Registration | About | HOME                                OATI webOASISSM Production Node                                        




Documents

  • NAESB Home Page

  • ISO-NE Website

  • Performance Metrics
    Transmission Study Metrics
    Standards of Conduct
    ISO Organizational Chart
    Business Practices, Waivers and Exemptions
  • Business Practices

  • Waivers and Exemptions
    Network Resource Designation
    Planning Redispatch
  • Schedule 24 - Incorporation by Reference of NAESB Standards

  • Standards of Conduct
    Transmission Service Request Metrics
    ATC Information
    ATCID
    CBMID
    TRMID
    ATC Methodology Contact
    ATC Algorithm
    Postback Methodology
  • ATC Monitor

  • Current Load Forecast Descriptive Statement

  • OASIS Notices
  • Congestion Relief Offers

  • Discretion

  • Personnel

  • Tariff/TOA
  • ISO Tariff

  • RNS Rates

  • TOA Grandfathered Intertie/Interconnection Agreements and Transmission Facilities

  • New or Modified Interconnection Requests

  • Tariff Studies

  • Discretionary Postings
    MEPCO Discretion_4-28-09
    Meriden Gas Turbine Settlement
    Transmission
  • Interconnection Request Tracking Tool

  • Path/POD/POR Reference Table
  • Service Types and Applications

  • Transmission Service Inquiries
  • TTC Summary Report (updated daily)

  • Transmission Outage Information

  • Regional and Local Service Applications received by ISO-NE
    FERC Order 784 Posting
    2013 ACE (1 minute data)
    2013 ACE (10 minute data)
    2014 ACE (1 minute data)
    2014 ACE (10 minute data)
    2015 ACE (1 minute data)
    2015 ACE (10 minute data)
    2016 ACE (1 minute data)
    2016 ACE (10 minute data)
    TOA Schedule 2.01A and 2.01B and BES Facilities
    Process for development and approval of TOA Schedule 2.01A&B and BES Listings
    TOA _Sched_ 2-01A_and_B_+_BES_ Facilities
    IRH
    Common Business Practices Schedule 20A
    Transmission Information and Services for the Phase I/II HVDC-TF Intertie with Hydro-Quebec
    Phase I-II Percentages
    Phase I/II HVDC-TF ATC Methodology
    Phase I/II HVDC-TF - pdf version
    Transfer Agreement Information and Notification Form (TA-1 Form)
    ATC Information
    ATC Algorithm for Schedule 20A providers
    ATCID for Schedule 20A providers
    IRH FERC Order 890 (Schedule 20A) Items
  • Designation of Network Resources

  • Conditional Firm Service
  • Annually Re-evaluate CBM, Section 3.2

  • Energy and Generation Imbalances
  • Load Forecast

  • Make CBM Set Aside Non-firm Available, Section 3.2

  • NAESB Business Practices

  • Planning Redispatch
  • TRM Methodology, Section 3.3

  • Transmission Studies



    OASIS Access Help      


    ©2001-2010 OATI webOasisTM/SM - Open Access Technology International, Inc. All Rights Reserved.