10/21/08 -- Updated Generator Interconnection Queue Summary, Independent Entity Generator Interconnection Queue Details.

This page contains a summary description with dates, and programs used of all transmission studies used to prepare data for the Primary Provider's ATC and TTC calculation along with information as to how to obtain the study data and results.  It also contains a list of Network & Firm Reservations Studies and the Generation Study Queue.

Network and Firm Reservation Studies

Generator Interconnection Queue Summary

Generator Interconnection Queue Details

Independent Entity Generator Interconnection Queue Details

Monthly Studies

Where to Contact for Studies or Interconnection Information

Supplemental Electronic Communication


Description
ATC and TTC results are computed using power flow analysis tools. The ATCs computed honor thermal limits, contract limits, voltage limits, and test levels performed in the VAST Studies. On & Off Peak ATC calculations use the expected peak load for a given period. The effect of each transmission reservation on ATC is calculated based on the given source and sink. Sources and sinks are grouped on a control area basis.

The above assumptions may change in the future if the calculated ATCs do not accurately reflect our operating experience. More detailed modeling may be required for specific transmission requests.

INDEPENDENT ENTITY INFORMATION - As of November 1, 2006
The Duke Energy Independent Entity (Midwest ISO) will process Generator Interconnection requests and Long-Term Network and Frim Reservation studies on Nov 1, 2006. All such requests on or after Nov 1, 2006 will be the responsibility of the Independent Entity. Operating Procedures can be found at: https://www.oatioasis.com/DUK/DUKdocs/IE_Gen_Int_Procedures.pdf

Customers needing information on interconnecting to Duke's transmission system may call Brian Pedersen (Midwest ISO) at 1-651-632-8541 or email at dukncie-gi@midwestiso.org.

Network and Firm Reservation Studies

The most recent changes are shown  in Red.

Go to Top           

Date Requested Customer Interface  Winter Capacity Summer Capacity Status
July 2, 1997 Progress Energy/Destec DUK>DUK 490 440 Completed
September 24, 1997 Progress Energy/Destec DUK>CPLE 490 440 Completed
October 2, 1997 Progress Energy/Destec DUK>DUK 660 590 Completed
January 07, 1998 LS Power, LLC DUK>CPLE 370 320 Completed
February 20, 1998 LS Power, LLC DUK>DUK 1270 1120 Withdrawn
March 23, 1998 Progress Energy/Destec DUK>CPLE 820 750 Withdrawn
March 23, 1998 Progress Energy/Destec DUK>CPLE 1150 1100 Withdrawn
March 23, 1998 Progress Energy/Destec DUK>CPLE 370 320 Withdrawn
April 6, 1998 LS Power, LLC DUK>CPLE 900   Completed
April 6, 1998 LS Power, LLC DUK>DUK 370 320 Completed
 June 1, 1998 Polsky Energy  DUK>CPLE  350   Completed 
 October 14, 1998 Polsky Energy  DUK>CPLE  175   Completed
May 28, 1999 NCEMC CPLE>DUK 450 450 Completed
June 23, 1999 New Horizon SC>DUK 423 423 Completed
February 24, 2000 SkyGen Energy LLC DUK>CPLE 350   Withdrawn
February 24, 2000 SkyGen Energy LLC DUK>CPLE 500   Withdrawn
August 28, 2000 Dynegy Power Marketing DUK>TVA 225   Withdrawn
April 11, 2002 NCEMC SCEG>DUK 150 150 Completed
April 11, 2002 NCEMC SCEG>DUK 250 250 Completed
April 11, 2002 NCEMC CPLE>DUK 50 50 Completed
April 11, 2002 NCEMC CPLE>DUK 150 150 Completed
April 11, 2002 NCEMC CPLE>DUK 420 420 Completed
June 12, 2002 NCEMC SOCO>DUK 100 100 Completed
June 12, 2002 NCEMC SCEG>DUK 25 25 Completed
April 24, 2003 Progress Energy Carolina DUK>CPLE 420 420 Completed
May 11, 2004 Williams Power AEP>SOCO 148 148 Completed
May 19, 2005 Constellation Energy Commodities Group DUK>TVA 400 400 Completed
January 26, 2006 Southern Company Services, Inc DUK>SOCO 1000 1000 Withdrawn
January 26, 2006 Southern Company Services, Inc DUK>PJM 1000 1000 Withdrawn
January 26, 2006 Southern Company Services, Inc DUK>CPLE 1000 1000 Withdrawn
January 26, 2006 Southern Company Services, Inc DUK>TVA 1000 1000 Withdrawn
January 26, 2006 Southern Company Services, Inc DUK>SCEG 1000 1000 Withdrawn
January 26, 2006 Southern Company Services, Inc DUK>SC 1000 1000 Withdrawn
March 30, 2006 NCEMC DUK>PJM 50 50 Completed
March 30, 2006 NCEMC DUK>PJM 50 50 Completed
March 30, 2006 NCEMC DUK>PJM 50 50 Completed
March 30, 2006 NCEMC DUK>PJM 50 50 Completed
April 13, 2006 Duke BPM DUK>TVA 100 100 Completed
April 13, 2006 Duke BPM DUK>TVA 100 100 Completed
April 13, 2006 Duke BPM DUK>TVA 100 100 Completed
April 13, 2006 Duke BPM DUK>TVA 100 100 Completed
*January 24, 2007 CPLC DUK>CPLE 300 300 Withdrawn
*January 24, 2007 CPLC DUK>CPLE 100 100 Withdrawn
*January 24, 2007 CPLC DUK>CPLE 100 100 Withdrawn
*January 24, 2007 CPLC DUK>CPLE 300 300 Withdrawn
*January 25, 2007 NCEMC DUK>PJM 50 50 Withdrawn
*January 25, 2007 NCEMC DUK>PJM 50 50 Withdrawn
*February 14, 2007 CPLC DUK>CPLW 150 150 SIS Completed
*April 12, 2007 FPWC DUK>CPLE 498 555 SIS Completed
*April 27, 2007 NCEMC DUK>CPLE 55 55 SIS Completed
*April 27, 2007 NCEMC DUK>CPLE 50 50 SIS Completed
*July 12, 2007 CPLC DUK>CPLE 150 150 Withdrawn
*July 12, 2007 CPLC DUK>CPLW 100 100 Withdrawn
*July 12, 2007 CPLC DUK>CPLE 100 100 Withdrawn
*July 12, 2007 CPLC CPLE>CPLW 200 200 Withdrawn
*July 12, 2007 CPLC CPLE>CPLW 100 100 Withdrawn
*August 1, 2007 CALP SCEG>PJM 171 171 Withdrawn
*August 1, 2007 CALP SCEG>PJM 171 171 Withdrawn
*September 24, 2007 CPLC SOCO>CPLW 100 100 SIS Complete
*September 24, 2007 CPLC SOCO>CPLE 50 50 SIS Complete
*September 24, 2007 CPLC DUK>CPLW 100 100 SIS Complete
*September 24, 2007 CPLC DUK>CPLE 150 150 SIS Complete
*September 25, 2007 SEPA SETH>DUK 120 120 SIS Complete
*October 1, 2007 SCBP SC>DUK 691 691 SIS Complete
*October 16, 2007 CPLC CPLE>CPLW 200 200 FS Complete/Withdrawn
*October 16, 2007 CPLC CPLE>CPLW 100 100 FS Complete/Withdrawn
*November 1, 2007 SCBP SC>DUK 217 217 SIS Complete
*January 9, 2008 DUKE DUK>CPLW 46 46 SIS Complete
*January 28, 2008 DUKE DUK>SCEG 200 200 SIS Complete/Withdrawn
*May 6, 2008 CPLC CPLE>CPLW 300 300 FS Complete
*June 11, 2008 CRGL PJM>SOCO 100 100 SIS Complete

* This request will be processed by the Independent Entity, however the study work (power flow/stability/other) will be performed by Duke Energy Carolinas under the direction of the Independent Entity.

Generation Interconnection Queue Summary

(Listed in Queue Order)

The most recent changes are shown  in Red.

Go to Top            

QueueID

County/State

Queue Date

Project Status

2-6-4 Anderson, SC
11/05/99
Withdrawn
15-39-1 Cherokee. SC
12/08/99
Complete
16-17-7 Rowan,   NC
12/08/99
Withdrawn
33-38-35 Cherokee, SC
02/01/00
Withdrawn
17-18-8 Greenville, SC
02/23/00
Withdrawn
18-19-9 Rowan, NC
02/23/00
Withdrawn
49-44- Cherokee, SC
02/23/00
Withdrawn
49-45- Cherokee, SC
02/23/00
Withdrawn
50-46- Cherokee, SC
02/23/00
Withdrawn
50-47- Cherokee, SC
02/23/00
Withdrawn
51-48- Anderson, SC
02/23/00
Withdrawn
51-49- Anderson, SC
02/23/00
Withdrawn
52-50- Spartanburg, SC
02/23/00
Withdrawn
52-51- Spartanburg, SC
02/23/00
Withdrawn
52-52- Spartanburg, SC
02/23/00
Withdrawn
53-53- Davidson, NC
02/23/00
Withdrawn
53-54- Davidson, NC
02/23/00
Withdrawn
3-7-5 Cherokee, SC
04/17/00
Complete
45-35-16 Rowan, NC 
05/19/00
Complete
48-41-18 Anderson, SC
06/23/00
Complete
46-36-17 Cherokee, SC
09/21/00
Withdrawn

22-23-13

Rowan, NC

10/05/00

Withdrawn

22-42-19

Rowan, NC

10/05/00

Withdrawn

22-43-20

Rowan, NC

10/05/00

Withdrawn

31-32-14 Greenville, SC
03/22/01

Withdrawn

1-1-22 Davidson, NC
03/27/01
Withdrawn
28-30-23 Cherokee, SC
04/01/01
Withdrawn
11-13-6 Rowan,  NC
04/03/01
Withdrawn
25-27-24 Greenville, SC
04/06/01
Withdrawn
27-29-25 Cherokee, SC
04/07/01

Withdrawn

9-11- Cherokee, SC
04/12/01
Withdrawn
7-2-28 Davidson, NC
04/13/01

Withdrawn

8-5-30 Davidson, NC
04/13/01
Withdrawn
24-26-26 Greenville, SC
04/18/01
Withdrawn
6-10- Gaston, NC
04/20/01
Withdrawn
10-12-31 Greenville, SC
04/26/01
Withdrawn
23-25- Spartanburg, SC
04/27/01
Withdrawn
4-8-32 York, SC
05/01/01
Withdrawn
5-9-34 Gaston, NC
05/01/01
Withdrawn
26-28-33 Gaston, NC
05/01/01
Withdrawn
29-31-45 Cherokee, SC
05/03/01
Withdrawn
32-3- York, SC
05/04/01
Withdrawn
14-16-37 Greenville, SC
05/16/01
Withdrawn
37-33-38 Greenville, SC
05/16/01
Withdrawn
38-34-39 Greenville, SC
05/16/01
Withdrawn
39-56-40 Greenville, SC
05/16/01
Withdrawn
12-60-41 Gaston, NC 
05/16/01
Withdrawn
13-61-42 Gaston, NC 
05/31/01
Withdrawn
35-4- Spartanburg, SC
06/06/01
Withdrawn
36-58- Spartanburg, SC 
06/06/01
Withdrawn
44-57-44 Davidson, NC
06/18/01
Withdrawn
34-40-49 Forsyth, NC
06/20/01
Withdrawn
30-59- York, SC
07/02/01
Withdrawn
59-63- Guilford, NC
08/30/01
Withdrawn
60-64- Rowan,  NC
08/30/01
Withdrawn
61-62- Anderson. SC
08/30/01
Withdrawn
62-65- Rowan,  NC
08/30/01
Withdrawn
63-67-36 York, SC
10/25/01
Withdrawn
64-68-43 York, SC
10/25/01
Withdrawn
67-69- Greenville, SC
11/16/01
Withdrawn
69-70- Greenville, SC
11/16/01
Withdrawn
70-73- Cherokee, SC
11/27/01
Withdrawn
71-75-48 Stanly, NC
01/03/02
Withdrawn
77-74- York, SC
01/22/02
Withdrawn
83-76- Lincoln, NC
03/08/02
Withdrawn
85-77- Lincoln, NC
03/08/02
Withdrawn
87-78- Lincoln, NC
03/08/02
Withdrawn
98-80-47 Anderson, SC
03/26/02
Complete
95-81- York, SC
04/04/02
Withdrawn
99-82-50 Anderson, SC
01/22/03
Withdrawn
101-83- Pickens, SC
03/05/03
Withdrawn
102-84- Gaston, NC
03/20/03
Completed
103-85-51 Davidson, NC
04/24/03
Withdrawn
104-86- Gaston, NC
04/30/03
Withdrawn
105-87- Anderson, SC
07/17/03
Withdrawn
107-89- Pickens, SC
09/06/03
Completed
108-88- Pickens, SC
09/06/03
Active
110-90 Gaston, NC
02/06/04
Completed
111-91 Anderson, SC
05/02/04
Completed
112-93 Oconee, SC
01/04/05
Withdrawn
113-92 York, SC
01/04/05
Withdrawn
114-94 Rowan, NC
06/20/05
Withdrawn
115-95 Rutherford, NC
06/20/05
Active
118-98 Cleveland, NC
10/13/05
Withdrawn
119-96 Cleveland, NC
10/13/05
Withdrawn
120-97 Cleveland, NC
10/13/05
Withdrawn
123-100 Cherokee, SC
01/12/06
Active
124-101 Cherokee, SC
01/12/06
Active
121-99 Cleveland, NC
01/25/06
Withdrawn
125-102 Greenwood, SC
04/08/06
Completed
126-107 Anderson, SC
10/31/06
Withdrawn
128-106 Anderson, SC
10/31/06
Withdrawn
129-105 Caswell, NC
10/31/06
Active
130-104 Caswell, NC
10/31/06
Active
131-103 Rowan, NC
10/31/06
Active
*39128-01 Burke, NC
02/13/07
Complete
*39176-01 Anderson, SC
4/4/07
Withdrawn
*39176-02 Anderson, SC
4/4/07
Withdrawn
*39176-03 Caswell, NC
4/4/07
Withdrawn
*39176-04 Caswell, NC
4/4/07
Withdrawn
*39178-01 Rowan, NC
4/6/07
Withdrawn
*39258-01 Cleveland, NC
6/29/07
Active
*39421-01 Salisbury, NC
12/5/07
Withdrawn
*39470-01 Guilford, NC
1/23/08
Active
*39471-01 Guilford, NC
1/24/08
Withdrawn
*39478-01 Gaston, NC
1/31/08
Active
*39540-01 Guilford, NC
4/3/08
Active
*39610-01 Rockingham, NC
6/11/08
Active
*39727-01 Rockingham, NC
10/06/08
Active

* This request will be processed by the Independent Entity, however the study work (power flow/stability/other) will be performed by Duke Energy Carolinas under the direction of the Independent Entity.

Click to see the Generation Interconnection Queue Details.

Click to see the Independent Entity Generation Interconnection Queue Details.

Go to Top      

Monthly Studies

The most recent changes are shown  in Red.

  Description         

The monthly transmission transfer capability information posted is based on Seasonal VAST OASIS Study results. These studies will be used as a starting point in calculating Duke's ATC values to model known outages of generation and transmission elements deemed to have a significant impact on transmission transfer capability. The VAST OASIS studies used are:

-

Seasonal

Month in which Studies are Conducted

Study

Jan-05

Apr-05

Jul-05 

Oct-05

Jan-06

Apr-06

Jul-06 

Oct-06

Jan-07

Apr-07

Jul-07

Oct-07

Jan-08

Apr-08 Jul-08 Oct-08 Jan-09 Apr-09

05 SPR 

Done

- - - - -

05 SUM 

Done

Done

- - - - -

05 FALL

Done

Done

Done

- - - - -

0506 WIN 

Done

Done

Done

Done

- - - - -

06 SPR

Done

Done

Done

Done

Done

- - - - -

  06 SUM 

Done

Done

Done

Done

Done

- - - - -

06 FALL

Done

Done

Done

Done

Done

- - - - -

0607 WIN

Done

Done

Done

Done

Done

- - - - -

07 SPR 

Done

Done

Done

Done

Done

- - - - -

07 SUM 

Done

Done

Done

Done

Done

- - - - -

07 FALL

Done

Done

Done

Done

Done 

- - - - -

0708 WIN 

Done

Done

Done

Done 

Done 

- - - - -

08 SPR 

-

Done

Done

Done 

Done 

Done 

- - - -

08 SUM 

-

-

Done

Done 

Done 

Done 

Done - - - -

08 FALL 

Done 

Done 

Done 

Done Done - - -

0809 WIN 

-  

Done 

Done 

Done Done Future - -

09 SPR 

-

Done 

Done Done Future Future -
09 SUM - - - - - - - - - - - -

-

Done Done Future Future Future
09 FALL - - - - - - - - - - - -

-

- Done Future Future Future
0910 WIN - - - - - - - - - - - -

-

- - Future Future Future
10 SPR - - - - - - - - - - - -

-

- - - Future Future
10 SUM - - - - - - - - - - - -

-

- - - - Future


 

 

Go to Top

 

SUPPLEMENTAL ELECTRONIC COMMUNICATION:  
Duke Energy Carolinas offers a service to provide supplemental electronic communication whenever one of the following Duke OASIS pages is changed:

Since it is impossible to guarantee delivery with electronic communications, users of this service must understand that this communication is a supplement to the primary means of notification. You may select one or more of the pages from the list and may choose to receive email or FAX communication.

Click here to register for the service or go to the following web address:   http://dpecs01.dukepower.com/ET/OASIScomm.nsf/regchoice 

If you have questions about this service or if you encounter problems, please contact Alan Pritchard.

Go to Top

 

Revision History: