Outage Name |
Outage Id |
Company | Facility | Flow Gate |
Segment/ JOTSFacility |
Original TTC In |
Original TTC Out |
New TTC |
Start Time (MPT) | Stop Time (MPT) | Status | Outage Category |
Outage Type |
Path Impact |
Report TPs |
Annotation | Creation Time (MPT) | EventId | Last Updated (MPT) |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
111253 | 117819 | BHBE | NSS1-WYO 69kv line | WY69-WYODAK(BHBE) | 325.0 | 325.0 | 210.0 | 2024-04-29 08:00 | 2024-05-03 14:00 | Scheduled | TRANSMISSION | FORCED | ONPATH | BHBE | NSS1-WYO 69kv line | 2024-03-04 13:02 | BHBE49830 | 2024-03-04 13:02 | |
BHBE 112399 | 119686 | BHBE | NSS 1-WYODAK 69 KV LINE: NSS 1 BKR 6X20, NSS 1 BKR 6X24, NSS 1 BKR 6X28, NSS 1 BKR 6X34, NSS 1 BKR | 0.0 | 0.0 | 0.0 | 2024-05-13 08:00 | 2024-05-17 14:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | BHBE | Maintenance and Construction. Note: The NSS 1- WYO 69kv line will be OOS during the switch replacement of NSS 1 SW 6x27.. Path: WY69-WYODAK(115) | 2024-03-22 13:08 | 112399 | 2024-03-22 13:08 | ||
BHBE 112861 | 120928 | BHBE | RAPID CITY DC TIE: Eastside Flowgate Path Restiction | 0.0 | 0.0 | 0.0 | 2024-05-13 09:00 | 2024-05-17 15:30 | SCHEDULED | TRANSMISSION | PLANNED | OFFPATH | BHBE | Third-Party Requests. Note: . Path: None | 2024-04-19 08:31 | 112861 | 2024-04-19 08:31 | ||
BHBE 112400 | 119687 | BHBE | NSS 1-NSS 2 69 KV LINE: NSS 1 BKR 6X28, NSS 1 BKR 6X38, NSS 1 SW 6X40, NSS 1-NSS 2 69 KV LINE | 0.0 | 0.0 | 0.0 | 2024-05-21 08:00 | 2024-05-24 14:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | BHBE | Maintenance and Construction. Note: Replacement of SW 6X40 (4 of 5). Path: WY69-WYODAK(115) | 2024-03-22 13:19 | 112400 | 2024-03-22 13:19 | ||
BHBE 111431 | 115317 | BHBE | RCDC TIE TRANSMISSION CONSTRAINTS OASIS Posting: RCWest to RCEast = 100mw | 0.0 | 0.0 | 0.0 | 2024-07-09 07:00 | 2024-07-19 17:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | BHBE | SOL Mitigation (Thermal). Note: SOL Mitigation for Osage-Teckla 230 Line outage. RCEAST Tie W to E Limit is 100 MW.. Path: RCWEST-RCEAST(100) | 2024-01-11 11:56 | 111431 | 2024-03-09 09:16 | ||
BHBE 111370 | 115301 | BHBE | OSAGE-TECKLA 230KV LINE: OSAGE-TECKLA 230KV LINE | 0.0 | 0.0 | 0.0 | 2024-07-09 08:00 | 2024-07-19 16:00 | SCHEDULED | TRANSMISSION | PLANNED | ONPATH | BHBE | Maintenance and Construction. Note: Hazard Remediation. Path: RC-WYODAK(721), WYODAK-RC(721) | 2024-01-10 10:15 | 111370 | 2024-03-09 09:15 |