Registration | About | HOME                                OATI webOASISSM Production Node                                        



Documents

  • NAESB Home Page

  • Standards of Conduct
    Emergency Circumstances Deviation
    Affiliates Engaging Marketing Function Employees
    Shared Facilities
    Employee Transfers
    Information Disclosures
    Potential Merger Partners
    Separate Implementation Procedure 5 Year Record Retention
    Compliance Plan
    Waiver of a Tariff Provision
    Shared Information Consent
    Transmission Provider Titles/Descriptions
    Discounts Postings
    Chief Compliance Officer
    Performance Metrics,
    CVPS Grants & Denial of Service
    Local Study Metrics
  • Local Study Process

  • Business Practices, Waivers, and Exemptions
    Schedule 20A
    Business Practices Amendments
    Business Practices Schedule
  • Conditional Firm Service Sched. 20A

  • Creditworthiness
    Creditworthiness Amendment
  • Designation of Network Resources

  • Energy and Generation Imbalances
  • NAESB Business Practices

  • Planning Redispatch

  • Transmission Studies

  • ISO Business Practices and Business Practices Amendments

  • Schedule 21
    Business Practices Amendments.
    Business Practices Schedule.
    CEII Disclosure
    Credit worthiness
    Credit worthiness Amendment
    Conditional Firm Service
  • Designation of Network Resources

  • Energy and Generation Imbalances.
    Transmission System Information and Studies
    Planning Redispatch
    Transmission Planning
  • Transmission Planning Strawman

  • ISO New England Regional system Plans

  • ISO-NE Attachment K Regional System Plan – December 7, 2007 FERC Order 890A Compliance Filing

  • ISO-NE Attachment K Regional System Plan –August 13, 2008 FERC Order 890A Compliance Filing

  • ATC Information
    Schedule 20A
    ATCID
  • CBMID.

  • TRMID
    ATC Methodology Contact
  • Current Load Forecast Descriptive Statement

  • Postback Methodology

  • Load Forecast

  • Attachment C Methodology to Assess Available Transfer Capability

  • Mathematic Algorithms for calculation of ATC

  • Total Transfer Capability Data

  • Schedule 21
    ATCID
    CBMID
    TRMID
    ATC Methodology Contact ,
    Postback Methodology,
  • Attachment A Methodology to Assess Available Transfer Capability

  • Mathematic Algorithms for calculation of ATC
    Total Transfer Capability Data
  • ATC/TTC Monitor Summary

  • OASIS Related Information
    OASIS Related Information
    CompanyTransmission Open Access Information
  • Company Transmission Open Access Information

  • Notice of Proposed Modifications to Schedule 20A
    Notice of Proposed Modifications to Schedule 20A
    Nov. 6 2009 Update and Cleanup Filing
    Reservation Timing Requirements
    Reservation Timing Requirements
    Transmission Outages
    Transmission Outages
    Available Capacity
    Available Capacity
    Company Web Site
  • CVPS Web Site

  • Company News
    CVPS News
    Request Validation: Error Comment Explanations
    Service Request Validation Processing: Error Comment Explanations
    CVPS General Transmission Information (INFO.HTM)
    Interconnection wide curtailment and interruption
  • NERC Transmission Loading Relief (TLR) Procedure

  • ISO-NE Transmission Operations - Short Term Outage Report - Long Term Transmission

  • ISO-NE Total Transfer Capability (TTC) Data

  • Methodology for Computing CBM and TRM
  • ISO-NE ATC Methodology for Phase I/II HVDC-FV

  • CVPS Available Capacity
  • IO-NE Transmission Information and Services for the Phase I/II HVDC-TF Intertie with HQ

  • Transmission System Studies
  • ISO-NE Transmission System Studies

  • Tariffs and Service Agreements
  • ISO-NE Transmission, Markets & Services Tariff

  • CVPS Open Access Transmission Information

  • Form of Phase I/II - TF Service Agreement Resale, Reassignment Phase I/II HVDC
    Interconnection Requests
  • ISO-NE Large Generator Interconnection Requests

  • CVPS Generator Interconnection Request Queue
    Reservation Timing Requirements
    Reservation Timing Requirements
    Notice of RTO Operations Date
    Notice of RTO Operations Date
    CVPS OASIS Archive Information
    CVPS OASIS Archive Information


    Welcome to CVPS

    What's New:

    On June 27, 2012, Gaz Metro Limited Partnership acquired all of the issued and outstanding stock of Central Vermont Public Service Corporation. A merger among CVPS, and Gaz Metro subsidiary, Green Mountain Power Corporation will be completed September 30, 2012.

    As of Oct.1 2012, all transmission reservations formerly made through the CVPS OASIS site must now be made on the GMP OASIS site.

    If problems occur, which cannot be resolved on OASIS, call:

    Carl Scott: 802-747-5534

    Grant Adams: 802-747-5344

    Ken Roberts: 802-747-5650

    GMP Control Center: 802-747-5257

     

     

         


    ©2001-2010 OATI webOasisTM/SM - Open Access Technology International, Inc. All Rights Reserved.