ICT Planning Studies and Related Documents

Transmission Service Requests & Studies

 

System Impact Studies

Facility Studies

Related Information

2013 System Impact Studies – MISO ICT

2012 System Impact Studies – MISO ICT

2012 System Impact Studies – SPP ICT

2011 System Impact Studies

2010 System Impact Studies

2009 System Impact Studies

2008 System Impact Studies

2007 System Impact Studies

 

Studies Prior to ICT

2006

2005

2004

2003

2013 Facility Studies – MISO ICT

2012 Facility Studies – MISO ICT

2012 Facility Studies – SPP ICT

2011 Facility Studies

2010 Facility Studies

2009 Facility Studies

2008 Facility Studies

2007 Facility Studies

 

Studies Prior to ICT

2007

2006

TSR Study Queue

Automatic Operating Guides Used to Evaluate Transmission Service Requests

SPECIAL STUDY MODELS

Pre-Order 888 Transactions

 

Generation Interconnection Requests & Studies

Related Information & Studies

Generation Interconnection Reports

LGIP Application Process and Contacts

Interconnection Study Requests Queue

Retrospective Generation Interconnection Analysis

All GI Study Reports Posted Under the MISO ICT

All GI Study Reports Posted Under the SPP ICT

All GI Study Reports Posted Prior To ICT

 

 

Planning Studies & Reports

 

AFC Flowgate 'Limiting Elements'

AFC Flowgate 'Limiting Elements'

ICT Strategic Transmission Expansion Plan

ISTEP

Economic Planning Studies

Economic Planning Studies Page

Entergy/SPP RTO Regional Planning Process (ESRPP)

ESRPP Documents & Meeting Materials

Construction Plan Monthly Status Reports

Entergy Construction Plan Monthly Status Reports

2014 Base Plan & Construction Plan

Draft Reliability Assessment Work Plan 03-28-2013

2013_BP-CP_ICT_Comparison_Report_2013-12-18

2014-18 ICT Reliability Assessment Report_2013-12-18

 

ICT Base Plan

            2014-2018 ICT FINAL Base Plan 2013-11-14           

            2014 – 2018 ICT DRAFT Base Plan 2013-08-20

            2014-2018 ICT Steady State Results 2013-08-20

           

 

Entergy Construction Plan

            2014 – 2018 Entergy DRAFT Construction Plan Update 2 (08/07/2013)

            2014 – 2018 Entergy DRAFT Construction Plan Update 1 (05/23/2013)

            2014 – 2018 Entergy DRAFT Construction Plan (04/01/2013)   

            2014 – 2018 Entergy Draft Construction Plan IDEVs (07/23/2013)

            2014 – 2018 Entergy FINAL Construction

 

July Transmission Summit Materials

September Transmission Summit Materials

Stakeholder Comments and Responses to Stakeholder Comments

2013 Base Plan & Construction Plan

Base Plan - Construction Plan Differences

            2013 - 2017 FINAL Base Plan - Construction Plan Differences Report

ICT Base Plan

            ICT 2013 FINAL Base Plan

            ICT 2013 DRAFT Base Plan (11/2/2012)

            ICT 2013 Final Reliability Assessment Report (8/2/2012)

            ICT 2013 Draft Reliability Assessment Report (7/5/2012)

            ICT 2013 Reliability Assessment Contingency Scan Spreadsheets (7/5/2012)

            ICT 2013 Reliability Assessment Modeling Files (7/5/2012)

Entergy Construction Plan

            2013 – 2017 Entergy FINAL Construction Plan Update 4 (08/07/2013)

            2013 – 2017 Entergy FINAL Construction Plan Update 3 (05/23/2013)

            2013 – 2017 Entergy FINAL Construction Plan Update 2 (04/01/2013)

            2013-2017 Entergy FINAL Construction Plan Update 1 (12/06/2012)

            2013-2017 Entergy FINAL Construction Plan

            2013-2017 Entergy DRAFT Construction Plan Update 3(10/26/2012)

            2013-2017 Entergy DRAFT Construction Plan Update 2(08/6/2012)

            2013-2017 Entergy DRAFT Construction Plan Update 1(07/16/2012)

            2013-2017 Entergy DRAFT Construction Plan (05/09/2012)

            2013-2017 Entergy Construction Plan Idev Files

            2012 Transmission Planning Summit Presentations

            2012 Transmission Planning Summit Notes

2012 Base Plan & Construction Plan

ICT Base Plan

            ICT 2012 FINAL Base Plan Update 2 (05/17/2012)

            ICT 2012 FINAL Base Plan Update 1 (03/01/2012)

            ICT 2012 FINAL Base Plan (12/30/2011)

            ICT 2012 DRAFT Base Plan Update 1 (12/01/2011)

            ICT 2012 DRAFT Base Plan (11/23/2011)

            ICT 2012 Final Reliability Assessment Report (08/04/2011)

            ICT 2012 Draft Reliability Assessment Report (06/24/2011)

            ICT 2012 Reliability Assessment Contingency Scan Spreadsheets (06/24/2011)

            ICT 2012 Reliability Assessment Modeling Files (06/24/2011)

Entergy Construction Plan

           

 

 2012-2016 Entergy FINAL Construction Plan Update 2 (05/09/2012)

            2012-2016 Entergy FINAL Construction Plan Update 1 (02/28/2012)

            2012-2016 Entergy FINAL Construction Plan (12/20/2011)

            2012-2016 Entergy DRAFT Construction Plan Update 2 (10/21/2011)

            2012-2014 Entergy DRAFT Construction Plan Update 1 (07/27/2011)

            2012-2014 Entergy DRAFT Construction Plan (04/29/2011)

            2012-2016 Entergy Construction Plan Idev Files

            2011 Transmission Summit Presentations and Notes

Operation Guides used in the development of the 2012 BP

            2012 Base Plan Overview (01/04/2012)

2011 Transmission Planning Summits Notes

2011 Base Plan & Construction Plan

ICT Base Plan

            ICT 2011 Final Base Plan Update 3(08/03/2011)

            ICT 2011 Final Base Plan Update 2(05/10/2011)

            ICT 2011 Final Base Plan Update 1(02/23/2011)

            ICT 2011 Final Base Plan (12/30/2010)

            ICT 2011 Draft Base Plan Update 1 (112910)(pdf)

            ICT 2011 Draft Base Plan (110810)(pdf)

            ICT 2011 Final Reliability Assessment Report

            ICT 2011 Draft Reliability Assessment Report

            ICT 2011 Draft Reliability Assessment Contingency Scan Spreadsheet

            ICT 2011 Draft Reliability Assessment Modeling Files

Entergy Construction Plan

            2011-2013 Entergy Final Construction Plan Update 3 (07/27/2011)

            2011-2013 Entergy Final Construction Plan Update 2(04/29/2011)

            2011-2013 Entergy Final Construction Plan Update 1(02/23/2011)

            2011-2013 Entergy Final Construction Plan (12/30/2010)

            2011-2013 Entergy DRAFT Construction Plan Update 1 (072810)(pdf)

            2011-2013 Entergy DRAFT Construction Plan (042910)(pdf)

 

2011-2013 Entergy Construction Plan Idev Files

Operation Guides used in the development of the 2011 BP and CP

2011 Base Plan Overview

 

2010 Transmission Summit Presentations and Notes

2010 Base Plan & Construction Plan

2010 Base Plan & Construction Plan

2009 Base Plan & Construction Plan

2009 Base Plan & Construction Plan

2008 Base Plan & Construction Plan

2008 Base Plan & Construction Plan

2007 Base Plan & Construction Plan

2007 Base Plan & Construction Plan

Planning Criteria

NERC Standards

SERC Supplements to NERC Reliability Standards

Entergy Transmission Local Planning Criteria

Entergy Transmission Planning Guidelines

Acadiana

ICT Acadiana Load Pocket Study

LPSC 5/22/2009 Technical Conference

South Louisiana Bulk Presentation

Base Plan / Construction Plan Differences Presentation

EIPC

Eastern Interconnection Planning Collaborative

 

 

YOU CAN DOWNLOAD STUDY REPORTS FROM ABOVE LINKS OR
SEND YOUR REQUEST TO  lrauch@misoenergy.org.


Laura Rauch

317-249-5853