Registration | About | HOME                                OATI webOASISSM Production Node                                        



Documents

  • NAESB Home Page

  • OASIS Notices
  • Std of Conduct

  • Waiver

  • Standards of Conduct
  • Emergency Circumstances Deviations

  • Marketing and Energy Affiliate List

  • Shared Facilities
    Organizational Charts and Job Descriptions
    Common Employees
  • Potential Merger Partners

  • Transfers

  • Information Disclosure

  • Voluntary Consent to Share Non-Affiliated Customer Information

  • Discretionary Actions under Tariff

  • Discounts

  • Chief Compliance Officer
    Written Procedures for Implementation
  • Notice of Tariff Waiver

  • Business Practices, Waivers and Exemptions
    CIPCO Business Practices
    ATC Information
    Available Transfer Capability Implementation Document - ATCID
    CBM Implementation Document - CBMID
    TRM Implementation Document - TRMID
    ATC/AFC Methodology Contact
    Load Forecast Descriptive Statement
    Postback Methodology
    Flowgate Methodology
    EFFATC Postings
    Zero ATC Narrative
  • Initial Zero ATC Narrative

  • Successive Zero ATC Narrative

  • ATC Change Narrative
  • ATC Change Narrative

  • ATC Information Link
    ATC or AFC Methodology Questions
    Actual and Forecasted Load
    Actual Load
    Forecasted Load
    Performance Metrics
    Transmission Study Metrics
    SIS Metrics
    Transmission Service Request Metrics
  • TSR Metrics 2011

  • Redispatch Cost
    Redispatch Cost
    Transmission Tariff
    CIPC OATT May-2017
    OATT Supporting Documentation
    2016 Attachment O with Supporting Documentation
    2016 CIPCO Loads Page 1 Line 8 (12 CP Load with Losses)
    FINAL 2017 - V35_Attach O - RUS 12 Non-Levelized_ER15-1210-001 (Eff 06.01.15)_protected
    Total Average Demand 2016 Page 1 Line 10 (12 CP of Network Load not in line 8)
    Contact Information
    CIPC Contact Information
    Outages
  • CIPC Outages

  • Generation Interconnection Information
    CIPC GI Queue
    LGIP Information
    LGIP / Interconnection Procedure Document
    SGIP Information
    SGIP / Interconnection Procedure Document
    Feasibility Study Report
    Feasibility Study
    System Impact Study Report
    System Impact Study
    Facility Study Report
    Facility Study
    DNR Information
    CIPCO DNR Information
    Transmission Service Studies
    TSR System Impact Study Report
    TSR SIS
    TSR Facility Study Report
    TSR Facility Study
    Customer Registration and Application Folder
    Customer Forms and Registration
    Transmission Planning
    Economic Planning Studies
    Attachment K
    NERC TLR Page
  • NERC TLR Page

  • Miscellaneous
    Backup TSR Form
    CIPCO Transmission and End-User Connection Doc
    General Information
  • Central Iowa Power Cooperative



  • Welcome To CIPCO



         


    ©2001-2010 OATI webOasisTM/SM - Open Access Technology International, Inc. All Rights Reserved.