Registration | About | HOME                                OATI webOASISSM Production Node                                        



Documents

  • NAESB Home Page

  • NERC Home Page

  • Standards of Conduct
  • Emergency Circumstances Deviations

  • Marketing and Energy Affiliate List
    Shared Facilities
    Organizational Charts and Job Descriptions
    Common Employees
  • Potential Merger Partners

  • Transfers

  • Information Disclosure

  • Voluntary Consent to Share Non-Affiliated Customer Information

  • Discretionary Actions under Tariff

  • Discounts

  • Chief Compliance Officer
    Written Procedures for Implementation
  • Notice of Tariff Waiver

  • Performance Metrics
    Transmission Study Metrics
    SIS Metrics
    Transmission Service Request Metrics
  • TSR Metrics

  • Redispatch Cost
    Redispatch Cost
    Business Practices, Waivers, & Exemptions
    MPCN OATT Business Practices
    MPCN OATT BP Comments & Responses
    ATC Information
    Available Transfer Capability Implementation Document - ATCID
    MPC CBM Notice
    CBM Procedure
    TRM Implementation Document - TRMID
    ATC/AFC Methodology Contact
    Load Forecast Descriptive Statement
    Postback Methodology
    Flowgate Methodology Grandfathered Agreements
    Zero ATC Narrative
  • Initial Zero ATC Narrative

  • Successive Zero ATC Narrative

  • ATC Change Narrative
  • ATC Change Narrative

  • Actual and Forecasted Load
    Actual Load
    Forecasted Load
    Transmission Tariff
    MPC_OATT-Aug_11_2017.pdf
    MPC Large Generator Interconnection Procedures
    MPC Large Generator Interconnection Agreement Template
    MPC Small Generator Interconnection Procedures
    Transmission Service Discounts
    Contact Information
    Minnkota Power Contact Information
    OASIS Notices
  • Discretion_

  • Personnel_

  • Std of Conduct

  • Waiver

  • Outages
  • MPCN Outages

  • Transmission Service Information
    MPC Transmission Rates
    Transmission Customer Application
    Mapping of TSRs from MPCN Oasis
    Generation Interconnection Information
    MPCN GI Queue
    Modifications to Minnkota's Interconnection Queue
    Feasibility Study Report
    MPC01600-02300 Interconnection Feasibility
    MPC01400 Interconnection Feasibility
    MPC01800 Interconnection Feasibility
    MPC02300 Interconnection Feasibility
    System Impact Study Report
    MPC0100-0200 Interconnection SIS-1
    MPC0100-0200 Interconnection SIS-2
    MPC0300 Interconnection SIS
    MPC0100-0300 Out-Year Interconnection SIS
    MPC0500 Interconnection SIS
    MPC0500 Restudy Report
    MPC0500 Out-Year Interconnection SIS
    MPC01200-01900 Interconnection SIS
    MPC01200-01900 Interconnection SIS Part 2
    MPC01200 Out-Year Interconnection SIS
    Center-Grand Forks Line SIS
    MPC02100 Interconnection SIS
    Facility Study Report
    Maple River-Wahpeton 230 kV Line Facility Study
    Center-Heskett 230 kV Line Facility Study
    Drayton SPS Facility Study
    Pillsbury-Maple River 230 kV Line Facility Study
    Square Butte-Center 230 kV and Jamestown-Bison 345 kV Facilities Study
    Roughrider-Mandan 230 kV Line Facility Study
    Transmission Service Studies
    TSR System Impact Study Report
    MPC Generation Study Report for Service to Native Load - 2011-05-06
    MPC Generation Study Report for Service to Native Load-App I-2015-01-06
    MPC Generation SIS for Service to MISO Border - 2015-08-26
    SIS Report for Jamestown-NSP TSR-2015-04-21 Final v2
    SIS Report for MPC02100 TSRs 20160211 - FINAL
    R114-17 MPC_TSR_85214108_Study_R10252017_Public
    TSR Facility Study Report
  • TSR Facility Study Reports

  • Transmission Planning
    MPC Transmission Planning BPM
  • MISO MTEP

  • MN Electric Transmission Planning

  • Economic Planning Studies
    Attachment K
    NERC TLR Page
  • NERC TLR Page

  • Miscellaneous
    Backup TSR Form
    General Information
  • Minnkota Power Cooperative, Inc.



  • Welcome To MPCN

    Visit the MAPP OASIS Information site for latest information

    MPCN OASIS Transition to MISO OASIS

    Beginning September 1, 2015 at 00:00:00 Eastern Standard Time, transmission service over Minnkota facilities will be accomplished through the MISO OASIS. Transmission Service Request (TSR) submittals with a Transmission Provider of MPCN will be available through the MISO OASIS.  See Minnkota's Transmission Service Business Practices, effective September 1, 2015 for more details.

    Posted Date & Time: 08/28/2015 at 4:38 PM CDT


     

     

    Please direct all questions to:

    Tariff Administrator at TariffAdministration@misoenergy.org

    And to Transmission Service Provider at TransmissionService@minnkota.com

    Application For Minnkota Open Access Transmission Service


    OATI Support

    Phone: 763-201-2020

    Email: support@oati.net

     

    Questions regarding:

    1) Access and registration to the OATi webOASIS

    2) Certificates and Users

    3) Access and registration to the OATi MMTA webTrans

    4) Certificates and Users

    5) Connectivity issues

     

     

     

         


    ©2001-2010 OATI webOasisTM/SM - Open Access Technology International, Inc. All Rights Reserved.