Generator Interconnection Information


 

Large Generator Interconnection Processes (LGIP) Information Small Generator Interconnection Processes (SGIP) Information Suppelmental Communications Revision History

 

As of November 1, 2006, all new Generator Interconnection requests shall be submitted to the Independent Entity.

 

Customers submitting Generation Interconnections should review the information on this site and in Attachment J and Attachment M of the Duke Energy Carolinas Open acess Transmission Tariff before submitting a request.  All new Generator Interconnection requests should be sent to the Independent Entity (Midwest ISO).  The request will be processed by the Independent Entity, however the study work (power flow/stability/other) will be performed by Duke Energy Carolinas under the direction of the Independent Entity. 

Contact Information as to where Generation Interconnection requests should be sent to or about billing can be found on the Contact Information page.

Customers requesting Generation Interconnection study results may download them from the following links: Duke Energy Carolinas IE Generator Interconnection Queue (after 11/01/06) or Duke Energy Carolinas Generator Interconnection Queue (before 11/01/06).

Back To Top


 

Duke Energy Carolinas Generation Interconnection Queue:

 

 

Duke Energy Carolinas has only one (1) Generation Queue but to accurately reflect the Independent Entity's management of Duke Energy Carolinas Queue after November 1, 2006, there are two (2) separate databases, the Duke Energy Carolinas Generator Interconnection Queue (before 11/01/06) and the Duke Energy Carolinas IE Generator Interconnection Queue (after 11/01/06)The request will be processed by the Independent Entity, however the study work (power flow/stability/other) will be performed by Duke Energy Carolinas under the direction of the Independent Entity.

Back To Top

 

Large Generator Interconnection Processes (LGIP) Information:

 

The Large Generator Interconnection Processes (LGIP) applies as defined in Attachment J of the Tariff as any generator that is greater than 20 MW.  The following information applies to the LGIP:

Back To Top


 

 

Small Generator Interconnection Processes (SGIP) Information:

 

 

The Small Generator Interconnection Process (SGIP) applies as defined in Attachment M of the Tariff as any generator that is Less than 20 MW.  The following information applies to the SGIP:

Back To Top


Revision History: