Transmission Service Offerings for the
Phase I/II HVDC-TF Intertie with Hydro-Québec

 - - -

The list of all Interconnection Rights Holders (IRH), including those that are Schedule 20A Service Providers, and their respective Phase I and Phase II Percentage Interest and Combined Percentage Interest MW share of the 2,000 MW Nominal Transfer Capability of the Phase II tie is provided in the table below.  The table is presented in three (3) sections: (A) the IRH that are Schedule 20A Service Providers offering service over the Phase I/II HVDC-TF pursuant to Schedule 20A to Section II of the ISO Tariff; (B) the IRH offering their share of the Phase I/II HVDC-TF through a Schedule 20A Service Provider listed in section (A); and (C) the IRH who are not currently offering their share of the Phase I/II HVDC-TF.  Clicking on the highlighted Schedule 20A Service Provider will bring you directly to their Transmission Provider Page on the ISO OASIS where an eligible customer can query and obtain Phase I/II HVDC-TF transmission services.

A customer wishing to move energy into or out of the New England Control Area over the Phase I/II HVDC-TF must acquire an advance reservation for transmission service over the facility by contacting a Schedule 20A Service Provider that is identified in section (A) of the table below, and include the OASIS reservation information in the submittal of Phase I/II HVDC-TF External Transaction to the ISO market system.

INTERCONNECTION RIGHTS HOLDERS ("IRH") PERCENTAGE INTEREST & MW AS OF: May 23, 2018

 

  

 

(A) Phase I/II HVDC-TF Service offered by the Schedule 20A Service Providers ("SSP") over Phase I/II HVDC-TF:

 

Schedule 20A Service Providers

Total
Phase I Percentage Interest

Total
Phase II Percentage Interest

Total
Combined Percentage Interest

MWs of
Transmission
Service
Offered
(reflects
Share of Tie
in Section B)

 

1.     Bangor Hydro-Electric Company ("BHE") (see Note A-BHE)

1.50834

1.52

1.51598

30

 

2.     Central Maine Power Company ("CMP")

6.99346

7.1205

7.07667

141

 

3.     Green Mountain Power Company ("GMP")

10.52727

12.5439

11.84816

236

 

4.     New England Power Company ("NEP")

21.9895

22.6158

22.39973

447

 

5.     Eversource (“ES”) (see Note A-ES)

34.21614

32.7734

33.27115

665

 

6.     NSTAR Electric Company (East) ("NSTAR")

15.77663

15.6873

15.71812

314

 

7.     The United Illuminating Company ("UI")

5.44715

5.45

5.44902

108

 

8.     Vermont Electric Co-Op ("VEC")

0.43984

0.5188

0.49156

9

 

Subtotal (A) =

96.89833

98.22970

97.77038

1950

 

 

 

 

 

 

 

(B) IRH that are offering Use Rights through a Schedule 20A Service Provider (see Section (A) above):

 

Interconnection Rights Holders

Phase I Percentage Interest

Phase II Percentage Interest

Combined Percentage Interest

Share of Tie
(MWs)

 

PP&L Energy Plus Co.

1.50834

1.52000

1.51598

30

 

Offered under SSP BHE (see A.1.)

1.50834

1.52000

1.51598

30

 

Central Maine Power Company

6.99346

7.12050

7.07667

141

 

Offered under SSP CMP (see A.2.)

6.99346

7.12050

7.07667

141

 

Green Mountain Power Company (see Note B-GMP)

10.52727

12.54390

11.84816

236

 

Offered under SSP GMP (see A.3.)

10.52727

12.54390

11.84816

136

 

New England Power Company (see Note B-NEP)

21.98950

22.61580

22.39973

447

 

Offered under SSP NEP (see A.4.)

21.98950

22.61580

22.39973

447

 

Connecticut Light and Power Co.

18.48700

18.82350

18.70741

374

 

Public Service Company of New Hampshire

11.84823

9.99840

10.63659

213

 

NSTAR Electric Company (West; see Note B-NSTAR2)

3.88091

3.95150

3.92715

79

 

Offered under SSP ES (see A.5.)

34.21614

32.77340

33.27115

665

 

NSTAR (East; see Note B-NSTAR1)

15.77663

15.68730

15.71812

314

 

Offered under SSP NSTAR (see A.6.)

15.77663

15.68730

15.71812

314

 

United Illuminating Company

5.44715

5.45000

5.44902

108

 

Offered under SSP UI  (see A.7.)

5.44715

5.45000

5.44902

108

 

Vermont Electric Co-Op (see Note B-VEC)

0.43984

0.51880

0.49156

9

 

Offered under SSP VEC (see A.8.)

0.43984

0.51880

0.49156

9

 

Subtotal (B) =

96.0983

97.4297

96.97039

1950

 

 

 

 

(C) IRH that are not offering Use Rights through a Schedule 20A Service Provider

 

Interconnection Rights Holders

Phase I Percentage Interest

Phase II Percentage Interest

Combined Percentage Interest

Share of Tie
(MWs)

 

Bangor Hydro-Electric Company

0

0

0

0

 

City of Burlington Electric Department

0.72912

0

0.25155

5

 

City of Chicopee Municipal Lighting Plant

0.32263

0.32000

0.32091

6

 

City of Holyoke Gas & Electric Light Dept.

0.24775

0.26910

0.26173

5

 

City of Peabody Municipal Light Plant

0.28306

0.28820

0.28643

5

 

City of Westfield Gas & Electric Light Dept.*

0

0

0

0

 

Connecticut Municipal Electric Energy Coop.

0.02968

0.04480

0.03958

0

 

Constellation Energy Commodities Grp.

0

0

0

0

 

Holyoke Power and Electric Co.

0

0

0

0

 

Holyoke Water Power Co.

0

0

0

0

 

Hudson Light and Power Dept.*

0

0

0

0

 

Massachusetts Municipal Wholesale Electric Co.

0

0

0

0

 

Pascoag Fire District - Electric Dept.*

0

0

0

0

 

Taunton Municipal Lighting Plant*

0

0

0

0

 

Town of Ashburnham Municipal Light Plant

0.01774

0.01810

0.01798

0

 

Town of Boylston Municipal Light Dept.

0.02002

0.02040

0.02027

0

 

Town of Braintree Electric Light Dept.*

0

0

0

0

 

Town of Concord Municipal Light Plant*

0

0

0

0

 

Town of Danvers Electric Dept.*

0

0

0

0

 

Town of Georgetown Municipal Light Dept.*

0

0

0

0

 

Town of Groton Electric Light Dept.

0.02646

0.02690

0.02675

0

 

Town of Hingham Municipal Lighting Plant*

0

0

0

0

 

Town of Holden Municipal Light Dept.

0.07356

0.07490

0.07444

1

 

Town of Hull Municipal Lighting Plant

0.03577

0.03640

0.03618

0

 

Town of Littleton Electric Light & Water Dept.*

0

0

0

0

 

Town of Mansfield Municipal Electric Dept.

0.16696

0.17010

0.16902

3

 

Town of Marblehead Municipal Light Dept.

0.08474

0.08630

0.08576

1

 

Town of Middleborough Gas and Electric Dept.*

0

0

0

0

 

Town of Middleton Municipal Electric Dept.*

0

0

0

0

 

Town of North Attleborough Electric Dept.*

0

0

0

0

 

Town of Paxton Municipal Light Dept.

0.01745

0.01780

0.01768

0

 

Town of Princeton Municipal Light Dept.

0.00823

0.00840

0.00834

0

 

Town of Reading Municipal Light Dept.*

0

0

0

0

 

Town of Rowley Municipal Light Dept.*

0

0

0

0

 

Town of Shrewsbury Electric Light Dept.

0.16902

0.16400

0.16573

3

 

Town of South Hadley Electric Light Dept.

0.11550

0.11760

0.11688

2

 

Town of Sterling

0.02832

0

0.00977

0

 

Town of Stowe Electrical Dept.*

0

0

0

0

 

Town of Templeton Municipal Light Plant

0.05449

0.05550

0.05515

1

 

Town of Wakefield Municipal Light Dept.*

0

0

0

0

 

Town of West Boylston Municipal Lighting Plant

0.05080

0.05180

0.05146

1

 

Vermont Electric Power Co.

0

0

0

0

 

Vermont Marble Co.

0

0

0

0

 

Vermont Public Power Supply Authority (see Note C-VPPSA)

0.62037

0

0.21403

4

 

Subtotal (C) =

3.10167

1.77030

2.22962

37

 

Grand Total for Sections B and C =
 (Excludes Section (A) values, which are already reflected in Section B)]
(Percentages may not sum to 100% and MW total
may not sum to 2,000 MW due to the rounding of values.)

100.00000

100.00000

100.00000

1987

 

Notes:

 

A-
BHE

Bangor Hydro Electric Company (BHE) Percentage Interest entitlements included in its Phase I/II-TF Service offering reflects the Percentage Interest entitlements from another IRH.  BHE (Percentage Interest: Phase I = 1.51% and Phase II = 1.52%).  BHE posts the aggregate Share of the Tie pursuant to the BHE Schedule 20A under Part II of the ISO Tariff (for more information go to: http://www.oatioasis.com/BHE).

 

The following IRH Share of the Tie is offered through the SSP BHE: PP&L Energy Plus Co.

 

A-
ES

Eversource Energy Service Company (ES) Percentage Interest entitlements included in its Phase I/II-TF Service offering reflects the Percentage Interest entitlements from other IRHs.  ES (Percentage Interest: Phase I = 34.22% and Phase II = 32.77%).  ES posts the aggregate Share of the Tie pursuant to the ES Schedule 20A under Part II of the ISO Tariff (for more information go to: http://www.oatioasis.com/NU).  Northeast Utilities Service Company changed its name to ES on July 1, 2015.

 

The following IRH Share of the Tie are offered through SSP ES: Connecticut Light and Power Company; Public Service Company of New Hampshire; and NSTAR (only the portion of the IRH Share formerly owned by Western Massachusetts Electric Company, which has been merged into NSTAR Electric Company; see Note B-NStar2).

 

B-
GMP

Green Mountain Power Company (GMP) Percentage Interest entitlements included in its Phase I/II-TF Service offering reflects its Percentage Interest entitlement and the Percentage Interest entitlements from other IRHs.  GMP, prior to October 1, 2012, (Percentage Interest: Phase I = 2.93243% and Phase II = 3.1792%); Central Vermont Public Service (CVPS) (Percentage Interest: Phase I = 4.5544% and Phase II = 5.132%); City of Westfield Gas & Electric Light Dept. (Percentage Interest: Phase I = 0.25304% and Phase II = 0.257%); Fitchburg Gas and Electric Light Co. (Percentage Interest: Phase I = 0.42636% and Phase II = 0.4341%); Hudson Light and Power Dept. (Percentage Interest: Phase I = 0.14765% and Phase II = 0.15%); Pascoag Fire District - Electric Dept. (Percentage Interest: Phase I = 0.02285% and Phase II = 0.0233%); Taunton Municipal Lighting Plant (Percentage Interest: Phase I = 0.3552% and Phase II = 0.3608%); Town of Braintree Electric Light Dept. (Percentage Interest: Phase I = 0.30879% and Phase II = 0.3136%); Town of Concord Municipal Light Plant (Percentage Interest: Phase I = 0% and Phase II = 0.1219%); Town of Danvers Electric Dept. (Percentage Interest: Phase I = 0.23892% and Phase II = 0.2433%); Town of Georgetown Municipal Light Dept. (Percentage Interest: Phase I = 0.02308% and Phase II = 0.0235%); Town of Hingham Municipal Lighting Plant (Percentage Interest: Phase I = 0.12007% and Phase II = 0.1222%); Town of Littleton Electric Light & Water Dept. (Percentage Interest: Phase I = 0.0733% and Phase II = 0.0747%); Town of Middleborough Gas and Electric Dept. (Percentage Interest: Phase I = 0.10638% and Phase II = 0.1083%); Town of Middleton Municipal Electric Dept. (Percentage Interest: Phase I = 0.04661% and Phase II = 0.0474%); Town of North Attleborough Electric Dept. (Percentage Interest: Phase I = 0.10838% and Phase II = 0.1104%);  Town of Reading Municipal Light Dept. (Percentage Interest: Phase I = 0.46418% and Phase II = 0.47260%); Town of Rowley Municipal Light Dept. (Percentage Interest: Phase I = 0.01565% and Phase II = 0.016%); Town of Stowe Electrical Dept. (Percentage Interest: Phase I = 0.09578% and Phase II = 0%); Town of Wakefield Municipal Light Dept. (Percentage Interest: Phase I = 0.12431% and Phase II = 0.1266%); UNITIL Power Corp. (Percentage Interest: Phase I = 0% and Phase II = 1.227%) and Vermont Marble Co.  (Percentage Interest: Phase I = 0.10989% and Phase II = 0%). GMP posts the aggregate Share of the Tie pursuant to the GMP Schedule 20A under Part II of the ISO Tariff (for more information go to: http://www.oatioasis.com/GMP and http://www.oatioasis.com/GMP/GMPDocs/Brokering.html).

 

B-
NEP

New England Power Company (NEP) Percentage Interest entitlements included in its Phase I/II-TF Service offering reflects the Percentage Interest entitlements for NEP and the NEP affiliates, which include Montaup Electric Company and Newport Electric Corporation.  NEP (Percentage Interest: Phase I = 17.96963% and Phase II = 18.5316%); Montaup Electric Company (Percentage Interest: Phase I = 3.5777% and Phase II = 3.634%); and Newport Electric Corporation (Percentage Interest: Phase I = 0.44217% and Phase II = 0.4502%).  NEP posts the aggregate Share of the Tie pursuant to the NEP Schedule 20A under Part II of the ISO Tariff (for more information go to: http://www.oatioasis.com/NEP).

 

B-
NSTAR1

NSTAR Electric Company (NSTAR) Percentage Interest entitlements (referred to herein as NSTAR (East)) include service from the Percentage Interest entitlements of the former affiliates that were merged into NSTAR, which include Boston Edison Company and Commonwealth/Canal Electric Company but do not include the Percentage Interest entitlements of Western Massachusetts Electric Company for purposes of service under Schedule 20A-NSTAR).  NSTAR: Percentage Interest: Phase I = 0.00%; Phase II = 0.00%; Boston Edison Company: Percentage Interest: Phase I = 11.24796%; Phase II = 11.0909% and Commonwealth/Canal Electric Company: Percentage Interest: Phase I = 3.72867%; Phase II = 3.7964%.  Connecticut Municipal Electric Energy Coop.: Percentage Interest: Phase I = 0.80000%; Phase II = 0.80000%.  NSTAR posts the aggregate Share of the Tie pursuant to the NSTAR Schedule 20A under Part II of the ISO Tariff (for more information go to: http://www.oatioasis.com/NSTR).

 

B-
NSTAR2

Effective March 2, 2018, the Western Massachusetts Electric Company (including its Percentage Interest of Phase I = 3.88091%; Phase II = 3.95150%) was absorbed into NSTAR and these Percentage Interest values continue to be offered by the ES SSP (see Note A-ES).

 

B-
VEC

Vermont Electric Co-Op (VEC) Percentage Interest entitlements included in its Phase I/II-TF Service offering reflects the Percentage Interest entitlements from other IRHs.  VEC (Percentage Interest: Phase I = 0.00% and Phase II = 0.00%); Citizens Utilities Co. (Percentage Interest: Phase I = 0.43984% and Phase II = 0.5188%).  VEC posts the aggregate Share of the Tie pursuant to the VEC Schedule 20A under Part II of the ISO Tariff (for more information go to: http://www.oatioasis.com/VECT).

 

C-
VPPSA

Vermont Public Power Supply Authority (VPPSA) Percentage Interest entitlements include Percentage Interest entitlements from Enosburg Falls (Percentage Interest: Phase I = 0.03142% and Phase II = 0%), Hardwick (Percentage Interest: Phase I = 0.0629% and Phase II = 0%), Ludlow (Percentage Interest: Phase I = 0.05757% and Phase II = 0%), Lyndonville (Percentage Interest: Phase I = 0.10768% and Phase II = 0%), Morrisville (Percentage Interest: Phase I = 0.09811% and Phase II = 0%), Northfield (Percentage Interest: Phase I = 0.05378% and; Phase II = 0%), Swanton (Percentage Interest: Phase I = 0.09219% and Phase II = 0%) and Washington Coop. (Percentage Interest: Phase I = 0.11672% and Phase II = 0%).

 

 

Calculation of MW Share of the 2,000 MW Phase I/II HVDC-TF: The values in the table above represent the current respective Percentage Interests in Phase I and Phase II of each IRH.  These values are reflective of the respective share of the costs of the Phase I and Phase II facilities that these IRH support, directly or indirectly, under the Phase I and Phase II Support Agreements.  The Combined Percentage Interest is derived in accordance with the following formula: {[(Phase I Percentage Interest x 690) + (Phase II Percentage Interest x 1,310)] / 2,000}.  The calculation of each IRH’s “Share of Tie” is based on their respective Combined Percentage Interest divided by 100, multiplied by the Phase II Nominal Transfer Capability of 2,000 MW, and rounded down to whole MW.  [Note: If one were to sum the Percentage Interest values for all IRH listed in the table above, the totals would be greater than 100% because the "Share of the Tie" for IRH listed in Section (B) of the table is also reflected in the "MWs of Transmission Service Offered" for the Schedule 20A Service Providers that offer service on behalf of the IRH listed in Section (A) of the table.  For this reason, the Schedule 20A Service Providers in Section (A) of the table are excluded from the grand total above to avoid double-counting.] 

 

 

 

 

Transfers of Use Rights since April 1, 2005

Prior To Transfer Date

As Of Transfer Date

No.

Interconnection Rights Holders

Effective
Date of
Transfer

End
Date of
Transfer

Phase I
Percentage
Interest

Phase II
Percentage
Interest

Combined
Percentage
Interest

Phase I
Percentage
Interest

Phase II
Percentage
Interest

Combined
Percentage
Interest

TA-1.01

Transferring IRH (Transferor): City of Burlington Electric Dept.

1/1/2006

Indefinite

See TA-1.13

0.72912

0.00000

0.25155

0.00000

0.00000

0.00000

Receiving IRH (Transferee): VEC

0.43984

0.51880

0.49156

1.16896

0.51880

0.74311

TA-1.02

Transferring IRH (Transferor): Princeton Municipal Light Dept. (Select)

3/1/2006

Indefinite

0.00823

0.00840

0.00834

0.00000

0.00000

0.00000

Receiving IRH (Transferee): VPPSA

0.71615

0.00000

0.24707

0.72438

0.00840

0.25541

TA-1.03

Transferring IRH (Transferor): Rowley Municipal Light Dept. (Select)

3/1/2006

Indefinite

0.01565

0.01600

0.01588

0.00000

0.00000

0.00000

Receiving IRH (Transferee): Constellation Energy Commodities Group

0.00000

0.00000

0.00000

0.01565

0.01600

0.01588

TA-1.04

Transferring IRH (Transferor): Concord Municipal Light Dept.

12/1/2006

Indefinite

0.00000

0.12190

0.07984

0.00000

0.00000

0.00000

Receiving IRH (Transferee): Constellation Energy Commodities Group

0.01565

0.01600

0.01588

0.01565

0.13790

0.09572

TA-1.05

Transferring IRH (Transferor): VPPSA

9/1/2007

Indefinite

0.72438

0.00840

0.25541

0.71615

0.00000

0.24707

Receiving IRH (Transferee): Princeton Municipal Light Dept.

0.00000

0.00000

0.00000

0.00823

0.00840

0.00834

TA-1.06

Transferring IRH (Transferor): BELD

9/1/2008

12/31/2013

0.30879

0.31360

0.31194

0.00000

0.00000

0.00000

Receiving IRH (Transferee): CVPS (GMP by acquisition 10/1/12)

8.02308

9.97230

9.29982

8.33187

10.2859

9.61176

TA-1.07

Transferring IRH (Transferor): VPPSA

1/1/2009

Indefinite

0.71615

0.00000

0.24707

0.62037

0.00000

0.21403

Receiving IRH (Transferee): Town of Stowe Electric Dept.

0.00000

0.00000

0.00000

0.09578

0.00000

0.03304

TA-1.08

Transferring IRH (Transferor): Holyoke Water Power Co.

3/1/2009

Indefinite

0.12350

0.12570

0.12494

0.00000

0.00000

0.00000

Receiving IRH (Transferee): Western Mass Electric

3.75741

3.82580

3.80221

3.88091

3.95150

3.92715

TA-1.09

Transferring IRH (Transferor): Constellation Energy Commodities Group

10/1/2009

Indefinite

0.01565

0.13790

0.09572

0.01565

0.01600

0.01588

Receiving IRH (Transferee): Concord Municipal Light Dept.

0.00000

0.00000

0.00000

0.00000

0.12190

0.07984

TA-1.10

Transferring IRH (Transferor): Constellation Energy Commodities Group

1/1/2010

Indefinite

0.01565

0.01600

0.01588

0.00000

0.00000

0.00000

Receiving IRH (Transferee): Rowley Municipal Light Dept. (Select)

0.00000

0.00000

0.000000

0.01565

0.01600

0.01588

TA-1.11

Transferring IRH(Transferor): Vermont Marble Company

8/1/2011

Indefinite

0.10989

0.00000

0.03791

0.00000

0.00000

0.00000

Receiving IRH (Transferee): CVPS (GMP by acquisition 10/1/12)

8.22198

10.28590

9.57385

8.33187

10.28590

9.61176

TA-1.12

Transferring IRH (Transferor): CVPS (Acquisition of CVPS by GMP – including Use Rights of BELD [until 12/31/2015], FGE, Unitil, and VMC)

10/1/2012

Indefinite

8.33187

10.28590

9.61176

0.00000

0.00000

0.00000

Receiving IRH (Transferee): GMP

0.00000

0.00000

0.00000

8.33187

10.28590

9.61176

 

 TA-1.13

Transferring IRH (Transferor): VEC

11/1/2012

Indefinite

1.16896

0.51880

0.74311

0.43984

0.51880

0.49156

 

Receiving IRH (Transferee): City of Burlington Electric Dept.

0.00000

0.00000

0.00000

0.72912

0.0000

0.25155

 

 TA-1.14

Transferring IRH (Transferor): GMP

1/1/2015

12/31/2015

8.33187

10.28590

9.61176

8.02308

9.97230

9.29982

 

Receiving IRH (Transferee): Braintree Electric Light Dept.

0.00000

0.00000

0.00000

0.30879

0.31360

0.31194

 

 TA-1.15

Transferring IRH (Transferor): Multiple [denoted by Asterisk (*) above]

1/1/2015

12/31/2018

2.04001

2.09900

2.07865

0.00000

0.00000

0.00000

 

Receiving IRH (Transferee): Energy New England

0.00000

0.00000

0.00000

2.04001

2.09900

2.07865

 

 TA-1.16

Transferring IRH (Transferor):  Energy New England

1/1/2015

12/31/2018

2.04001

2.09900

2.07865

0.00000

0.00000

0.00000

 

Receiving IRH (Transferee): GMP

8.02308

9.97230

9.29982

10.06309

12.07130

11.37847

 

 TA-1.17

Transferring IRH (Transferor):  Connecticut Municipal Electric Energy Coop.

7/1/2015

06/30/2018

0.82968

0.84480

0.83958

0.02968

0.04480

0.03958

 

Receiving IRH (Transferee): NSTAR

14.97663

14.88730

14.91812

15.77663

15.6873

15.71812

 

TA-1.18

Effective March 2, 2018 and for the purpose of this table, the Western Massachusetts Electric Company (including its Percentage Interest of Phase I = 3.88091%; Phase II = 3.95150%) was absorbed into NSTAR and these Percentage Interest values continue to be offered by the ES SSP (see Note A-ES).

 

TA-1.19

Transferring IRH (Transferor):  Connecticut Municipal Electric Energy Coop.

7/1/2018

10/31/2020

0.82968

0.84480

0.83958

0.02968

0.04480

0.03958

 

Receiving IRH (Transferee): NSTAR

14.97663

14.88730

14.91812

15.77663

15.6873

15.71812