Documents

  • NAESB Home Page

  • Performance Metrics
    1 - Transmission Study Metrics (37.6(h))
    2 - Transmission Service Request Metrics (37.6(i))
    3 - Redispatch Cost 37.6 (j)(2)
    Business Practices, Waivers, and Exemptions
    1 - Transmission Service Requests
    2 - Curtailments and Interruptions
    3 - Schedules
    4 - Losses
    5 - Rates
    6 - TSR Annulment
    ATC Information
    1 ATC Implementation Document - ATCID (MOD-001-1)
    2 CBM Implementation Document - CBMID (MOD-004-1)
    3 TRM Implementation Document - TRMID (MOD-008-1)
    4 ATC Methodology Contact (WEQ-001-16)
    5 Load Forecast Descriptive Statement (WEQ-001-17.6.5)
    6 Postback Methodology
    7 MOD-029 Report BHBE
    Standards of Conduct
    1 Emergency Circumstances Deviations
    2 Information Disclosure (358.5(b)(3))
  • 2 Information Disclosure

  • 3 Voluntary Consent to Share Non-Affiliated Customer Information (358.5(b)(4))
    4 Black Hills Standards of Conduct Compliance Procedures (358.7(d))
    5 Marketing and Energy Affiliate List (358.7(e)(1)
    6 Shared Facilites (358.7(e)(2)
    7 Potential Merger Partners (358.7(e)(3))
    8 Organizational Chart & Job Description (358.7(f)(1)
    9 Transfers (358.7(f)(2))
    10 Chief Compliance Officer (358.8(c)(2))
    11 Common Employees (358.4(b)(iii))
    12 Discretionary Actions under Tariff (358.5(c)(4))
    13 Discounts (358.5(d))
    2/3/2017 Redacted File
    BHBE JOATT
  • BHBE JOATT

  • WestConnect

  • 1-2015 ATTACHMENT H - JOINT TARIFF RATES
    1-2016 ATTACHMENT H - JOINT TARIFF RATES
    2-2015 SCHEDULE 2 - JOINT TARIFF RATES
    2-2016 SCHEDULE 2 - JOINT TARIFF RATES
    2-2017 SCHEDULE 2 - JOINT TARIFF RATES
    3-BHBE JOATT Attachment p (LGIP)
    4-BHBE APPENDIX 1 TO LGIP - INTERCONNECTION REQUEST
    7-Schedule 1 Rates 8-1-15 to 7-31-16
    8-Regional Transmission Service Customer Application
    9-Attachment H Supplemental Supporting Schedules 2016
    9-Attachment H Supplemental Supporting Schedules 5-29-15
    10-BHP CUS Transmission Rate and Schedule 1-True up 5-29-15
    11-Schedule 2 BHP 2014 True-up 5-29-15
    12-Notice for Annual Projected Net Revenue Requiremenet Meeting 10-26-15
    13-2015 True-up Stakeholder Mtg Presentation 6-29-15
    14 - 2016 Projected Net REvenue Requirement Meeting 10-26-15
    ATRR Projected Net Revenue Requirement
    2017 BHP Attachment H Transmission Rate
    2017 BHP Attachment H Transmission Rate 01-30-17
    2017 BHP Attachment H Transmission Rate Estimate Supplemental Supporting Schedules
    2017 Projected Net Revenue Requirement Meeting 10-25-16
    2017 Projected Net Revenue Requirement Presentation
    2018 Attachment H Transmission Rate
    2018 Attachment H Transmission Rate Estimate Supplemental Supporting Schedules
    2018 Schedule 2 Joint Tariff Rates
    2018 Projected Net Revenue Requirement Meeting Notice 10-25-17
    2018 Projected Net Revenue Requirement Presentation 10-25-17
    2016
    2016 BHP Atachment H ATRR Rates
    2016 BHP Attachment H ATRR Supplemental Supporting Schedules 2016 Final
    Informational Filing
    2017
    2015 BHP Attachment H Transmission Rate True-Up 5-31-16
    2015 BHP Attachment H True-Up Supplemental Supporting Schedules 5-31-16
    2017 BHP Attachment H ATRR Rates
    2017 BHP Attachment H ATRR Supplemental Supporting Schedules
    2017 BHP Attachment H ATRR Rates Effective 01-30-2017
    2016
    2014 BHP Attachment H Transmission Rate True Up 5-29-15
    2014 BHP Attachment H True-Up Supplemental Supporting Schedules 5-29-15
    2016 BHP Attachment H ATRR Rates
    2016 BHP Attachment H ATRR Supplemental Supporting Schedules 2016 FINAL
    Annual True-Up
    Schedule 1 Rates 8-1-15 to 7-31-16
    2014 BHP Attachment H Transmission Rate True-Up 5-29-15
    2014 BHP Attachment H True-Up Supplemental Supporting Schedules 5-29-15
    Schedule 1 Rates 8-1-16 to 7-31-17
    2015 BHP Attachment H Transmission Rate True-Up 5-31-16
    2015 BHP Attachment H True-Up Supplemental Supporting Schedules 5-31-16
    2015 BHP_Schedule 2 Rate True up_FINAL
    2015 Formula Rate True Up Annual Meeting Notice
    2015 Formula Rate True-Up Meeting Presentation 6-14-16
    Schedule 1 Rates 8-1-17 to 7-31-18
    2016 BHP Attachment H Transmission Rate True-Up 5-31-17
    2016 BHP Attachment H True-Up Supplemental Supporting Schedules
    2016 BHP Schedule 2 Rate True-Up Final
    2016 Formula Rate True Up Annual Meeting Notice 6-19-17
    2016 Formula Rate True-Up Meeting Presentation 6-19-17
    NITS on OASIS
    BHBE NITS on OASIS Intro
    NITS Letter
    NITS on OASIS Workbook
    Customer Presentations
    2008 CUSTOMER RATE CASE PRESENTATIONS
    BEPC JULY 14 2009 CUSTOMER PRESENTATION
    BEPC JULY 14 2009 CUSTOMER PRESENTATION debt_2009
    BEPC JULY 14 2009 CUSTOMER PRESENTATION debt_2010
    BEPC JULY 27 2009 CUSTOMER PRESENTATION
    BEPC JULY 27 2009 CUSTOMER PRESENTATION debt_2009
    BEPC JULY 27 2009 CUSTOMER PRESENTATION debt_2010
    BHBE RATE SCRATCH WORKSHEET
    FERC Order 890
    1-Additional Study Posting Requirements
    2-BHBE ATTACHMENT C REVISON 09-14-2009
    3-Confidentiality Agreement
    4-Designation of Off-system Resources
    5-Planning Strawman
    6-Redesignation of Network Resources
    General Information
  • Black Hills Power Home Page

  • TRM
    1-Affiliate Network Resource Disposition on Denials
    2-Application Procedure for New NITS or DNR
    3-BHBE WestConnect Participation Application
    4-Designated Network Loads and Resources
    5-Designated Network Resource Attestation
    6-OASIS Status Definitions
    7-OATI OASIS Access Policy
    8-Procedure for Updating Business Practices
    9-REQUEST FOR MODIFICATION OF TRANSMISSION SERVICE
    10-TRANSMISSION PROVIDER BROKERING POWER FOR AFFILIATES
    11-TRANSMISSION SERVICES APPLICATION
    12-Third Party Offers to Relieve Congestion
    13-How to Contact Us
    Interconnection Requests
    1-BHC Facility Interconnection Requirements
    2-Generation Interconnection Queue
    1-BHBE-G1
    BHBE-G1 SIS Report
    BHBE-G1 Facilities Study Report
    2-BHBE-G2
    BHBE-G2a SIS Report
    BHBE-G2b SIS Report
    BHBE-G2b Facilities Study Report
    3-BHBE-G7
    BHBE-G7 Facilites Study Report
    BHBE-G7 Feasibility Study Report
    BHBE-G7 SIS Report
    4-BHBE-G8
    BHBE-G8 Feasibility Study Report
    BHBE-G8 System Impact Study Report
    BHBE-G8 Facilities Study Report
    5-BHBE-G9
    BHBE-G9 Feasibility Study Report
    6-BHBE-G11
    System Impact Study Report
    Load Forecast
  • Load Forecast

  • Network Customer DNR Temporary Terminations
    BHP 1-2018
    2017
    BHP 1-2017
    BHP 2-2017
    BHP 3-2017
    BHP 4-2017
    BHP 5-2017
    BHP 6-2017
    BHP 7-2017
    BHP 8-2017
    BHP 9-2017
    BHP 10-2017
    BHP 11-2017
    BHP 12-2017
    2016
    BHP 1-2016
    BHP 2-2016
    BHP 3-2016
    BHP 4-2016
    BHP 5-2016
    BHP 6-2016
    BHP 7-2016
    BHP 8-2016
    BHP 9-2016
    BHP 10-2016
    BHP 11-2016
    BHP 12-2016
    2015
    BHP 01-2015
    BHP 02-2015
    BHP 03-2015
    BHP 04-2015
    BHP 05-2015
    BHP 06-2015
    BHP 07-2015
    BHP 08-2015
    BHP 09-2015
    BHP 10-2015
    BHP 11-2015
    BHP 12-2015
    2014
    BHP 1-2014
    BHP 10-2014
    BHP 11-2014
    BHP 12-2014
    BHP 2-2014
    BHP 3-2014
    BHP 4-2014
    BHP 5-2014
    BHP 6-2014
    BHP 7-2014
    BHP 8-2014
    BHP 9-2014
    OASIS Notices
  • Congestion Relief Offers

  • Discretion

  • Personnel

  • Joint Energy Dispatch Initiative
    JEDI Meeting Notes 021913
    JEDI Presentation 021913
    Outages
    BHBE Outages
    wesTTrans Outages
    System Information
    10 Min ACE Data
  • 2013-Q1-10-Minutes-ACE-Data.pdf

  • 2013-Q2-10-Minutes-ACE-Data.pdf

  • 2013-Q3-10-Minutes-ACE-Data.pdf

  • 2013-Q4-10-Minute-ACE-Data.pdf

  • 2013 1 Min ACE Data
  • 2013-Q1-1Minute-ACE-Data.pdf

  • 2013-Q2-1Minute-ACE-Data.pdf

  • 2013-Q3-1Minute-ACE-Data.pdf

  • 2013-Q4-1Minute-ACE-Data.pdf

  • 2014 Ace Data
  • 2014 1 Min Ace Data

  • 2014 10 Min Ace Data

  • 2015 Ace Data
  • 2015 - 1 Min Ace Data

  • 2015 - 10 Min Ace Data

  • System Maps - System Conditions
    OASIS Map
    Transmission Planning
    BHBE Attachment K Hyperlink List
    BHBE_Economic_Planning_Study_Request_Form
    BHBE_Process_For_Modifying_Planning_Documents
    BHP 2014-2025 Load Forecast
    How to Contact us
    JOATT_Attachment K_Business_Practices
    JOATT_Method_Criteria_Process_Business_Practices
    Notice of Filing - Dec 7, 2007
    Stakeholder Comments
    TCPC Membership Registration
    TCPC Registration Form
    TEPPC Planning Protocol (v1-3)
    Transmission Customer Data Request
    WECC Non-Member Confidentiality Agreement
    Attachment K
    JOATT Method Criteria Process Business Practice (03Feb2010 WRW)
    BHP Integrated Resource Plan
    BHP 2011 IRP Report
    CEII
    CEII Procedures
    Posted BHBE CEII Information
    Economic Studies
    BHBE Economic Study Request History
    Economic Study Request Form
    NTTG
    NTTG Public Meeting Announcement (28Jan2009)
    NTTG Public Meeting Annoucement (22Jul2009)
    NTTG Cost Allocation Committee Charter
    NTTG Cost Allocation Principles
    NTTG Planning Agreement
    NTTG Planning Committee Charter
    Planning Documents For Comment
    Document Posting Log
    Transmission Service Request Studies
    565 CLUSTER SIS RESTUDY REPORT_060408
    765 MW Cluster SIS Report
    20 MW PTP SIS REPORT
    565 MW Cluster FS Report
    130 MW NITS SIS REPORT
    50 MW Cluster SIS Report
    WestConnect
    Objectives and Procedures for Regional Transmission Planning (24Aug2006)
    Regional Planning Agreement (23May2007)
    Planning Workshop Meeting Agenda (14Jan2009)
    Planning Workshop Meeting Notice (14Jan2009)
    SWAT-CCPG Transmission Planning Principals
    TCPC - 2008
    2008 CUS LTP Calendar
    FINAL 2008 CUS LTP Report
    Request for Comments
    Q1 Meeting Agenda (March 5, 2008)
    Q1 Meeting Notes (March 5, 2008)
    Q1 Meeting Notice (March 5, 2008)
    Q1 Meeting Presentation (March 5, 2008)
    Q2 Meeting Agenda (August 12, 2008)
    Q2 Meeting Delay (June 26, 2008)
    Q2 Meeting Information (August 12, 2008)
    Q2 Meeting Notes (August 12, 2008)
    Q2 Meeting Notice (August 12, 2008)
    Q2 Meeting Presentation (August 12, 2008)
    Q3 Meeting Information (October 1, 2008)
    Q3 Meeting Notes (October 1, 2008)
    Q3 Meeting Notice (October 1, 2008)
    Q3 Meeting Presentation (October 1, 2008)
    Q4 Meeting Information (December 18, 2008)
    Q4 Meeting Notes (December 18, 2008)
    Q4 Meeting Notice (December 18, 2008)
    2008 LTP Study Scope
    MEMO - 2008 LTP Study Scope Comments Due
    Data Request Worksheet
    TCPC - 2009
    2009 CUS LTP Study Scope
    Q1 Meeting Notice (March 4, 2009)
    Q1 Meeting Presentation (March 4, 2009)
    Q1 Meeting Notes (March 4, 2009)
    Q2 Meeting Notice (July 8, 2009)
    Q2 Meeting Presentation (July 8, 2009)
    Q2 Meeting Notes (July 8, 2009)
    Q3/Q4 Meeting Notice (December 17, 2009)
    Q3/Q4 Meeting Presentation (December 17, 2009)
    Q3/Q4 Meeting Notes (December 17, 2009)
    DRAFT TCPC Report (December 22, 2009)
    FINAL 2009 CUS LTP Report
    TCPC - 2010
    2010 BHBE LTP Study Scope
    2010 TCPC Data Request Worksheet
    2010 DRAFT BHBE LTP Report
    2010 Q1 Meeting Notice (25Mar2010)
    2010 Q1 Meeting Presentation (25Mar2010)
    2010 Q1 Meeting Notes (25Mar2010)
    2010 Q2 Meeting Notice (28Jun2010)
    2010 Q4 Meeting Notice (20Dec2010)
    2010 Q4 Meeting Presentation (20Dec2010)
    2010 Q4 Meeting Notes (20Dec2010)
    2010 FINAL BHBE LTP Report
    TCPC - 2011
    2011 BHBE LTP Study Scope
    2011 TCPC Data Request Worksheet
    2011 Q1 Meeting Notice (16Feb2011)
    2011 Q1 Meeting Presentation (16Feb2011)
    2011 Q1 Meeting Notes (16Feb2011)
    2011 Q2 Meeting Notice (16Aug2011)
    2011 Q2 Meeting Presentation (16Aug2011)
    2011 Q2 Meeting Notes (16Aug2011)
    2011 Q4 Meeting Notice (21Dec2011)
    2011 Q4 Meeting Presentation (21Dec2011)
    2011 Q4 Meeting Notes (21Dec2011)
    2011 DRAFT BHBE LTP Report
    2011 FINAL BHBE LTP REPORT
    TCPC - 2012
    2012 Final BHBE LTP Study Scope
    2012 Q1 Meeting Notice (19Apr2012)
    Final 2012 BHBE LTP Report_05062013
    2012 Q1 Meeting Presentation (19Apr2012)
    2012 Q1 Meeting Notes (19Apr2012)
    2012 TCPC Data Request Workheet
    2012 Q3 Meeting Notice (28Sep2012)
    2012 TCPC Q3 Meeting Presentation (28Sept2012)
    2012 TCPC Q3 Meeting NOTES (28Sep2012)
    2012 BHBE TCPC Q4 Meeting #1 Notice (28Nov2012)
    2012 BHBE TCPC Q4 Meeting #2 Notice (18Dec2012)
    2012 BHBE TCPC Q4 Meeting Presentation (28Nov2012)
    2012 BHBE TCPC Q4 Meeting Presentation (18Dec2012)
    2012 BHBE TCPC Q4 Meeting NOTES (18Dec2012)
    TCPC - 2013
    2013 TCPC Data Request Worksheet
    Draft 2013 BHBE LTP Report_121913
    Final 2013 BHBE LTP Report 121913
    2013 BHBE Final LTP Study Scope
    2013 BHBE TCPC Q1 Meeting Notice (14Mar2013)
    2013 BHBE TCPC Q1 Meeting NOTES (14Mar2013)
    2013 BHBE TCPC Q1 Meeting Presentation (14Mar2013)
    2013 BHBE TCPC Q3 Meeting Notice (24Sept2013)
    2013 BHBE TCPC Q3 Meeting Presentation (24Sep2013).
    2013 BHBE TCPC Q4 Meeting Notice (19Dec2013)
    2013 BHBE TCPC Q4 Meeting Presentation (19Dec2013)
    2013 BHBE TCPC Q3 Meeting Notes (24Sept2013)
    2013 BHBE TCPC Q4 Meeting NOTES (19Dec2013)
    TCPC - 2014
    2014 BHBE TCPC Q1 Meeting Notes
    2014 BHBE TCPC Q1 Meeting Presentation
    2014 BHBE TCPC Q1 Stakeholder Meeting Notice
    2014 BHBE TCPC Q2 Meeting NOTES
    2014 BHBE TCPC Q2 Meeting Presentation
    2014 BHBE TCPC Q2 Stakeholder Meeting Notice
    2014 BHBE TCPC Q3 Meeting Notes
    2014 BHBE TCPC Q3 Meeting Presentation
    2014 BHBE TCPC Q3 Stakeholder Meeting Notice
    2014 BHBE TCPC Q4 Meeting Notes
    2014 BHBE TCPC Q4 Meeting Presentation
    2014 BHBE TCPC Q4 Stakeholder Meeting Notice
    FINAL 2014 BHBE LTP Report 1-30-15
    Final 2014 BHBE LTP Study Scope
    2014 TCPC Data Request Worksheet
    TCPC - 2015
    2015 BHBE TCPC Q1 Meeting Notes
    2015 BHBE TCPC Q1 Presentation
    2015 BHBE TCPC Q1 Stakeholder Meeting Notice
    2015 BHBE TCPC Q2 Meeting Notes
    2015 BHBE TCPC Q2 Presentation
    2015 BHBE TCPC Q3 Meeting Notes
    2015 BHBE TCPC Q4 Meeting Notes
    2015 BHBE TCPC Q4 Meeting Presentation
    2015 TCPC Data Request
    BHBE LTP Study Scope
    FINAL 2015 BHBE LTP Report
    2015 BHBE TCPC Q3 Meeting Notice
    2015 BHBE TCPC Q3 Meeting Presentation
    TCPC - 2016
    2016 BHBE LTP Study Scope
    2016 BHBE TCPC Q1 Meeting Notes
    2016 BHBE TCPC Q1 Meeting Presentation
    2016 BHBE TCPC Q1 Stakeholder Meeting Notice
    2016 BHBE TCPC Q3 Meeting Notes
    2016 BHBE TCPC Q3 Meeting Presentation
    2016 BHBE TCPC Q3 Stakeholder Meeting Notice
    2016 BHBE TCPC Q4 Meeting Notes
    2016 BHBE TCPC Q4 Stakeholder Meeting Notice
    2016 BHBE TCPC Q4 Stakeholder Meeting Presentation
    2016 TCPC Data Request Worksheet
    Final 2016 BHBE LTP Report (28Feb2017)
    TCPC - 2017
    2017_TCPC_Data_Request_Worksheet
    Draft 2017 BHBE LTP Study Scope
    2017 BHBE TCPC Q1 Stakeholder Meeting Notice
    2017 BHBE TCPC Q1 Meeting Presentation
    2017 BHBE TCPC Q1 Meeting Notes
    2017 BHBE TCPC Q2 Stakeholder Meeting Notice
    2017 BHBE TCPC Q2 Meeting Presentation_r1
    2017 BHBE TCPC Q2 Meeting Notes
    2017 BHBE TCPC Q3 Stakeholder Meeting Notice
    2017 BHBE TCPC Q3 Meeting Presentation
    2017 BHBE TCPC Q3 Meeting Notes


    Welcome To BHBE


    10/16/17: The Annual Projected Net Revenue Requirement Meeting will be held October 25, 2017 at 10:00 am MPT. For full details see the notice in the BHBE JOATT folder under ATRR Projected Net Revenue Requirement.

    09/12/17: On Thursday September 7, 2017 Non Public Transmission Customer information in the form of generator outage information was temporarily visible to BHP marketing function employees though an outage management software system. The information was not utilized by marketing function employees, and upon noticing the issue the marketing function employees reported the issue to the Transmission Services Group who immediately remedied the access issue and disallowed any further access.

    08/01/17: Two real time generation operators will be at the system control emergency dispatch center for testing of emergency functions in compliance with EOP-008-1 from 08:00 AM to 10:00 AM on August 1, 2017.

     

    06/01/17: The Annual True-Up Meeting will be held June 19, 2017. For full details see the notice in the BHBE JOATT folder under Annual True-Up.

     

    05/04/17: One real time generation operators will be at the system control emergency dispatch center for testing of emergency functions in compliance with EOP-008-1 from 11:00 AM to 1:00 PM May 5, 2017.

    05/02/17: Two real time generation operators will be at the system control emergency dispatch center for testing of emergency functions in compliance with EOP-008-1 from 08:30 AM to 10:30 AM May 2, 2017.

     

    03/01/17: Black Hills Power has filed a transmittal letter and supporting materials for the 2017 Annual Formula Rate Update Informational Filing. FERC has assigned Docket No. ER17-1062-000 to the filing.

     

    02/07/17: Two real time generation operators will be at the system control emergency dispatch center for testing of emergency functions in compliance with EOP-008-1 from 08:30 AM to 10:30 AM February 7, 2017.

     

    02/03/2017: On February 3, 2017, Black Hills Transmission became aware of a Standards of Conduct incident that occurred on January 27, 2017. The Black Hills Transmission and Marketing Functions were performing testing of the new transmission/generation outage software and during this testing a single marketing function employee saw a screen with test and real transmission and generation outages. The information shown did not identify outages on a scheduling path and the employee did not use any of the information for a marketing advantage. An example of the information in the test environment can be found in the Standard of Conduct folder. Generator outage information has been redacted in the document as this market sensitive and not transmission function information.

     

    12/05/16: Two real time generation operators will be at the system control emergency dispatch center for testing of emergency functions in compliance with EOP-008-1 from 08:30 AM to 10:30 AM December 5, 2016.

     

    10/14/16: The Annual Projected Net Revenue Requirement Meeting will be held October 25, 2016 at 10:30 am MPT. For full details see the notice in the BHBE JOATT folder under ATRR Projected Net Revenue Requirement.

     

    09/26/16: The 2016 Q3 Stakeholder Meeting will be held October 6, 2016 at 1:30 pm MPT. For full details see the notice in the Transmission Planning folder under TCPC 2016.

     

    08/02/16: Two real time generation operators will be at the system control emergency dispatch center for testing of emergency functions in compliance with EOP-008-1 from 08:30 AM to 10:30 AM August 2, 2016.

     

    07/15/16: Effective July 18, 2016, Matthew Jester, Rotational Engineer for Transmission Services (transmission function employee) is transferring to Generation Dispatch and Power Marketing as a Rotational Engineer (marketing function employee).

     

    06/07/16: The Annual True-Up Meeting will be held June 14, 2016. For full details see the notice in the BHBE JOATT folder under Annual True-Up.

     

    05/13/16: It was discovered on 5/12/16 by transmission personnel that generation dispatch and energy marketing employees had access to two new RCDC tie schedule points in SCADA. Although, these employees were able to see the points, no data was being sent to the points. The SCADA display permissions were corrected and tested on May 13, 2016. The generation dispatch employees were not aware of the change and did not query the information or use it for business, marketing or other purposes.

     

    05/02/16: Two real time generation operators will be at the system control emergency dispatch center for testing of emergency functions in compliance with EOP-008-1 from 08:30 AM to 10:30 AM May 3, 2016.

     

    04/29/16: LiDAR data has indicated clearance concerns on the BHBE 230 kV transmission system, resulting in reduced TTC in some instances. Work is underway to remediate these concerns.

     

    03/01/16: Black Hills Power has filed a transmittal letter and supporting materials for the 2016 Annual Formula Rate Update Informational Filing. FERC has assigned Docket No. ER14-2869 to the filing.

     

    02/02/16: 3/11/15: As of February 4 the BHBE system will have updated TTC values for numerous paths.

     

    02/02/16: Two real time generation operators will be at the system control emergency dispatch center for testing of emergency functions in compliance with EOP-008-1 from 08:30 AM to 10:30 AM today.

     

    10/22/15: The business practice for Annulments has been updated and is effective immediately. The file can be found in the Business Practice, Waivers, and Exemptions folder.

     

    09/23/15: The Annual Projected Net Revenue Requirement Meeting will be held October 26, 2015 at 10 AM MDT. For full details see the notice in the BHBE JOATT folder.

     

    09/23/15: Four real time generation operators will be at the system control emergency dispatch center for testing of emergency functions in compliance with EOP-008-1 from 08:30 AM to 10:30 AM today.

     

    07/27/15: In accordance with NAESB Version 003 standards, and FERC Order 676-H, Black Hills Power, Inc. posted on July 23, 2015 a Plan and Procedures on OASIS for transitioning existing customers NITS service arrangements to Version 002 NITS OASIS Templates. This document can be found under the NITS on OASIS folder to the left.

     

    06/15/15: The Annual True-Up Meeting will be held June 29, 2015. For full details see the notice in the BHBE JOATT folder.

     

    05/22/15: The FERC Order 676-H Service Across Multiple Transmission Systems (SAMTS) coordinated group functionality was activated on May 15, 2015.

     

    03/11/15: The e-Tag 1.8.2 cutover was completed on March 30, 2015. All new tags created after the cutover date are on the new e-Tag 1.8.2. Tags created in version 1.8.1 for dates occurring after the cutover will be supported until April 30, 2015 HE 00 CST.

     

    03/11/15: As of March 11 the BHBE system will have updated TTC values for numerous paths.

     

    01/14/15: Effective January 15, 2015, Eric Egge, Director of Electric Transmission Services (transmission function employee) is transferring to be the Director of Generation Dispatch and Power Marketing (marketing function employee).

     

    10/29/14: Four real time generation operators will be at the system control emergency dispatch center for testing of emergency functions in compliance with EOP-008-1 from 08:30 AM to 11:30 AM today.

     

    09/11/14: It was discovered on 9/10/14 that generation dispatch and energy marketing employees had access to SCADA reports beyond the normal restricted permissions of AGC and generation SCADA information. The permissions were inadvertently changed during the most recent SCADA software system upgrade that occurred in mid-August. The SCADA report permissions were corrected and tested within a few hours of discovery. The generation dispatch employees were not aware of the change and did not query the information or use it for business, marketing or other purposes.

     

    01/15/14: Four real time generation operators will be at the system control emergency dispatch center for testing of emergency functions in compliance with EOP-008-1 from 10:00 AM to 1:00 PM today. (Andy Currie, Cady Paris, Chad Thies, Chase Whittaker)

     

    12/30/13: As of January 2nd BHBE & BHCT systems will have updated TTC values for numerous paths.

     

    08/19/13: Notice: Jim Haefs, held a Real Time Marketer position (marketing function employee) and has transferred to a System Operator position (transmission function employee) effective August 19, 2013.

     

    07/23/13: Representatives from Black Hills Power Generation Dispatch & Power Marketing (GDPM) department will participate in a short tour of the recently remodeled Black Hills Corporation System Control Center starting at 9:00 am. No live transmission information will be actively displayed. Only distribution information will be displayed on the wall screens and transmission screens will be minimized at the system operator’s desk. GDPM employees will not actively interact with the system operators.

     

    06/26/13: An update to Business Practice 1-Transmission Service Request was made based on the addition of Business Practice 6-TSR Annulment. The updates are effective immediately as they are in the best interest of all customers.

     

    06/26/13: A real time generation dispatcher will be at the system control emergency dispatch center for testing of emergency functions in compliance with EOP-008-1.

     

    03/30/13: An escorted tour of the unoccupied system control area that is being remodeled was provided to two Generation Dispatch and Power Marketing employees of Black Hills Power. No non-public transmission function was discussed or readily available.

     

    01/03/13: A customer meeting with Black Hills Power’s Generation Dispatch and Power Marketing department was held on 1/3/13. An escorted tour of the remodeled system control area was provided

     

    12/14/12: For request for service or inquiries about the tariff please contact Kenna Hagan, Manager of FERC Tariff Administration and Policy, at 605-716-3961 or by email at Kenna.Hagan@blackhillscorp.com.

     

    12/06/12: This issue has been resolved. The OUTAGES link on the BHBE Home Page was not functioning properly and has been removed until OATI can resolve the issue. BHBE outage information is available under the ?Notices? tab on OASIS ? use the Message Summary with the following filter settings: TP=BHBE; Customer Code=ALL; Time=Active Today Forward; Ref=[empty]; Category=OUTAGE; then Enter.

     

    08/31/12: For request for service or inquires about the tariff please contact Eric Egge, Director of Transmission Services, at 605-721-2646 or by email at eric.egge@blackhillscorp.com.

     

    06/01/12: BHBE became a WestConnect Regional Transmission Service participant effective June 1, 2012. The FERC Tariff filing and customer application are located in the BHBE OATT folder.

     

    05/31/12: Posted 2011 Transmission Service True Ups and new Schedule 1 Rate effective 08/01/2011.

     

    05/31/12: Effective June 5, 2012, Transmission services and ancillary service will no longer be combined in one offering. The ancillary services will be posted under the ancillary offerings on OASIS.

     

    05/16/12: BHBE expects to begin participation in WestConnect Regional Pricing June 1, 2012.

     

    04/16/12: The “no-touch” policy for Black Hills generation in the Gillette area has been terminated.

     

    01/20/12: Due to a 230/69 KV transformer being out of service BHBE has implemented a “no-touch” policy for Black Hills generation in the Gillette area. Loss of generation in the area may cause an overload of transmission elements under certain conditions.

     

    01/12/12: 21ST Century Transmission Holdings, LLC has initiated discussions for the expansion of the Rapid City Converter Station.

     

    11/29/2011: Added Business Practices for TSR Annulment, Curtailment and Reload of Arranged Interchange, and RCCS Dead Band Curtailment.

     

    10/25/2011: The “OUTAGES” link on the BHBE Home Page was not functioning properly and has been removed until OATI can resolve the issue. BHBE outage information is available under the “Notices” tab on OASIS – use the Message Summary with the following filter settings: TP=BHBE; Customer Code=ALL; Time=Active Today Forward; Ref=[empty]; Category=OUTAGE; then Enter.

     

    09/27/2011: Effective September 30, 2011 at 9:00 MST, Black Hills Power will begin processing TSRs and RFIs on behalf of the BHBE system; this function was previously performed by Western Area Power Authority. Any issues with TSRs or RFIs should be direct to Black Hills Power 24hour reliability desk at (605) 721-1472.

     

    08/05/2011: Effective October 1, 2011 Western Area Power Administration (WAPA) will no longer administer short term transmission service agreements for BHBE. Please note that existing short term transmission agreements will be terminated by WAPA and new applications for service must be submitted prior to October 1, 2011. The application (Transmission Service Application – Effective October 1, 2011) may be located in the Business Practices, Waivers, and Exemptions folder to the left.

     

    08/02/2011: Posted "2011 Attachment H - Joint Tariff Rates" under "BHBE JOATT" folder.

     

    07/28/2011: UPDATED BUSINESS PRACTICES - MODIFICATION OF AC SYSTEM TRANSMISSION RATES EFFECTIVE 8/01/2011.

     

    05/31/2011: UPDATED Posted 2010 Transmission Service True Ups and new Shedule 1 Rate effective 08/01/2011.

     

    03/22/2011: UPDATED BUSINESS PRACTICES - MODIFICATION OF SCHEDULE 2 RATES EFFECTIVE 01/16/2011.

     

    01/03/2011: UPDATED BUSINESS PRACTICES - MODIFICATION OF AC SYSTEM TRANSMISSION RATES EFFECTIVE 01/01/2011.

     

    09/29/2010: Posted "2011 Attachment H - Joint Tariff Rates" under "BHBE JOATT" folder.

     

    09/17/2010: Annual Customer and Regulatory meeting to explain Black Hills Power formula rate input projections and cost detail scheduled for 10:00 AM MPT 10/29/2010.

     

    08/17/2010: UPDATED BUSINESS PRACTICES - MODIFICATION OF SCHEDULE 1 RATES EFFECTIVE 09/01/2010.

     

    12/29/2009: UPDATED BUSINESS PRACTICES - MODIFICATION OF AC SYSTEM TRANSMISSION RATES EFFECTIVE 01/01/2010.

     

    10/27/2009: CORRECTED TYPO IN SCHEDULE 2 TABLE.

     

    10/05/2009: POSTED BHBE RATES EFFECTIVE 01/01/2010 UNDER BHBE JOATT FOLDER.

     

    09/30/2009: UPDATED BUSINESS PRACTICES - MODIFICATION OF AC SYSTEM TRANSMISSION RATES.

    Changes are a result of FERC approval of the Basin Electric Rate Filing in Docket No. ER09-1511-000

     

    09/30/2009: POSTED BLACK HILLS POWER REVENUE REQUIREMENTS EFFECTIVE 01/01/2010 UNDER BHBE JOATT FOLDER.

     

    09/29/2009: POSTED BROKERING CHARGES FOR MARKET-REGULATED AFFILIATE BLACK HILLS WYOMING UNDER GENERAL INFORMATION FOLDER.

     

    08/26/2009: UPDATED BUSINESS PRACTICES - MODIFICATION OF SCHEDULE 2 RATES.

    Changes include increased Schedule 2 costs due to the inclusion of BHW services and annual true up.

     

    07/14/2009: UPDATED BUSINESS PRACTICES - MODIFICATION OF AC SYSTEM TRANSMISSION RATES.

    Changes are a result of the Basin Electric Settlement Agreement in Docket No. ER08-1600-000

     

    07/07/2009: UPDATED BUSINESS PRACTICES - MODIFICATION OF SCHEDULE 2 RATES.

    Changes include increased Schedule 2 costs due to the inclusion of CLFP services and annual true up.

     

    03/18/2009: UPDATED BUSINESS PRACTICES - GENERATION REDISPATCH FOR RELIABILITY.

    Changes include requirements for submission of costs incurred by Transmission Customers as a result of generation redispatch for reliability by the Transmission Provider.

     

    02/27/2009: UPDATED BUSINESS PRACTICES - ANCILLARY SERVICE RATES.

    Changes include Schedule 1 rates for Scheduling, System Control and Dispatch Service.

     

     

         