-26 16:00 |
Scheduled | TRANSMISSION | PLANNED | ONPATH | SMD1,TANC | COI N>S 4040MW, S>N 1780MW.BUCKLEY-GRIZZLY NO 1 500kV LINE, BPA- ALVEY-LANE #1 230kV LINE | 2024-04-05 21:39 | BANC54256 | 2024-04-17 18:13 | |
COI DERATE (N-S AND S-N) | 151973 | BANC | COTP N-S(BANC) COTP S-N(BANC) |
4800.0 3675.0 |
4800.0 3675.0 |
4025.0 2725.0 |
2024-04-22 06:00 2024-04-22 06:00 |
2024-04-23 18:00 2024-04-23 18:00 |
Scheduled | TRANSMISSION | PLANNED | ONPATH | SMD1,TANC | DERATE: Round Mountain 500kV Series Cap 1, SC1, COI N>S 4025 MW; S>N 2725 MW | 2024-04-10 18:25 | BANC54259 | 2024-04-10 18:25 | ||
COI DERATE (N-S AND S-N) | 151996 | BANC | RDM-TBM #1, TBM SCaps, RDM Scaps, | COTP N-S(BANC) COTP S-N(BANC) |
4800.0 3675.0 |
4800.0 3675.0 |
4025.0 2725.0 |
2024-04-22 06:00 2024-04-22 06:00 |
2024-04-23 18:00 2024-04-23 18:00 |
Cancelled | TRANSMISSION | PLANNED | ONPATH | SMD1,TANC | DERATE: 4025 N>S, 2725 S>N. PGAE Various work. | 2024-04-13 04:18 | BANC54262 | 2024-04-13 04:20 | |
COI DERATE (N-S AND S-N) | 152032 | BANC | COI DERATE | COTP N-S(BANC) COTP S-N(BANC) |
4800.0 3675.0 |
4800.0 3675.0 |
4000.0 2700.0 |
2024-04-24 07:00 2024-04-24 07:00 |
2024-04-24 10:00 2024-04-24 10:00 |
Scheduled | TRANSMISSION | PLANNED | ONPATH | SMD1,TANC | DERATE: N>S 4000MW, S>N 2700 Round Mountain-Table Mountain #1 500KV Line, WASN -TRACY KT1A 500/230KV Bank, TABLE Mountain SCAP-1 & SCAP2 | 2024-04-17 20:15 | BANC54268 | 2024-04-17 20:15 | |
COI DERATE (N-S AND S-N) | 152035 | BANC | COI DERATE N>S 3300 MW | COTP N-S(BANC) COTP S-N(BANC) |
4800.0 3675.0 |
4800.0 3675.0 |
3300.0 3600.0 |
2024-04-24 10:00 2024-04-24 10:00 |
2024-04-24 16:00 2024-04-24 16:00 |
Scheduled | TRANSMISSION | PLANNED | ONPATH | SMD1,TANC | DERATE: N>S 3300 MW, S>N 3600 MW, WASN -TRACY KT1A 500/230KV Bank, TABLE Mountain SCAP-1 & SCAP2 | 2024-04-17 20:19 | BANC54269 | 2024-04-17 20:19 | |
COI DERATE (S-N ONLY) | 152015 | BANC | COI Derate | COTP S-N(BANC) | 3675.0 | 3675.0 | 1600.0 | 2024-04-29 07:00 | 2024-05-02 16:00 | Scheduled | TRANSMISSION | PLANNED | ONPATH | SMD1,TANC | DERATE: BPA – Buckley-Grizzly No 1 500kV Line, Alvey: Marion 1 500kV Line Series Cap Group 1, COI S->N 1600 MW. | 2024-04-15 18:05 | BANC54265 | 2024-04-15 18:05 | |
COI DERATE (N-S ONLY) | 151712 | BANC | COTP N-S(BANC) | 4800.0 | 4800.0 | 4325.0 | 2024-06-18 09:00 | 2024-07-08 09:00 | Scheduled | TRANSMISSION | PLANNED | ONPATH | SMD1,TANC | DERATE: COI N>S 4325MW, S>N NO CHANGE. TABLE MOUNTAIN 500KV SCAP-2 | 2024-03-12 19:48 | BANC54213 | 2024-03-12 19:48 | ||
TEPC Outages: | |||||||||||||||||||
JOJOBA-PINAL WEST 500KV | 442499 | TEPC | Browning-Pinal Central 500 | JOJOBA500-PINALWEST500(TEPC) PINALWEST500-JOJOBA500(TEPC) JOJOBA500-PINALWEST500(TEPC) PINALWEST500-JOJOBA500(TEPC) JOJOBA500-PINALWEST500(TEPC) PINALWEST500-JOJOBA500(TEPC) |
670.0 670.0 670.0 670.0 670.0 670.0 |
670.0 670.0 670.0 670.0 670.0 670.0 |
633.0 633.0 511.0 511.0 633.0 633.0 |
2023-10-20 07:00 2023-10-20 07:00 2024-04-17 06:00 2024-04-17 06:00 2024-04-17 17:00 2024-04-17 17:00 |
2024-04-17 06:00 2024-04-17 06:00 2024-04-17 17:00 2024-04-17 17:00 2024-04-22 17:00 2024-04-22 17:00 |
Active | TRANSMISSION | PLANNED | ONPATH | TEPC | Repair hot spot on 916 disconnect | 2023-10-13 14:30 | TEPC169345 | 2024-04-16 16:48 | |
Orme - Rudd 230kV Line 1 | 459858 | TEPC | JOJOBA500-PINALWEST500(TEPC) PINALWEST500-JOJOBA500(TEPC) |
670.0 670.0 |
670.0 670.0 |
605.0 605.0 |
2024-01-30 16:00 2024-01-30 16:00 |
2024-03-27 09:43 2024-03-27 09:43 |
Completed | TRANSMISSION | FORCED | ONPATH | TEPC | Reconductor of line 1 ATL | 2024-01-30 14:34 | TEPC175154 | 2024-03-27 09:43 | ||
SAGUARO-TORTOLITA | 460653 | TEPC | SAGUARO500-TORTOLITA500(TEPC) TORTOLITA500-SAGUARO500(TEPC) SAGUARO500-TORTOLITA500(TEPC) TORTOLITA500-SAGUARO500(TEPC) |
692.0 692.0 692.0 692.0 |
692.0 692.0 692.0 692.0 |
0.0 0.0 0.0 0.0 |
2024-02-28 19:00 2024-03-26 07:00 2024-03-26 10:09 2024-03-26 10:09 |
2024-03-26 10:09 2024-03-26 10:09 2024-03-26 15:00 2024-03-26 15:00 |
Completed | TRANSMISSION | PLANNED | ONPATH | TEPC | APS to repair switch SG3053. | 2024-02-09 16:13 | TEPC175481 | 2024-03-26 10:13 | ||
JOJOBA-PINAL WEST 500KV | 464471 | TEPC | JOJOBA500-PINALWEST500(TEPC) PINALWEST500-JOJOBA500(TEPC) |
670.0 670.0 |
670.0 670.0 |
0.0 0.0 |
2024-03-26 10:00 2024-03-26 10:00 |
2024-03-26 10:12 2024-03-26 10:12 |
Completed | TRANSMISSION | FORCED | ONPATH | TEPC | 2024-03-26 10:01 | TEPC176930 | 2024-03-26 10:11 | |||
WESTWING -PINAL WEST 345 | 456182 | TEPC | PINALWEST345-WESTWING345(TEPC) WESTWING345-PINALWEST345(TEPC) |
703.0 703.0 |
703.0 703.0 |
0.0 0.0 |
2024-03-29 12:00 2024-03-29 12:00 |
2024-03-29 16:00 2024-03-29 16:00 |
Completed | TRANSMISSION | FORCED | ONPATH | TEPC | 2024-01-12 17:48 | TEPC173970 | 2024-01-12 17:48 | |||
JOJOBA-PINAL WEST 500KV | 464690 | TEPC | Rudd 500/230kV Transformer 3A | JOJOBA500-PINALWEST500(TEPC) PINALWEST500-JOJOBA500(TEPC) |
670.0 670.0 |
670.0 670.0 |
577.0 577.0 |
2024-04-01 06:00 2024-04-01 06:00 |
2024-04-05 17:00 2024-04-05 17:00 |
Completed | TRANSMISSION | PLANNED | ONPATH | TEPC | Preventative Maintenance | 2024-03-27 12:49 | TEPC177024 | 2024-03-27 12:49 | |
CORONADO-SPRINGERVILLE | 461873 | TEPC | CORONADO500-SPRINGER345(TEPC) SPRINGER345-CORONADO500(TEPC) |
572.0 572.0 |
572.0 572.0 |
0.0 0.0 |
2024-04-01 08:00 2024-04-01 08:00 |
2024-04-01 12:00 2024-04-01 12:00 |
Cancelled | TRANSMISSION | PLANNED | ONPATH | TEPC | Coronado 9B Transformer | 2024-02-28 09:29 | TEPC175983 | 2024-03-08 10:28 | ||
CORONADO-SPRINGERVILLE | 461876 | TEPC | CORONADO500-SPRINGER345(TEPC) SPRINGER345-CORONADO500(TEPC) |
572.0 572.0 |
572.0 572.0 |
0.0 0.0 |
2024-04-04 13:00 2024-04-04 13:00 |
2024-04-04 17:00 2024-04-04 17:00 |
Cancelled | TRANSMISSION | PLANNED | ONPATH | TEPC | Coronado 9B Transformer | 2024-02-28 09:32 | TEPC175984 | 2024-03-08 10:28 | ||
CATRON-GREENLEE | 462516 | TEPC | CATRON345-GREENLEE345(TEPC) GREENLEE345-CATRON345(TEPC) |
2390.0 2390.0 |
2390.0 2390.0 |
1195.0 1195.0 |
2024-04-09 07:00 2024-04-09 07:00 |
2024-04-11 14:14 2024-04-11 14:14 |
Completed | TRANSMISSION | PLANNED | ONPATH | TEPC | INSTALL LINE ARRESTORS. 345KV LINE #1 | 2024-03-06 11:09 | TEPC176162 | 2024-04-11 14:14 | ||
PINALWEST500-PINALWEST345 | 456176 | TEPC | PINALWEST345-PINALWEST500(TEPC) PINALWEST500-PINALWEST345(TEPC) |
511.0 511.0 |
511.0 511.0 |
0.0 0.0 |
2024-05-13 08:00 2024-05-13 08:00 |
2024-05-17 16:00 2024-05-17 16:00 |
Scheduled | TRANSMISSION | FORCED | ONPATH | TEPC | 2024-01-12 17:44 | TEPC173968 | 2024-01-12 17:44 | |||
TPWT Outages: | |||||||||||||||||||
TSGT Outages: | |||||||||||||||||||
STEGALL HVDC TIE (TS) | 435682 | TSGT | STEGALL HVDC TIE | TSGTNORTH-TSGTNORTH(TSGT) TSGTNORTH-TSGTNORTH(TSGT) |
0.0 0.0 |
0.0 0.0 |
0.0 0.0 |
2023-08-31 13:00 2024-08-31 16:00 |
2024-08-31 16:00 2024-12-31 23:00 |
Active | TRANSMISSION | FORCED | ONPATH | TSGT | Unique system conditions may requiring posting. | 2023-08-31 12:58 | TSGT167125 | 2024-04-10 11:18 | |
TOT 3 RESTRICTION | 463012 | TSGT | Laramie River Station 345 KV 345 kV CB 2996 | LRS-TOT3GS(TSGT) TOT3GS-LRS(TSGT) AU-TOT3GS(TSGT) LRS-TOT3GS(TSGT) TOT3GS-AU(TSGT) TOT3GS-LRS(TSGT) AU-TOT3GS(TSGT) TOT3GS-AU(TSGT) |
400.0 400.0 371.0 182.0 460.0 400.0 371.0 460.0 |
400.0 400.0 371.0 400.0 460.0 400.0 371.0 460.0 |
300.0 300.0 0.0 300.0 0.0 300.0 371.0 460.0 |
2024-03-23 08:00 2024-03-23 08:00 2024-04-02 15:00 2024-04-02 15:00 2024-04-02 15:00 2024-04-02 15:00 2024-04-04 22:41 2024-04-04 22:41 |
2024-04-02 15:00 2024-04-02 15:00 2024-04-04 22:41 2024-05-10 16:00 2024-04-04 22:41 2024-05-10 16:00 2024-05-10 16:00 2024-05-10 16:00 |
Active | TRANSMISSION | PLANNED | ONPATH | TSGT | Outage limits TOT 3 path TTC. Limit may change based upon system conditions. Series #32 | 2024-03-11 14:32 | TSGT176365 | 2024-04-04 22:43 | |
RADIAL LOAD | 463261 | TSGT | Bernardo Bernardo - Socorro (TS) 115 kV Line Secti | TSGTEAST-TSGTEAST(TSGT) TSGTNORTH-TSGTNORTH(TSGT) TSGTSOUTH-TSGTSOUTH(TSGT) TSGTWEST-TSGTWEST(TSGT) |
0.0 0.0 0.0 0.0 |
0.0 0.0 0.0 0.0 |
0.0 0.0 0.0 0.0 |
2024-03-25 08:00 2024-03-25 08:00 2024-03-25 08:00 2024-03-25 08:00 |
2024-05-21 17:00 2024-05-21 17:00 2024-05-21 17:00 2024-05-21 17:00 |
Active | TRANSMISSION | PLANNED | ONPATH | TSGT | TTC is not impacted. Member load affected. Bernardo Loads will be Radial from Belen | 2024-03-13 06:48 | TSGT176434 | 2024-03-13 06:48 | |
RADIAL LOAD | 462538 | TSGT | PINE BLUFFS - KIMBALL 115KV LINE | TSGTNORTH-TSGTNORTH(TSGT) | 0.0 | 0.0 | 0.0 | 2024-03-25 09:00 | 2024-04-05 18:00 | Completed | TRANSMISSION | PLANNED | ONPATH | TSGT | THE PINE BLUFFS - KIMBALL SECTION OF THE ARCHER - SIDNEY 115KV LINE OUTAGE WILL NOT IMPACT TSG TTC. JACINTO AND KIMBALL WILL BE RADIAL FROM SIDNEY AND PINE BLUFFS WILL BE RADIAL FROM ARCHER DURING THIS TIME. | 2024-03-06 15:04 | TSGT176173 | 2024-03-06 15:04 | |
RADIAL LOAD | 463970 | TSGT | CAHONE - EMPIRE 115KV LINE | TSGTWEST-TSGTWEST(TSGT) | 0.0 | 0.0 | 0.0 | 2024-04-02 08:00 | 2024-04-07 18:00 | Cancelled | TRANSMISSION | PLANNED | ONPATH | TSGT | THE CAHONE - EMPIRE 115KV LINE OUTAGE WILL NOT IMPACT TSGT TTC. GREAT CUT TAP WILL BE DE-ENERGIZED DURING THIS OUTAGE. | 2024-03-20 13:25 | TSGT176735 | 2024-03-28 08:09 | |
TOT 5 RESTRICTION | 463815 | TSGT | CRAIG - HAYDEN 230KV LINE #1 | CRG-TOT5GW(TSGT) TOT5GW-CRG(TSGT) |
260.0 210.0 |
260.0 210.0 |
154.0 154.0 |
2024-04-08 08:00 2024-04-08 08:00 |
2024-04-09 16:00 2024-04-09 16:00 |
Completed | TRANSMISSION | PLANNED | ONPATH | TSGT | THIS CRAIG - HAYDEN 230KV LINE #1 OUTAGE WILL REDUCE TSGT TOT5 TTC. | 2024-03-18 13:44 | TSGT176660 | 2024-04-09 06:03 | |
RADIAL LOAD | 466227 | TSGT | AULT-CAREY 230KV LINE | TSGTEAST-TSGTEAST(TSGT) TSGTNORTH-TSGTNORTH(TSGT) TSGTSOUTH-TSGTSOUTH(TSGT) TSGTWEST-TSGTWEST(TSGT) |
0.0 0.0 0.0 0.0 |
0.0 0.0 0.0 0.0 |
0.0 0.0 0.0 0.0 |
2024-04-08 12:00 2024-04-08 12:00 2024-04-08 12:00 2024-04-08 12:00 |
2024-04-09 16:18 2024-04-09 16:18 2024-04-09 16:18 2024-04-09 16:18 |
Completed | TRANSMISSION | FORCED | ONPATH | TSGT | TTC is not impacted. Member load affected. CAREY LOADS WILL BE RADIAL FROM TIMBERLINE PARK DURING THIS OUTAGE. | 2024-04-08 11:33 | TSGT177586 | 2024-04-09 16:17 | |
TOT 5 RESTRICTION | 463820 | TSGT | CRAIG - HAYDEN 230KV LINE #2 | CRG-TOT5GW(TSGT) HDN-TOT5GW(TSGT) TOT5GW-CRG(TSGT) TOT5GW-HDN(TSGT) |
260.0 52.0 210.0 110.0 |
260.0 52.0 210.0 110.0 |
154.0 0.0 154.0 0.0 |
2024-04-09 16:00 2024-04-09 16:00 2024-04-09 16:00 2024-04-09 16:00 |
2024-04-11 14:57 2024-04-11 14:57 2024-04-11 14:57 2024-04-11 14:57 |
Completed | TRANSMISSION | PLANNED | ONPATH | TSGT | THE CRAIG - HAYDEN 230KV LINE #2 OUTAGE WILL REDUCE TSGT TOT 5 TTC AND REDUCE TTC ON THE PATH. | 2024-03-18 13:52 | TSGT176663 | 2024-04-11 14:56 | |
GENERATION RESTRICTION | 454336 | TSGT | Wray (TS), Wray Emergency Tap | TSGTEAST-TSGTEAST(TSGT) | 0.0 | 0.0 | 0.0 | 2024-04-10 08:00 | 2024-04-10 14:00 | Completed | TRANSMISSION | PLANNED | ONPATH | TSGT | Outage does not impact TTC. GENERATION RESTRICTION | 2023-12-21 16:10 | TSGT173136 | 2024-02-26 09:49 | |
PATH TTC IMPACT | 465403 | TSGT | CRAIG - RIFLE 230KV LINE | CRG-RFL(TSGT) CRG-TOT5GW(TSGT) HSP-SJ345(TSGT) RFL-CRG(TSGT) SJ345-HSP(TSGT) TOT5GW-CRG(TSGT) |
412.0 260.0 15.0 412.0 60.0 210.0 |
412.0 260.0 15.0 412.0 60.0 210.0 |
0.0 200.0 15.0 0.0 60.0 200.0 |
2024-04-12 08:00 2024-04-12 08:00 2024-04-12 08:00 2024-04-12 08:00 2024-04-12 08:00 2024-04-12 08:00 |
2024-04-13 10:03 2024-04-13 10:03 2024-04-13 10:03 2024-04-13 10:03 2024-04-13 10:03 2024-04-13 10:03 |
Completed | TRANSMISSION | PLANNED | ONPATH | TSGT | THE CRAIG - RIFLE 230KV LINE OUTAGE WILL REDUCE TSGT TOT 2 AND TOT 5 TTC. | 2024-04-01 13:40 | TSGT177284 | 2024-04-13 10:05 | |
PATH TTC IMPACT | 464927 | TSGT | GLADSTONE - WALSENBURG 230KV LINE | GLAD-WALT(TSGT) WALT-GLAD(TSGT) |
207.0 207.0 |
207.0 207.0 |
0.0 0.0 |
2024-04-15 08:00 2024-04-15 08:00 |
2024-05-03 16:00 2024-05-03 16:00 |
Active | TRANSMISSION | PLANNED | ONPATH | TSGT | Outage limits path TTC. Member load affected. | 2024-03-28 15:56 | TSGT177111 | 2024-03-28 15:56 | |
RADIAL LOAD | 465634 | TSGT | ELSIE SWITCH - PAXTON 115KV LINE | TSGTWEST-TSGTWEST(TSGT) | 0.0 | 0.0 | 0.0 | 2024-04-15 08:00 | 2024-04-20 17:00 | Active | TRANSMISSION | PLANNED | ONPATH | TSGT | THE ELSIE SWITCH - PAXTON SECTION OF THE ELSIE SWITCH - SUTHERLAND 115KV LINE OUTAGE WILL NOT IMPACT TSGT TTC. PAXTON WILL BE RADIAL FROM SUTHERLAND. BLACKWOOD CREEK, RED WILLOW CREEK, AND ROSCOE WILL BE RADIAL FROM OGALLALA. | 2024-04-02 15:11 | TSGT177357 | 2024-04-02 15:11 | |
PATH TTC IMPACT | 467249 | TSGT | SPRINGER - STORRIE LAKE 115KV LINE | SPGR-STORLK115(TSGT) STORLK115-SPGR(TSGT) |
92.0 92.0 |
92.0 92.0 |
0.0 0.0 |
2024-04-16 06:20 2024-04-16 06:20 |
2024-05-03 16:00 2024-05-03 16:00 |
Active | TRANSMISSION | PLANNED | ONPATH | TSGT | THE SPRINGER - STORRIE LAKE 115KV LINE OUTAGE WILL REDUCE TSGT TTC ON THE PATH. RAINSVILLE WILL BE RADIAL FROM SPRINGER DURING THIS TIME. | 2024-04-16 06:23 | TSGT177925 | 2024-04-16 06:23 | |
TOT 3 RESTRICTION | 464313 | TSGT | AULT 230KV EAST BUS | LRS-TOT3GS(TSGT) TOT3GS-LRS(TSGT) |
400.0 400.0 |
400.0 400.0 |
300.0 300.0 |
2024-04-16 07:00 2024-04-16 07:00 |
2024-04-17 17:00 2024-04-17 17:00 |
Completed | TRANSMISSION | PLANNED | ONPATH | TSGT | Outage limits TOT 3 path TTC. Limit may change based upon system conditions. TOT 3 WILL BE SERIES 10 539MW LIMIT NORTH TO SOUTH PER WAPA | 2024-03-25 06:00 | TSGT176866 | 2024-03-25 06:00 | |
RADIAL LOAD | 467307 | TSGT | WAUNETA - WRAY 115KV LINE | TSGTEAST-TSGTEAST(TSGT) | 0.0 | 0.0 | 0.0 | 2024-04-16 15:45 | 2024-04-17 06:00 | Completed | TRANSMISSION | FORCED | ONPATH | TSGT | THE FORCED WAUNETA - WRAY 115KV LINE OUTAGW WILL NOT IMPACT TSGT TTC. NO ETR | 2024-04-16 15:46 | TSGT177937 | 2024-04-17 05:46 | |
PATH TTC IMPACT | 461988 | TSGT | COW CREEK - SOUTH CANAL 115KV LINE | 0.0 | 0.0 | 0.0 | 2024-04-18 09:00 | 2024-04-18 15:00 | Scheduled | TRANSMISSION | PLANNED | ONPATH | TSGT | THE COW CREEK - SOUTH CANAL SECTION OF THE DALLAS CREEK - SOUTH CANAL 115KV LINE OUTAGE WILL IMPACT TSGT TTC. | 2024-03-01 07:22 | TSGT176024 | 2024-03-27 14:18 | ||
TOT 3 RESTRICTION | 467180 | TSGT | AULT - CAREY 230KV LINE | LRS-TOT3GS(TSGT) TOT3GS-LRS(TSGT) |
400.0 400.0 |
400.0 400.0 |
300.0 300.0 |
2024-04-22 08:00 2024-04-22 08:00 |
2024-05-23 17:00 2024-05-23 17:00 |
Scheduled | TRANSMISSION | PLANNED | ONPATH | TSGT | THE AULT - CAREY 230KV LINE OUTAGE WILL IMPACT TSGT TOT 3 TTC. CAREY WILL BE RADIAL FROM TIMBERLINE DURING THIS TIME. | 2024-04-15 14:03 | TSGT177900 | 2024-04-15 14:03 | |
TOT 3 RESTRICTION | 463462 | TSGT | AULT 230KV EAST BUS | LRS-TOT3GS(TSGT) TOT3GS-LRS(TSGT) |
400.0 400.0 |
400.0 400.0 |
300.0 300.0 |
2024-04-24 07:00 2024-04-24 07:00 |
2024-04-25 17:00 2024-04-25 17:00 |
Scheduled | TRANSMISSION | PLANNED | ONPATH | TSGT | THE AULT 230KV EAST BUS OUTAGE WILL REDUCE TSGT TOT 3 TTC. | 2024-03-14 15:07 | TSGT176510 | 2024-03-14 15:07 | |
TOT 5 RESTRICTION | 467183 | TSGT | BLUE RIVER - GORE PASS 230KV LINE | CRG-TOT5GW(TSGT) TOT5GW-CRG(TSGT) |
260.0 210.0 |
260.0 210.0 |
147.0 147.0 |
2024-04-29 07:00 2024-04-29 07:00 |
2024-05-31 17:00 2024-05-31 17:00 |
Scheduled | TRANSMISSION | PLANNED | ONPATH | TSGT | THE BLUE RIVER - GORE PASS 230KV LINE OUTAGE WILL REDUCE TSGT TOT 5 TTC. | 2024-04-15 14:10 | TSGT177901 | 2024-04-15 14:10 | |
TOT 1 RESTRICTION | 467353 | TSGT | MEEKER - WHITE RIVER CITY 138KV LINE | BOZ-CRG(TSGT) CALRIDGE-CRG(TSGT) CRG-BOZ(TSGT) CRG-CALRIDGE(TSGT) |
29.0 105.0 29.0 105.0 |
29.0 105.0 29.0 105.0 |
28.0 0.0 28.0 0.0 |
2024-04-29 08:00 2024-04-29 08:00 2024-04-29 08:00 2024-04-29 08:00 |
2024-05-10 17:00 2024-05-10 17:00 2024-05-10 17:00 2024-05-10 17:00 |
Scheduled | TRANSMISSION | PLANNED | ONPATH | TSGT | THE MEEKER - WHITE RIVER CITY SECTION OF THE SOUTHWEST RANGLEY - MEEKER 138KV LINE OUTAGE WILL REDUCE TSGT TOT 1 TTC. WHITE RIVER CITY WILL BE RADIAL FROM SOUTHWEST RANGLEY DURING THIS TIME. | 2024-04-17 14:22 | TSGT177957 | 2024-04-17 14:22 | |
RADIAL LOAD | 462979 | TSGT | Big Springs 115 kV CB 1102 | TSGTEAST-TSGTEAST(TSGT) TSGTNORTH-TSGTNORTH(TSGT) TSGTSOUTH-TSGTSOUTH(TSGT) TSGTWEST-TSGTWEST(TSGT) |
0.0 0.0 0.0 0.0 |
0.0 0.0 0.0 0.0 |
0.0 0.0 0.0 0.0 |
2024-05-07 08:00 2024-05-07 08:00 2024-05-07 08:00 2024-05-07 08:00 |
2024-05-07 16:00 2024-05-07 16:00 2024-05-07 16:00 2024-05-07 16:00 |
Scheduled | TRANSMISSION | PLANNED | ONPATH | TSGT | TTC is not impacted. Member load affected. Blue Creek, Wildhorse, Coldwater Creek, Lynn, and Covalt will be on a radial feed from Snake Creek during this work | 2024-03-11 08:03 | TSGT176357 | 2024-03-11 08:03 | |
RADIAL LOAD | 467358 | TSGT | DEL CAMINO SWITCH - RINN VALLEY 115KV LINE | TSGTEAST-TSGTEAST(TSGT) | 0.0 | 0.0 | 0.0 | 2024-05-07 10:00 | 2024-05-10 17:00 | Scheduled | TRANSMISSION | PLANNED | ONPATH | TSGT | THE DEL CAMINO SWITCH - RINN VALLEY 115KV LINE OUTAGE WILL NOT IMPACT TSGT TTC. DACONO AND RINN VALLEY WILL BE RADIAL FROM ERIE DURING THIS TIME. | 2024-04-17 14:27 | TSGT177958 | 2024-04-17 14:27 | |
RADIAL LOAD | 461772 | TSGT | North Cody-Ralston Section of the North Cody-Lovel | TSGTEAST-TSGTEAST(TSGT) TSGTNORTH-TSGTNORTH(TSGT) TSGTSOUTH-TSGTSOUTH(TSGT) TSGTWEST-TSGTWEST(TSGT) |
0.0 0.0 0.0 0.0 |
0.0 0.0 0.0 0.0 |
0.0 0.0 0.0 0.0 |
2024-05-15 09:00 2024-05-15 09:00 2024-05-15 09:00 2024-05-15 09:00 |
2024-05-16 17:00 2024-05-16 17:00 2024-05-16 17:00 2024-05-16 17:00 |
Scheduled | TRANSMISSION | PLANNED | ONPATH | TSGT | TTC is not impacted. Member load affected. City of Powell, Ralston and Garland will be radial from Lovell for the duration of this work. | 2024-02-27 10:52 | TSGT175951 | 2024-02-27 10:52 | |
WALC Outages: | |||||||||||||||||||
PPK-Rogers #2 Line | 55665 | WALC | PPK-Rogers #2 Line | PNPKWALC230-ROGERS230(WALC) ROGERS230-PNPKWALC230(WALC) PNPKWALC230-ROGERS230(WALC) ROGERS230-PNPKWALC230(WALC) PNPKWALC230-ROGERS230(WALC) ROGERS230-PNPKWALC230(WALC) PNPKWALC230-ROGERS230(WALC) ROGERS230-PNPKWALC230(WALC) PNPKWALC230-ROGERS230(WALC) ROGERS230-PNPKWALC230(WALC) |
374.0 374.0 374.0 374.0 374.0 374.0 374.0 374.0 374.0 374.0 |
374.0 374.0 374.0 374.0 374.0 374.0 374.0 374.0 374.0 374.0 |
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 |
2022-08-20 19:00 2022-08-20 19:00 2023-01-21 19:00 2023-01-21 19:00 2024-01-21 19:00 2024-01-21 19:00 2024-05-10 16:00 2024-05-10 16:00 2024-05-24 17:00 2024-05-24 17:00 |
2023-01-21 19:00 2023-01-21 19:00 2024-01-21 19:00 2024-01-21 19:00 2024-05-10 16:00 2024-05-10 16:00 2024-05-24 17:00 2024-05-24 17:00 2024-07-01 17:00 2024-07-01 17:00 |
Active | TRANSMISSION | FORCED | ONPATH | WALC | This is an update to outage ID 55458. PPK-Rogers #2 Line OOS. | 2022-08-20 18:16 | WALC16750 | 2024-03-08 15:55 | |
RATTLESNAKE-TUSCON 115KV | 57582 | WALC | RATTLESNAKE-TUSCON 115KV | MARANA115-TUCSON115(WALC) TUCSON115-MARANA115(WALC) |
0.0 120.0 |
0.0 120.0 |
0.0 0.0 |
2023-09-18 06:00 2023-09-18 06:00 |
2024-05-03 18:00 2024-05-03 18:00 |
Cancelled | TRANSMISSION | PLANNED | ONPATH | WALC | Cancelled. Will be re-scheduled for later date | 2023-03-17 00:05 | WALC17388 | 2023-04-21 03:12 | |
RSK-TUC 115 KV LINE | 57615 | WALC | RSK-TUC 115 KV LINE | MARANA115-TUCSON115(WALC) TUCSON115-MARANA115(WALC) |
0.0 120.0 |
0.0 120.0 |
0.0 0.0 |
2023-09-18 06:00 2023-09-18 06:00 |
2024-05-03 18:00 2024-05-03 18:00 |
Cancelled | TRANSMISSION | PLANNED | ONPATH | WALC | 2023-03-24 04:38 | WALC17395 | 2023-04-06 08:43 | ||
Bouse-Kofa 161kV Line | 57742 | WALC | Bouse-Kofa 161kV Line | PARKER161-SWAZSYS(WALC) SWAZSYS-PARKER161(WALC) |
441.0 441.0 |
441.0 441.0 |
294.0 294.0 |
2023-10-02 05:00 2023-10-02 05:00 |
2024-04-26 17:00 2024-04-26 17:00 |
Cancelled | TRANSMISSION | PLANNED | ONPATH | WALC | 2023-04-06 14:23 | WALC17442 | 2023-05-08 20:25 | ||
Bouse-Kofa 161KV LINE | 57753 | WALC | Bouse-Kofa 161KV LINE | PARKER161-SWAZSYS(WALC) SWAZSYS-PARKER161(WALC) |
441.0 441.0 |
441.0 441.0 |
294.0 294.0 |
2023-10-30 05:00 2023-10-30 05:00 |
2024-04-26 18:00 2024-04-26 18:00 |
Cancelled | TRANSMISSION | PLANNED | ONPATH | WALC | Bouse-Kofa 161KV LINE | 2023-04-09 15:47 | WALC17447 | 2023-10-02 05:35 | |
Bouse-Kofa161 Line | 58944 | WALC | PARKER161-SWAZSYS(WALC) SWAZSYS-PARKER161(WALC) |
441.0 441.0 |
441.0 441.0 |
294.0 294.0 |
2024-01-02 06:00 2024-01-02 06:00 |
2024-05-24 18:00 2024-05-24 18:00 |
Active | TRANSMISSION | PLANNED | ONPATH | WALC | Reconductoring | 2023-09-29 23:46 | WALC17901 | 2023-09-29 23:46 | ||
PPK-Rogers #1 Line | 59285 | WALC | PPK-Rogers #2 Line | COOLIDGE-PNPKWALC230(WALC) PNPKWALC230-COOLIDGE(WALC) PNPKWALC230-ROGERS230(WALC) ROGERS230-PNPKWALC230(WALC) COOLIDGE-PNPKWALC230(WALC) PNPKWALC230-COOLIDGE(WALC) PNPKWALC230-ROGERS230(WALC) ROGERS230-PNPKWALC230(WALC) |
359.0 359.0 374.0 374.0 359.0 359.0 374.0 374.0 |
359.0 359.0 374.0 374.0 359.0 359.0 374.0 374.0 |
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 |
2024-01-08 07:00 2024-01-08 07:00 2024-01-08 07:00 2024-01-08 07:00 2024-05-24 17:00 2024-05-24 17:00 2024-05-24 17:00 2024-05-24 17:00 |
2024-05-24 17:00 2024-05-24 17:00 2024-05-24 17:00 2024-05-24 17:00 2024-07-01 17:00 2024-07-01 17:00 2024-07-01 17:00 2024-07-01 17:00 |
Active | TRANSMISSION | PLANNED | ONPATH | WALC | PPK-Rogers #1 Line OOS. (PNPK230-COOLIDGE TTC=0 when PPK-RGRS #1 & #2 is OOS.) (Facility = PPK-RGRs #1 Line) | 2023-10-15 00:02 | WALC17995 | 2024-03-08 15:56 | |
Orme-Rudd 230Kv Line 1 | 60250 | WALC | Orme-Rudd 230Kv Line 1 | DELANEY500-SUNVALLEY500(WALC) PALOVERDE500-PINALWEST500(WALC) PINALWEST500-PALOVERDE500(WALC) SUNVALLEY500-DELANEY500(WALC) |
102.0 350.0 350.0 102.0 |
102.0 350.0 350.0 102.0 |
92.0 317.0 317.0 92.0 |
2024-02-05 18:00 2024-02-05 18:00 2024-02-05 18:00 2024-02-05 18:00 |
2024-04-05 05:00 2024-04-05 05:00 2024-04-05 05:00 2024-04-05 05:00 |
Completed | TRANSMISSION | PLANNED | ONPATH | WALC | Orme-Rudd 230Kv Line 1 (SRP outage # 459848) | 2024-02-05 17:19 | WALC18206 | 2024-04-05 04:22 | |
LIB-PHX-LOB 230KV | 58661 | WALC | LIB-PHX-LOB 230KV | LIBERTY230-LONEBUTTE230(WALC) LONEBUTTE230-LIBERTY230(WALC) |
0.0 0.0 |
0.0 0.0 |
0.0 0.0 |
2024-03-25 07:00 2024-03-25 07:00 |
2024-04-04 18:00 2024-04-04 18:00 |
Cancelled | TRANSMISSION | PLANNED | ONPATH | WALC | Liberty-Phoenix-Lone Butte 230kv line Maintenance | 2023-08-15 23:52 | WALC17810 | 2024-02-28 11:02 | |
Delaney-Sunvalley | 60834 | WALC | DELANEY500-SUNVALLEY500(WALC) SUNVALLEY500-DELANEY500(WALC) |
102.0 102.0 |
102.0 102.0 |
88.0 88.0 |
2024-04-01 06:00 2024-04-01 06:00 |
2024-04-05 05:00 2024-04-05 05:00 |
Completed | TRANSMISSION | PLANNED | ONPATH | WALC | SRP Rudd 500/230KV Transformer maintenance. | 2024-03-28 21:32 | WALC18382 | 2024-04-05 04:20 | ||
Kyrene 500kV West Bus | 60911 | WALC | Kyrene 500kV West Bus | DELANEY500-SUNVALLEY500(WALC) PALOVERDE500-PINALWEST500(WALC) PINALWEST500-PALOVERDE500(WALC) SUNVALLEY500-DELANEY500(WALC) |
102.0 350.0 350.0 102.0 |
102.0 350.0 350.0 102.0 |
94.0 322.0 322.0 94.0 |
2024-04-08 06:00 2024-04-08 06:00 2024-04-08 06:00 2024-04-08 06:00 |
2024-04-12 11:00 2024-04-12 11:00 2024-04-12 11:00 2024-04-12 11:00 |
Completed | TRANSMISSION | PLANNED | ONPATH | WALC | Kyrene 500kV West Bus (SRP OUTAGE # 465880) | 2024-04-06 01:09 | WALC18426 | 2024-04-12 10:25 | |
PAD 230/161kV XFMR KX6A | 60531 | WALC | PAD 230/161kV KX6A Xfmr | PARKER161-PARKER230(WALC) PARKER230-PARKER161(WALC) |
334.0 334.0 |
334.0 334.0 |
167.0 167.0 |
2024-04-08 06:00 2024-04-08 06:00 |
2024-04-19 18:00 2024-04-19 18:00 |
Active | TRANSMISSION | PLANNED | ONPATH | WALC | 2024-03-01 04:16 | WALC18250 | 2024-03-01 04:16 | ||
Parker 230kV N Main Bus | 60544 | WALC | PAD 230KV NORTH MAIN BUS INCLUDING PAD-782 | BLACKMESA230-PARKER230(WALC) GENE-PARKER230(WALC) LIBERTY230-PARKER230(WALC) PARKER230-BLACKMESA230(WALC) PARKER230-GENE(WALC) PARKER230-LIBERTY230(WALC) PARKER230-TOPOCK230(WALC) TOPOCK230-PARKER230(WALC) |
360.0 0.0 812.0 360.0 220.0 812.0 826.0 826.0 |
360.0 0.0 713.0 360.0 220.0 812.0 826.0 826.0 |
0.0 0.0 413.0 0.0 0.0 413.0 465.0 465.0 |
2024-04-10 06:00 2024-04-10 06:00 2024-04-10 06:00 2024-04-10 06:00 2024-04-10 06:00 2024-04-10 06:00 2024-04-10 06:00 2024-04-10 06:00 |
2024-04-10 14:00 2024-04-10 14:00 2024-04-10 14:00 2024-04-10 14:00 2024-04-10 14:00 2024-04-10 14:00 2024-04-10 14:00 2024-04-10 14:00 |
Completed | TRANSMISSION | PLANNED | ONPATH | WALC | 2024-03-03 12:46 | WALC18254 | 2024-04-10 13:27 | ||
Marketplace-Mead 500KV | 60255 | WALC | Marketplace-Mead 500KV Line | MARKETPLACE500-MEAD500(WALC) MEAD500-MARKETPLACE500(WALC) |
2600.0 2600.0 |
2600.0 2600.0 |
0.0 0.0 |
2024-04-15 10:00 2024-04-15 10:00 |
2024-04-15 11:55 2024-04-15 11:55 |
Completed | TRANSMISSION | PLANNED | ONPATH | WALC | Marketplace-Mead 500KV Line maintenance | 2024-02-05 17:26 | WALC18207 | 2024-04-15 11:55 | |
Rudd 500/230kvTransformer | 60980 | WALC | Rudd 500/230kv Transformer | DELANEY500-SUNVALLEY500(WALC) PALOVERDE500-PINALWEST500(WALC) PINALWEST500-PALOVERDE500(WALC) SUNVALLEY500-DELANEY500(WALC) |
102.0 350.0 350.0 102.0 |
102.0 350.0 350.0 102.0 |
78.0 269.0 269.0 78.0 |
2024-04-17 06:00 2024-04-17 06:00 2024-04-17 06:00 2024-04-17 06:00 |
2024-04-17 12:23 2024-04-17 12:23 2024-04-17 12:23 2024-04-17 12:23 |
Completed | TRANSMISSION | PLANNED | ONPATH | WALC | SRP outage 467274 | 2024-04-17 00:44 | WALC18455 | 2024-04-17 12:23 | |
Perkins-Mead Series Comp | 60335 | WALC | Perkins-Mead Series Compensation bypassed | MEAD500-WESTWING500(WALC) WESTWING500-MEAD500(WALC) |
1967.0 1967.0 |
1967.0 1967.0 |
1228.0 1228.0 |
2024-04-21 07:00 2024-04-21 07:00 |
2024-04-26 17:00 2024-04-26 17:00 |
Scheduled | TRANSMISSION | PLANNED | ONPATH | WALC | Perkins-Mead Series Compensation one-end-bypassed | 2024-02-12 11:05 | WALC18222 | 2024-02-12 11:07 | |
Orme-Rudd 230KV Line 1 | 60906 | WALC | Orme-Rudd 230KV Line 1 | DELANEY500-SUNVALLEY500(WALC) PALOVERDE500-PINALWEST500(WALC) PINALWEST500-PALOVERDE500(WALC) SUNVALLEY500-DELANEY500(WALC) |
102.0 350.0 350.0 102.0 |
102.0 350.0 350.0 102.0 |
92.0 317.0 317.0 92.0 |
2024-04-22 05:00 2024-04-22 05:00 2024-04-22 05:00 2024-04-22 05:00 |
2024-04-26 06:00 2024-04-26 06:00 2024-04-26 06:00 2024-04-26 06:00 |
Scheduled | TRANSMISSION | PLANNED | ONPATH | WALC | Orme-Rudd 230KV Line 1 (SRP OUTAGE - REFER TO SRP OASIS) | 2024-04-06 00:55 | WALC18425 | 2024-04-06 00:55 | |
LIB-PHX-LOB LIB-LOB 230kV | 60695 | WALC | Liberty-LoneButte and Liberty-PHX-LoneButte lines | LIBERTY230-LONEBUTTE230(WALC) LONEBUTTE230-LIBERTY230(WALC) |
0.0 0.0 |
0.0 0.0 |
0.0 0.0 |
2024-04-22 20:00 2024-04-22 20:00 |
2024-04-23 07:00 2024-04-23 07:00 |
Cancelled | TRANSMISSION | FORCED | ONPATH | WALC | 2024-03-18 02:33 | WALC18303 | 2024-03-18 02:34 | ||
Liberty-LoneButte 230kV | 60700 | WALC | Liberty-LoneButte and Liberty-PHX-LoneButte lines | LIBERTY230-LONEBUTTE230(WALC) LONEBUTTE230-LIBERTY230(WALC) |
0.0 0.0 |
0.0 0.0 |
0.0 0.0 |
2024-04-22 20:00 2024-04-22 20:00 |
2024-04-23 07:00 2024-04-23 07:00 |
Scheduled | TRANSMISSION | PLANNED | ONPATH | WALC | LIB-LOB and LIB-PHX will both be outaged for the duration. | 2024-03-18 02:37 | WALC18304 | 2024-03-18 02:37 | |
Liberty-LoneButte 230kV | 60703 | WALC | Liberty-LoneButte and Liberty-PHX-LoneButte lines | LIBERTY230-LONEBUTTE230(WALC) LONEBUTTE230-LIBERTY230(WALC) |
0.0 0.0 |
0.0 0.0 |
0.0 0.0 |
2024-04-23 20:00 2024-04-23 20:00 |
2024-04-24 07:00 2024-04-24 07:00 |
Scheduled | TRANSMISSION | PLANNED | ONPATH | WALC | LIB-LOB and LIB-PHX will be outaged for the duration. | 2024-03-18 02:40 | WALC18305 | 2024-03-18 02:40 | |
Liberty-LoneButte 230kV | 60706 | WALC | Liberty-LoneButte and Liberty-PHX-LoneButte lines | LIBERTY230-LONEBUTTE230(WALC) LONEBUTTE230-LIBERTY230(WALC) |
0.0 0.0 |
0.0 0.0 |
0.0 0.0 |
2024-04-24 20:00 2024-04-24 20:00 |
2024-04-25 07:00 2024-04-25 07:00 |
Scheduled | TRANSMISSION | PLANNED | ONPATH | WALC | LIB-LOB and Lib-PHX will both be outaged for the duration | 2024-03-18 02:42 | WALC18306 | 2024-03-18 02:42 | |
Liberty-LoneButte 230kV | 60709 | WALC | Liberty-LoneButte and Liberty-PHX-LoneButte lines | LIBERTY230-LONEBUTTE230(WALC) LONEBUTTE230-LIBERTY230(WALC) |
0.0 0.0 |
0.0 0.0 |
0.0 0.0 |
2024-04-25 20:00 2024-04-25 20:00 |
2024-04-26 07:00 2024-04-26 07:00 |
Scheduled | TRANSMISSION | PLANNED | ONPATH | WALC | LIB-LOB and LIB-PHX will both be outaged for the duration. | 2024-03-18 02:44 | WALC18307 | 2024-03-18 02:44 | |
Adams-Apache 115KV Line | 60226 | WALC | Adams-Apache 115KV Line | ADAMS115-APACHE115(WALC) APACHE115-ADAMS115(WALC) |
120.0 0.0 |
120.0 0.0 |
0.0 0.0 |
2024-05-20 07:00 2024-05-20 07:00 |
2024-05-31 17:00 2024-05-31 17:00 |
Scheduled | TRANSMISSION | PLANNED | ONPATH | WALC | Adams-Apache 115KV Line | 2024-02-05 01:50 | WALC18200 | 2024-03-21 06:23 | |
WASN Outages: | |||||||||||||||||||
CVP PLANNED OUTAGE | 23112 | WASN | HUR-TRY#2 | KES230-TRY230(WASN) OBN230-TRY230(WASN) RSC230-TRY230(WASN) TRY230-KES230(WASN) |
781.0 750.0 750.0 781.0 |
781.0 750.0 750.0 781.0 |
781.0 357.0 357.0 781.0 |
2024-04-20 07:00 2024-04-20 07:00 2024-04-20 07:00 2024-04-20 07:00 |
2024-04-20 17:00 2024-04-20 17:00 2024-04-20 17:00 2024-04-20 17:00 |
Scheduled | TRANSMISSION | PLANNED | ONPATH | WASN | Outage on CVP Paths:HUR-TRY#2 | 2024-04-14 23:31 | WASN9053 | 2024-04-14 23:31 | |
CVP PLANNED OUTAGE | 23117 | WASN | HUR-TRY#2 | TRY230-TRY_PSEUDO(WASN) TRY_PSEUDO-TRY230(WASN) |
750.0 750.0 |
750.0 750.0 |
357.0 357.0 |
2024-04-20 07:00 2024-04-20 07:00 |
2024-04-20 17:00 2024-04-20 17:00 |
Scheduled | TRANSMISSION | PLANNED | ONPATH | WASN | EIM Outage | 2024-04-14 23:44 | WASN9054 | 2024-04-14 23:44 | |
WITP Outages: |