Transmission
Service Offerings for the
Phase I/II HVDC-TF Intertie with Hydro-Québec
- - -
The list of all Interconnection Rights Holders (IRH), including those that are Schedule 20A Service Providers, and their respective Phase I and Phase II Percentage Interest and Combined Percentage Interest MW share of the 2,000 MW Nominal Transfer Capability of the Phase II tie is provided in the table below. The table is presented in three (3) sections: (A) the IRH that are Schedule 20A Service Providers offering service over the Phase I/II HVDC-TF pursuant to Schedule 20A to Section II of the ISO Tariff; (B) the IRH offering their share of the Phase I/II HVDC-TF through a Schedule 20A Service Provider listed in section (A); and (C) the IRH who are not currently offering their share of the Phase I/II HVDC-TF. Clicking on the highlighted Schedule 20A Service Provider will bring you directly to their Transmission Provider Page on the ISO OASIS where an eligible customer can query and obtain Phase I/II HVDC-TF transmission services.
A customer wishing to move energy into or out of the New England Control Area over the Phase I/II HVDC-TF must acquire an advance reservation for transmission service over the facility by contacting a Schedule 20A Service Provider that is identified in section (A) of the table below, and include the OASIS reservation information in the submittal of Phase I/II HVDC-TF External Transaction to the ISO market system.
INTERCONNECTION RIGHTS HOLDERS ("IRH") PERCENTAGE INTEREST & MW AS OF: May 23, 2018 |
|
|||||||||||||||
|
|
|||||||||||||||
(A) Phase I/II HVDC-TF Service offered by the Schedule 20A Service Providers ("SSP") over Phase I/II HVDC-TF: |
|
|||||||||||||||
Schedule 20A Service Providers |
Total |
Total |
Total |
MWs of |
|
|||||||||||
1.50834 |
1.52 |
1.51598 |
30 |
|
||||||||||||
6.99346 |
7.1205 |
7.07667 |
141 |
|
||||||||||||
10.52727 |
12.5439 |
11.84816 |
236 |
|
||||||||||||
21.9895 |
22.6158 |
22.39973 |
447 |
|
||||||||||||
34.21614 |
32.7734 |
33.27115 |
665 |
|
||||||||||||
15.77663 |
15.6873 |
15.71812 |
314 |
|
||||||||||||
5.44715 |
5.45 |
5.44902 |
108 |
|
||||||||||||
0.43984 |
0.5188 |
0.49156 |
9 |
|
||||||||||||
Subtotal (A) = |
96.89833 |
98.22970 |
97.77038 |
1950 |
|
|||||||||||
|
|
|
|
|
|
|||||||||||
(B) IRH that are offering Use Rights through a Schedule 20A Service Provider (see Section (A) above): |
|
|||||||||||||||
Interconnection Rights Holders |
Phase I Percentage Interest |
Phase II Percentage Interest |
Combined Percentage Interest |
Share of Tie |
|
|||||||||||
PP&L Energy Plus Co. |
1.50834 |
1.52000 |
1.51598 |
30 |
|
|||||||||||
Offered under SSP BHE (see A.1.) |
1.50834 |
1.52000 |
1.51598 |
30 |
|
|||||||||||
Central Maine Power Company |
6.99346 |
7.12050 |
7.07667 |
141 |
|
|||||||||||
Offered under SSP CMP (see A.2.) |
6.99346 |
7.12050 |
7.07667 |
141 |
|
|||||||||||
Green Mountain Power Company (see Note B-GMP) |
10.52727 |
12.54390 |
11.84816 |
236 |
|
|||||||||||
Offered under SSP GMP (see A.3.) |
10.52727 |
12.54390 |
11.84816 |
136 |
|
|||||||||||
New England Power Company (see Note B-NEP) |
21.98950 |
22.61580 |
22.39973 |
447 |
|
|||||||||||
Offered under SSP NEP (see A.4.) |
21.98950 |
22.61580 |
22.39973 |
447 |
|
|||||||||||
Connecticut Light and Power Co. |
18.48700 |
18.82350 |
18.70741 |
374 |
|
|||||||||||
Public Service Company of New Hampshire |
11.84823 |
9.99840 |
10.63659 |
213 |
|
|||||||||||
NSTAR Electric Company (West; see Note B-NSTAR2) |
3.88091 |
3.95150 |
3.92715 |
79 |
|
|||||||||||
Offered under SSP ES (see A.5.) |
34.21614 |
32.77340 |
33.27115 |
665 |
|
|||||||||||
NSTAR (East; see Note B-NSTAR1) |
15.77663 |
15.68730 |
15.71812 |
314 |
|
|||||||||||
Offered under SSP NSTAR (see A.6.) |
15.77663 |
15.68730 |
15.71812 |
314 |
|
|||||||||||
United Illuminating Company |
5.44715 |
5.45000 |
5.44902 |
108 |
|
|||||||||||
Offered under SSP UI (see A.7.) |
5.44715 |
5.45000 |
5.44902 |
108 |
|
|||||||||||
Vermont Electric Co-Op (see Note B-VEC) |
0.43984 |
0.51880 |
0.49156 |
9 |
|
|||||||||||
Offered under SSP VEC (see A.8.) |
0.43984 |
0.51880 |
0.49156 |
9 |
|
|||||||||||
Subtotal (B) = |
96.0983 |
97.4297 |
96.97039 |
1950 |
|
|||||||||||
|
|
|
||||||||||||||
(C) IRH that are not offering Use Rights through a Schedule 20A Service Provider |
|
|||||||||||||||
Interconnection Rights Holders |
Phase I Percentage Interest |
Phase II Percentage Interest |
Combined Percentage Interest |
Share of Tie |
|
|||||||||||
Bangor Hydro-Electric
Company |
0 |
0 |
0 |
0 |
|
|||||||||||
City of Burlington
Electric Department |
0.72912 |
0 |
0.25155 |
5 |
|
|||||||||||
City of Chicopee
Municipal Lighting Plant |
0.32263 |
0.32000 |
0.32091 |
6 |
|
|||||||||||
City of Holyoke Gas
& Electric Light Dept. |
0.24775 |
0.26910 |
0.26173 |
5 |
|
|||||||||||
City of Peabody
Municipal Light Plant |
0.28306 |
0.28820 |
0.28643 |
5 |
|
|||||||||||
City of Westfield Gas
& Electric Light Dept.* |
0 |
0 |
0 |
0 |
|
|||||||||||
Connecticut Municipal
Electric Energy Coop. |
0.02968 |
0.04480 |
0.03958 |
0 |
|
|||||||||||
Constellation Energy
Commodities Grp. |
0 |
0 |
0 |
0 |
|
|||||||||||
Holyoke Power and
Electric Co. |
0 |
0 |
0 |
0 |
|
|||||||||||
Holyoke Water Power
Co. |
0 |
0 |
0 |
0 |
|
|||||||||||
Hudson Light and Power
Dept.* |
0 |
0 |
0 |
0 |
|
|||||||||||
Massachusetts
Municipal Wholesale Electric Co. |
0 |
0 |
0 |
0 |
|
|||||||||||
Pascoag Fire District
- Electric Dept.* |
0 |
0 |
0 |
0 |
|
|||||||||||
Taunton Municipal
Lighting Plant* |
0 |
0 |
0 |
0 |
|
|||||||||||
Town of Ashburnham
Municipal Light Plant |
0.01774 |
0.01810 |
0.01798 |
0 |
|
|||||||||||
Town of Boylston
Municipal Light Dept. |
0.02002 |
0.02040 |
0.02027 |
0 |
|
|||||||||||
Town of Braintree
Electric Light Dept.* |
0 |
0 |
0 |
0 |
|
|||||||||||
Town of Concord
Municipal Light Plant* |
0 |
0 |
0 |
0 |
|
|||||||||||
Town of Danvers
Electric Dept.* |
0 |
0 |
0 |
0 |
|
|||||||||||
Town of Georgetown
Municipal Light Dept.* |
0 |
0 |
0 |
0 |
|
|||||||||||
Town of Groton
Electric Light Dept. |
0.02646 |
0.02690 |
0.02675 |
0 |
|
|||||||||||
Town of Hingham
Municipal Lighting Plant* |
0 |
0 |
0 |
0 |
|
|||||||||||
Town of Holden
Municipal Light Dept. |
0.07356 |
0.07490 |
0.07444 |
1 |
|
|||||||||||
Town of Hull Municipal
Lighting Plant |
0.03577 |
0.03640 |
0.03618 |
0 |
|
|||||||||||
Town of Littleton
Electric Light & Water Dept.* |
0 |
0 |
0 |
0 |
|
|||||||||||
Town of Mansfield
Municipal Electric Dept. |
0.16696 |
0.17010 |
0.16902 |
3 |
|
|||||||||||
Town of Marblehead
Municipal Light Dept. |
0.08474 |
0.08630 |
0.08576 |
1 |
|
|||||||||||
Town of Middleborough
Gas and Electric Dept.* |
0 |
0 |
0 |
0 |
|
|||||||||||
Town of Middleton
Municipal Electric Dept.* |
0 |
0 |
0 |
0 |
|
|||||||||||
Town of North
Attleborough Electric Dept.* |
0 |
0 |
0 |
0 |
|
|||||||||||
Town of Paxton
Municipal Light Dept. |
0.01745 |
0.01780 |
0.01768 |
0 |
|
|||||||||||
Town of Princeton
Municipal Light Dept. |
0.00823 |
0.00840 |
0.00834 |
0 |
|
|||||||||||
Town of Reading Municipal
Light Dept.* |
0 |
0 |
0 |
0 |
|
|||||||||||
Town of Rowley
Municipal Light Dept.* |
0 |
0 |
0 |
0 |
|
|||||||||||
Town of Shrewsbury
Electric Light Dept. |
0.16902 |
0.16400 |
0.16573 |
3 |
|
|||||||||||
Town of South Hadley
Electric Light Dept. |
0.11550 |
0.11760 |
0.11688 |
2 |
|
|||||||||||
Town of Sterling |
0.02832 |
0 |
0.00977 |
0 |
|
|||||||||||
Town of Stowe
Electrical Dept.* |
0 |
0 |
0 |
0 |
|
|||||||||||
Town of Templeton
Municipal Light Plant |
0.05449 |
0.05550 |
0.05515 |
1 |
|
|||||||||||
Town of Wakefield
Municipal Light Dept.* |
0 |
0 |
0 |
0 |
|
|||||||||||
Town of West Boylston
Municipal Lighting Plant |
0.05080 |
0.05180 |
0.05146 |
1 |
|
|||||||||||
Vermont Electric Power
Co. |
0 |
0 |
0 |
0 |
|
|||||||||||
Vermont Marble Co. |
0 |
0 |
0 |
0 |
|
|||||||||||
Vermont Public Power
Supply Authority (see Note C-VPPSA) |
0.62037 |
0 |
0.21403 |
4 |
|
|||||||||||
Subtotal
(C) = |
3.10167 |
1.77030 |
2.22962 |
37 |
|
|||||||||||
Grand Total for Sections B and C = |
100.00000 |
100.00000 |
100.00000 |
1987 |
|
|||||||||||
Notes: |
|
|||||||||||||||
A- |
Bangor Hydro Electric Company (BHE) Percentage Interest entitlements included in its Phase I/II-TF Service offering reflects the Percentage Interest entitlements from another IRH. BHE (Percentage Interest: Phase I = 1.51% and Phase II = 1.52%). BHE posts the aggregate Share of the Tie pursuant to the BHE Schedule 20A under Part II of the ISO Tariff (for more information go to: http://www.oatioasis.com/BHE). |
|
||||||||||||||
The following IRH Share of the Tie is offered through the SSP BHE: PP&L Energy Plus Co. |
|
|||||||||||||||
A- |
Eversource Energy Service Company (ES) Percentage Interest entitlements included in its Phase I/II-TF Service offering reflects the Percentage Interest entitlements from other IRHs. ES (Percentage Interest: Phase I = 34.22% and Phase II = 32.77%). ES posts the aggregate Share of the Tie pursuant to the ES Schedule 20A under Part II of the ISO Tariff (for more information go to: http://www.oatioasis.com/NU). Northeast Utilities Service Company changed its name to ES on July 1, 2015. |
|
||||||||||||||
The following IRH Share of the Tie are offered through SSP ES: Connecticut Light and Power Company; Public Service Company of New Hampshire; and NSTAR (only the portion of the IRH Share formerly owned by Western Massachusetts Electric Company, which has been merged into NSTAR Electric Company; see Note B-NStar2). |
|
|||||||||||||||
B- |
Green Mountain Power Company (GMP) Percentage Interest entitlements included in its Phase I/II-TF Service offering reflects its Percentage Interest entitlement and the Percentage Interest entitlements from other IRHs. GMP, prior to October 1, 2012, (Percentage Interest: Phase I = 2.93243% and Phase II = 3.1792%); Central Vermont Public Service (CVPS) (Percentage Interest: Phase I = 4.5544% and Phase II = 5.132%); City of Westfield Gas & Electric Light Dept. (Percentage Interest: Phase I = 0.25304% and Phase II = 0.257%); Fitchburg Gas and Electric Light Co. (Percentage Interest: Phase I = 0.42636% and Phase II = 0.4341%); Hudson Light and Power Dept. (Percentage Interest: Phase I = 0.14765% and Phase II = 0.15%); Pascoag Fire District - Electric Dept. (Percentage Interest: Phase I = 0.02285% and Phase II = 0.0233%); Taunton Municipal Lighting Plant (Percentage Interest: Phase I = 0.3552% and Phase II = 0.3608%); Town of Braintree Electric Light Dept. (Percentage Interest: Phase I = 0.30879% and Phase II = 0.3136%); Town of Concord Municipal Light Plant (Percentage Interest: Phase I = 0% and Phase II = 0.1219%); Town of Danvers Electric Dept. (Percentage Interest: Phase I = 0.23892% and Phase II = 0.2433%); Town of Georgetown Municipal Light Dept. (Percentage Interest: Phase I = 0.02308% and Phase II = 0.0235%); Town of Hingham Municipal Lighting Plant (Percentage Interest: Phase I = 0.12007% and Phase II = 0.1222%); Town of Littleton Electric Light & Water Dept. (Percentage Interest: Phase I = 0.0733% and Phase II = 0.0747%); Town of Middleborough Gas and Electric Dept. (Percentage Interest: Phase I = 0.10638% and Phase II = 0.1083%); Town of Middleton Municipal Electric Dept. (Percentage Interest: Phase I = 0.04661% and Phase II = 0.0474%); Town of North Attleborough Electric Dept. (Percentage Interest: Phase I = 0.10838% and Phase II = 0.1104%); Town of Reading Municipal Light Dept. (Percentage Interest: Phase I = 0.46418% and Phase II = 0.47260%); Town of Rowley Municipal Light Dept. (Percentage Interest: Phase I = 0.01565% and Phase II = 0.016%); Town of Stowe Electrical Dept. (Percentage Interest: Phase I = 0.09578% and Phase II = 0%); Town of Wakefield Municipal Light Dept. (Percentage Interest: Phase I = 0.12431% and Phase II = 0.1266%); UNITIL Power Corp. (Percentage Interest: Phase I = 0% and Phase II = 1.227%) and Vermont Marble Co. (Percentage Interest: Phase I = 0.10989% and Phase II = 0%). GMP posts the aggregate Share of the Tie pursuant to the GMP Schedule 20A under Part II of the ISO Tariff (for more information go to: http://www.oatioasis.com/GMP and http://www.oatioasis.com/GMP/GMPDocs/Brokering.html). |
|
||||||||||||||
B- |
New England Power Company (NEP) Percentage Interest entitlements included in its Phase I/II-TF Service offering reflects the Percentage Interest entitlements for NEP and the NEP affiliates, which include Montaup Electric Company and Newport Electric Corporation. NEP (Percentage Interest: Phase I = 17.96963% and Phase II = 18.5316%); Montaup Electric Company (Percentage Interest: Phase I = 3.5777% and Phase II = 3.634%); and Newport Electric Corporation (Percentage Interest: Phase I = 0.44217% and Phase II = 0.4502%). NEP posts the aggregate Share of the Tie pursuant to the NEP Schedule 20A under Part II of the ISO Tariff (for more information go to: http://www.oatioasis.com/NEP). |
|
||||||||||||||
B- |
NSTAR Electric Company (NSTAR) Percentage Interest entitlements (referred to herein as NSTAR (East)) include service from the Percentage Interest entitlements of the former affiliates that were merged into NSTAR, which include Boston Edison Company and Commonwealth/Canal Electric Company but do not include the Percentage Interest entitlements of Western Massachusetts Electric Company for purposes of service under Schedule 20A-NSTAR). NSTAR: Percentage Interest: Phase I = 0.00%; Phase II = 0.00%; Boston Edison Company: Percentage Interest: Phase I = 11.24796%; Phase II = 11.0909% and Commonwealth/Canal Electric Company: Percentage Interest: Phase I = 3.72867%; Phase II = 3.7964%. Connecticut Municipal Electric Energy Coop.: Percentage Interest: Phase I = 0.80000%; Phase II = 0.80000%. NSTAR posts the aggregate Share of the Tie pursuant to the NSTAR Schedule 20A under Part II of the ISO Tariff (for more information go to: http://www.oatioasis.com/NSTR). |
|
||||||||||||||
B- |
Effective March 2, 2018, the Western
Massachusetts Electric Company (including its Percentage Interest of Phase I
= 3.88091%; Phase II = 3.95150%) was absorbed into NSTAR and these Percentage
Interest values continue to be offered by the ES SSP (see Note A-ES). |
|
||||||||||||||
B- |
Vermont Electric Co-Op (VEC) Percentage Interest entitlements included in its Phase I/II-TF Service offering reflects the Percentage Interest entitlements from other IRHs. VEC (Percentage Interest: Phase I = 0.00% and Phase II = 0.00%); Citizens Utilities Co. (Percentage Interest: Phase I = 0.43984% and Phase II = 0.5188%). VEC posts the aggregate Share of the Tie pursuant to the VEC Schedule 20A under Part II of the ISO Tariff (for more information go to: http://www.oatioasis.com/VECT). |
|
||||||||||||||
C- |
Vermont Public Power Supply Authority (VPPSA) Percentage Interest entitlements include Percentage Interest entitlements from Enosburg Falls (Percentage Interest: Phase I = 0.03142% and Phase II = 0%), Hardwick (Percentage Interest: Phase I = 0.0629% and Phase II = 0%), Ludlow (Percentage Interest: Phase I = 0.05757% and Phase II = 0%), Lyndonville (Percentage Interest: Phase I = 0.10768% and Phase II = 0%), Morrisville (Percentage Interest: Phase I = 0.09811% and Phase II = 0%), Northfield (Percentage Interest: Phase I = 0.05378% and; Phase II = 0%), Swanton (Percentage Interest: Phase I = 0.09219% and Phase II = 0%) and Washington Coop. (Percentage Interest: Phase I = 0.11672% and Phase II = 0%). |
|
||||||||||||||
|
||||||||||||||||
Calculation of MW Share of the 2,000 MW Phase I/II HVDC-TF: The values in the table above represent the current respective Percentage Interests in Phase I and Phase II of each IRH. These values are reflective of the respective share of the costs of the Phase I and Phase II facilities that these IRH support, directly or indirectly, under the Phase I and Phase II Support Agreements. The Combined Percentage Interest is derived in accordance with the following formula: {[(Phase I Percentage Interest x 690) + (Phase II Percentage Interest x 1,310)] / 2,000}. The calculation of each IRH’s “Share of Tie” is based on their respective Combined Percentage Interest divided by 100, multiplied by the Phase II Nominal Transfer Capability of 2,000 MW, and rounded down to whole MW. [Note: If one were to sum the Percentage Interest values for all IRH listed in the table above, the totals would be greater than 100% because the "Share of the Tie" for IRH listed in Section (B) of the table is also reflected in the "MWs of Transmission Service Offered" for the Schedule 20A Service Providers that offer service on behalf of the IRH listed in Section (A) of the table. For this reason, the Schedule 20A Service Providers in Section (A) of the table are excluded from the grand total above to avoid double-counting.] |
|
|||||||||||||||
|
|
|||||||||||||||
Transfers of Use Rights since April 1, 2005 |
Prior To Transfer Date |
As Of Transfer Date |
||||||||||||||
No. |
Interconnection Rights Holders |
Effective |
End |
Phase I |
Phase II |
Combined |
Phase I |
Phase II |
Combined |
|||||||
TA-1.01 |
Transferring IRH (Transferor): City of Burlington Electric Dept. |
1/1/2006 |
Indefinite See TA-1.13 |
0.72912 |
0.00000 |
0.25155 |
0.00000 |
0.00000 |
0.00000 |
|||||||
Receiving IRH (Transferee): VEC |
0.43984 |
0.51880 |
0.49156 |
1.16896 |
0.51880 |
0.74311 |
||||||||||
TA-1.02 |
Transferring IRH
(Transferor): Princeton Municipal Light Dept. (Select) |
3/1/2006 |
Indefinite |
0.00823 |
0.00840 |
0.00834 |
0.00000 |
0.00000 |
0.00000 |
|||||||
Receiving IRH (Transferee): VPPSA |
0.71615 |
0.00000 |
0.24707 |
0.72438 |
0.00840 |
0.25541 |
||||||||||
TA-1.03 |
Transferring IRH (Transferor):
Rowley Municipal Light Dept. (Select) |
3/1/2006 |
Indefinite |
0.01565 |
0.01600 |
0.01588 |
0.00000 |
0.00000 |
0.00000 |
|||||||
Receiving IRH (Transferee):
Constellation Energy Commodities Group |
0.00000 |
0.00000 |
0.00000 |
0.01565 |
0.01600 |
0.01588 |
||||||||||
TA-1.04 |
Transferring IRH
(Transferor): Concord Municipal Light Dept. |
12/1/2006 |
Indefinite |
0.00000 |
0.12190 |
0.07984 |
0.00000 |
0.00000 |
0.00000 |
|||||||
Receiving IRH (Transferee):
Constellation Energy Commodities Group |
0.01565 |
0.01600 |
0.01588 |
0.01565 |
0.13790 |
0.09572 |
||||||||||
TA-1.05 |
Transferring IRH
(Transferor): VPPSA |
9/1/2007 |
Indefinite |
0.72438 |
0.00840 |
0.25541 |
0.71615 |
0.00000 |
0.24707 |
|||||||
Receiving IRH (Transferee):
Princeton Municipal Light Dept. |
0.00000 |
0.00000 |
0.00000 |
0.00823 |
0.00840 |
0.00834 |
||||||||||
TA-1.06 |
Transferring IRH (Transferor): BELD |
9/1/2008 |
12/31/2013 |
0.30879 |
0.31360 |
0.31194 |
0.00000 |
0.00000 |
0.00000 |
|||||||
Receiving IRH (Transferee): CVPS
(GMP by acquisition 10/1/12) |
8.02308 |
9.97230 |
9.29982 |
8.33187 |
10.2859 |
9.61176 |
||||||||||
TA-1.07 |
Transferring IRH
(Transferor): VPPSA |
1/1/2009 |
Indefinite |
0.71615 |
0.00000 |
0.24707 |
0.62037 |
0.00000 |
0.21403 |
|||||||
Receiving IRH (Transferee): Town of
Stowe Electric Dept. |
0.00000 |
0.00000 |
0.00000 |
0.09578 |
0.00000 |
0.03304 |
||||||||||
TA-1.08 |
Transferring IRH
(Transferor): Holyoke Water Power Co. |
3/1/2009 |
Indefinite |
0.12350 |
0.12570 |
0.12494 |
0.00000 |
0.00000 |
0.00000 |
|||||||
Receiving IRH (Transferee): Western
Mass Electric |
3.75741 |
3.82580 |
3.80221 |
3.88091 |
3.95150 |
3.92715 |
||||||||||
TA-1.09 |
Transferring IRH
(Transferor): Constellation
Energy Commodities Group |
10/1/2009 |
Indefinite |
0.01565 |
0.13790 |
0.09572 |
0.01565 |
0.01600 |
0.01588 |
|||||||
Receiving IRH (Transferee): Concord Municipal Light Dept. |
0.00000 |
0.00000 |
0.00000 |
0.00000 |
0.12190 |
0.07984 |
||||||||||
TA-1.10 |
Transferring IRH (Transferor):
Constellation Energy Commodities Group |
1/1/2010 |
Indefinite |
0.01565 |
0.01600 |
0.01588 |
0.00000 |
0.00000 |
0.00000 |
|||||||
Receiving IRH (Transferee): Rowley
Municipal Light Dept. (Select) |
0.00000 |
0.00000 |
0.000000 |
0.01565 |
0.01600 |
0.01588 |
||||||||||
TA-1.11 |
Transferring IRH(Transferor):
Vermont Marble Company |
8/1/2011 |
Indefinite |
0.10989 |
0.00000 |
0.03791 |
0.00000 |
0.00000 |
0.00000 |
|||||||
Receiving IRH (Transferee): CVPS
(GMP by acquisition 10/1/12) |
8.22198 |
10.28590 |
9.57385 |
8.33187 |
10.28590 |
9.61176 |
||||||||||
TA-1.12 |
Transferring IRH (Transferor): CVPS
(Acquisition of CVPS by GMP – including Use Rights of BELD [until
12/31/2015], FGE, Unitil, and VMC) |
10/1/2012 |
Indefinite |
8.33187 |
10.28590 |
9.61176 |
0.00000 |
0.00000 |
0.00000 |
|||||||
Receiving IRH (Transferee): GMP |
0.00000 |
0.00000 |
0.00000 |
8.33187 |
10.28590 |
9.61176 |
||||||||||
|
TA-1.13 |
Transferring IRH
(Transferor): VEC |
11/1/2012 |
Indefinite |
1.16896 |
0.51880 |
0.74311 |
0.43984 |
0.51880 |
0.49156 |
||||||
|
Receiving IRH (Transferee): City of Burlington Electric Dept. |
0.00000 |
0.00000 |
0.00000 |
0.72912 |
0.0000 |
0.25155 |
|||||||||
|
TA-1.14 |
Transferring IRH
(Transferor): GMP |
1/1/2015 |
12/31/2015 |
8.33187 |
10.28590 |
9.61176 |
8.02308 |
9.97230 |
9.29982 |
||||||
|
Receiving IRH (Transferee): Braintree Electric Light Dept. |
0.00000 |
0.00000 |
0.00000 |
0.30879 |
0.31360 |
0.31194 |
|||||||||
|
TA-1.15 |
Transferring IRH
(Transferor): Multiple [denoted by Asterisk (*) above] |
1/1/2015 |
12/31/2018 |
2.04001 |
2.09900 |
2.07865 |
0.00000 |
0.00000 |
0.00000 |
||||||
|
Receiving IRH (Transferee): Energy New England |
0.00000 |
0.00000 |
0.00000 |
2.04001 |
2.09900 |
2.07865 |
|||||||||
|
TA-1.16 |
Transferring IRH
(Transferor): Energy New England |
1/1/2015 |
12/31/2018 |
2.04001 |
2.09900 |
2.07865 |
0.00000 |
0.00000 |
0.00000 |
||||||
|
Receiving IRH (Transferee): GMP |
8.02308 |
9.97230 |
9.29982 |
10.06309 |
12.07130 |
11.37847 |
|||||||||
|
TA-1.17 |
Transferring IRH
(Transferor): Connecticut Municipal
Electric Energy Coop. |
7/1/2015 |
06/30/2018 |
0.82968 |
0.84480 |
0.83958 |
0.02968 |
0.04480 |
0.03958 |
||||||
|
Receiving IRH
(Transferee): NSTAR |
14.97663 |
14.88730 |
14.91812 |
15.77663 |
15.6873 |
15.71812 |
|||||||||
|
TA-1.18 |
Effective March 2, 2018 and for the purpose of this table, the
Western Massachusetts Electric Company (including its Percentage Interest of
Phase I = 3.88091%; Phase II = 3.95150%) was absorbed into NSTAR and these
Percentage Interest values continue to be offered by the ES SSP (see Note
A-ES). |
||||||||||||||
|
TA-1.19 |
Transferring IRH
(Transferor): Connecticut Municipal
Electric Energy Coop. |
7/1/2018 |
10/31/2020 |
0.82968 |
0.84480 |
0.83958 |
0.02968 |
0.04480 |
0.03958 |
||||||
|
Receiving IRH (Transferee): NSTAR |
14.97663 |
14.88730 |
14.91812 |
15.77663 |
15.6873 |
15.71812 |
|||||||||